Loading...
HomeMy WebLinkAbout20240322Staff 1-30 to SWS.pdfFIRST PRODUCTION REQUEST TO CDS STONERIDGE UTILITIES, LLC 1 MARCH 22, 2024 MICHAEL DUVAL DEPUTY ATTORNEY GENERAL IDAHO PUBLIC UTILITIES COMMISSION PO BOX 83720 BOISE, IDAHO 83720-0074 (208) 334-0320 IDAHO BAR NO. 11714 Street Address for Express Mail: 11331 W CHINDEN BLVD, BLDG 8, SUITE 201-A BOISE, ID 83714 Attorney for the Commission Staff BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF CDS STONERIDGE UTILITIES, LLC’S APPLICATION FOR AUTHORITY TO INCREASE ITS RATES AND CHARGES FOR WATER SERVICE IN THE STATE OF IDAHO ) ) ) ) ) ) ) ) CASE NO. SWS-W-24-01 FIRST PRODUCTION REQUEST OF THE COMMISSION STAFF TO CDS STONERIDGE UTILITIES, LLC Staff of the Idaho Public Utilities Commission (“Commission”), by and through its attorney of record, Michael Duval, Deputy Attorney General, requests that CDS Stoneridge Utilities, LLC (“Company”) provide the following documents and information as soon as possible, but no later than FRIDAY, APRIL 12, 2024. This Production Request is to be considered as continuing, and the Company is requested to provide, by way of supplementary responses, additional documents that it, or any person acting on its behalf, may later obtain that will augment the documents or information produced. Please provide answers to each question, supporting workpapers that provide detail or are the source of information used in calculations, and the name, job title, and telephone number of the person preparing the documents. Please also identify the name, job title, location, and telephone number of the record holder. RECEIVED Friday, March 22, 2024 2:24 PM IDAHO PUBLIC UTILITIES COMMISSION FIRST PRODUCTION REQUEST TO CDS STONERIDGE UTILITIES, LLC 2 MARCH 22, 2024 In addition to the written copies provided as response to the requests, please provide all Excel spreadsheets and electronic files with formulas intact and enabled. REQUEST NO. 1: Please provide a schedule showing all costs incurred in processing the general rate case to present. REQUEST NO. 2: Please provide a schedule showing the details of the Known Changes in the Accumulated Depreciation as shown in Exhibit No. 1, Schedule B. REQUEST NO. 3: Please provide the costs and benefits to the system and a narrative to explain why it is necessary for the golf course to be on its own well, as is stated in Exhibit No. 2, Schedule A. REQUEST NO. 4: Please provide a schedule explaining the known changes for the Purchased Power and Chemical Expenses shown in Exhibit No. 2, Schedule B. REQUEST NO. 5: Please provide a schedule detailing the calculation of the test year actual depreciation expense and known changes to depreciation expense as shown in Exhibit No. 2, Schedule C. REQUEST NO. 6: Please provide the loan documents for all debt outstanding. Please include a current balance and amortization schedule for each debt. REQUEST NO. 7: Please provide up-to-date and separate geo-spatial system maps that outline all contiguous water utility systems operated by the Company. The map should include the location and elevation of major equipment including wells, distribution piping, storage tanks, booster pumps, shut-off valves, meters, fire hydrants, water treatment equipment, etc. NOTE: Please provide this map in electronic format (PDF) which can be scaled and enlarged to identify all aspects of the system. REQUEST NO. 8: Please provide a thorough and complete description of the water system including the following details regarding the system as applicable: a. The depth, width, length, capacity, length of time in service, and construction materials of each well (including backup wells, if any). RECEIVED Friday, March 22, 2024 3:04:35 PM IDAHO PUBLIC UTILITIES COMMISSION FIRST PRODUCTION REQUEST TO CDS STONERIDGE UTILITIES, LLC 3 MARCH 22, 2024 b. The make, model, type, length of time in service, and rating of each well pump motor. c. The make, model, capacity, length of time in service, and limit switch settings of each pressurized storage tank. d. The make, model, capacity, length of time in service, and limit switch settings of each unpressurized storage tank/reservoir. e. The make, model, length of time in service, and rating of each booster pump and motor. f. The make, model, length of time in service, and capacity of all water treatment equipment. g. The year, make, model, length of time in service, and capacity for backup generation supporting the well pumps. Indicate if the generation has an Automatic Transfer Switch or if it must be manually started. h. The distribution piping line size, length of time in service, and materials specified in the installation. REQUEST NO. 9: Please provide detailed information related to the capacity and sizing of the system and the ability of the system to meet historical and future system peak demands. Provided information should include identification of the potential constraints in the system, the capacity of each constraint, and the average and maximum peak consumption. Please provide necessary workpapers in spreadsheet (such as, Microsoft Excel) format with formulas intact. REQUEST NO. 10: For each well used by the water system, please provide the following: a. The Idaho Department of Water Resources (“IDWR”) Well Tag Number (i.e. D- Tag Number) that is currently on-file with IDWR. b. Location (Township, Range, Section, and Tract) REQUEST NO. 11: Please provide the monthly power bills indicating the amount of electricity, in kilowatt hours, used and corresponding electricity cost (in US Dollars) for each RECEIVED Friday, March 22, 2024 3:04:35 PM IDAHO PUBLIC UTILITIES COMMISSION FIRST PRODUCTION REQUEST TO CDS STONERIDGE UTILITIES, LLC 4 MARCH 22, 2024 well and booster pump from January 2019 to December 2023. Please provide your responses in spreadsheet (such as, Microsoft Excel) format with formulas intact. REQUEST NO. 12: Please provide the monthly metered amount of water (in gallons) pumped from each well from January 2019 to December 2023. Please provide your responses in spreadsheet (such as, Microsoft Excel) format with formulas intact. REQUEST NO. 13: Please provide the monthly metered total customer water usage data (in gallons) by customer types, customer ID, route, and meter size from January 2019 to December 2023. Please provide your responses in spreadsheet (such as, Microsoft Excel) format with formulas intact. REQUEST NO. 14: Please provide an estimate of total unaccounted water losses due to leaks, wasted water, etc. by month from January 2019 to December 2023. Please provide your responses in spreadsheet (such as, Microsoft Excel) format with formulas intact. REQUEST NO. 15: Please provide the total monthly amount of Chlorine used (in pounds), and total expense for Chlorine purchase (including Sales Tax) for each well from January 2019 to December 2023. Also please specify whether a solid or liquid form of Chlorine was used for each well. Please provide your responses in spreadsheet (such as, Microsoft Excel) format with formulas intact. REQUEST NO. 16: Please provide a copy of the Company’s latest Idaho Division of Environmental Quality Sanitary Survey. REQUEST NO. 17: Please provide the average monthly pressure data in the main distribution line from January 2019 to December 2023. Please provide your responses in spreadsheet (such as, Microsoft Excel) format with formulas intact. REQUEST NO. 18: Please describe the Company’s methodology for developing, managing, executing, and completing Capital Projects in a least cost manner. Please provide a copy of all Company policies and procedures documenting the process. RECEIVED Friday, March 22, 2024 3:04:35 PM IDAHO PUBLIC UTILITIES COMMISSION FIRST PRODUCTION REQUEST TO CDS STONERIDGE UTILITIES, LLC 5 MARCH 22, 2024 REQUEST NO. 19: In “Exhibit 9 Cap Ex. Backup Generators Etc.” of the Application, the Company listed the following items: 1. Well Pump House ($104,940) 2. Forest Lift Station ($26,235) 3. Upper Tank Pump ($13,118) For each of the above-mentioned items, please provide the following documentation. If any of the information requested below cannot be provided or is not available, please explain why; also explain how the Company can ensure the project was or will be completed at least cost. a. Analysis of Need: a justification of need for the project and a cost/benefit analysis comparing alternatives. b. Project Plan: i. Initial project scope. ii. Proposed budget. iii. Proposed schedule. c. Requests for proposals (“RFP”) or requests for quotes (“RFQ”): i. Project requirements and specifications. ii. RFP/RFQ from winning bid. d. Project construction documentation including: i. Construction contracts, invoices, etc. ii. Contractors change order request(s). e. Explain how the Company ensured the project was or will be completed at least cost. REQUEST NO. 20: In “Exhibit 10 Cap Ex. Budget Wireless Meters” of the Application, the Company listed several items. 1. For the Line Item “Meters Replaced (360),” please provide a list of customers whose meters were or will be replaced including, but not limited to, meter installation date, water service activation date, respective address for each customer. RECEIVED Friday, March 22, 2024 3:04:35 PM IDAHO PUBLIC UTILITIES COMMISSION FIRST PRODUCTION REQUEST TO CDS STONERIDGE UTILITIES, LLC 6 MARCH 22, 2024 2. For the Line Item “Plus Transceiver & Software ($9,275),” please provide the following information and supporting documentation: a. Proposed budget. b. Proposed schedule. c. Information regarding RFP or RFQ including, but not limited to, requirements and specifications, RFP/RFQ of winning bid, etc. d. Installation contracts, invoices, etc. justifying the cost. e. Explain how the Company ensured the project was or will be completed at least cost. REQUEST NO. 21: In “Exhibit 11 Capital Expansion Budget Pump Motor Replacement” of the Application, the Company listed the following items: 1. Well Pump House ($120,000) 2. Forest Lift Station ($14,000) For each of the above-mentioned items, please provide the following documentation. If any of the information requested below cannot be provided or is not available, please explain why. a. Analysis of Need: a justification of need for the project and a cost/benefit analysis comparing alternatives. b. Project Plan: i. Initial project scope. ii. Proposed budget. iii. Proposed schedule. c. RFP or RFQ: i. Project requirements and specifications. ii. RFP/RFQ from winning bid. d. Project construction documentation including: i. Construction contracts, invoices, etc. ii. Contractors change order request(s). e. Explain how the Company ensured the project was or will be completed at least cost. RECEIVED Friday, March 22, 2024 3:04:35 PM IDAHO PUBLIC UTILITIES COMMISSION FIRST PRODUCTION REQUEST TO CDS STONERIDGE UTILITIES, LLC 7 MARCH 22, 2024 REQUEST NO. 22: In “Exhibit #12 CAP EX VEHICLE INVESTMENTS” of the Application, the Company listed the following items: 1. 2024 Toyota Tundra 4 Wheel Drive Max 6 Hybrid ($78,000) 2. 4 Wheel Gator ($20,000) For each of the above-mentioned items, please provide the following documentation. If any of the information requested below cannot be provided or is not available, please explain why. a. Analysis of Need: a justification of need for the project and a cost/benefit analysis comparing alternatives. b. Project Plan: i. Proposed budget. ii. Proposed schedule. c. RFP or RFQ: i. Project requirements and specifications. ii. RFP/RFQ from winning bid. d. Documentation including, but not limited to, vehicle contracts, invoices, etc. e. Explain how the Company ensured the purchase was or will be completed at least cost. REQUEST NO. 23: Does the Company expect customer growth? If so, please provide workpapers and documentation including, but not limited to, the potential number of customers and type of customers by year for the next five years. REQUEST NO. 24: Please reconcile the Monthly Minimum Charge of Current Tariff for 1-inch metered customers from Exhibit Nos. 5 and 7 of $42.72 and Attachment E “copy of Customer Notice and Mailing Date” of $24. REQUEST NO. 25: In Attachment B “Details on any affiliated entity relationships,” it states that Esprit Enterprises, LLC leases “Vehicles and other light truck equipment” to the Company. Please answer the following: RECEIVED Friday, March 22, 2024 3:04:35 PM IDAHO PUBLIC UTILITIES COMMISSION FIRST PRODUCTION REQUEST TO CDS STONERIDGE UTILITIES, LLC 8 MARCH 22, 2024 1. Please provide a list of the vehicles and other light truck equipment leased to the Company, please include: a. A description of each leased item. b. Purpose of the leased item. c. Cost of the leased item; and d. Length of the lease. 2. Please explain if each of the vehicles and other light truck equipment leased are used full time by the Company; and 3. Please explain how the vehicle expenses were allocated to the Company. REQUEST NO. 26: Please provide the proposed “disconnect/reconnect” fees as mentioned in the Customer Notice. Please provide any supporting worksheets with formulas intact. REQUEST NO. 27: Please clarify what the proposed 1-inch irrigation minimum monthly charge is. Additionally, please provide the following: 1. Please provide supporting workpapers of how the irrigation charge was calculated. 2. Please provide the current number of 1-inch residential and irrigation customers. 3. Please explain if 1-inch irrigation customers have separate irrigation meters from domestic meters. If not, please explain how the Company will meter irrigation water use; and 4. Please explain why the Company wants to separate irrigation charges from residential only for 1-inch meters. REQUEST NO. 28: In Exhibit 5 “Sch C Proof Revenue,” included is a “Service Type” of “Irrigation/Residential.” Please explain if one meter serves both domestic and irrigation water use. If not, please explain the meter structure. REQUEST NO. 29: Please explain why the Company believes that the Customer Group “MCV Irrigation Backup” will not turn back on after being turned off on “10/22.” RECEIVED Friday, March 22, 2024 3:04:35 PM IDAHO PUBLIC UTILITIES COMMISSION FIRST PRODUCTION REQUEST TO CDS STONERIDGE UTILITIES, LLC 9 MARCH 22, 2024 REQUEST NO. 30: Please confirm the Company is proposing to charge all Residential 1-inch meter customers at the proposed ¾-inch meter rate as shown in Exhibit No. 7. If this is not the Company’s proposal, please provide the following information related to ¾-inch and 1- inch meters. a. Please provide a list of all the Residential customers the Company has connected to the system with ¾-inch meters and a separate list of customers with 1-inch meter sizes; b. For the customers with 1-inch meters, please identify those who requested 1-inch meters and those that requested ¾-inch meters but received 1-inch meters due to 3/4 -inch meter unavailability. c. Please provide any written evidence of meter size requests for all customers with ¾ and 1-inch meter sizes during the period when ¾-inch meters were unavailable. d. Does the Company plan to replace all 1-inch meters with ¾-inch meters for customers that requested them? If so, please provide details of the plan including a schedule for replacement. DATED at Boise, Idaho, this 22 day of March 2024. _________________________________ Michael Duval Deputy Attorney General I:\Utility\UMISC\PRDREQ\SWS-W-24-01 PR# 1.docx RECEIVED Friday, March 22, 2024 3:04:35 PM IDAHO PUBLIC UTILITIES COMMISSION CERTIFICATE OF SERVICE CERTIFICATE OF SERVICE I HEREBY CERTIFY THAT I HAVE THIS 22ND DAY OF MARCH 2024, SERVED THE FOREGOING FIRST PRODUCTION REQUEST OF THE COMMISSION STAFF TO CDS STONERIDGE UTILITIES, LLC, IN CASE NO. SWS-W-24-01, BY E-MAILING A COPY THEREOF, TO THE FOLLOWING: Chan Karupiah Managing Partner CDS StoneRidge Utilities, LLC P.O. Box 298 364 Stoneridge Road Blanchard, ID 83804 chansan@comcast.net utilities@stoneridgeidaho.com _________________________________ SECRETARY RECEIVED Friday, March 22, 2024 3:04:35 PM IDAHO PUBLIC UTILITIES COMMISSION