HomeMy WebLinkAboutsch-12-3.leg.docELECTRIC SERVICE SCHEDULE NO. 12 - Continued
(2) B. Street Lighting - "Full Maintenance"
Nominal Lamp Rating:
Initial Lumens Watts Per Lamp Sodium Vapor High Intensity Discharge Lamps: 5,600 70 $ 4.78 9,500 100 $ 5.73 16,000 150 $ 5.84 27,500 250 $ 5.91 50,000 400 $ 6.04 Metal Halide Lamps: 12,000 175 $ 6.53 19,500 250 $ 6.80 32,000 400 $ 6.94 107,000 1,000 $ 9.74
SPECIFICATIONS AND SERVICE FOR STREET LIGHTING WITH PARTIAL AND FULL MAINTENANCE: Each street lighting lamp will be operated from a series or multiple circuit at the Company's option. The entire installation including initial lamp requirements and wiring with suitable connection to Company's system will be furnished and installed by Customer, except that installations on Company-owned poles will be made by Company and the cost thereof will be billed to Customer. Installations must meet Company construction standards in place at the time of installation in order to receive "full maintenance." If Company is unable to obtain materials to perform maintenance, the street light facilities will be deemed obsolete and must be upgraded at customer expense in order to qualify for maintenance under the Electric Service Schedule. Street Lighting Service under "partial maintenance" includes energy, lamp and glassware renewals and cleaning of glassware.
(Continued)
Third Revised Sheet No. 12.3
I.P.U.C. No. 28 Canceling Second Revised Sheet No. 12.3
Submitted Under Case No. PAC-E-05-1
ISSUED: January 14, 2005 EFFECTIVE: September 16, 2005