Loading...
HomeMy WebLinkAboutsch-11-2.leg.docELECTRIC SERVICE SCHEDULE NO. 11 - Continued MONTHLY BILL: Rate: Nominal Lamp Rating: Initial Lumens: Watts Per Lamp Sodium Vapor Lamps: 5,600 high intensity discharge 70 $11.11 9,500 high intensity discharge 100 $12.84 16,000 high intensity discharge 150 $16.03 27,500 high intensity discharge 250 $18.98 50,000 high intensity discharge 400 $26.07 Should Customer desire a steel pole instead of a wood pole, an additional charge will be made according to the following schedule: 1. All steel poles installed prior to June 1, 1973. 11 gauge $1.00 per pole per month 3 gauge $1.50 per pole per month 2. Steel poles installed after June 1, 1973. 30 ft. 11 gauge, direct buried $2.35 per pole per month 30 ft. 3 gauge, direct buried $3.95 per pole per month 35 ft. 11 gauge, direct buried $2.85 per pole per month 35 ft. 3 gauge, direct buried $4.65 per pole per month For anchor base poles, add 20¢ per pole per month to all poles installed after June 1, 1973. SPECIFICATIONS AND SERVICE: Each lamp will be operated from a series or multiple circuit, at the Company's option. Fixtures and supports will be in accordance with the Company's specifications. Service includes energy supplied from the Company's overhead circuits, maintenance, lamp and glassware renewals. Lamps will be controlled by the Company to burn each night from dusk to dawn. (Continued) Third Revised Sheet No. 11.2 I.P.U.C. No. 28 Canceling Second Revised Sheet No. 11.2 Submitted Under Case No. PAC-E-05-1 ISSUED: January 14, 2005 EFFECTIVE: September 16, 2005