Loading...
HomeMy WebLinkAboutsch-10-1.rev.docUTAH POWER & LIGHT COMPANY ELECTRIC SERVICE SCHEDULE NO. 10 STATE OF IDAHO ______________ Irrigation and Soil Drainage Pumping Power Service ______________ AVAILABILITY: At any point on the Company's interconnected system where there are facilities of adequate capacity. APPLICATION: This Schedule is for alternating current, single or three-phase electric service supplied at the Company's available voltage through a single point of delivery for service to motors on pumps and machinery used for irrigation and soil drainage. IRRIGATION SEASON AND POST-SEASON SERVICE: The Irrigation Season is from June 1 to September 15 each year. Service for post-season pumping may be taken by the same Customer at the same point of delivery and through the same facilities used for supplying regular irrigation pumping service during months from September 16 to the following May 31. MONTHLY BILL: Irrigation Season Rate Customer Service Charge: Small Pumping Operations: 15 horsepower or less total connected horsepower served through one service connection - $11.00 per Customer Large Pumping Operations: 16 horsepower or more total connected horsepower served through one service connection - $33.00 per Customer (Continued) Sixth Revised Sheet No. 10.1 I.P.U.C. No. 28 Canceling Fifth Revised Sheet No. 10.1 Submitted Under Case No. PAC-E-05-1 ISSUED: January 14, 2005 EFFECTIVE: September 16, 2005