Loading...
HomeMy WebLinkAbout20160809Application.pdfJuly 31, 2016 Jean D. Jewell Commission Secretary \ECE\VE:D 7.0i& •1L3 -8 PM Lt: 12 Idaho Public Utilities Commission P.O. Box 83720 Boise, Idaho 83720-0074 Dear Ms. Jewell, Centurylink® Pursuant to Commission Order No. 28784, GNR-T-01-10 please find enclosed Qwest Corporation's application for the Idaho Broadband Tax Credit for the year 2015. This application is being submitted for Commission determination that the broadband equipment installed for 2015 meets the definition of qualified broadband equipment as found in Idaho code 63-3029I. 1. Name address of the applicant: Qwest Corporation 100 Centurylink Drive Monroe, LA 71203 Contact Person: Johnathan Groan, Director Corporate Income Tax Phone: 318-330-6390 Qwest Corporation is a Telecommunications Carrier 2. Identify the area or location where the equipment is installed in Idaho. Please refer to Exhibit 1 for equipment installed in the year 2015. See Exhibit 2 for retirements. Broadband investment and retirements for 2015 are as follows: YEAR INVESTMENT RETIREMENTS NET INVESTMENT 2015 $24,488,181 ($946,468) $23,541,713 3. Type of Broadband service offered to the public in Idaho. Qwest Corporation uses terrestrial wireline technology. Various forms of DSL-based equipment are used (ADSL & VDSL in various vintages). Transport is a mix of fiber optic and metallic cable, which typically is also supporting trad itional telephony services. Equipment terminals are located in Central Office buildings, remote buildings and in cabinets on concrete pads each serving a neighborhood . 100 CenturyLink Drive Monroe, LA 71203 Tel: 318.388.9000 Fax: 318.388.9093 www.centurylink.com 4. Network Transmission rate: The transmission rate of DSL-based broadband services ranges from 256kbs to 40 mbps, to and from a subscriber. Please refer to Exhibit 3. 5. Provide a specific list of equipment types that the application is requesting the Commission to determine is "qualified broadband equipment" as defined in Idaho Code Section 63-30291. Please refer to Exhibit 1 for the year 2015. 6. Installation dates: Please refer to Exhibit 1 for the year 2015. 7. Written description of our Broadband Network including a description of how the installed equipment is an "integral part" of the broadband network: Services are supported by our telecommunications network which consists of voice and data switches (circuit and packet), copper and fiber optic cables and transmission equipment. At central office building and at remote sites, multiplexers and advanced digital switches are controlled by licensed software. Fiber-optic cable is the primary transport media between nodes including interconnection points with other carriers. We continue to enhance and expand our network as broadband enabled technology improves and as customers, new and existing, demand significant additional capacity. 8. Percentage and number of potential subscribers: Total customers with the potential to be high-speed internet subscribers in Idaho is 226,513 of 238,867 potential subscribers, or 95%. Please refer to Exhibit 4. 9. Certified statement from applicant: Please See Exhibit 5. If you have any questions concerning this filing, please contact me at (318) 330-6390. Sincerely, Johnathan Groan Director Corporate Income Tax Encl EXHIBIT 1 Equipment Installed In Idaho 2015 QWEST CORPORATION -=l-BROADBAND EQUIPMENT INSTALLED IDAHO 2015 EXHIBIT 1 .... J. I .. ' ... -_. .... I 1 EXCHANGE AMERICAN COTTONWOO EDEN· INVEST_MENT REASON --·-··· DESCREPTION FALlS BANCROFT ...... BlACKFOOT ___ _ BLIS~ BOISE BUHL BURLEY CALDWELL D ---~-CRAIGMONT ____ DAYTON ------HAZELTON .. _____ EMMETT -·---·--· FIRTH -------___ FRANKLIN _____ GLENNS FERRY DSL EXISTING MKT EXPANSION COPPER -• $0 . . . . .. $0 ~ $80 I ENGINEERING $539 -FIBER OPTIC $0 NEW FEATURES $0 OUTSIDE PLANT $15 TRANSMISSION/DLC $5,781 ·1 t DSLGROWTH CONSTANTS $7,971 I 1COPPER $86,929 $2,852 $696 1 $4,465 1 $3,186 1 I so I I ---' ENGINEERING $8,187 $925 $183,966 $52,362 $2,981 $15,959 $5,895 FIBER OPTIC $8,152 __ $8,261 $3,685 , $846 , LAND/BUILDING $0 ~ NEW FEATURES $40,704 so_ $85,205 i $8,267 $30,338 $22,222 SWITCHING $21,855 I TRANSMISSION/DLC $4,480 $3,965 $526,179 $322 $89,697 $18,274 $19,212 $11,052 EQVIDEO ENGINEERING $11 OUTSIDE PLANT $0 HSI BANDWIDTH AUGMENTATION COPPER $7,091 T ENGINEERING $3,688 s2s,1GiJ $180 $4,365 FIBER OPTIC $0 • $16,064 I $0 $11,761 : t-j NEW FEATURES I $0 0 .. ,., TRANSMISSION/DLC I I $5,078 I $61,824 . $0 I $5,911 MARKETABLE REVENUE -FTTT COPPER $0 ENGINEERING $841 ($7,100) $18,516 +-($3,757) $12,500 $137 i $353 : FIBER OPTIC $3,638 $1,248 $33,419 $1,752 1 $76,762 $0 . $0 TRANSMISSION/DLC $293 $13,554 $16,5661 $17 $28,195 I $0 $0 NATIONAL MARK£TABLE REVENUE-Fl ENGINEERING $4,310 FIBER OPTIC $14,702 1 TRANSMISSION/DLC $16,48_7___ NATL MARK£T REV· BUSINESS COPPER $250 $0 $469 :i $0 ENGINEERING $137 $90 $10,555 $472 : $178,733 $3,332 $14,538 $11,693 $401 $445 $2,287 $0 $1,006 j FIBER OPTIC $0 $0 $115,119 $429,668 $16,786 $26,679 $0 $0 $0 I $0 OUTSIDE PLANT $334,Srrt TRANSMlSSION/DLC $2.523 r $4,317 $41,140 I $39,570 $2,599 $641 $4,610 ~ $0 I $659 , NATL MARKET REV· WHOLESALE 1COPPER $0 $0 ENGINEERING $89 ($2,065) $134,085 , $555 $7,480 ' $4,267 $387 FIBER OPTIC $0 $563,282 $0 $18,034 $61,133 $1,981 .. TRANSMISSION/DLC $0 $63,711 $0 $2,428 +--$921 '. NETWORK PLAN · ACCESS CONSTANTS $3,880,948 $58,125 -+ COPPER $0 $1,957 $4,141 $43,661 $634 $4,139 g7,548 $1,587 $B23 $1,024 $0 $0 ENGINEERING $606 $2.133 $4,976 $56,825 ~ $7,238 $6,100 -t-$8,723 $1,298 I $67 $659 $2,302 $0 $1,104 FIBER OPTIC $38,944___ LAND/BUILDING $0 $0 NEW FEATURES $603 OUTSIDE PLANT $1,696 $11,180 $3,338 I $0 ~ $2,089 1 I $0 + ... 1 TRANSMISSION/DLC $3,093 : $7,761 $2,900 $0 $0 $3.560 I $4,288 NETWORK PlAN -SWITCHING COPPER $0 I ENGINEERING $1,270 $4,9_1_5__,.... I ~ -+ SWITCHING $3,083 $11,057 .. TRANSMISSION/DLC $1,399 f NETWORK RELIABILITY ENGINEERING $691 $1,257 $0 ($2,311) $0 $2,200 $5 $983 $1 NEW FEATURES ~ SWITCHING $5,899 $10,731 $0 $0 $0 $13,803 $15 $6,603 $5 .. TRANSMISSION/DLC $31..i_ $0 NETWORK STABILITY COPPER I ENGINEERING $3,521 I $59,397 I $3,421 $2,940 FIBER OPTIC I 1SWITCHING ' $318,322 1 [TRANSMISSION/DLC $23,307 $435,205 $15,809 '. $6,890 NEW RES DEVELOPMENTS COPPER $0 $5,819 $0 1 I $0 . ' I ENGINEERING $0 $291,296 $11,439 ($661)_ $98 FIBER OPTIC $1,153,525 $80,253 I ' NEW FEATURES $39 621 I $0 EXHIBIT 1 QWEST CORPORATION BROADBAND EQUIPMENT INSTALLED IOAHO 2015 EXHIBIT 1 INVE_STMENI REIISON NEW RES DEVELOPMENTS TRANSPORT IP CORE . DESCREPTION SWITCHING TRANSMISSION/DLC COPPER ENGINEERING FIBER OPTIC NEW FEATURES SWITCHING EXCHANGE AMERICAN .. FALIS TRANSMISSl_()N/_DLC::_ ___ _ Grand Total !92,392 BA_l'lf:!IOFT BLACKFOO! _ • _B_LISJ. . • BQISE $0 $873 $1S0,682 so I $436,719 $924,944 ~lBO !178,608 $4,789 $10,608,482 ·-------·------------ i-- conONWOO EDEN- B_UHL_ . BURgY ..• c:A~_D-~E!_L . D_. CRAIGMON.!.._._,_l>_ll!!ON .f!.~).!_DN . __ EM!o:I_ITT FIRTH __ _F_R_II_N_K,~lt>! GLENNS FE!!_~ $0 $6,202 + $S,6Sl $3,607 $S,2S6 I I ' $13,SS6 $2,S20 $0 $1S,762 $58,582 --$119,478 $592,827 $61,651 ~16,271 ~23,314 .. ~7,337 ~154,392 ~ $40,835 $28,785 , EXHIBIT 1 QWEST CORPORATION BROADBAND EQUIPMENT INSTALLED IDAHO 2015 INVESTMENT REA_SON ________ ..... __________ DESCREPTION____ . __ GOODING_ . GRACE DSL EXISTING MKT EXPANSION DSLGROWTH COPPER 1 ENGINEERING FIBER OPTIC !NEW FEATURES : OUTSIDE PLANT TRANSMISSION/DLC CONSTANTS jCOPPER ENGINEERING ; FIBER OPTIC LAND/BUILDING NEW FEATURES SWITCHING _ _ _ _ . _ TRANSMISSION/DLC EQVIDEO ENGINEERING OUTSIDE PLANT HSI BANDWIDTH AUGMENTATION COPPER MARKETABLE REVENUE· FTIT ENGINEERING FIBER OPTIC NEW FEATURES TRANSMISSION/DLC COPPER ENGINEERING ~ FIBER OPTIC .. TRANSMISSION/DLC NATIONAL MARKETABLE REVENUE· Fl. ENGINEERING NATL MARKET REV· BUSINESS FIBER OPTIC TRANSMISSION/DLC COPPER ENGINEERING FIBER OPTIC louTSIDE PLANT __ fTRANSMISSION/DLC NATL MARKET REV· WHOLESALE ! COPPER /NGINEERING ! FIBER OPTIC _TRANSMISSION/DLC NETWORK PLAN· ACCESS NETWORK PLAN· SWITCHING NETWORK RELIABILITY NETWORK STABILITY NEW RES DEVELOPMENTS CONSTANTS COPPER 1 ENGINEERING FIBER OPTIC t LAND/BUILDING t NEW FEATURES jouTSIDE PLANT .... TRANSMISSION/DLC COPPER ENGINEERING SWITCHING .. TRANSMISSION/DLC ENGINEERING NEW FEATURES ,SWITCHING __ TRANSMISSION/DLC COPPER ENGINEERING J FIBER OPTIC I SWITCHING TRANSMISSION/DLC !COPPER ~ ENGINEERING FIBER OPTIC NEW FEATURES S9,678 $67,841 S25,789 so S6,394 -S2,907 S7,848 S294 so Sl,929 S2,197 I (Slll)t So I -t -+ S9,211 S38,803 + S3,356 $9,071 1 so ' S6,235 1 S4,878 $15,781 S3,583 S5,014 $0 so so ($2,870l t i-r t LAVA HOT LEWISTON GRANGEVILLE .t:t~G_E~~~f'j-r HAILEY ________ 1 ____ 10~>1oc1r.r _ 1 !ll~H()~ALLS .JER()_~E __ KETCHUM KIMBERLY KOOSKIA 1·····:;.:...····· .. 1 I KAMIAH . KUNA... _____ LAPWAI ... __ SPRINGS ___ SHERWOOD 1 so S2,515 , S3,284 I t ' (S287)1 1 Sl,830 S271 1 1 s20 I ! I '"I f I i Sl,867 S574 -+ I I-so $81+ S7,534 so Sl,948 S908 Sl,329 Sl2,682 --- S6,:i_ S25,040 S9.~ S16,450 S8,342 $1,23~ S34,056 S3,520 Sl6,299 $15,998 S71,538 (S781l Sl0,994 Sl,529 :::~:!LI SB,422 ± -j s2os_;__ S595 Sl,964 so S268 -I­Sl,2SD_i so S3,177 t S93,010 S16,280+ Sl0,941 . $213,9311 I so r $40 1 sot so so ' ~,973 l---­ S59,511 Sl,519 S927 Sl,660 so S57,149 $188,426 S32,330 S39,029 Sl71,801 Sl8,535 S42,326 $42,767 $0 so $995 Sl7,924 $1,046 S2,654 - I S604 I S2,598 $2,326 f S6,688 so S70,620 $228,964 $41,620 I · · 1 l S2.434-~ S3.:f33 • Sl.659t_ J $1:.;:: l + ~3 $249 1 :s r ~'"'"; ,.,., 1 r ::::: . so S60 so $2,135 , $1,3301 so $4 so J sA Sl,525 Sl4,238 S8,464 S23,000 Sl,570 $11,927 S35,562 so L f $5,121 S2,004-t-­ so S4,319 S464 _;___ Sl0,757 1 ::j • :i I Sl S2,190 ' S2,676 S2,01 S4,032 Sll,737 i S47,811 S28 Sl7,061 Sl4,537 __ S684 ' Sl,074+--S72,6SS __[ --,--+ S3,7ij S4,015 S5,702 Sl2,SS2 -S22,274 ~ S40,702 $848 Sl,800 Sl4,539 '"":[ $12,060. $609 --(S391) S4,571 S6,410~ S9,938 S3,275 Sl,992 -__ $125- - so S4,627_ S3,668 -- + ' $350 I ----t--Sl,676 ~ --+--$2,02_1 __ S4,542 -l-- Sl,8461 S9,7i- +--_,_ S24,920 t S23,045 : SS,368 -l- 1 sot S439 l f- S155 "I __j__ - + S3,223 so $20 , so~ $0 S3 S24 S17 SS33 so S29,454 ~· _ S71,233 . $127,049 (S661) ss S384 so Sl,905 S284 Sl,276 so $0 Sl,752 $36,569_ S19 $174 so SQ_ S31,056 S286,881 (Slll) Sll,724 Sll,584 S98,338 Sl7,260 Sl4,363 Sll,051 so S65,623 S930 S7,788 so_ S26,709 S180,01_2_ $13,150 $8,830 S32,103 1583 EXHIBIT 1 QWEST CORPORATION BROADBAND EQUIPMENT INSTALLED IDAHO 201S EXHIBIT l ~N.Y.f:STM_~NT REASON NEW RES DEVELOPMENTS TRANSPORT IP CORE Grand Total D_ESC~EPTION SWITCHING ... TRANSMISSION/DLC ,COPPER ENGINEERING FIBER OPTtC NEW FEATURES SWITCHING TRANSMISSION/DLC . GClODIN(i__ .. GRACE .. ~_124,764 193,063 T T j r LAVA HOT LEWISTON GRANGEVILLE _H_A<l_t:R"!111N _HAILEY IDA~O CITY ._ 1 __ 1DAHCl!_IIL~ S811 K<>OJKIA I-,~,----~-·""" so JEROME ... _J KAMIAH KETCHUM r . s~ •. ~.;1 KIMBERLY KU!".~--LAPWAI S8,657 so SG,114 Sll8 SlG,768 S4,609 12,441 so S163,928 . ~-S30,s32.L_ Sll,418 $-Zll,831 -$6S,043 $1,SS4,244 $107,832 $2S,408 $207,674 $170,821 $3,8S9 $36S,252 $3,194 $0 $988,llS I 17,612 EXHIBIT 1 QWEST CORPORATION BROADBAND EQUIPMENT INSTALLED IDAHO 2015 I I EXHIBIT 1 I I I- LEWISVILLE-MOUNTAIN NEW INVESTMENT REASON DESCREPTION MENA MCCAMMON MELBA MERIDIAN MIDDLETON MONTPELIER HOME MURTAUGH NAMPA PLYMOUTH NEZ PERCE •.... PAYITTE __ POCATEUO T----PRESTON . ····-__ REXBURG ......... RIGBY ·-·--·--------·-··-----··--·-·---··-----·····-·--··--·---·--···-··-·----·-· ·-------· --·--··---·----··-··--· •...... T .... ·-----------·--r ····--·--·-----·· ·-. ···---···.,···----~--OSL EXISTING MKT EXPANSION COPPER $0 $0 ENGINEERING $147 $19 $2,721 FIBER OPTIC $0 $0 NEW FEATURES 1 I + OUTSIDE PLANT I _jTRANSMISSION/DLC $0 so I I I I I j DSLGROWTH CONSTANTS I $7,650 l COPPER $0 $37,122 $649 $0 $0 $0 ENGINEERING $321 $1,099 $82,164 , $2,182 $741 $13,888 $7,771 $71,440 $376 $20 $9,425 $6,425 $3,384 FIBER OPTIC so $0 $5,583 $1,498 $1,832 I $0 LANO/BUILDING $29,314 1 I I NEW FEATURES i $0 $3,872 1 $12,292 $34,096 1 $26,810 I $33,374 1 l ;°SWITCHING I so I TRANSMISSION/DLC $0 $4,444 $200,634 I 1 $16,471 $184.073 t $0 $12,289 $7,905 EQVIDEO ENGINEERING OUTSIDE PLANT ---·· HSI BANDWIDTH AUGMENTATION COPPER $5,335 $0 ' ENGINEERING $8,839 $10,422 $6,083 $212 $SO FIBER OPTIC s12.679 I $64,623 1 I $3,074 1 $0 I I $01 NEW FEATURES l TRANSMISSION/DLC $9,936 $6,790 $4,097 T $0 $0 ----t-MARKETABLE REVENUE -FTTT COPPER ENGINEERING $596 $8,623 $10,026 $1,683 $19 $13,807 $3,6"i'I___ $11,842 $3,879 FIBER OPTIC $5,703 $37,953 $4,563 $0 $30,243 $0 $23,056 $10,470 TRANSM ISSlON/OLC $34,039 $27.610 I $288 $0 ' $50,557 I $1,581} $34,161 $61 NATIONAL MARKETABLE REVENUE · Fl ENGINEERING $4,128 l I $963 FIBER OPTIC 1 TRANSMISSION/DLC I $26,435 $9,243 NATL MARKET REV · BUSINESS COPPER I $3,241 ENGINEERING $75,004 $13,702 ($1,460) $30,151 $84 $15,155 $239 $13,456 FIBER OPTIC $217,615 $116,180 $0 $119,885 $30 I $60,390 $0 $47,109 I OUTSIDE PLANT I $2,319 J .. TRANSMISSION/DLC $8,851 . $482 1 $40,293 I $0 $6,513 i $2,927 : $0 NATL MARKET REV -WHOLESALE COPPER $39,622 1 I I $0 ENGINEERING $1,158 I $23,248 $132 $14,943 $2,564 $0 I FIBER OPTIC $149,150 $10,456 I $83,306 $14,639 I $30,222 I $27,519 TRANSMISSION/OLC $15,987 $477 $1,814 $11,284 $326 $30,405 $21 $0 ... NETWORK PLAN -ACCESS CONSTANTS -COPPER $0 $32,413 I $11,486 ($10,835)° $26,488 . $3,795 ($7,300) $866 ($10,445) ($1,540) ENGINEERING $80 -$30,620 t- $339 i $332 t $18,473 1 $2,235 $24,372 $1,500 , $6,895 $6,344 FIBER OPTIC $4,549 1 I T $8.640 I I $4,596 LAND/BUILDING $0 $0 NEW FEATURES OUTSIDE PLANT +-$0 $1,172 $16,770 TRANSMISSION/DLC $27,496 $828 $2,714 so .. NETWORK PLAN · SWITCHING COPPER I ENGINEERING 1 ; I $0 $4,758 $401 I I e SWITCHING I 1 $907 $5,389 1 1 $1.691 I .. TRANSMISSION/DLC $32 NETWORK RELIABILITY ENGINEERING $1,513 $1,652 $2,307 $6,189 $2,162 $2,776 t $424 , NEW FEATURES $5,040 SWITCHING $13,258 $16,695 $14,817 $13,347 $13,340 $5,540 $4,481 --TRANSMISSION/OLC $4,335 I 1 $0 NETWORK STABILITY COPPER f I I $1,398 l + ENGINEERING $2,638 s,.874 I I FIBER OPTIC SWITCHING TRANSMISSION/OLC $5,893 $9,231 $4,473 1 $7,428 NEW RES DEVELOPMENTS COPPER $99 $74 $156 $1,560 $0 $0 ENGINEERING $274,823 ___$22,233 I $89,040 $1,104 I $138 $50,681 $10,838 FIBER OPTIC $1,299,827 $135,532 l $572,526 : f $200,372 l $12,747 1 NEW FEATURES ~eM14 $46,562 $36 756 I $8 820 EXHIBIT 1 QWEST CORPORATION BROADBAND EQUIPMENT INSTALLED IDAHO 2015 + INVESTMENT_REASON NEW RES DEVELOPMENTS TRANSPORT IP CORE Grand Total --! ~ t LEWISVILLE-MOUNTAIN NEW I SWl-.fc~~irTl()t. ____ l'II_ENA __ l'll(c:AMMClN MELBA ____ l'II_ER_IDIAN __ MIDDLE_TON I M()NTPELIER__ HOME C URTAUGHI _NAMPA 1 PLYM<JUTH NEZPERCE • PAYETTE __ 1 PC>c:AIELLO -"'""""'"" ''"·"' . I i ...... t ··- 1/~~l::,.,, _ _ _ .. .. .... . . I .~~ L :: ~ .::) _ -· __ · __ -__ ,;;J .::J ~ "': ::::: $15,239 $18,943 $5,623 $3,051,215 $392,686 $44,105 $279,960 $52,097 $1,799,070 $68,359 $1,021 $37,919 $626,074 t ~ P_~ESTClN . R£XBUR\: 1 .... . -~l_!iBY $5,049-+ $1,695 . $5,379 L $17,64d ____ $31.251 $73,360 $180,429 $69,492 EXHIBIT 1 QWEST CORPORATION BROADBAND EQUIPMENT INSTALLED IDAHO 2015 EXHIBIT 1 SHOSHONE· INVES~~.ENT RE~~-q~ DESCREPTION RIRIE ROBERTS SHEUY .. DIETRICH SODA SPRINGS STAR_ _ ----~IN FALLS WEISER WENDEU . ~r~~~--!~.~~-t DSL EXISTING MKT EXPANSION COPPER $0 $0 ENGINEERING $138 j $3,663 FIBER OPTIC $0 $0 NEW FEATURES $0 OUTSIDE PLANT $15 TRANSMISSION/DLC $0 $5.781 DSLGROWTH CONSTANTS $7.971 -COPPER $1,097 $149,396 ENGINEERING $983 $19,008 $31,229 $670,103 FIBER OPTIC $4,3SS $61,868 LAND/BUILDING so NEW FEATURES $8,830 I $S8,152 . $10,699 $525.769 SWITCHING -I-I $19,279 1 $66,923 TRANSMISSION/DLC $17,289 $113,491 $1,581,032 EQVIDEO ENGINEERING $11 OUTSIDE PLANT so HSI BANDWIDTH AUGMENTATION COPPER so $13,997 ENGINEERING so so ~ $1,653 $86,183 FIBER OPTIC so $155,073 NEW FEATURES so $0 $25,040 TRANSMISSION/DLC I $0 $141,712 MARKETABLE REVENUE· Fm COPPER so so ENGINEERING $60 $578 $1,680 I $1,024 $22,055 $281 so $135,482 FIBER OPTIC so $2,626 $4,629 $505 $161,025 $0 so $510,683 TRANSMISSION/OLC so $365 so $0 so so $250.784 NATIONAL MARKETABLE REVENUE · Fl ENGINEERING $10,502 FIBER OPTIC $14,702 TRANSMISSION/DLC $53,825 NATL MARKET REV · BUSINESS COPPER so ($9,281) $402 ENGINEERING $1,029 $102 ; $2,312 $32,747 $11,115 $5,374 $560,029 FIBER OPTIC $0 so I $5,689 $186,692 $30,512 $3,522 $1,949,784 OUTSIDE PLANT +-I ($111) TRANSMISSION/DLC $165 so ' $7,230 $1,725 $43,495 ; $742,609 NATL MARKET REV-WHOLESALE COPPER so ENGINEERING $53 $50 $19,381 $310,050 FIBER OPTIC $0 so $57,732 $1,374,116 TRANSMISSION/DLC so $20,929 $202,839 NETWORK PLAN . Acass CONSTANTS $3,939,073 COPPER $0 $0 $966 so $26,285 $1,023 $7,947 $263,SS2 ENGINEERING $169 $42 $1,142 ($2,315) $31,856 $539 ~ $3,018 $310,335 FIBER OPTIC $14,276 ; $86,544 LAND/BUILDING $18 $18 NEW FEATURES $603 c OUTSIDE PLANT $102,576 TRAN5Ml5SION/DLC I $2,699 $81,557 NETWORK PLAN -SWITCHING COPPER I so ENGINEERING $17,483 SWITCHING $22,338 TRANSMISSION/OLC $1,431 NETWORK RELIABILITY ENGINEERING $4,961 $9 ' $717 $302 $1,347 $32,372 NEW FEATURES $27 1 $3,295 '. so I $5,040 SWITCHING $20,158 : s220 I $161,054 ' I I TRANSMISSION/DLC $3,894 $3,927 NETWORK STABILITY COPPER so ~ ENGINEERING $1,506 $111,911 FIBER OPTIC $180,012 SWITCHING $318,322 TRANSMISSION/DLC $9,872 $547,686 NEW RES DEVELOPMENTS COPPER + $19,286 $26,994 ENGINEERING $50,512 $59,697 $995,063 FIBER OPTIC I $270,104 $299,570 -l $4,379,800 NEW FEATURES I $22 551 $14,625 $407 169 EXHIBIT 1 QWEST CORPORATION BROADBAND EQUIPMENT INSTALLED IDAHO 2015 EXHIBIT 1 INVESTMENT REASON--·····--···-··-··-DESCREPTION NEW RES DEVELOPMENTS TRANSPORT IP CORE SWITCHING ... TRANSMISSION/DLC COPPER ENGINEERING FIBER OPTIC NEW FEATURES SWITCHING ---··----···--------···· TRANSMISSION/DLC RIRIE SHOSHONE- ROBERTS ............... SHELLY ___ ........ DIETRICH ...... SODA SPRINGS STAR . TWIN FALLS_ $3,391 $853 . $144 $202 $11,247 $5,520 ·---·-----------------$0 _ $12,374 !Grand Total $60 $31204 $61895 $11381 $371344 $5101494 $44 . $3,819 I 11,141;s11 WEISER $50,445 WENDELl Grand Total . ..... ... $0 $102,273 $0 $~24,158 $4,609 $44 $635,460 $1,816,546 $58,120 $24,488,181 EXHIBIT 1 EXHIBIT 2 Equipment Retirements 2015 QWEST CORPORATION IDAHO BROADBAND RETIREMENTS 2015 RETIREMENTS BY VINTAGE IDAHO CODE SECTION. 63-30298 YEAR 2015 2015 2015 2015 2015 VINTAGE V2011 V2012 V2013 V2014 V2015 !TOTAL RETIREMENTS 2015 RETIREMENTS 509,221 123,747 80,093 128,003 105,404 946,468 I EXHIBIT 2 EXHIBIT 3 Network Transmission Rates 2015 QWEST CORPORATION IDAHO BROADBAND CREDIT NETWORK TRANSMISSION RATES QUESTION #4 ID LUs 40 mbps EOY 2015 249,652 20mbps 12mbps 141,960 29,652 7mbps Smbps 3mbps 1.Smbps 256kbps Total ID 42,066 29,983 38,306 58,098 1,793 591,510 NOTE: Where LU means Living Unit. A Living Unit is a street address where Qwest Corporation might send a bill and where wireline plant is not far away. Where mbps means megabits per second. These are download speeds. Upload speeds vary. These are availability counts, not subscribership counts. EXHIBIT 3 EXHIBIT 4 Idaho Broadband Subscribers 2015 QWEST CORPORATION IDAHO BROADBAND CREDT 2015 PERCENTAGE AND NUMBER OF POTENTIAL SUBSCRIBERS QUESTION #8 ID LUs TOTAL LU'S TOTAL WKG LU'S WKG QUALIFIED TOTAL QUALIFIED LU'S LU'S EOY 2015 645,237 238,867 226,513 591,510 %WKG QUALIFIED LU'S'-4 95% NOTE: Where LU means Living Unit. A Living Unit is a street address where Qwest Corporation might send a bill and where wireline plant is not far away. A working Living Unit is an address where Qwest now sends a bill for some type of service, not necessarily internet access service and not necessarily telephony service. A qualified LU is an address where DSL-based service could be provisioned in a short interval of time. EXHIBIT 4 EXHIBIT 5 Idaho Broadband Certification 2015 IDAHO BROADBAND CERTIFICATION EXHIBIT 5 2015 I hereby, certify that Representatives of Qwest Corporation (the applicant) have read the application statutes for the broadband investment income tax credit and the applicant believes that the subject broadband equipment qualifies for the tax credit under Idaho Code Section 63-3029!. ~· ~Roblnson Vice President Tax