Loading...
HomeMy WebLinkAbout20071119Application.pdf~V8ZUOì NOV i 9 At; iO: 05 IDAHO PUBLIC _ UTILITIES COMMlSSlûi , 20575 NW Von Neumann DR Hilsbro, OR 97076 November 19, 2007 Ms. Jean Jewell, Secretary Idaho Public Utilites Commission P.O. Box 83720 Boise, 1083720-0074 V 2-1J -( - Or¡ -oS- Dear Ms. Jewell: Attached please find an original plus three copies of Eltopia Communications, LLC's adoption of the interconnection agreement between Verizon and Northwest Telephone, Inc. under Secion 252(i) of the T A96. If you have any questions concerning this filng, please contact me at 972-718-3418. -;1:mJ1u1~Kim Douglass Sr. Staff Consultant - Regulatory and Government Affairs Attachments r- i:..~~.! t;,., 10= 05 Gary Libri Dire-Negtitis Parter Souts Intercnen servces Policy & Planning ~vezg 741 ZecendorBlvd. Flor 2 Garden Cit, NY 1153 Tel.: 516-7062 Fax: 516-3-7622 gary.r.iibrii~ri.com Ocober 24, 2007 Wil MacHugh Vice President Eltopia Communications, LLC 230 Ringold Rd. Eltopia, WA 99330 li i.1J ::- 07 -d ~ Re: Requested Adoption Under Sen 252(i) of the Communications Act Dear Mr. MacHugh: Verizon Nortwest Inc. ("Verion"), a Washingon corpration, wit principal place of business at 1800 41 st Strt, Everett, WA 98201, has reived corrspondence stting that Eltopia Communications, LLC ("EPJ"), a Washingon limited liabilit company, with principal place of business at 2304 Ringod Rd., Eltopia, WA 99330 wishes, pursuant to Sec 252(i) of the Communications Act, to adopt the terms of the Intercnnecon Agrement between Northwest Telephone, Inc. ("Nortwest Telephone") and Verion that was approved by the Idaho Public Utilities Commission (the "Commission") as an effectve agreement in the State of Idaho, as such agreement exists on the date hereof (including, without limitation, Amendment 1 thereto) after giving effect to operation of law (the "Terms"). I understand EPJ has a copy of the Terms. Please note the following with respec to EPJ's adoption of the Terms. 1. By EPJ's countersignature on this letter, EPJ hereby reresents and agres to the following seven points: A. EPJ adopts (and agre to be bound by) the Term and, in applyng the Terms, agres that EPJ shall be substied in place of Nortwest Telephone, Inc. and Nortwest Telephone in the Terms wherever approriate. EPJ 10 MFN 040507 B. For the avoidance of any doubt, adoption of the Terms does not include adoption of any provision impoing an unbundling obligation on Verizon (i) that no longer applies to Verion under the Report and Order and Order on Remand (FCC 03- 36) release by the Federal Communications Commission ("FCC") on August 21 , 2003 in CC Doet Nos. 01-338, 9698, 98-147 ("Triennial Review Order"), or the Order on Remand in WC Doet No. 04-313 and CC Doet No. 01-338, released by the FCC on February 4, 2005 (the "TRO Remand Order"), or (ii) that is otherwise not require by 47 U.S.C. Secon 251 (c)(3) or by 47 C.F.R. Part 51. C. Notice to EPJ and Verion as may be require or permitt under the Terms shall be provided as folow: To Eltopia Comunications, LLC: Attention: Will MacHugh Vice President 2304 Ringold Rd. Eltpia, WA 99330 Telephone Number: (50) 430-0411, Ext.: None Facsimile Number: Not Provided Internt Address: wmachugh(eeltopia.com To Verizon: Direcor-Negtiatins Verion Parter Solutions 600 Hidden Ridge HQEWMNOTICES Irvng, TX 75038 Facsimile Number: (972) 719-1519 Intemet Address: wmnotices(verizon.com with a copy to: Vice Preident and Deputy General Counsel Verizon Partner Solutons 1515 N. Court House Road Suite 50 Arlington, VA 22201 Facsimile: (703) 351-36 D. EPJ represents and warrnts that it is a certed provider of locl telecmmunications service in the State of Idaho, and that its adoption of the Terms wil cover services in the State of Idaho only. E. In the event an intercnnecton agrement between Verizon and EPJ is currentl in effect in the State of Idaho (the "OriginaIICA"), this adoptin shall be an amendment and retatement of the operating terms and conditons of the OriginallCA, and shall replace in their entirety the terms of the OriginallCA. This adoption is not intended to be, nor shall it be constred to create, a novation or accrd and satisfacton with respec to the Original ICA. Any outstanding payment obligations of the partes that were incurr but not fully perfrmed under the Oriinal ICA shall constitte payment obligatins of the partes under this adoption. EPJ 10 MFN 040507 2 F. Verizon's standard pricing scedule for interconnecton agreements in th State of Idaho (as such scedule may be amended fr time to time) (attched as Appendix A hereto) shall apply to EPJ's adoption of the Term. EPJ should note that the aforementioned pricing schedule may contain rates for certin services the terms for which are not included in the Terms or that are otherwse not part of this adoptin, and may include phrase or wording not identical to those utilized in the Terms. In an effrt to expedite th adoption process, Verion has not deleted such rates from the pricing scedule or attempte to customize the wording in the pricing schedule to match the Terms. However, the inclusion of such rates in no way obligates Verizon to provide the subjec servic and in no way waives Verion's rights, and the use of difrent wording or phrasing in the pricing scedule does not alter the obligations and rights set fort in the Terms. G. EPJ's adoption of the Terms shall become effctve on Ocober 8,207. Verion shall file this adoption letter with the Commission promptly upon receipt of an original of this letter countersigned by EPJ as to the points set out in Paragraph One hereof. The term and termination provisions of the Terms shall govern EPJ's adoption of the Terms. 2. As the Terms are being adopted by EPJ pursuant to Secion 252(i) of the Act, Verizon does not provide the Terms to you as eiter a voluntary or negotiated agrement. The filing and performance by Verizon of the Terms does not in any way costitute a waiver by Verion of any position as to the Terms or a portion theref, nor does it constitute a waiver by Verizon of all rights and remeies it may have to seek review of the Terms, or to seek review in any way of any provisions included in the Terms as a result of EPJ's adoption of the Terms. 3. Nothing herein shall be construed as or is intended to be a concession or admission by Verion that any provision in the Terms complies with the rights and duties imposed by the Act, the decisions of the FCC and the Commission, the decsions of the courts, or other law, and Verion expressly rerves its full right to assrt and pursue claims arising frm or related to the Terms. 4. Verizon resrves the right to deny EPJ's application of the Term, in whole or in part, at anytime: A. when the cots of providing the Terms to EPJ are greter than the cots of providing them to Northwest Telephone; B. if the provision of the Terms to EPJ is not tenically feasible; and/or C. to the extent that Verizon otherwse is not reuire to make the Terms available to EPJ under applicble law. 5. For the avoidance of any doubt, please note that adoption of the Terms wil not result in reciprol compensation payments for Internet trffc. Verion has always taken the position that reprol compensation was not due to be paid for Internet trffc under seon 251 (b)(5) ofthe Act. Verizon's position that reciprocal compensation is not to be paid for Internet trffc was confirmed by the FCC in the Order on Remand and Report and Order adopted on April 18, 2001 ("FCC Internet Order"), which held that Internet trffc constitutes "information acc" outside the scope of the recprol compensation EPJ 10 MFN 04507 3 obligations set forth in seion 251 (b)(5) of the Act. 1 Accrdingly, any compensation to be paid for Intemet traffc wil be handled pursuant to the terms of the FCC Internet Order, not pursuant to adoption of the Terms.2 Morever, in light of the FCC Internet Order, even if the Terms include provisions invoking an intercrrer compensation mechanism for Intemet traffc, any reasonable amount of time permitted for adopting such provisions has expired under the FCC's rules implementing secon 252(i) of the Act. 3 In fact, the FCC Internet Ordr made clear that carrers may not adopt provisions of an existing intercnnecon agrement to the extent that such provisions provide compensation for Internet trffc.4 6. Should EPJ attempt to apply the Terms in a manner that conflict wi Pararaphs Two through Paragraphs Five above, Verizon reserves its rights to sek appropriate legal andlor equitable relief. 7. In the event that a voluntary or involuntary petition has been or is in the future filed against EPJ under bankruptcy or insolvency laws, or any law relating to the relief of debtors, redjustment of indebtedness, debtor reanizatio or composition or extension of debt (any such proceing, an "Insolvency Proceing"), then: (A) all rights of Verion under such laws, including, witout limitation, all rights of Verizon under 11 U.S.C. § 366, shall be preserved, and EPJ's adoption of the Terms shall in no way impair such rights of Verizon; and (B) all rights of EPJ reulting frm EPJ's adoption of the Terms shall be subjec to and modified by any Stipulations and Orders entered in the Insolvency Procing, including, without limittion, any Stipulation or Order providing adequate assurance of payment to Verizon pursuant to 11 U.S.C. § 366. 1 Orr on Remnd and Reprt and Or. In th Mat of: Implmentatin of th Locl Competin Provins in th Telemunictis Ac of 199 and Intercrrer Copesa fo ISP-Bund Traff. CC Doet No. ~8 (rei' Apl 27, 2001) tFCC Remand Orer"~. remand. Worom, Inc. v. FCC, No. 01-1218 (O.C. Cir. May 3, 2002). Alugh the O.C. Circuit remanded th FCC Remand Onrto pennit th FCC to clari It reasoning. it left th orer in pla as soving feral la. se WorCo, Inc. v. FCC, No. 01-1218. slip op. at 5 (O.C. Cir. May 3.20). For your covenienc, an industr le distrbut by Ver expaining It plns to implent the FCC Intemat Onr can be view at Verion's Custome Supp Websit at URL ww.verjzon.comlWise (sele Verj Ea Custmer Suppo, Busine Resurc, Custmer Dometation, Resourc. Industr Leter, CLEC. May 21, 2001 Ordr on Remand).3 Se, e.g., 47 C.F.R se 51.80(c). 4 FCC Internt Onfr' 82. EPJ 10 MFN 040507 4 SIGNATURE PAGE Please arrnge for a duly authoried reprtatie of EPJ to sign this le in the space provided below and return it to Verion. Sincerely, VERIZON NORTHWEST INC. Gary Li . i Dire..Negotations Intercnnecn Service Policy & planning Reviewed and countersigned as to Paragraph 1: ELTOPIA COMMUNICATIONS, LLC w;. oj. ~\~.,6 Will MacHugh ' Vice President Attchrnent EPJ 10 MFN 047 5 APPENDIXA1 (IDAHO) V1.11 i. Rates and Charges for Transport and Terrnination of Traffc2 A. Reciprocal Compensation Traffc Termination Reciprocal Compensation Traffc End Offce Rate: $0.0050687 per minute of use. Reciprocal Compensation Traffc Tandem Rate: $0.0070138 per minute of use. B. The Tandem Transit Traffc Service Charge is $0.0018345 per minute of use. C. Entrance Facilty and Transport for Interconnection Charges: See Intrastate Special Access Tariff D. Exchange Access Service: Per Verizon interstate and/or Verizon intrastate access tariff This Appendix may contain rates for (and/or reference) services, facilties, arrangements and the like that Verizon does not have an obligation to provide under the Agreement (e.g., services, facilties, arrangements and the like that Verizon is not required to provide under Section 251 of the Act). Notwithstanding any such rates (and/or references) and, for the avoidance of any doubt, nothing in this Appendix shall be deemed to require Verizon to provide a service, facilty, arrangement or the like that the Agreement does not require Verizon to provide, or to provide a service, facilty, arrangement or the like upon rates, terms or conditions other than those that may be required by the Agreement. All rates and charges set forth in this Appendix shall apply until such time as they are replaced by new rates and/or charges as the Commission or the FCC may approve or allow to go into effect from time to time, subject however, to any stay or other order issued by any court of competent jurisdiction. In addition to any rates and charges set forth herein, Verizon, effective as of March 11, 2005, may, but shall not be required to, charge (and EPJ shall pay) any rates and charges that apply to a CLEC's embedded base of certain UNEs pursuant to the FCC's Order on Remand, Unbundled Access to Network Elements; Review of the Section 251 Unbundling Obligations of Incumbent Local Exchange Camers, WC Oocket No. 04-313, CC Docket No. 01-338 (FCC reI. Feb. 4, 2005) (the "TRRO"), the foregoing being without limitation of other rates and charges that may apply under subsequent FCC orders or otherwise. In addition, as set forth in Industry Notices, access tariff rates and/or other applicable non-UNE rates may apply for certain facilties and arrangements that are no longer available as unbundled network elements or combinations thereof. 2 All rates and charges specified herein are pertaining to the Interconnecion Attachment. EPJ 10 MFN appa-comp-id Idaho Comprehensive - 09/01/06 II. Services Available for Resale The avoided cost discount for all Resale services is 13.50%. Non.Recurring Charges (NRCs) for Resale Services Pre-ordering CLEC Account Establishrnent Per CLEC Customer Record Search Per Account $273.09 $ 11.69 Ordering and Provisioning Engineered Initial Service Order (ISO) - New Service Engineered Initial Service Order - As Specified Engineered Subsequent Service Order Non-Engineered Initial Service Order - New Service Non-Engineered Initial Service Order - Changeover Non-Engineered Initial Service Order - As Specified Non-Engineered Subsequent Service Order Central Offce Connect Outside Facilty Connect Manual Ordering Charge $311.98 $123.84 $ 59.61 $ 42.50 $ 21.62 $ 82.13 $ 19.55 $ 12.21 $ 68.30 $ 12.17 Product Specific NRCs, other than those for Pre-ordering, Ordering and Provisioning, and Custom Handling as listed in this Appendix, will be charged from the appropriate retail tariff. No discount applies to such NRCs. Custom Handling Service Order Expedite: Engineered Non-Engineered $ 35.48 $ 12.59 Coordinated Conversions: ISO Central Office Connection Outside Facilty Connection $ 17.76 $ 10.71 $ 9.59 Hot Coordinated Conversion First Hour: ISO Central Offce Connection Outside Facility Connection $ 30.55 $ 42.83 $ 38.34 Hot Coordinated Conversion per Additional Quarter Hour:ISO $ 6.40Central Offce Connection $ 10.71Outside Facilty Connection $ 9.59 EPJ ID MFN appa-comp-id 2 Idaho Comprehensive - 09/01/06 Application of NRCs Pre-ordering: CLEC Account Establishment is a one-time charge applied the first time that EPJ orders any service from this Agreement. Customer Record Search applies when EPJ requests a summary of the services currently subscribed to by the end-user. Ordering and Provisioning: Engineered Initial Service Order - New Service applies per Local Service Request (LSR) when engineering work activity is required to complete the order, e.g. digital loops. Non-Engineered Initial Service Order - New Service applies per LSR when no engineering work activity is required to complete the order, e.g. analog loops. Initial Service Order - As Specified (Engineered or Non-Engineered) applies only to Complex Services for services migrating from Verizon to EPJ. Cornplex Services are services that require a data gathering form or have special instructions. Non-Engineered Initial Service Order - Changeover applies only to Basic Services for services migrating from Verizon to EPJ. End-user service may remain the same or change. Central Offce Connect applies in addition to the ISO when physical installation is required at the central office. Outside Facilty Connect applies in addition to the ISO when incremental fieldwork is required. Manual Ordering Charge applies to orders that require Verizon to rnanually enter EPJ's order into Verizon's Secure Integrated Gateway System (SIGS), e.g. faxed orders and orders sent via physical or electronic maiL. Custom Handling (These NRCs are in addition to any Preordering or Ordering and Provisioning NRCs): Service Order Expedite (Engineered or Non-Engineered) applies if EPJ requests service prior to the standard due date intervals. Coordinated Conversion applies if EPJ requests notification and coordination of service cut over prior to the service becoming effective. Hot Coordinated Conversion First Hour applies if EPJ requests real-time coordination of a service cut-over that takes one hour or less. Hot Coordinated Conversion Per Additional Quarter Hour applies, in addition to the Hot Coordinated Conversion First Hour, for every 15-minute segment of real-time coordination of a service cut-over that takes more than one hour. EPJ 10 MFN appa-comp-id 3 Idaho Comprehensive - 09/01/06 II.Prices for Unbundled Network Elements3 Monthly Recurring Charges4 Local Loop 2 Wire Analog Loop (inclusive of NIO)$45.00 4 Wire Analog Loop (inclusive of NIO)$67.00 2 Wire Digital Loop (inclusive of NIO)$45.00 4 Wire Digital Loop (inclusive of NIO)$67.00 OS-1 Loop $160.31 OS-3 Loop $320.38 Supplemental Features: ISON-BRI Line Loop Extender $5.06 OS1 Clear Channel Capabilty $26.00 Sub-Loop 2-Wire Distribution $26.04 4-Wire Distribution $45.64 2-Wire Drop $5.57 4-Wire Drop $5.91 Inside Wire BFR Network Intenace Device (leased separately) Basic NIO:$1.80 Complex (12 x) NIO $1.90 Dedicated Transport Facilities Interoffce Dedicated Transport lOT OSO Transport Facilty per ALM $0.13 lOT OSO Transport Termination $12.90 lOT OS1 Transport Facilty per ALM $1.91 lOT OS1 Transport Termination $45.00 lOT OS3 Transport Facilty per ALM $25.15 lOT OS3 Transport Termination $234.14 Multiplexing (Dedicated Transport) OS1 to Voice Multiplexing $194.78 DS3 to OS 1 Multiplexing $550.00 OS1 Clear Channel Capabilty $26.00 3 For the avoidance of any doubt, in addition to any rates and charges set forth herein, Verizon, effectve as of March 11, 2005, may, but shall not be required to, charge (and EPJ shall pay) any rates and charges that apply to a CLEC's embedded base of certain UNEs pursuant to the TRRO, the foregoing being without limitation of other rates and ch¡:rges that may apply under subsequent FCC orders or otherwise; in addition, as set forth in Industry Notices, access tariff rates and/or other applicable non-UNE rates may apply for certain facilties and arrangements that are no longer available as unbundled network elements or combinations thereof. In compliance with the FCC Order approving the Merger of GTE Corporation and Bell Atlantic (CC Oocket No. 98-1840), Verizon wil offer limited duration promotional discounts on resold residential exchange access lines. The terms and conditions on which these promotional discounts are being made available can be found on Verizon's web site, at http://www_gte.com/wise for former GTE service areas and http://ww.bell-atLcom/wholesale/html/resources.htm fOr former Bell Atlantic service areas. EPJ 10 MFN appa-comp-id 4 Idaho Comprehensive - 09/01/06 Unbundled Dark Fiber Unbundled Dark Fiber Loops Dark Fiber Loop Unbundled Dark Fiber Dedicated Transport Dark Fiber IDT -Facilty Dark Fiber lOT -Termination Intermediate Offce Cross Connect EPJ 10 MFN appa-eomp-id 5 $67.13 $ $ 24.80 6.34 TSD Idaho Comprehensive - 09/01/06 EEL Pricing MRCs. The MRCs for an EEL wil generally be equal to the applicable MRCs for UNEs and Multiplexing that comprise an EEL arrangement (e.g. UNE Loop, lOT, Multiplexing, & Clear Channel Capability). EPJ 10 MFN appa-comp-id 6 Idaho Comprehensive - 09/01/06 Line Splitting (also referred to as "Loop Sharing,,)5 6 A. Unbundled Local Loops As Applicable per this Appendix A for UNE Local 2-Wire Digital (DSL. qualified) Loops Monthly Recurring Charges and Non-Recurring Charges as amended from time to time. Includes, without limitation, Recurring 2-Wire Digital (DSL qualified) Loop Charges, Service Order Charge (per order), Service Connection Charge* (per loop), Service Connection- Other Charge* (per loop), and Provisioning charges. Also includes, without limitation, if applicable, Field Dispatch, TC Not Ready, Loop Qualification, Engineering Query, Engineering Work Order, Trouble Dispatch, Misdirects, Dispatch In, Out, and Dispatch Expedites, Installation Dispatch, Manual Intervention, Expedited, Digital Designed Recurring and Non-Recurring Charges B. Other Charges i. Regrade $9.59 NRC ii. *Service Connection *Service Connection/Other A second Service Connection NRC and Service Connection/ Other NRC applies on New Loop Sharing Arrangernents involving the connection of both voice and data connections. ii. Disconnect A disconnect NRC applies, as applicable, on total Loop Sharing disconnects. iv. Line and Station Transfers /Pair Swaps A LST/Pair Swap NRC applies, as applicable, on LST activity perforrned on New Loop Sharing Arrangements. C. Collocation Rates As Applicable per this Appendix A. Collocation Rates (including, without limitation, Splitter Connection and Installation Rates) Rates for the individual line splitting components are contained in existing terms for Unbundled Network Elements and Collocation. This Pricing Attachment incorporates by reference the rates set forth in the Agreement for the services and charges referenced herein. In the event this Pricing Attachment refers to a service that is not available under the Agreement, the Agreement shall control. Nothing in this Appendix A shall be deemed to require Verizon to provide a service that the Agreement does not require Verizon to provide. EPJ 10 MFN appa-comp-id 7 Idaho Comprehensive - 09/01/06 NON-RECURRING CHARGES - LOOP AND NID Pre~ordering CLEC Account Establishrnent Per CLEC Customer Record Search $ $ 166.32 4.21. Ordering and Provisioning Loop: Engineered Initial Service Order (ISO) Non-Engineered ISO Central Office Connection Outside Facility Connection (See Note 1) $294.07 $49.31 $12.21 $68.30 $33.38 $42.69 NID: ISO Outside Facility Connection Custorn Handling Manual Ordering Charge $12.17 $25.80 $3.36 $17.76 $10.71 $9.59 $30.55 $42.83 $38.34 $6.40 $10.71 $9.59 Service Order Expedite: Engineered Loop LSRs All Other LSRs Coordinated Conversions: ISO Central Office Connection Outside Facilty Connection Hot Coordinated Conversion First Hour: ISO Central Offce Connection Outside Facilty Connection Hot Coordinated Conversion per Additional Quarter Hour: ISO Central Offce Connection Outside Facilty Connection Note 1: The Outside Loop Facilty Charge wil apply when fieldwork is required for establishment of a new unbundled loop service. EPJ 10 MFN appa-comp-id 8 Idaho Comprehensive - 09/01/06 NON-RECURRING CHARGES - OTHER UNEs Exchange - FDI Distribution Interconnection - Initial Exchange - FDI Distribution Interconnection - Subsequent Exchange - Serving Terminal Interconnection -Initial Exchange - Serving Terrninallnterconnection - Subsequent $ 36.32 $ 15.01 $36.32 $ 15.01 $ 26.88 $ 11.83 $ 26.88 $ 11.83 $ 61.90 $ 16.99 $ 28.99 $ 13.23 $ 30.36 $ 7.22 $ 15.51 $ 6.41 Advanced - Service Inquiry Charge Advanced - Interoffce Dedicated Transport - Initial Advanced - Unbundled Loop - Initial Intermediate Offce Cross Connect Dark fiber Record Review (with reservations) Dark Fiber Optional Engineering Services $405.87 $ 64.80 $ 64.80 TBD TBD TBD $405.65 $ 64.57 $ 64.57 N/A $267.28 $261.86 N/A $224.68 $220.43 Advanced - Basic (2-wire and 4-wire) - Initial Advanced - Basic (2-wire and 4-wire) - Subsequent DS1/DS3 - Initial OS 1/DS3 - Subsequent DS3 to DS1 Multiplexer DS1 to DSO Multiplexer $ 88.39 $ 38.02 $ 97.94 $ 38.02 N/A N/A $ 56.13 $ 21.89 $ 65.68 $ 21.89 N/A N/A $12.21 $ 12.21 $12.21 $ 12.21 $450.00 $800.00 N/A N/A N/A N/A N/A N/A Advanced - Basic (2-wire and 4-wire) Changeover (As Is)$161.87 $99.77 $41.64 N/A Advanced - Basic (2-wire and 4-wire) Changeover (As Is)-$7.52 $4.56 $41.64 N/A Additional MOG (Mass Order Generator) Only Advanced - Complex (DS1 and above) Changeover (As Is)$179.37 $117.27 $41.64 N/A Advanced - Complex (DS1 and above) Changeover (As Is)-$7.52 $4.56 $41.64 N/A Additional MOG (Mass Order Generator) Only EPJ ID MFN appa-comp-id 9 Idaho Comprehensive - 09/01/06 Loop Conditioning - Bridged Tap Loop Conditioning - Load Coils Loop Conditioning - Load Coils I Bridged Tap N/A N/A N/A N/A N/A N/A $318.71 $249.91 $568.62 $ 34.88 $ $ 34.88 Advanced - Basic(2-wire and 4-wire) - Initial Advanced - Basic (2-wire and 4-wire)- Subsequent Advanced - Complex (DS1 and above) -Initial Advanced - Complex (DS1 and above) - Subsequent $ 95.49 $ 45.12 $105.04 $ 45.12 $ 63.01 $ 28.77 $ 72.56 $ 28.77 $428.58 $ 58.20 $584.49 $ 86.80 N/A N/A N/A N/A Exchange Products Advanced Products $ 3.36 $ 25.80 $ 3.36 $ 25.80 N/A N/A N/A N/A Customer Record Search (per account) CLEC Account Establishment (per CLEC) Design Change Charge - EELs and Transport $ 4.21 $166.32 $40.96 $ $166.32 $40.96 N/A N/A N/A These charges are interim and subject to retroactive true back to the Effective Oate of this Agreement. A Line and Station Transfer (LST) Charge appfies when Verizon arranges or rearranges an individual circuit at a terminal or cross-connect box to free up a pair or suitable facilty at the required service location; examples include an arrangement of copper to OLC, the rearrangement of IOLC to copper and the rearrangement of 10LC to UOLC. 8 EPJ 10 MFN appa-comp-id 10 N/A N/A N/A Idaho Comprehensive - 09/01/06 Engineering Query 10 N/A N/A $183.99 N/A Engineering Work Order11 N/A N/A $ 94.40 N/A Expedite Engineering Query10 12 N/A N/A $ 41.67 N/A Expedite Engineering Work Order11 12 N/A N/A $ 27.94 N/A Clear Defective Pair N/A N/A $ 272.35 N/A Reassignment of Non-Working Cable Pair N/A N/A $ 272.35 N/A Binder Group Rearrangement N/A N/A $ 529.77 N/A Repeater - Installation N/A N/A $1,597.10 N/A Apparatus Case - Installation N/A N/A $2,992.81 N/A Range Extenders - DSO Installation N/A N/A $ 809.72 N/A Range Extenders - DS1 Installation N/A N/A $ 809.72 N/A Channel Unit to Universal/Cotted DLC System (existing)N/A N/A $170.30 N/A Serving Terminal-Installation/Upgrade N/A N/A Time and N/A Material Activate Dead Copper Pair N/A N/A $199.90 N/A Multiplexer - 1/0 - Installation N/A N/A $12,211.41 N/A Multiplexer - 1/0 - Reconfiguration N/A N/A $170.30 N/A Multiplexer - 3/1 - Installation N/A N/A $26,981.19 N/A Multiplexer - 3/1 - Reconfiguration N/A N/A $382.34 N/A Multiplexer - Other - Installation N/A N/A Time and N/A Material Move Drop N/A N/A $109.28 N/A Cross-Connection - Existing Fiber Facilty N/A N/A $346.93 N/A Line Card - Installation N/A N/A $314.63 N/A Copper Rearrangement N/A N/A $482.90 N/A Central Offce Terminal-Installation N/A N/A $35,307.87 N/A IDLC Only Condition N/A N/A $36,847.28 N/A Other Required Modifications N/A N/A Time and N/A Material N/A N/A N/A OTHER N/A N/A N/A Commingled Arrangements - per circuit NRC N/A N/A $ 50.00 N/A Conversion - Service Order N/A N/A $ 19.33 N/A Conversion - Installation per circuit N/A N/A $7.27 N/A Circuit Retag - per circuit N/A N/A $ 59.43 N/A N/A N/A N/A Dark Fiber - Dark Fiber Routine Network Modifications N/A N/A Time and N/A Material This Appendix may contain rates and charges for (and/or reference) services, facilties, arrangements and the like that Verizon does not have an obligation to provide under the Agreement (e.g., services, facilties, arrangements and the like for which an unbundling requirement does not exist under 47 U.S.C. Section 251 (c)(3)). Notwithstanding anysuch rates and/or charges (and/or references) and, for the avoidance of any doubt, nothing in this Appendix shall be deemed to require Verizon to provide a service, facility, arrangement or the like that the Agreement does not require Verizon to provide, or to provide a service, facilty, arrangement or the like upon rates, terms or conditions other than those that may be required by the Agreement. Engineering Query Charges apply in addition to charges for actual network modification and Engineering Work Order charges where applicable. 10 Engineering Work Order Charges apply in addition to charges for actual network modifcation and Engineering Query charges where applicable. 11 12 Expedite Charges apply in additon to other listed rates. EPJ 10 MFN appa-comp-id 11 Idaho Comprehensive - 09/01/06 Application of NRCs Preordering: CLEC Account Establishment is a one-time charge applied the first time that EPJ orders any service from this Agreernent. Customer Record Search applies when EPJ requests a summary of the services currently subscribed to by the end-user. Ordering and Provisioning: Initial Service Order (iSO) applies to each Local Service Request (LSR) and Access Service Request (ASR) for new service. Charge is Manual (e.g. for a faxed order) or Semi-Mechanized (e.g. for an electronically transmitted order) based upon the method of submission used by the CLEC. Subsequent Service Order applies to each LSRlASR for modifications to an existing service. Charge is Manual or Semi-Mechanized based upon the method of submission used by the CLEC. Advanced ISO applies per LSRlASR when engineering work activity is required to complete the order. Exchange iSO applies per LSRlASR when no engineering work activity is required to complete the order. Provisioning - Initial Unit applies per ISO for the first unit installed. The Additional Unit applies for each additional unit installed on the same ISO. Basic Provisioning applies to services that can be provisioned using standard network components maintained in inventory without specialized instructions for switch translations, routing, and service arrangements. Complex Provisioning applies to services that require special instruction for the provisioning of the service to meet the customer's needs. Examples of services and their Ordering/Provisioning category that applies: Exchange-Basic: 2-Wire Analog, 4-Wire Analog, Standard Sub-Loop Distribution, Drop and NID. Exchange-Complex: Non-loaded Sub-Loop Distribution and Loop Conditioning. Advanced-Basic: 2-Wire Digital Loop, 4-Wire Digital Loop Advanced-Complex: DS 1 Loop, DS3 Loop, Dark Fiber and EELs. Conditioning applies in addition to the ISO, for each Loop or Sub-Loop UNE for the installation and grooming of Conditioning requests. DS1 Clear Channel Capability applies in addition to the ISO, per DS1 for the installation and grooming of DS 1 Clear Channel Capability requests. Changeover Charge applies to EEL orders when an existing retail, resale, or special access service is already in place. Service Inquiry - Dark Fiber applies per service inquiry when a CLEC requests Verizon to determine the availabilty of dark fiber on a specific route. EPJ 10 MFN appa-comp-id 12 Idaho Comprehensive - 09/01/06 EELs - The NRCs that generally apply to an EEL arrangement are applicable ordering & provisioning charges for EEL Loops, IDT, Multiplexing and Clear Channel Capabilty Custom Handling (These NRCs are in addition to any Preordering or Ordering and Provisioning NRCs): Service Order Expedite applies if EPJ requests service prior to the standard due date intervals and the expedite request can be met by Verizon. Coordinated Conversion applies if EPJ requests notification and coordination of service cut-over prior to the service becoming effective. Hot Coordinated Conversion First Hour applies if EPJ requests real-time coordination of a service cut-over that takes one hour or less. Hot Coordinated Conversion Per Additional Quarter Hour applies, in addition to the Hot Coordinated Conversion First Hour, for every 15-minute segment of real-time coordination of a service cut-over that takes more than one hour. Design Change Charge applies to EELs & Transport orders for design changes requested by the CLEC. EPJ 10 MFN appa-comp-id 13 Idaho Comprehensive - 09/01/06 IV. Rates and Charges for 911 See State Tariff. EPJ 10 MFN appa-comp-id 14 Idaho Comprehensive - 09/01/06 V. Collocation Rates Non-Recurring Prices Engineering Costs Engineering/Major Augment Fee Minor Augment Fee Access Card Administration (New/Replacement) Cage Grounding Bar DC Power per occurrence per occurrence per card per bar Engineering Cable PullfTermination Ground Wire per project per cable per wire Overhead Superstructure per project Facilty Cable or Fiber Optic Patchcord PuiirrerminationEngineering per project Facilty Cable Pull per cable run Fiber Optic Patchcord Pull per cable runDSO Cable Termination per 100 pairDS1 Cable Termination per 28 pair DS3 Coaxial Cable Termination (Preconnectorized) per termination DS3 Coaxial Cable Termination (Unconnectorized) per termination Fiber Optic Patchcord Termination per termination Fiber Cable Pull Engineering Place Innerduct Pull Cable Cable Fire Retardant Fiber Cable Splice Engineering Splice Cable BITS Timing per project per lin ft per lin ft per occurrence per project per fiber per project NRC NRC NRC NRC NRC NRC NRC NRC NRC NRC NRC NRC NRC NRC NRC NRC NRC NRC NRC NRC NRC NRC NRC $1,129.00 200.00 22.00 1,437.55 75.43 1341.62 18.12 2,440.00 76.00 211.00 207.20 5.00 2.00 2.00 11.00 1.12 607.00 2.00 1.00 42.00 31.00 70.00 307.00 Monthly Recurring Prices Caged Floor Space including Shared Access Area per sq ft MRC 5.00 DC Power per load amp MRC 14.79 Building Modification per request MRC 201.00 Environmental Conditioning per load amp MRC 2.28 Facilty Termination DSO per 100 pr MRC 4.00 DS1 per 28 pr MRC 16.00 DS3 per DS3 MRC 11.00 Fiber Optic Patchcord per connector MRC 1.01 Cable Rack Space. Metallc per cable run MRC 2.00 Cable Rack Space. Fiber per innerduct ft MRC 0.02 Fiber Optic Patchcord Duct Space per cable run MRC 0.56 Manhole Space - Fiber per project MRC 6.00 EPJ 10 MFN appa-comp-id 15 Idaho Comprehensive - 09/01/06 Subduct Space. Fiber per lin ft MRC 0.04 Cable Vault Splice Fiber Cable. 48 Fiber Material per splice MRC 10.00 Fiber Cable. 96 Fiber Material per splice MRC 27.00 BITS Timing per occurrence MRC 11.00 EPJ 10 MFN appa-comp-id 16 Idaho Comprehensive - 09/01/06 Non-Recurring Prices Engineering Costs Engineering/Major Augment Fee per occurrence NRC $1,129.00 Minor Augment Fee per occurrence NRC 200.00 Access Card Administration (New/Replacement)per card NRC 22.00 DC Power Engineering per project NRC 75.43 Cable PulllTermination per cable NRC 1341.62 Ground Wire per wire NRC 18.12 Overhead Superstructure per project NRC 2,440.00 Facilty Cable or Fiber Optic Patchcord PulllTermination Engineering per project NRC 76.00 Facilty Pull per cable run NRC 211.00 Fiber Optic Patchcord Pull per cable run NRC 207.20 DSO Cable Termination per 100 pair NRC 5.00 DS1 Cable Termination per 28 pair NRC 2.00 DS3 Coaxial Cable Termination per termination NRC 2.00 (Preconnectorized) DS3 Coaxial Cable Termination per termination NRC 11.00 (Unconnectorized) Fiber OpticPatchcord Termination per termination NRC 1.12 Fiber Cable Pull Engineering per project NRC 607.00 Place Innerduct per lin ft NRC 2.00 Pull Cable per lin ft NRC 1.00 Cable Fire Retardant per occurrence NRC 42.00 Fiber Cable Splice Engineering per project NRC 31.00 Splice Cable per fiber NRC 70.00 BITS Tirning per project NRC 307.00 Monthly Recurring Prices Relay Rack Floor Space per lin ft MRC 20.00 DC Power per load amp MRC 14.79 Building Modification per request MRC 201.00 Environmental Conditioning per load amp MRC 2.28 Facilty Termination DSO per 100 pr MRC 4.00 DS1 per 28 pr MRC 16.00 DS3 per DS3 MRC 11.00 Fiber Optic Patch cord per connector MRC 1.01 Cable Rack Space - Metallc per cable run MRC 2.00 Cable Rack Space - Fibér per innerduct ft MRC 0.02 Fiber Optic Patchcord Duct Space per cable run MRC 0.56 Manhole Space - Fiber per project MRC 6.00 Subduct Space - Fiber per lin ft MRC 0.04 EPJ 10 MFN appa-comp-id 17 Idaho Comprehensive - 09/01/06 Elements Cable Vault Splice Fiber Cable - 48 Fiber Material Fiber Cable. 96 Fiber Material BITS Tirning EPJ 10 MFN appa-comp-id per splice MRC 10.00 per splice MRC 27.00 11.00per occurrence MRC 18 Idaho Comprehensive - 09/01/06 Non.Recurring Prices Engineering Fee per occurrence NRC $958.00 Facilty Pull 1 lin ft NRC 2.00 Facilty Termination DSO Cable Connectorized per 100 pr NRC 5.00 Unconnectorized per 100 pr NRC 42.00 DS1 Cable Connectorized per 28 pr NRC 2.00 Unconnectorized per 28 pr NRC 32.00 DS3 (Coaxial) Cable Connectorized per DS3 NRC 2.00 Unconnectorized per DS3 NRC 11.00 Fiber per fiber term NRC 70.00 Monthly Recurring Prices Facilty Terrnination DSO per 100 pr MRC 4.00 DS1 per 28 pr MRC 16.00 DS3 per coaxial MRC 11.00 Cable Vault Space Fiber Cable. 48 fiber Space Utilzation per subduct MRC 1.00 Fiber Cable. 96 fiber Space Utilization per subduct MRC 1.00 Cable Rack Space Metallc DSO 1 lin ft MRC 0.01 Metallc DS1 1 lin ft MRC 0.01 Fiber per innerduct ft MRC 0.02 Coaxial 1 lin ft MRC 0.01 EPJ 10 MFN appa-comp-id 19 Idaho Comprehensive - 09/01/06 Non-Recurring Prices Engineering Costs Engineering/Major Augment Fee Equipment Installation Softare Upgrades Card Installation DC Power per occurrence per quarter rack per base unit per card NRC NRC NRC NRC 557.81 3,474.25 96.08 222.52 Engineering Cable PulllTermination Ground Wire per project per cable per wire NRC NRC NRC 75.43 1341.62 18.12 Facilty Cable or Fiber Optic Patchcord PulllTermination Engineering per project NRC 76.00 Facilty Cable Pull per cable run NRC 211.00 Fiber Optic Patchcord Pull per cable run NRC 207.20 DSO Cable Termination per 100 pair NRC 5.00 DS1 Cable Termination per 28 pair NRC 2.00 DS3 Coaxial Cable Termination per termination NRC 2.00 (Preconnectorized) DS3 Coaxial Cable Termination per termination NRC 11.00 (Unconnectorized) Fiber Optic Patch cord Termination per terrnination NRC 1.12 Fiber Cable Pull Engineering per project NRC 607.00 Place Innerduct per lin ft NRC 2.00 Pull Cable per lin ft NRC 1.00 Cable Fire Retardant per occurrence NRC 42.00 Fiber Cable Splice Engineering per project NRC 31.00 Splice Cable per fiber NRC 70.00 BITS Timing per project NRC 307.00 Monthly Recurring Prices Equipment Maintenance per quarter rack MRC 82.15 DC Power per load amp MRC 14.79 Environmental Conditioning per load amp MRC 2.28 Facilty Termination DSO per 100 pr MRC 4.00 DS1 per 28 pr MRC 16.00 DS3 per DS3 MRC 11.00 Fiber Optic Patch cord per connector MRC 1.01 Cable Rack Space - Metallc per cable run MRC 2.00 Cable Rack Space - Fiber per innerduct ft MRC 0.02 Fiber Optic Patchcord Duct Space per cable run MRC 0.56 Manhole Space - Fiber per project MRC 6.00 Subduct Space - Fiber per lin ft MRC 0.04 Cable Vault Splice EPJ ID MFN appa-comp-id 20 Idaho Comprehensive - 09/01/06 Elements Fiber Cable. 48 Fiber Material per splice MRC 10.00 Fiber Cable. 96 Fiber Material per splice MRC MRC 27.00 BITS Timing per occurrence 11.00 EPJ ID MFN appa-comp-id 21 Idaho Comprehensive - 09/01/06 Elements Non-Recurring Prices Augrnent Fee per occurrence NRC 998.92 Facilty Pull Engineering per project NRC 76.00 Labor per linear ft NRC 1.12 Building Penetration for Microwave Cable per occurrence NRC ICB Special Work for Microwave per occurrence NRC ICB Monthly Recurring Prices Rooftop Space per sq ft MRC 4.65 EPJ 10 MFN appa-comp-id 22 Idaho Comprehensive - 09/01/06 Non-Recurring Prices DSO Service Order - Semi-Mechanized Service Order - Manual Service Connection - CO Wiring Service Connection - Provisioning per order per order per jumper per order DS1/DS3/Dark Fiber Service Order - Semi-Mechanized Service Order - Manual Service Connection - CO Wiring Service Connection - Provisioning per order per order per jumper per order Lit Fiber EPJ 10 MFN appa-comp-id 23 NRC NRC NRC NRC 21.89 38.02 7.20 64.95 NRC NRC NRC NRC 21.89 38.02 17.59 78.57 ICB Idaho Comprehensive - 09/01/06 EPJ 10 MFN appa-comp-id 24 Idaho Comprehensive - 09/01/06 DESCRIPTION AND APPLICATION OF RATE ELEMENTS Non-Recurring Charges The following are non-recurring charges (one-time charges) that apply for specific work activity: Engineering/Major Augment Fee. The Engineering/Major Augment Fee applies for each initial Caged, Cageless, Virtual, or Microwave collocation request and major augment requests for existing Caged, Cageless, and Virtual collocation arrangements. This charge recovers the costs of the initial walkthrough to determine if there is suffcient collocation space, the best location for the collocation area, what building modifications are necessary to provide collocation, and if suffcient DC power facilties exist in the premises to accommodate collocation. This fee also includes the total time for the Building Services Engineer and the time for the Outside Plant and Central Offce Engineers to attend status meetings. Engineering/Major Augment Fee (Microwave Only). The Engineering/Major Augment Fee for Microwave Collocation applies when an existing Caged and Cageless collocation arrangement is augmented with newly installed microwave antennae and other exterior facilties. This charge recovers the costs of the initial walkthrough to determine if there is suffcient space, the best location for the microwave antennae and other exterior facilties, what building modifications are necessary, if any, and if suffcient support facilities exist in the premises to accommodate the microwave antennae and other exterior facilties. This fee also includes the total time for the Building Services Engineer to coordinate the entire project. Mirior Augment Fee. The Minor Augment Fee applies for each minor augment request of an Existing Caged, Cageless, Virtual, or Microwave collocation arrangement that does not require additional AC or DC power systems, HVAC system upgrades, or additional cage space. Minor augments are those requests that require the Company to perform a service or function on behalf of the CLEC including, but not limited to: installrition of Virtual equipment cards or softare upgrades, removal of Virtual equipment, requests to pull cable from exterior microwave facilities, and requests to terminate DSO, DS1 and DS3 cables. Access Card Administration. The Access Card Administration rate covers activities associated with the issuance and management of premises access cards. The rate is applied on a per card basis. Cage Grounding Bar. The Cage Grounding Bar rate recovers the material and labor costs to provision a ground bar, including necessary ground wire, in the collocator's cage. BITS Timing. The non-recurring charge for BITS Timing includes engineering, materials, and labor costs to wire a BITS port to the CLEC's equipment. If requested, it is applied on a per project basis. Overhead Superstructure. The Overhead Superstructure charge is applied for each initial caged and cageless collocation application. The Overhead Superstructure charge is designed to recover Verizon's engineering, material, and installation costs for extending dedicated overhead superstructure. Facilty Cable or Fiber Optic Patchcord Pull/Termination-Engineering. The Facility Cable or Fiber Optic Patchcord Pull/Termination-Engineering charge is applied per project to recover the engineering costs of pullng and terminating the interconnection wire (cable or fiber patchcord) from the collocation cage or relay rack to the Main Distribution Frame block, DSX panel, or fiber distribution paneL. The charge would also apply per project to recover the engineering costs of pullng transmission cable from microwave antennae facilties on the rooftop to the collocation cage or relay rack. EPJ ID MFN appa-comp-id 25 Idaho Comprehensive - 09/01/06 Facility PulL. The Facility Pull charge is applied per cable run and recovers the labor cost of pullng metallc cable or fiber optic patchcord from the collocation cage or relay rack to the Main Distribution Frame block, DSX panel, or fiber distribution paneL. Cable Termination. The Cable Termination charge is applied per cable or fiber optic patchcord terminated and is designed to recover the labor cost of terminating or disconnecting transmission cable or fiber optic patchcord from the collocation cage or relay rack to the Main Distribution Frame block, DSX panel, or fiber distribution paneL. Fiber Cable Pull-Engineering. The Fiber Cable Pull-Engineering charge is applied per project to cover the engineering costs for pullng the CLEC's fiber cable, when necessary, into Verizon's central office. Fiber Cable Pull-Place Innerduct The Fiber Cable Pull-Place Innerductcharge is applied per linear foot to cover the cost of placing innerduct. Innerduct is the split plastic duct placed from the cable vault to the CLEC's equipment area through which the CLEC's fiber cable is pulled. Fiber Cable Pull-Labor. This charge is applied per linear foot and covers the labor costs of pullng the CLEC's fiber cable into Verizon's central offce. Fiber Cable Pull-Fire Retardant. This charge is associated with the fillng of space around cables extending through walls and between floors with a non-flammable material to prevent fire from spreading from one room or floor to another. Fiber Optic Patchcord Termination. The Fiber Optic Patchcord Termination is applied per fiber cable termination and recovers the labor cost to terminate the fiber optic patchcord cable. Fiber Splice-Engineering. The Fiber Splice-Engineering charge is applied per project and covers the engineering costs for fiber cable splicing projects. Fiber Splice. The Fiber Splice charge is applied per fiber cable spliced and recovers the labor cost associated with the splicing. DC Power. Non-recurring charges for DC Power are applied for each caged, cageless, and virtual collocation application and major DC Power augments to existing arrangements. These charges recover Verizon's engineering and installation costs for pullng and terminating DC power cables to the collocation area. For initial applications, each DC Power feed wil require two (2) cables. Cable Material Charges. The CLEC has the option of providing its own cable or Verizon may, at the CLEC's request, provide the necessary transmission and power cables for caged, cageless, and virtual collocation arrangements. If Verizon provides these cables, the applicable Cable Material Charge wil be charged. Adjacent Engineering Fee. The Adjacent Engineering Fee provides for the initial activities of the Central Offce Equipment Engineer, Land & Building Engineer and the Outside Plant Engineer associated with determining the capabilties of providing Adjacent On-Site collocation. The labor charges are for an on-site visit, preliminary investigation of the manhole/conduit systems, wire center and propert, and contacting other agencies that could impact the provisioning of adjacent collocation. Adjacent Facility Pull-Labor. This charge covers the labor of running the interconnection wire (cable) from the main distribution frame connector to a termination block or DSX paneL. Adjacent Fiber Cable Termination. This charge covers the labor of terminating fiber cable for adjacent collocation to the main distribution frame block or DSX paneL. Collocation Space Report. When requested by a CLEC, Verizon wil submit a report that indicates Verizon's available collocation space in a particular premise. The report wil be issued EPJ 10 MFN appa-comp-id 26 Idaho Comprehensive- 09/01/06 within ten calendar days of the request. The report wil specify the amount of collocation space available at each requested premise, the nurnber of collocators, and any modifications in the use of the space since the last report. The report wil also include measures that Verizon is taking to make additional space available for collocation. Miscellaneous Services Labor. Additional labor, if required, by Verizon to complete a collocation request, disconnect collocation power cables, remove collocation equipments, or perform inventory services for CLECs. Facilty Pull (Microwave Only). The Facilty Pull charge is applied per linear foot and recovers the labor cost of pullng transmission cable from the microwave antennae and other exterior facilties on the rooftop to the transmission equipment in the collocation cage or relay rack. Building Penetration for Microwave Cable. The reasonable costs to penetrate buildings for microwave cable to connect microwave antennae facilties and other exterior facilities to the transmission equipment in the collocation cage or relay rack wil be determined and applied on an individual case basis, where technically feasible, as determined by the initial and subsequent Engineering surveys. Special Work for Microwave. The costs incurred by Verizon for installation of CLEC's microwave antennae and other exterior facilties that are not recovered via other microwave rate elements wil be determined and applied on an individual case basis. Virtual Equipment Installation. The Virtual Equipment Installation charge is applied on a per quarter rack (or quarter bay) basis and recovers the costs incurred by Verizon for engineering and installation of the virtual collocation equipment. This charge would apply to the installation of powered equipment including, but not limited to, ATM, DSLAM, frame relay, routers, OC3, OC12, OC24, 0C48, and NGDLC. This charge does not apply for the installation of splitters. Virtual Softare Upgrade. The Virtual Softare Upgrade charge is applied per base unit when Verizon, upon CLEC request, installs softare to upgrade equipment for an existing Virtual Collocation arrangement. Virtual Card Installation. The Virtual Card Installation charge is applied per card when Verizon, upon CLEC request, installs additional cards for an existing Virtual Collocation arrngernent. Dedicated Transit Service (DTS) Service Order Charge. Applied per DTS order to the requesting CLEC for recovery of DTS order placement and issuance costs. The manual charge applies when the semi-mechanized ordering interface is not used. Dedicated Transit Service (DTS) - Service Connection CO Wiring. Applied per DTS circuit to the requesting CLEC for recovery of DTS jumper material, wiring, service turn-up for DSO, DS1, DS3, and dark fiber circuits. Dedicated Transit Service (DTS) - Service Connection PrOVisioning. Applied per DTSorder to the request CLEC for recovery of circuit design and labor costs associated with the provisioning of DSO, DS1, DS3, and dark fiber circuits for DTS. EPJ 10 MFN appa-comp-id 27 Idaho Comprehensive - 09/01/06 Monthly Recurring Charges The following are monthly charges. Monthly charges apply each rnonth or fracton thereof that Collocation Service is provided. Caged Floor Space. Caged Floor Space is the cost per square foot to provide environrnentally conditioned caged floor space to the CLEC. Environmentally conditioned space is that which has proper humidification and temperature controls to house telecommunications equipment. The cost includes only that which relates directly to the land and building space itself. Relay Rack Floor Space. The Relay Rack Floor Space charge provides for the environmentally conditioned floor space that a relay rack occupies based on linear feet. The standardized relay rack floor space depth is based on half the aisle area in front and back of the rack, and the depth of the equipment that wil be placed within the rack. Cable Subduct Space-Manhole. This charge applies per project per month and covers the cost of the space that the outside plant fiber occupies within the manhole. Cable Subduct Space. The Subduct Space charge covers the cost of the subduct space that the outside plant fiber occupies and applies on a per linear foot basis. Fiber Cable Vault Splice. The Fiber Cable Vault Splice charge applies per splice and covers the space and rnaterial cost associated with the CLEC's fiber cable splice within Verizon's cable vault. Cable Rack Space-Metallc. The Cable Space-Metallc charge is applied for each DSO, DS1 and DS3 cable run. The charge is designed to recover the space utilzation cost that the CLEC's metallc and coaxial cable occupies within Verizon. Cable Rack Space-Fiber. The Cable Rack Space-Fiber charge recovers the space utilzation cost that the CLEC's fiber cable occupies within Verizon's cable rack system. Fiber Optic Patchcord Duct Space. The Fiber Optic Duct Space rate element is applied per cable run and recovers the cost for the central office duct space occupied by the fiber optic patchcord cable. DC Power. The DC Power monthly charge is applied on a per load amp basis with a 10 arnp minimum for each caged, cageless, and virtual collocation arrangement. This charge is designed to recover the monthly facility and utility expense to power the collocation equipment. Facilty Termination. This charge is applied per cable terminated. This charge is designed to recover the labor and material costs of the applicable main distribution frame 100 pair circuit block, DSX facilty termination panel, or fiber distribution paneL. BITS Timing. The BITS Timing monthly charge is designed to recover equipment and installation cost to provide synchronized timing for electronic communications equipment. This rate is based on a per port cost. Building Modification. The Building Modification monthly charge is applied to each caged and cageless arrangement and is associated with provisioning the following items in Verizon's premises: security, dust partition, ventilation ducts, demolition/site work, lighting, outlets, and grounding equipment. Environmental Conditioning. The Environmental Conditioning charge is applied to each caged, cageless, and virtual arrangement on a per load amp increment (10 amp minimum) based on the CLEC's DC Power requirements. This charge is associated with the provisioning of heating, ventilation, and air conditioning systems for the CLEC's equipment in Verizon's premises. EPJ 10 MFN appa-comp-id 28 Idaho Comprehensive - 09/01/06 Adjacent Cable Vault Space. The Adjacent Cable Vault Space charge covers the cost of the space the CLEC's cable occupies within the cable vault. The charge is based on the diameter of the cable or subduct. Adjacent Cable Rack Space. This charge covers the space utilzation cost that the CLEC's fiber, metallc or coaxial cable occupies within the cable rack system. The charge is based on the linear feet occupied. Microwave Rooftop Space. Microwave Rooftop Space is the cost per square foot to provide rooftop space to the CLEC for microwave antennae and other exterior facilties. The cost includes only that which relates directly to the land and building space itself. Virtual Equipment Maintenance. The Virtual Equipment Maintenance charge is applied on a per quarter rack (or quarter bay) basis and recovers the costs incurred by the Company for maintenance of the CLEC's virtual collocation equipment. This charge would apply to the maintenance of equipment including, but not limited to, ATM, DSLAM, frame relay, routers, OC3, OC12, OC24, 0C48, and NGDLC. This charge does not apply for the maintenance of splitters. EPJ 10 MFN appa-comp-id 29 Idaho Comprehensive - 09/01/06