Loading...
HomeMy WebLinkAbout20120524Letter of Clarification.pdfRECEIVE D 29t2 MAY 2L PM 4-- 40 May 23, 2012 UTUJIIES COMMSSV);L Randy C. Allphin Energy Contracts Coordinator, Ldr Tel: (208) 388-2614 rallphin(äiidahoyower.com Idaho Public Utilities Commission Attn: Kristine A. Sasser P0 Box 83720 Boise, ID 83720-0074 RE: CASE NOS. GNR-E-12-02 IN THE MATTER OF THE ANNUAL REVISION AND UPDATED CALCULATION OF THE ADJUSTABLE PORTION OF THE AVOIDED COST RATE(S) FOR EXISTING PURPA CONTRACTS FOR AVISTA CORPORATION DBA AVISTA UTILITIES, FOR IDAHO POWER COMPANY AND FOR PACIFICORP DBA ROCKY MOUNTAIN POWER. We have reviewed the information you have provided in your letter dated May 14, 2012, notifying Idaho Power of revision of the adjustable portion of the Avoided Cost Rate(s) for existing PURPA contracts. Idaho Power concurs that the model and calculations used by the IPUC staff for Idaho Power Company are consistent with IPUC Order No. 28708. On the page titled "Coistrip Adjustable Rate Calculation" and the section is titled "Coistrip Fuel Cost from Avista FERC Form 1 for CY 2010", the correct data to use for this calculation is the CY 2011 data, we confirmed that the actual data is the CY 2011 data as contained within the Avista FERC Form 1 and we assume the page title is simply incorrect. Sincerely, C .yewe C Allphin Energy Contracts Coordinator, Ldr. cc: Donovan Walker (JPC0) Page 1 of I P 0 Box 70 Boise, Idaho 83707 1221 W Idaho St. Boise, Idaho 83702