HomeMy WebLinkAbout20230306Amended Application.pdf
March 6, 2023
Jan Noriyuki
Idaho Public Utilities Commission
11331 W. Chinden Blvd. Building 8, Suite 201-A
Boise, ID 83714
SENT VIA ELECTRONIC MAIL TO SECRETARY@PUC.IDAHO.GOV
RE: Amended Broadband Investment Tax Credit – Syringa Networks, LLC for 2022
Dear Ms. Noriyuki,
I have attached our filing for the Broadband Investment Tax Credit for 2022. We invested a total of
$1,930,095.92 for the year ended December 31, 2022. I have attached the detailed report of our
investments along with relevant footnotes for your review. These assets were operational in 2022.
Please let me know if you have any questions relating to the information that I have submitted.
Sincerely,
Bill Cole
Senior Tax Analyst
Syringa Networks, LLC
RECEIVED
2023 March 6, PM 12:47
IDAHO PUBLIC
UTILITIES COMMISSION
CASE NO. SZ9-T-23-01
BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
IN THE MATTER OF THE AMENDED APPLICATION
OF SYRINGA NETWORKS, LLC, FOR
BROADBAND INVESTMENT TAX CREDIT
CERTIFICATION
Syringa Networks, LLC files this Amended Application for an Idaho Public Utilities Commission
(“Commission”) order certifying that certain telecommunications equipment is eligible for the broadband
infrastructure tax credit authorized by Section 63-3029I(3)(b), Idaho Code. In support of its Application,
Syringa Networks, LLC states as follows:
1) Communications regarding this application should be addressed to:
Bill Cole
Senior Tax Analyst
Syringa Networks, LLC
12301 W Explorer Dr
Boise, ID 83713
(208) 229-6100
bcole@syringanetworks.net
Syringa Networks, LLC is a telecommunications carrier.
2) Exhibit A of this amended application identifies the areas or locations of equipment purchased and fiber
optic routes constructed.
3) Syringa Networks provides the following broadband services to our customers: ethernet, internet, voice,
colocation, and SD-WAN
4) The minimum upload and download speed available to customers is 1.5 MB/second or 12,000,000
bits/second
5) Refer to Exhibit A of this application for a listing of installed equipment, cost, brand, manufacturer, and
model numbers.
6) Refer to Exhibit A of this application for the dates the equipment was installed
7) As of December 31, 2022 Syringa Networks, LLC provides one of the above services to approximately 700
Idaho customers.
Case No:
SZ9‐T‐23‐01
SYRINGA NETWORKS, LLC APPLICATION
Exhibit A, attached hereto, describes Syringa Networks, LLC’s qualified broadband equipment and
contains the information and representation required by this Commission’s Order No. 35297 in Case No.
GNR-T-21-10. The list of installed equipment is necessary to the provision of broadband service and an
integral part of the broadband network.
Syringa Networks, LLC has reviewed the applicable statutes for the Broadband Investment Income Tax
Credit. Syringa Networks, LLC also believes that the broadband equipment included within Exhibit A
qualifies for the tax credit under Section 63-3029I of the Idaho Code.
Syringa Networks, LLC does not believe that the public interest requires a hearing on this matter, and
therefore requests that the Commission approve the Application by Minute Order or under Modified
Procedure. In the event the Commission determines that further proceedings are necessary, Applicant
stands ready for immediate hearings.
WHEREFORE, Syringa Networks, LLC requests that the Commission issue its order determining that the
installed equipment in Exhibit A constitutes qualified broadband equipment eligible for the investment tax
credit authorized by Section 63-2039I, Idaho Code.
RESPECTFULLY SUBMITTED, This 6th day of March, 2023.
Bill Cole
Senior Tax Analyst
Syringa Networks, LLC
Investment Group Location of Investment Quantity UOM Investment Description Manufcturer Brand Model
Value of
Investment
Equipment Blackfoot 1 Each Battery Monitoring System Servato Servato SPS 248 9AB‐0248‐72 2,760.52
Equipment Boise 1 Each Towable Generator Kohler Kohler 175REOZT4 102,325.26
Equipment Boise 1 Each Adva 3000R7 and Componets Adva Adva 3000R7 95,277.65
Equipment Boise 1 Each Cisco NCS‐5501 Cisco Cisco NCS‐5501 43,548.89
Equipment Boise 1 Each Cisco NCS5501 Cisco Cisco NCS5501 43,548.89
Equipment Boise 1 Each Adva 3000R7 and Componets Adva Adva 3000R7 43,001.69
Equipment Boise 1 Each Adva 3000R7 and Componets Adva Adva 3000R7 34,850.64
Equipment Boise 1 Each FORTIGATE‐600E Fortigate Fortigate 600E 20,316.81
Equipment Boise 1 Each FORTIGATE‐600E Fortigate Fortigate 600E 20,316.81
Equipment Boise 1 Each Cisco NCS 540 28x10G Cisco Cisco NCS 540 28x10G + 4x100G DC 20,282.90
Equipment Boise 1 Each Cisco NCS 540 28x10G Cisco Cisco NCS 540 28x10G + 4x100G DC 20,282.90
Equipment Boise 1 Each Gateway Server Dell netElastic Systems SVR‐80 18,496.63
Equipment Boise 1 Each Dell 4740 Server Dell Dell R740 Server CTO 18,149.10
Equipment Boise 1 Each Dell 4740 Server Dell Dell R740 Server CTO 17,526.85
Equipment Boise 1 Each Cisco N540‐28Z4C‐SYS‐D Cisco Cisco N540‐28Z4C‐SYS‐D ‐ 300G 540 15,156.51
Equipment Boise 1 Each Cisco N540‐28Z4C‐SYS‐D Cisco Cisco N540‐28Z4C‐SYS‐D ‐ 300G 540 15,156.51
Equipment Boise 1 Each Accedian Skylight Flex 100G Accedian Accedian Skylight Flex 100 Quad 100G 12,758.56
Equipment Boise 1 Each Accedian Skylight Flex 100G Accedian Accedian Skylight Flex 100 Quad 100G 12,758.54
Equipment Boise 1 Each Accedian Skylight Flex 100G Accedian Accedian Skylight Flex 100 Quad 100G 12,758.54
Equipment Boise 1 Each Accedian Skylight Flex 100G Accedian Accedian Skylight Flex 100 Quad 100G 12,758.54
Equipment Boise 1 Each Accedian Skylight Flex 100G Accedian Accedian Skylight Flex 100 Quad 100G 12,758.54
Equipment Boise 1 Each HVAC for CO Jace Jace 8010 Controller 11,465.00
Equipment Boise 1 Each Palo Alto Firewall
Palo Alto
Networks Palo Alto Networks PAN‐PA‐820 4,347.77
Equipment Boise 1 Each VM Ware Edge 3800 VM Ware VM Ware Edge3800 4,052.10
Equipment Boise 1 Each VM Ware Edge 3800 VM Ware VM Ware Edge3800 4,052.09
Equipment Boise 1 Each VM Ware Edge 3800 VM Ware VM Ware Edge3800 4,052.09
Equipment Boise 1 Each VM Ware Edge 3800 VM Ware VM Ware Edge3800 4,052.09
Equipment Boise 1 Each ASR920 Series ‐ 24GE Fiber and Cisco Cisco ASR 920 24GE 2,856.04
Equipment Boise 1 Each ASR920 Series ‐ 24GE Fiber and Cisco Cisco ASR 920 24GE 2,856.04
Equipment Caldwell 1 Each Manual Transfer Switch Emerson Emerson Powertite 200A 9,040.00
Equipment Emmett 1 Each Manual Transfer Switch Emerson Emerson Powertite 200A 9,040.00
Equipment Emmett 1 Each 24GE Fiber and 4‐10GE ‐ Modul Cisco Cisco 24GE Fiber and 4‐10GE ‐ Modular PSU: 1G 2,418.02
Equipment Garden City 1 Each ADVA F7/2WCC‐PCN‐10G: 10G ADVA ADVA ADVA F7/2WCC‐PCN‐10G: 10G 3,341.18
Equipment Garden City 1 Each ADVA F7/2WCC‐PCN‐10G: 10G ADVA ADVA ADVA F7/2WCC‐PCN‐10G: 10G 3,341.18
Equipment Hagerman 1 Each Manual Transfer Switch Emerson Emerson Powertite 200A 12,209.00
Syringa Networks LLC
Idaho Broadband Investment Credit Exhibit A
Tax Year Ended 12/31/2022
Exhibit A Page 1 of 3
Investment Group Location of Investment Quantity UOM Investment Description Manufcturer Brand Model
Value of
Investment
Equipment Hailey 1 Each Manual Transfer Switch Emerson Emerson Powertite 200A 9,940.00
Equipment Hailey 1 Each Cisco ASR920 24GE Cisco Cisco ASR920 24GE 2,856.04
Equipment Hailey 1 Each Cisco ASR920 24GE Cisco Cisco ASR920 24GE 2,856.04
Equipment Idaho Falls 1 Each Adva 3000R7 and Componets Adva Adva 3000R7 14,515.73
Equipment Lowman 1 Each Cisco ASR‐920‐4SZ‐D: 600M Cisco Cisco ASR 920‐4SZ 2,001.80
Equipment McCall 1 Each HVAC for CO Lennox Lennox MLA018S4S 5,495.00
Equipment McCall 1 Each Security System Lenel Lenel 2210 2,668.11
Equipment Meridian 1 Each Adtran Netvanta 1550‐48P Adtran Adtran Netvanta 1550‐48P 2,085.19
Equipment Payette 1 Each Manual Transfer Switch Emerson Emerson Powertite 200A 9,940.00
Equipment Pocatello 1 Each Adva 3000R7 and Componets Adva Adva 3000R7 34,850.64
Equipment Pocatello 1 Each Adva F7 RAMAN‐C10 ADVA ADVA Adva F7 RAMAN‐C10 8,093.84
Equipment Pocatello 1 Each Cisco ASR‐920‐4SZ‐A Cisco Cisco ASR‐920‐4SZ‐A 2,002.40
Fiber Build Ada County 6,738 Feet Fiber Build
Prysmian;
Sterlite Prysmian; Sterlite 48A‐10, 144A‐05 87,830.35
Fiber Build Ada County 716 Feet Fiber Build Southwire Southwire BL 48A‐01 15,589.52
Fiber Build Ada County 434 Feet Fiber Build C‐Enterprises C‐Enterprises XSYR‐D06‐SAS‐XXX‐875F 7,989.45
Fiber Build Ada County 56 Feet Fiber Build C‐Enterprises C‐Enterprises XSYR‐D06‐SAS‐XXX‐650F 5,732.17
Fiber Build Adams and Valley Counties 114,500 Feet Fiber Build Prysmian Prysmian F‐EDH1JKT‐12‐ES‐096‐E3 62,129.24
Fiber Build Bellevue 480 Feet Fiber Build C‐Enterprises C‐Enterprises XSYR‐D06‐SAS‐XXX‐650F 11,632.61
Fiber Build Boise 1,697 Feet Fiber Build C‐Enterprises C‐Enterprises XSYR‐D06‐SAS‐XXX‐1250F 60,603.51
Fiber Build Boise 2,233 Feet Fiber Build Corning Corning 48A‐11 39,031.67
Fiber Build Boise 1,246 Feet Fiber Build Sterlite Sterlite OSP‐F‐4 15,844.54
Fiber Build Boise 897 Feet Fiber Build Commscope Commscope 48NA‐01 14,410.49
Fiber Build Boise 293 Feet Fiber Build Existing Fiber Existing Fiber Spliced existing fiber 9,805.08
Fiber Build Boise 524 Feet Fiber Build C‐Enterprises C‐Enterprises XSYR‐D06‐SAS‐XXX‐650F 9,532.45
Fiber Build Boise 1,133 Feet Fiber Build C‐Enterprises C‐Enterprises 48A‐009, XSYR‐D06‐SAS‐XXX‐500F 8,917.04
Fiber Build Boise 508 Feet Fiber Build C‐Enterprises C‐Enterprises XSYR‐D06‐SAS‐XXX‐650F 4,327.42
Fiber Build Caldwell 16,394 Feet Fiber Build
Prysmian,
Corning, C‐
Enterprises
Prysmian, Corning, C‐
Enterprises 48A‐10, 48A‐11, pigtails 112,332.99
Fiber Build Caldwell 425 Feet Fiber Build C‐Enterprises C‐Enterprises XSYR‐D06‐SAS‐XXX‐650F 19,178.58
Fiber Build Caldwell 522 Feet Fiber Build C‐Enterprises C‐Enterprises XSYR‐D06‐SAS‐XXX‐875F 16,921.35
Fiber Build Caldwell 706 Feet Fiber Build C‐Enterprises C‐Enterprises XSYR‐D06‐SAS‐XXX‐875F 8,871.65
Fiber Build Garden City 291 Feet Fiber Build C‐Enterprises C‐Enterprises XSYR‐D06‐SAS‐XXX‐650F 4,568.84
Fiber Build Greenlea 14,850 Feet Fiber Build Prysmian Prysmian F‐EDH1JKT‐12‐ES‐096‐E3 12,766.24
Fiber Build Hailey 783 Feet Fiber Build C‐Enterprises C‐Enterprises XSYR‐D06‐SAS‐XXX‐1250F 36,006.13
Fiber Build Kuna 426 Feet Fiber Build C‐Enterprises C‐Enterprises XSYR‐D12‐SAS‐XXX‐500 4,794.59
Fiber Build McCall 7,312 Feet Fiber Build Corning Corning 144A‐07 26,041.35
Fiber Build McCall 999 Feet Fiber Build Corning Corning 48A‐11 17,410.98
Fiber Build McCall 1,155 Feet Fiber Build
Corning; C‐
Enterprises Corning; C‐Enterprises 48A‐11, 650, 500 15,849.01
Exhibit A Page 2 of 3
Investment Group Location of Investment Quantity UOM Investment Description Manufcturer Brand Model
Value of
Investment
Fiber Build McCall 196 Feet Fiber Build C‐Enterprises C‐Enterprises 375 and 650 9,016.55
Fiber Build McCall 343 Feet Fiber Build C‐Enterprises C‐Enterprises XSYR‐D06‐SAS‐XXX‐650F 8,586.25
Fiber Build McCall 297 Feet Fiber Build C‐Enterprises C‐Enterprises XSYR‐D06‐SAS‐XXX‐375F 4,532.20
Fiber Build Meridian 5,773 Feet Fiber Build
Corning,
Southwire Corning, Southwire 48A‐11, BL96A‐01 126,865.82
Fiber Build Meridian 12,511 Feet Fiber Build Southwire Southwire BL144A‐02 57,501.55
Fiber Build Meridian 1,184 Feet Fiber Build C‐Enterprises C‐Enterprises XSYR‐D06‐SAS‐XXX‐375F 26,989.31
Fiber Build Meridian 2,769 Feet Fiber Build Corning Corning 96A‐01, XSYR‐D06‐SAS‐XXX‐375F 26,531.42
Fiber Build Meridian 502 Feet Fiber Build C‐Enterprises C‐Enterprises XSYR‐D06‐SAS‐XXX‐875F 18,389.63
Fiber Build Meridian 2,405 Feet Fiber Build
Corning; C‐
Enterprises Corning; C‐Enterprises 48A‐11, 650, 500 15,278.61
Fiber Build Meridian 548 Feet Fiber Build C‐Enterprises C‐Enterprises XSYR‐D06‐SAS‐XXX‐650F 11,730.67
Fiber Build Meridian 639 Feet Fiber Build C‐Enterprises C‐Enterprises XSYR‐D06‐SAS‐XXX‐650F 11,163.81
Fiber Build Meridian 1,245 Feet Fiber Build Commscope Commscope 48NA‐01 8,455.76
Fiber Build Meridian 691 Feet Fiber Build
Prysmian, C‐
Enterprises
Prysmian, C‐
Enterprises 48A‐10, XSYR‐D06‐SAS‐XXX‐375F 8,014.58
Fiber Build Meridian 961 Feet Fiber Build C‐Enterprises C‐Enterprises XSYR‐D06‐SAS‐XXX‐1250F 7,246.30
Fiber Build Meridian 628 Feet Fiber Build Existing Fiber Existing Fiber Leasing strands from CTC 6,862.16
Fiber Build Meridian 838 Feet Fiber Build C‐Enterprises C‐Enterprises XSYR‐D06‐SAS‐XXX‐1250F 6,519.51
Fiber Build Meridian 428 Feet Fiber Build C‐Enterprises C‐Enterprises XSYR‐D06‐SAS‐XXX‐650F 5,540.24
Fiber Build Meridian 2,388 Feet Fiber Build Prysmian Prysmian F‐EDH1JKT‐12‐ES‐096‐E3 2,796.30
Fiber Build Meridian 136 Feet Fiber Build C‐Enterprises C‐Enterprises XSYR‐D06‐SAS‐XXX‐375F 2,006.78
Fiber Build Mountain Home 994 Feet Fiber Build
Sterlite; C‐
Enterprises Sterlite; C‐Enterprises 48A‐12, XSYR‐D06‐SAS‐XXX‐650F 44,310.12
Fiber Build Nampa 1,063 Feet Fiber Build C‐Enterprises C‐Enterprises XSYR‐D06‐SAS‐XXX‐1250F 23,626.73
Fiber Build Nampa 832 Feet Fiber Build C‐Enterprises C‐Enterprises XSYR‐D06‐SAS‐XXX‐1250F 18,859.05
Fiber Build Nampa 735 Feet Fiber Build C‐Enterprises C‐Enterprises XSYR‐D06‐SAS‐XXX‐375F 11,570.01
Fiber Build Nampa 541 Feet Fiber Build C‐Enterprises C‐Enterprises XSYR‐D12‐SAS‐XXX‐875 6,532.70
Fiber Build Pocatello 835 Feet Fiber Build C‐Enterprises C‐Enterprises XSYR‐D12‐SAS‐XXX‐1250 31,267.95
Fiber Build Pocatello 432 Feet Fiber Build C‐Enterprises C‐Enterprises XSYR‐D12‐SAS‐XXX‐875F 16,253.45
Fiber Build Shoshone 163 Feet Fiber Build C‐Enterprises C‐Enterprises XSYR‐D06‐SAS‐XXX‐375F 9,186.53
Fiber Build Twin Falls 87 Feet Fiber Build C‐Enterprises C‐Enterprises XSYR‐D06‐SAS‐XXX‐375F 7,126.01
Total Investment 1,930,095.92
Broadband Investment Credit (Total Investment x 3%)57,902.88
Exhibit A Page 3 of 3