Loading...
HomeMy WebLinkAbout20020524Exhibit C Effective 05-24-02.pdfEXHIBIT C SERVICE INTERVAL TABLES Qwest Idaho SGAT Third Revision, Exhibit C May 24, 2002 Page 1 1.0 Unbundled Loops, Line Sharing and Line Splitting Service Interval Table: (a) Established Service Intervals 2/4 Wire Analog (Voice Grade): a) 1-8 lines Five (5) business days b) 9-16 lines Six (6) business days c) 17-24 lines Seven (7) business days d) 25 or more ICB (b) Established Service Intervals for 2/4 Wire Non-Loaded Loops, and ADSL Compatible Loops that do not require conditioning: a) 1-8 lines Five (5) business days b) 9-16 lines Six (6) business days c) 17-24 lines Seven (7) business days d) 25 or more ICB (c) Established Service Intervals for xDSL-I/ BRI ISDN Capable Loops that do not require conditioning: a) 1-8 lines Five (5) business days b) 9-16 lines Six (6) business days c) 17-24 lines Seven (7) business days d) 25 or more ICB (d) Established Service Intervals for existing DS-1 Capable Loops, DS1 Capable Feeder Loop: a) 1 – 24 lines Nine (9) business days b) 25 or More ICB (e) Established Service Intervals for existing DS3 Capable Loops: a) 1-3 lines Seven (7) business days b) 4 or more ICB (f) Established Service Intervals for Line Sharing and Line Splitting that do not require conditioning: a) 1-24 lines Three (3) business days d) 25 or More Three (3) business days (g) Conditioned Loops for 2/4 Wire Non-Loaded Loops, ADSL Compatible, Basic Rate ISDN Capable, xDSL-I Capable Loops, Line Sharing and Line Splitting: a) 1-8 lines Fifteen (15) business days b) 9 or more ICB (h) Established Repair Intervals for Basic 2-wire Analog Loops, Line Sharing, Line Splitting, and Shared Distribution Loop: Twenty-four (24) hours OSS EXHIBIT C SERVICE INTERVAL TABLES Qwest Idaho SGAT Third Revision, Exhibit C May 24, 2002 Page 2 Forty-eight (48) hours AS (i) Established Repair Intervals for 4-wire Analog Loops, 2/4 Wire Non-Loaded Loops, Basic Rate ISDN Capable Loops, and ADSL Compatible Loops, xDSL-I Capable Loops, DS1 Capable Loops, DS3 Capable Loops, and Ocn Capable Loops: Four (4) hours (j) Quick Loop a) 1 to 24 Lines Three (3) business days b) 25 or more Lines ICB Quick Loop with Number Portability a) 1 to 8 Lines Three (3) business days b) 9 to 24 Lines Four (4) business days c) 25 or more Lines ICB (k) OCn Loop 1 or more Lines ICB (l) Shared Distribution Loop 1 or more Lines Five (5) business days (M) Established Service Intervals for 2/4 wire Distribution and Non-loaded Distribution Loop 1 or more Lines Two (2) business days or Appointment Scheduler 2.0 Unbundled Dedicated Interoffice Transport (UDIT) Service Interval Table: Product Services Ordered Installation Commitments Repair Commitments UDIT, EUDIT, UCCRE 1 to 8 Zone 1: Five (5) business days Zone 2: Six (6) business days Four (4) hrs. Zone 1 Four (4) hrs. Zone 2 9 to 16 Zone 1: Six (6) business days Zone 2: Seven (7) business days Four (4) hrs. Zone 1 Four (4) hrs. Zone 2 DS0 17 to 24 Zone 1: Seven (7) business days Zone 2: Eight (8) business days Four (4) hrs. Zone 1 Four (4) hrs. Zone 2 EXHIBIT C SERVICE INTERVAL TABLES Qwest Idaho SGAT Third Revision, Exhibit C May 24, 2002 Page 3 25 or more ICB ICB 1 to 8 Zone 1: Five (5) business days Zone 2: Eight (8) business days Four (4) hrs Zone 1 Four (4) hrs Zone 2 9 to 16 Zone 1: Six (6) business days Zone 2: Nine (9) business days Four (4) hrs Zone 1 Four (4) hrs Zone 2 17 to 24 Zone 1: Seven (7) business days Zone 2: Ten (10) business days Four (4) hrs Zone1 Four (4) hrs Zone 2 DS1 25 or more ICB Four (4) hrs 1 to 3 Circuits Zone 1: Seven (7) business days Zone 2: Nine (9) business days Four (4) hrs Zone 1 Four (4) hrs Zone 2 DS3 4 or more Circuits ICB Four (4) hrs OC3 and Higher 1 or more Circuits ICB Four (4) hrs EXHIBIT C SERVICE INTERVAL TABLES Qwest Idaho SGAT Third Revision, Exhibit C May 24, 2002 Page 4 3.0 Unbundled Local Switching Service Interval Table: Product Services Ordered Installation Commitments Repair Commitments Unbundled Switching 1 to 8 Zone 1: Five (5) business days Zone 2: Six (6) business days Twenty-four (24) hrs. Zone 1 Twenty-four (24) hrs. Zone 2 9 to 16 Zone 1: Six (6) business days Zone 2: Seven (7) business days Twenty-four (24) hrs. Zone 1 Twenty-four (24) hrs. Zone 2 17 to 24 Zone 1: Seven (7) business days Zone 2: Eight (8) business days Twenty-four (24) hrs. Zone 1 Twenty-four (24) hrs. Zone 2 Unbundled Switching – Line Side Analog With Line Class Code (LCC) already supported in requested switch. 25 or more ICB Twenty-four (24) hrs. 1 to 19 Two (2) business days Twenty-four (24) hrs. OOS Forty-eight (48) hrs. AS 20 to 39 Four (4) business days Twenty-four (24) hrs. OOS Forty-eight (48) hrs. AS Unbundled Switching – Line Side Analog – Existing – Vertical Feature(s) (Features change without inward line activity and not impacting the design of the circuit.) 40 or more ICB Twenty-four (24) hrs. OOS Forty-eight (48) hrs. AS Unbundled Switching –New Line Class Code (LCC) ordered through customized routing ICB Twenty-four (24) hrs. 1 to 4 Lines Zone 1: Seven (7) business days Zone 2: ICB Twenty-four (24) hrs. Zone 1 Twenty-four (24) hrs. Zone 2 Unbundled Switching – BRI-ISDN Line-side Port. With a QWEST standard configuration and Line Class Code (LCC) already supported in the requested switch 5 or more ICB Twenty-four (24) hrs. Unbundled Switching – BRI-ISDN Line-side Port. With non-standard configuration and Line Class Code (LCC) already supported in the requested switch 1 to 4 Lines Zone 1: Seventeen (17) business days (includes 10 days for complex translations.) Zone 2: ICB Twenty-four (24) hrs. Zone 1 Twenty-four (24) hrs. Zone 2 EXHIBIT C SERVICE INTERVAL TABLES Qwest Idaho SGAT Third Revision, Exhibit C May 24, 2002 Page 5 5 or more ICB Twenty-four (24) hrs. 1 to 8 Ports Zone 1: Five (5) business days Zone 2: Six (6) business days Twenty-four (24) hrs. Zone 1 Twenty-four (24) hrs. Zone 2 9 to 16 Ports Zone 1: Six (6) business days Zone 2: Seven (7) business days Twenty-four (24) hrs. Zone 1 Twenty-four (24) hrs. Zone 2 17 to 24 Ports Zone 1: Seven (7) business days Zone 2: Eight (8) business days Twenty-four (24) hrs. Zone 1 Twenty-four (24) hrs. Zone 2 Unbundled Switching – DS1 Trunk Port 25 or more Ports ICB Twenty-four (24) hrs. Zone 1: 1 to 24 Seven (7) business days Twenty-four (24) hrs. 25 to 48 Eight (8) business days Twenty-four (24) hrs. 49 to 72 Ten (10) business days Twenty-four (24) hrs. 73 to 96 Twelve (12) business days Twenty-four (24) hrs. 97 to 120 Fourteen (14) business days Twenty-four (24) hrs. 121 to 144 Fifteen (15) business days Twenty-four (24) hrs. 145 to 168 Sixteen (16) business days Twenty-four (24) hrs. 169 to 240 Eighteen (18) business days Twenty-four (24) hrs. 241 or more ICB Twenty-four (24) hrs. Zone 2: 1 to 24 Eighteen (18) business days Twenty-four (24) hrs. 25 to 72 Nineteen (19) business days Twenty-four (24) hrs. 73 to 120 Twenty (20) business days Twenty-four (24) hrs. Unbundled Switching – Message Trunk Groups • Translation questionnaire required • Routing to trunks is ordered separately as Customized Routing • DS1 trunk port & UDIT in place. 121 or more ICB Twenty-four (24) hrs. EXHIBIT C SERVICE INTERVAL TABLES Qwest Idaho SGAT Third Revision, Exhibit C May 24, 2002 Page 6 1 to 8 Trunks Zone 1: Five (5) business days Zone 2: Six (6) business days Twenty-four (24) hrs. Zone 1 Twenty-four (24) hrs. Zone 2 9 to 16 Trunks Zone 1: Six (6) business days Zone 2: Seven (7) business days Twenty-four (24) hrs. Zone 1 Twenty-four (24) hrs Zone 2 17 to 24 Trunks Zone 1: Seven (7) business days Zone 2: Eight (8) business days Twenty-four (24) hrs. Zone 1 Twenty-four (24) hrs. Zone 2 Unbundled Switching – Two Way and DID Equivalent Group (add/change/increase) DS1 trunk port in place 25 or more Trunks ICB Twenty-four (24) hrs. 1 to 8 Zone 1: Five (5) business days Zone 2: Six (6) business days 4 hrs. Zone 1 4 hrs. Zone 2 9 to 16 Zone 1: Six (6) business days Zone 2: Seven (7) business days 4 hrs. Zone 1 4 hrs. Zone 2 17 to 24 Zone 1: Seven (7) business days Zone 2: Eight (8) business days Four (4) hrs. Zone 1 Four (4) hrs. Zone 2 Unbundled Switching – PRI-ISDN Capable Trunk-Side DS1 Trunk port in place 25 or more ICB Four (4) hrs. Unbundled Packet Switching • Design changes – 8 Business days • Non-design changes – 5 Business days • Service changes – 5 Business days New service request – 10 Business days Twenty-four (24) hrs EXHIBIT C SERVICE INTERVAL TABLES Qwest Idaho SGAT Third Revision, Exhibit C May 24, 2002 Page 7 4.0 Unbundled Dark Fiber Interval Table: Installation Guidelines apply where facilities/network capacity is in place, on Qwest-owned, in region facilities. Where non-Qwest locations are involved, intervals are handled on an Individual Case Basis – (ICB). Product Activity/ Features Services Ordered FOC Guidelines Installation Guidelines Repair Guidelines Dark Fiber Initial Records Inquiry (IRI) (simple & complex) N/A Ten (10) business days N/A Field Verification And Quote Preparation (FVQP) N/A Twenty (20) business days N/A Provisioning (non- FVQP requests) N/A Twenty (20) business days EXHIBIT C SERVICE INTERVAL TABLES Qwest Idaho SGAT Third Revision, Exhibit C May 24, 2002 Page 8 5.0 Unbundled Network Elements Platform (UNE-P) Service Interval Table: For UNE-P POTS, Saturday due dates are available under the following circumstances: The Saturday Desired Due Date (DDD) must be at least the standard interval. For dispatched orders, a Saturday appointment must be available and reserved in Appointment Scheduler. For UNE-P POTS non-dispatched orders, Saturday is counted as part of the standard installation interval, even if a Saturday due date is not desired. For example: when the standard interval is 2 (two) business days, an LSR submitted on a Friday morning may have a due date as early as the following Monday. Product Services Ordered Installation Commitments Repair Commitments UNE-P POTS New Installs, Address Changes, or Change Requests adding new lines.Facility Check indicates "AVAILABLE (SDT)" and DISPATCH "NO" Three (3) business days Twenty-four (24) hrs OOS Forty-eight (48) hrs AS Forty-eight (48) Three (3) Business Days Twenty-four (24) hrs OOS Forty-eight (48) hrs AS Addition, removal, or change of CO Features, PIC/LPIC change, number changes without inward line activity, or hunting changes without inward line activity Customers with service placed on “vacation” Next Business Day (includes Saturday) Twenty-four (24) hrs OOS 48 hrs AS UNE-P POTS Suspend/Restore Deny/Restore Treatment for Non- payment issues Same Business Day if request received before noon MT, otherwise next business day (includes Saturday) Twenty-four (24) hrs OOS Forty-eight (48) hrs AS EXHIBIT C SERVICE INTERVAL TABLES Qwest Idaho SGAT Third Revision, Exhibit C May 24, 2002 Page 9 Product Services Ordered Installation Commitments Repair Commitments Next available due date as indicated by Appointment Scheduler Note: Appointment Scheduler minimum default interval is 3 (Three) Business Days. Twenty-four (24) hrs OOS Forty-eight (48) hrs AS UNE-P POTS New Installs, Address Changes, Changes with inward line activity Facility Check indicates “AVAILABLE DISP. REQ” and DISPATCH “YES” Same business day UNE-P POTS Directory Listings Changes – • Simple (Non-complex) Listings - Simple Straight Line and/or Straight-Line Under (SLU) Listings Depends on changes requested. For instance, addition of another line would follow New Installs guidelines. Twenty-four (24) hrs OOS Forty-eight (48) hrs AS Conversion as Specified Retail, Resale, or UNE-P POTS to UNE-P POTS 1 to 39 Lines Same Business Day if received before noon MT, or Next Business Day if received later than noon MT. Twenty-four (24) hrs OOS Forty-eight (48) hrs AS Conversions to UNE-P POTS- UNE-P POTS to UNE-P POTS - Conversion as Is UNE-P Line Splitting – UNE-P POTS to UNE-P POTS with Line Splitting - Conversion As Specified 3 business days 24 hrs OOS Forty-eight (48) hrs AS EXHIBIT C SERVICE INTERVAL TABLES Qwest Idaho SGAT Third Revision, Exhibit C May 24, 2002 Page 10 Product Services Ordered Installation Commitments Repair Commitments 3 BUSINESS DAYS UNE-P Line Splitting – POTS Residence or POTS Business with Line Sharing to UNE-P POTS with Line Splitting - Conversion as Specified 1 to 8 Trunks Zone 1: Five (5) Business Days Zone 2: Six (6) business days Four (4) hrs 9 to 16 Trunks Zone 1; Six (6) business days Zone 2: Seven (7) business days Four (4) hrs 17 to 24 Trunks Zone 1: Seven (7) business days ZONE 2: EIGHT (8) BUSINESS DAYS Four (4) hrs UNE-P PBX New Install, Conversion As Specified, Changes (ex. PIC/LPIC or feature changes, etc.), and Suspend/Restore 25 or more Trunks ICB Four (4) hrs business days business days business days UNE-P DSS T1 Facility Installation 1 to 3 Facilities Nine (9) business days Four (4) hrs 4 to 6 Facilities Twelve (12) business days Four (4) hrs 7 to 9 Facilities Thirteen (13) business days Four (4) hrs 10 to 12 Facilities Seventeen (17) business days Four (4) hrs EXHIBIT C SERVICE INTERVAL TABLES Qwest Idaho SGAT Third Revision, Exhibit C May 24, 2002 Page 11 Product Services Ordered Installation Commitments Repair Commitments 1 to 3 Facilities Twelve (12) business days Four (4) hrs 4 to 6 Facilities Sixteen (16) business days Four (4) hrs UNE-P DSS Trunk Installation when ordered with new T1 Facility (Note: The number of facilities ordered drives the due dates for both facilities and trunks. 7 to 9 Facilities Twenty (20) business days Four (4) hrs 10 to 12 Facilities Twenty four (24) business days Four (4) hrs Five (5) business Days Four (4) hrs Conversions to UNE-P DSS- As Is Conversion As Specified See intervals for type of change requested Four (4) hrs 1 to 8 Trunks Five (5) business Days Four (4) hrs 9 to 16 Trunks Six (6) business days Four (4) hrs 17 to 24 Trunks Seven (7) business days Four (4) hrs UNE-P DSS- Add/Change Trunks on existing facilities Each Additional 8 Trunks One (1) business Day for each Four (4) hrs 1 to 10 Loops Thirteen (13) business days Twenty-four (24) hrs UNE-P ISDN BRI New Installs, Address Changes, Change to add Loop (N2Q) 11 or more Loops ICB Twenty-four (24) hrs 1 to 10 Loops Three (3) business days Twenty-four (24) hrs UNE-P ISDN BRI Add or Change Feature(s), Add Primary Directory Number (PDN ) to established Loop (N2Q), Add Call Appearance 11 or more Loops ICB Twenty-four (24) hrs 1 to 10 Loops Three (3) business days Twenty-four (24) hrs Conversion to UNE-P ISDN BRI- Conversion As Is 11 or more Loops ICB Twenty-four (24) hrs 1 to 10 Loops Three (3) business days if a Loop is not involved (or) Thirteen (13) business days if a Loop is added or changed Twenty-four (24) hrs Conversion to UNE-P ISDN BRI- Conversion As Specified 11 or more Loops ICB Twenty-four (24) hrs UNE-P ISDN PRI ‘New’- 1 to 3 Nine (9) business days Four (4) hrs EXHIBIT C SERVICE INTERVAL TABLES Qwest Idaho SGAT Third Revision, Exhibit C May 24, 2002 Page 12 Product Services Ordered Installation Commitments Repair Commitments New Facility and Associated Trunks (With this activity, the number of facilities ordered drives the due dates for both facilities and trunks. See table below.) 4 to 6 7 to 9 10 to 12 Over 12 Twelve (12) business days Thirteen (13) business Seventeen (17) business Add 4 business days for each additional 3 facilities (13-16=21 days, 17-20=25 days, etc.) Four (4) hrs 1 to 3 Trunks Twelve (12) business days Four (4) hrs 4 to 6 Trunks Sixteen (16) business days Four (4) hrs 7 to 9 Trunks Twenty (20) business days Four (4) hrs 10 to 12 Trunks Twenty-four (24) business days Four (4) hrs UNE-P ISDN PRI ‘New’- Trunks 13 or more Trunks Facility due date plus 5 days Four (4) hrs EXHIBIT C SERVICE INTERVAL TABLES Qwest Idaho SGAT Third Revision, Exhibit C May 24, 2002 Page 13 Product Services Ordered Installation Commitments Repair Commitments See intervals for type of change requested Four (4) hrs Conversion to UNE-P ISDN PRI- As Specified As Is Five (5) business days Four (4) hrs 1 to 8 Five (5) business daysbusiness days Four (4) hrs 9 to 16 Six (6) business days Four (4) hrs 17 to 24 Seven (7) business days Four (4) hrs Over 25 ICB Four (4) hrs UNE-P ISDN PRI- Add/Change Trunks on Existing Facility Five (5) business days Twenty-four (24) hrs OOS Forty-eight (48) hrs AS UNE-P Centrex 21 - Non Designed- Conversions as Specified [Facility check indicates “Available Dispatch Required” and Dispatch “Yes”.] Next available due date as indicated by Appointment Scheduler Note: Appointment Scheduler minimum default interval is 3 (Three) business days. Twenty-four (24) hrs OOS Forty-eight (48) hrs AS UNE-P Centrex 21 - Non Designed- New Installations, Address Changes, and Change Requests adding new lines 1 to 21 Lines - No Optional Features Twenty (20) business days Twenty-four (24) hrs OOS Forty-eight (48) hrs AS 1 to 21 Lines - w/ Optional Features (i.e., ARS, DFIs, SMDR, UCD, etc.) ICB Twenty-four (24) hrs OOS Forty-eight (48) hrs AS UNE-P Centrex Plus / UNE-P Centron [Centron is MN only] Common Block Configuration Required - Establish Common Block 22 or more Lines with or without Optional Features ICB Twenty-four (24) hrs OOS Forty-eight (48) hrs AS 1 to 10 Lines Twenty (20) business days Twenty-four (24) hrs OOS Forty-eight (48) hrs AS UNE-P Centrex Plus / UNE-P Centron [Centron is MN only] Common Block Configuration Required - Feature Additions requiring Common Block activity per Common Block 11 or more Lines ICB Twenty-four (24) hrs OOS Forty-eight (48) hrs AS EXHIBIT C SERVICE INTERVAL TABLES Qwest Idaho SGAT Third Revision, Exhibit C May 24, 2002 Page 14 Product Services Ordered Installation Commitments Repair Commitments UNE-P Centrex Plus / UNE-P Centron [Centron is MN only] Common Block Configuration Required - Line Class Codes (LCCs)/ CAT/NCOS/DPAT additions/changes requiring Common Block work. Per Common Block (must be existing Line Class Codes(LCCs)/ CAT/NCOS/DPAT) Five (5) business days Twenty-four (24) hrs OOS Forty-eight (48) hrs AS If new LCC/CAT/NCOS or DPAT Twenty (20) business days Twenty-four (24) hrs OOS Forty-eight (48) hrs AS UNE-P Centrex Plus / UNE-P Centron [Centron is MN only] Common Block Configuration Required - Centrex Management System (CMS) New Common Blocks & Cust ID’s (lines installed at the same time the Common Block is installed) Twenty (20) business days (after the initial Common Block & associated lines are installed) N/A UNE-P Centrex Plus / UNE-P Centron [Centron is MN only] Common Block Configuration Required - Designed Services subsequent to initial Common Block installation Tie Lines/DFI/FX Thirteen (13) business days (may be longer due to facility due date requirements) Twenty-four (24) hrs OOS Forty-eight (48) hrs AS Additional/New Station Lines to be added to CMS Five (5) business days after line is installed N/A Additions Five (5) business days N/A UNE-P Centrex Plus / UNE-P Centron [Centron is MN only] No Common Block Configuration Required - Centrex Management System (CMS) Network Access Registers (NARs) Change from Non Blocked to Blocked Service ICB N/A EXHIBIT C SERVICE INTERVAL TABLES Qwest Idaho SGAT Third Revision, Exhibit C May 24, 2002 Page 15 Product Services Ordered Installation Commitments Repair Commitments 1 to 10 Lines per location Five (5) business days or Next available due date thereafter as indicated by Appointment Scheduler. Twenty-four (24) hrs OOS Forty-eight (48) hrs AS 11 to 20 Lines per location Ten (10) business days or Next available due date thereafter as indicated by Appointment Scheduler. Twenty-four (24) hrs OOS Forty-eight (48) hrs AS UNE-P Centrex Plus / UNE-P Centron [Centron is MN only] No Common Block Configuration Required - Station Lines (subsequent to the establishment of the Common Block) Includes: Conversions New Lines Moves NOTE: On conversions, numbers are “chipped” into the Common Block at the time of installation. 21 or more Lines per location ICB Twenty-four (24) hrs OOS Forty-eight (48) hrs AS 1 to 19 Lines Three (3) business days Twenty-four (24) hrs OOS Forty-eight (48) hrs AS UNE-P Centrex Plus / UNE-P Centron [Centron is MN only] No Common Block Configuration Required Line Feature changes/additions/ Removals 20 or more Lines ICB Twenty-four (24) hrs OOS Forty-eight (48) hrs AS UNE-P Centrex Plus / UNE-P Centron [Centron is MN only] No Common Block Configuration Required Designed Services subsequent to initial Common Block installation Tie Lines/DFI/FX Thirteen (13) business days (may be longer due to facility due date requirements) Twenty-four (24) hrs OOS Forty-eight (48) hrs AS Subsequent to Common Block Installation Twenty (20) business days (may be longer if the activation of ARS is tied to a Private Line facility installation) Twenty-four (24) hrs OOS Forty-eight (48) hrs AS Changes to Patterns: 1 to 25 changes 26 to 50 changes 51 or more changes business days: Five (5) days Ten (10) days Twenty (20) days Twenty-four (24) hrs OOS Forty-eight (48) hrs AS UNE-P Centrex Plus / UNE-P Centron [Centron is MN only] No Common Block Configuration Required Automatic Route Selection (ARS) Adding new Patterns Twenty (20) business days Twenty-four (24) hrs OOS Forty-eight (48) hrs AS EXHIBIT C SERVICE INTERVAL TABLES Qwest Idaho SGAT Third Revision, Exhibit C May 24, 2002 Page 16 Product Services Ordered Installation Commitments Repair Commitments UNE-P Centrex Plus / UNE-P Centron [Centron is MN only] No Common Block Configuration Required Uniform Call Distribution (UCD) Per Request Thirteen (13) business days Twenty-four (24) hrs OOS Forty-eight (48) hrs AS UNE-P Centrex Plus / UNE-P Centron [Centron is MN only] No Common Block Configuration Required Additional Numbers subsequent to initial Common Block installation NOTE: Additional numbers are “chipped” into the Common Block at the time of request. Blocks (No limit on amount of numbers.) Five (5) business days N/A EXHIBIT C SERVICE INTERVAL TABLES Qwest Idaho SGAT Third Revision, Exhibit C May 24, 2002 Page 17 6.0 Enhanced Extended Loop Service Interval Table (EEL): Product Services Ordered Installation Commitments Repair Commitments 1 to 8 Zone 1: Five (5) business days Zone 2: Six (6) business days Four (4) hrs Zone 1 Four (4) hrs Zone 2 9 to 16 Zone 1: Six (6) business days Zone 2: Seven (7) business days Four (4) hrs Zone 1 Four (4) hrs Zone 2 17 to 24 Zone 1: Seven (7) business days Zone 2: Eight (8) business days Four (4) hrs Zone 1 Four (4) hrs Zone 2 Enhanced Extended Loop (EEL)- DS0 or Voice Grade Equivalent 25 or more ICB Four (4) hrs 1 to 8 Zone 1: Five (5) business days Zone 2: Eight (8) business days Four (4) hrs Zone 1 Four (4) hrs Zone 2 9 to 16 Zone 1: Six (6) business days Zone 2: Nine (9) business days Four (4) hrs Zone 1 Four (4) hrs Zone 2 17 to 24 Zone 1: Seven (7) business days Zone 2: Ten (10) business days Four (4) hrs Zone 1 Four (4) hrs Zone 2 Enhanced Extended Loop (EEL) – DS1 25 or more ICB Four (4) hrs 1 to 3 Circuits Zone 1: Seven (7) business days Zone 2: Nine (9) business days Four (4) hrs Zone 1 Four (4) hrs Zone 2 Enhanced Extended Loop (EEL) – DS3 4 or more Circuits ICB Four (4) hrs Enhanced Extended Loop Conversions (EEL-C) – Private Line (PLTS) - Conversion as is ICB Twenty-four (24) hrs OOS Forty-eight (48) hrs AS * Installation Guidelines apply where facilities/network capacity is in place. Where facilities/network capacity are not in place, intervals are handled on an Individual Case Basis (ICB).