HomeMy WebLinkAbout20080404Compliance filing.pdf892 W MAISON AVE.D ~ L GLENNS FERRY, IDAHO 83623
IV I' " (208) 366-2614' FAX (208) 366-2615
TEL E P H 0 NEe 0 M PAN Y WWRTCI.NET
RECEIVED
20GB APR - 4 êt'i 8: 08
April 3, 2008 R.uR :(-ò'--ol
Joe Cusick
Idaho Public Utilties Commission
PO Box 83720
Boise,ID 83720-0074
Dear Mr. Cusick:
Pursuant to the Idaho PUC Order No. 29566, Rural Telephone Company is forwarding
copies of their request for fuds from Rural Utilties Service (RUS). If you have any
questions, please feel free to call me at 208-366-2614.
l'. ereiy" ..J) 11. Ji,,BevA~pY
Sr. Accounting Specialist
Rural Telephone Company
892 WI MADISON AVE.
GLENNS FERRY, LDAHO 8%2:\
(208) 366.2614 . FAX (208) 366.2615
TE L E P H 0 NEe 0 M PAN Y W'X'W.RTCI.NET
~.....~L RECE1VED
zona APR -I, A~l a.B6
Ru~~-otl-o(
April 3, 2008
Ms. Aylene Mafnas, Chief
Nortwest Engineering Branch - RUS
STOP 1595
1400 Independence Ave. SVV
VVashington, DC 20250-1595
RE: Idaho 515 (O-Loan Request for Funds)
Dear Ms. Mafnas:
Enclosed, is RUS Form 481, Financial Requirement Statement (FRS) No. 69. We are
makng a request of loan fuds to be drawn from our approved "0" Loan for the
following budget purose line items:
1.a. Approved Work Orders $595,930.00
Please see attched RUS Form 771, Sumares 1.
1.f. Special Equipment Contract 0-35
1.g. Special Equipment Contract 0-36
$228,197.00
$428,474.00
Please encumber and approve for advance fuds to be drawn from the RUS money loan. I
would like to request this advance to be transferred to our Constrction account using the
following ban information:
Farers National Ban
Routing Number: 124102509
Account Number: 76020922
con fOR YDUR
lllfO\UAAnOI
We are reporting interest eared on our constrction fuds of $1147 as reflected on
budget purose 11 b. VV e are also requesting increases in the amount advanced for budget
purose 1 c, OP Force Account CT F-32 for $1147, for a net advance effect of$O.
Than you for your attention in regards to these matters. If you have any questions,
please feel free to call me at any time. If you are unable to reach me, please call Bev
Argton to discuss any questions.
~ 1f;Wei
a:~~~~ Marell
Rur Telephone Company
COpy FOR YOUR
INFORMATION
Accing to the Paperwrk Redudion Ad of 1995, an agency may not condud or sponsor, and a person is not reuire to respond to, a colladion of information unless ~
displays a valid OMB contl number. Th valid OMB control numbe for this infrmation colladion is 0572-023. The time reuire to complete this infion collecon
is estimated to averae 2 hours per response, including the time fo reviewng insrudions, searcing existing dat sorcs, gatering and maintining th dat need,
and completing and reviewing the colladion of infrmaton.
USDA.RUS
FINANCIAL REQUIREMENT STATEMENT
(RUS; RTB; FFB)
mST. - Submit an original & 2 copies to RUS. See Bull. 327-1
RUSUSEONLYDATE RECENED RUS NUER
FORM APPROVED OMS NO. 0572-0023
BORR. DESIG. I STATEMENT NO. ¡DATE PREPARD
ID 515 I 69 Apr. 3, 2008
BORROWER NAME AND ADDRESS
Rur Telephone Company
892 W. Madison Ave
Glenns Ferr, lD 83623
APPROVED PURSES
(Use Supplementa Sheets
as necessar)
AMOUNT ENCUERED
RUSUSEONLY TOTAL
WITLD ON APPROVED
CONTRACT FOR ADVANCE(I) (2)
TOTAL
ADVANCES
TO DATE
(3)
ADVANCES
NOW
REQUESTED
(4)
RUS USE ONLY
ADVANCES
CURNTLY
APPROVED
(5)
TOTAL
DISBUREMNTS
& CREDITS AS
OF FEB-8
(6)I. Conston
a. approved work orders
b.
c. OP. CT F-32 FAP
d.
e.
f Speial Eauipment G-35
g. Speial EauiDment G-36
2. Engineering-a 1)28E
b. Pre-loa Eng
c. Post-Lo eng CT G-33E
3. Ooetig Equip.
b.
4. General-a
b.
c. RTB Stock
5. Oprating Funds
6. Debt Retrement
7. Acquisitions-a.
b. Lad and Buildings
8a. Close Budget-Unaudite
8b. Closed Budget-Audite
9 Subtotas-All Funds
10. Sale of Propert
I i. Oter-a.Req'd Non-Loan
b. Interest Income
c.
12. Net Totas - Loan Funds
1,563,924 1,563,924 595,930
1,04,546 1,020,210 1,147
228,197
428,474
8,075 8,075
120,000 120,000
1,980,000 355,526
1,562,420.00
995,050.00
8,075.00
120,000.00
355,526.00
13. RUSLOAN
14. RTBLOAN
15. FFBLOAN
16. TOTAL
TOTAL LOAN
26,678,00
8,153,647 8,153,647
12,866,192 11,221,382 1,253,748
(4,110)(4,110)-c
(4,326)(4,326)(1,147)
12,857,756 11,212,946 1,252,601
UNDER NOTE PREVIOUSLY ADVANCED 17. Cash Bal. Per Gen Ledger
ADVANCED THIS FR 18. Adv. Not Deposited FRS 68
26,678,000 11,212,946 19. Oter Adjusents (Speify)
8,153,647.00
11,194,718.00
(4,110.00)
(5,473.00)
11,185,135.00
26,748.00
26,678,000
20. Tota Item 12,Col 6+17,18&19
26,678,000 11,212,946 21. Funds Not Released
UNCUMERED RESERVES (This Spac For RUS Use Ony)
Genera and Contigency
Speial Projed
Funds Not Desite (CR)
Tota Unencumbered Reserves
1,063.00
11,212,946.00
Centr Offce Equipment
Outide Plant and Station Equipment
Lad and Buildings
Enl!neering-a
CERTIFICATION
On behaf of the designed borrower, I request that the amoun set forth as "Advanes Now Requested" (Item 12, Col. 4 above) be adaned undr the loa
conttut. "Lo contract" includs in adtion to the RUS an RTB loan contacts, the Federal Finaing Ba - RUS Loan Commitment Agreement, an
the related Commitmnt Notice an correspondnce concerning loan terms an conditions, I certfY tha the amoun so requested is for a purpose or puses
"Or which fu hae either been approved for adane or for which approval is requested herewith; that the amoun adanced will be deposited in the Trutee,
RUS Constrtion Fun accoun of the corpration in the Farers Natona Ban
bti W1 IS a member of the FDIC; tha the loan an other jU requrea tooe
aeposltea In such ban accoun will be aisbursea only lor the puses an not to exceed the amoun approved for each purpose in Column (2) "Total
Approved for Advane" of the Finacia Requirement Staements; tha the cash balae shown hereon is the balane of the Constrtion Fun-Trutee
account of the general ledger as of Febru 29,2008 ; an that the disbursements reported in Column (6) were mae in the
amouns staed for etuh purse; all in accordace with thê provisions oj thê loa contact.
COPY FOR
INfORMJ
YOUR
ION
-
SIG~TU~ (ORIGINAL MUST A!PE~N EACWA~)/
"' fA - _ æ ff /, AÁø 7' /. /
TITLE (Authorized Corprate Ofcer or Mager)
President
RUS ~ 481 (Rev. 5-03)PAGE I OF _I_PAGES
COpy I - SEN TO RUS
According to the Paperwork Reduction Act of 1995, an agency may not conduct or sponsor. and a person is not required to respond to, a co11ection of information unless it displays a valid
OMB control number. The valid OMB control number for this information co11ection is 0572-0059. The time required to complete this information is estimated to average 30 minutes per
response, including the time for reviewing instructions, searching existing data sources. gathering and maintaining the data needed. and completing and reviewing the co11ection of
information.
U.S. DEPARTMENT OF AGRICULTURE
RURA UTILITIES SERVICE
SUMMARY OF WORK ORDERS SYSTEM DESIGNATION
(Inspection By RUS Field Engineer)Idao 515 Rural G
INSTRUCTONS - Prepare 3 copies. Original to be forwarded to Area Ofce of RUS afler RUS Field SUMMARY NUMBEREngineer has approved construction. For detailed instructions see RUS Bulletin 382-2,
1ADpendixB.
APPROVAL IS REQUESTED FOR THE ENCUMBRANCE OF LOAN FUNDS AS SHOWN IN COLUMN "h" FOR COMPLETED CONSTRUCTION OF SYSTEM
IMPROVEMENTS AND EXTENSIONS OR FOR PURCHASES OF STATION APPARATUS AND EXEMPT MATERIALS:
COST OF CONSTRUCTION LESS ADVANCES NOT REQUIREDWORK NETORDERLABOR AND REUSABLE STATION ADVANCESMATERIALSAPPARATUS & OTHERNO.OTHER MATERIAL TOTAL COST
SALVAGED EXEMPT MAT'L.(Explain)REQUIREDabcdef9h
1075333 17,118.28 17,118.28 33.81 17,084.47
1076861 73,021.90 31,458.47 104,480.37 31,458.47 820.64 72,201.26
1076461 53,410.63 222,958.39 276,369.02 222,958.39 1,631.26 51,779.37
1076611 50,105.25 26,911.68 77,016.93 1,200.43 75,816.50
1076431 1,292.88 40,375.45 41,668.33 82.31 41,586.02
1075331 9,393.01 5,628.85 15,021.86 103.34 14,918.52
1079611 68,336.88 70,019.69 138,356.57 2,421.5 135,935.22
1076831 33.81 17,084.47 17,118.28 33.81 17,084.47
'076911 24,275.38 15,538.46 39,813.84 1,946.77 37,867.07
077031 9,759.80 31,359.02 41,118.82 242.70 40,876.12
'056931 56,121.65 928.07 57,049.72 2,276.51 54,773.21
1079631 2,166.74 33,912.61 36,079.35 71.26 36,008.09
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 O.()O
TOTAL 347,917.93 513,293.44 861,211.7 0.00 254,416.86 10,864.19 595,930.32
CERTIFICATION
i certif that, (l) the total costs and net requirements for the construction included above are the actual costs and net requirements for loan.f reflected in the permanent records of this _'00 ~J -=- if..""dW "''' 'M" dCDmSL_by R'" ¡. _.. RUS_ I'J ~"
areas not included in existing loans, has been approve by RUS, (2 a11 the reiuired acceptance iests hae been made on the construction and JlfiSjåc/OI) "5) ara
corrections required on the portions 0t. construction that were fiel -inspected ave been made on a11 the construction mcluded in the sum . ,.lJØJe ri iremen the'" UJ¡
American" proision have been comle iedwith where a'Z0reign made materials or equipment were used in the construction. lfirth. erti lalo bod --'._"" Ji"'" ~."";oo ¡" - ""."' "", ,"" ¡".. 00 1"- "" '" _"' of"" '"~ = "
...-Æ~'-. / ..~ ice-Pres den
"'
l~~~ATUREANDTITLE0119 -08 Rural Tel 0 . omnany
DATE // NAME OF BORROWER
APPROVAL OF CONSTRUCTION \.
The above con.~truction or purchae has been reviewed and is approved front an engineering standpoint.
--. !EVEWD _ c;FR.
DATE RUSFIE ~INigR 1.!4 J 6L
ACCOUNTING VERIFICATION (RUS USE ONLY)
COPl fOR OU
RUS Form n1 (Rev. 10-75) ~\Otl
t
R
-WfJr,k c;,.~~-
fß - SIS~SJ/"/¥ol' !i..L- /6,c.:
The following work orders were performed to provide a better link for our customers for
toll puroses and to offer enhanced services.
VVO# 1075333 This work order in the Boise River (Pine), Id exchange was for Central Offce
Electronics. It is a T elstrat ESA Server and Softare. Ths equipment will allow us to connect this
exchange to our new soft switch that is being installed in our new Central Offce in Glenns Ferr. This
work order was completed 09/30/07
VVO# 1076861 Ths work order includes all labor and overhead that was involved in instaling new
microwave equipment on Triity Mountain in the Praie, Id exchange side. The equipment was
purchased under Special Equipment Contract G-35. Ths work order was closed out 12/31107.
VVO# 1076461 This work order includes all labor and overhead that was involved in instaling new
microwave equipment on James Creek in the Atlanta Id exchange side. This equipment was purchased
under Special Equipment Contract G- 35. This work order was closed out 12/31/07
VVO# 1076611 This work order includes all equipment, labor and overhead that was involved in
bringing fiber into Glenns Ferr to our new CO building. VVe placed 13773 feet of conduit, 6440 feet if
72 Fiber, 7600 feet of 48 Fiber and all associated handholes. This placement will allow us to connect
our new switch to most of our Idaho exchanges through our new CO. This work order was closed out
12/1107. VVe have a 773 Contrct on fie for Ear Energy for varous 2007 projects.
VVO# 1076431 Ths work order in the Atlanta ID exchange was for Central Offce Electronics. It is a
Telstrat ESA Server and Softare. This equipment will allow us to connect this exchange to our new
soft switch that is being instaled in our new Central Offce in Glenns Ferr. This work order was
completed 09/30/07
VVO # 1075331 This work order in the Boise River, ID exchange includes all equipment, labor and
overhead to instal a Digita Loop Carer. Ths DLC was placed in the Elk Valley Subdivision in Boise
River. This work order was completed 08/31107.
WO# 1079611 This work order in the Tipanuk, ID exchange includes all materials, labor and overhead
involved in placing 36390 feet of Fiber Optic Cable, Conduit, 16472 feet of 6x22 cable, 682 feet of
12x22 cable, 1578 feet of 25x22 cable and all associated hand holes. Ths work order was closed out
12117/07. . VV e have a 773 Contract on fie for Ear Energy for varous 2007 projects.
VVO# 107683 i This work order in the Prairie, ID exchange was for Central Offce Electronics. It is a
Telstrat ESA Server and Softare. This equipment will allow us to connect this exchange to our new
soft switch that is being instaled in our new Central Offce in Glenns Ferr. Ths work order was
completed 09/30/07.
REVEWD
Joe D. Bradley - G~
DATE:.J'-~.L
COpy FOR YDUR
INfORMATlOll
~~ uJ ' ~ tf c)#" et r -
JßSII"_S:i~0? ß..J& ~ ,f:i
VVO# 2076911 This work order in the Red Rock, NV exchange includes all materials, labor and
overhead involved in placing conduit and cable. Ths work order was completed 12/31/07. I have
removed the charges for Mautner Constrction of$ 1250.00 from the requested advances as we don't
have a 773 Contract for them.
VVO# 2077031 This work order in the Antelope Valley, NV exchange includes all materials, labor and
overhead involved in placing a Digita Loop Carer at Alum Rock subdivision. Ths work order was
closed 09/30/07
VVO# 2056931 Ths work order in the Red Rock, NV exchange includes all materials, labor and
overhead involved in expanding and remodeling the Central Office Building. Ths work order was
completed 12/31/07. VVe have a 773 contract for Steve Hoeft for this project.
VVO# 1079631 This work order in the Tipanuk, ID exchange was for Central Offce Electronics. Itis a
Telstrat ESA Server, Softare and GPON-2420. Ths equipment will allow us to connect ths exchange
to our new soft switch that is being installed in our new Central Offce in Glenns Ferr. This work
order was completed 12/31/07.
COpy FOR YOUR
INfORMATION
REVEWD
Joe D. Bradley - G:~DATE:-./..i