Loading...
HomeMy WebLinkAbout200503257th Amended 3rd Revision to Exhibit A of SGAT.pdfMary S. Hobson (ISB #2142) Stoel Rives LLP 101 South Capitol Boulevard - Suite 1900 Boise, ill 83702 Telephone: (208) 387-4277 Facsimile: (208) 389-9040 mshobson~stoel.com tCE lVED H r-ILt ZD65~1AR2 fJrj L,: lJ i; ; ;'i ') j "' UTI E s j COt'~ SIGN Adam L. Sherr (WSBA #25291) Qwest 1600 ih Avenue - Room 3206 Seattle, W A 98191 Telephone: (206) 398-2507 Facsimile: (206) 343-4040 adam. sherr~qwest. com BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF QWEST CORPORATION'S REVISIONS TO ITS S T A TEMENT OF GENERALLY AVAILABLE TERMS AND CONDITIONS (SGAT) PURSUANT TO 47 U.C. ~ 252(f) CASE NO. QWE-O3- REVISIONS TO EXHIBIT " Qwest Corporation ("Qwest"), by and through its undersigned attorneys, files the attached Third Revision, Seventh Amended Exhibit A dated March 24, 2005 ("Seventh Amended Exhibit A" ). The Seventh Amended Exhibit A corrects a clerical error in sections 9.23.6.4., 9.23.6.4., and 9.23.6.4.2.3 in which the wrong rates were listed for the DS1 Capable Loop in zones 1-3. The Seventh Amended Exhibit A reflects the prices for unbundled network elements (UNEs) ordered by the Commission in Case No. QWE-01-11 and is otherwise identical to the version of Exhibit A now in effect, with the exception of a small number of additional minor changes discussed below and shown on the "redline" version of the Seventh Amended Exhibit A provided for the convenience of the Commission. REVISIONS TO EXHIBIT "A" - Page 1 Boise-182344.1 0000-000 ; , r: if A JY j'), f : ',; Ii ? : lC Iii fi '('j,j."t Ii i The DSI Capable Loop Rates The Third Revised Fourth Amended Exhibit A, dated January 16, 2004, reflected the rates set by the Commission in Qwest cost docket, Docket No. QWE-01-11. At that time Qwest did not list recurring charges for DS 1 loops used in Loop MUX Combination (LMC). However, the rate listed for DS 1 capable loops in zones 1-3 was correctly identified in the January 16 2004 Exhibit A in section 9.2.3. The error that Qwest now seeks to correct was made in the Fifth Amended Third Revision Exhibit A filed April 26, 2004. At that time, Qwest added recurring charges for the loop portion of the LMC DS1 and, instead of using the standalone rates established in 9.2.3.3, Qwest inadvertently used the rates for the four-wire analog loop. Because of this error the April 26, 2004 version of Exhibit A, and the present version of Exhibit A, reflected a rate for the LMC DS 1 that is substantially lower than the correct rate. Despite this error, Qwest has negotiated 35 contracts containing LMC DS 1. The rate was correctly identified for that combination in each of these 35 contracts. As a result, no Idaho customer has been billed the incorrect amount and no Idaho wholesale customer will experience a rate increase due to the change reflected in the Idaho SGA Additional Changes As the foregoing description of the error in the LMC DS 1 rate elements demonstrates, it is useful to be able to readily locate the source of the standalone rate elements when they appear as part of a combination service in the Exhibit A. To facilitate that comparison and better understanding of the Exhibit, this Seventh Amended Exhibit A contains such explanations in the following sections: 9.23., 9.23.6.3., 9.23.6.4.2 (as discussed above), 9.23.1.2, 9.23. REVISIONS TO EXHIBIT "A" - Page 2 Boise-182344.1 0000-000 23.7.3., and 9.23.7.4.2. The changes are all in the form of clarifications and do not affect the prices or availability of the elements listed. Because the change to the LCM DS 1 rate corrects an error that could otherwise mislead customers, Qwest respectfully requests that the Commission accept the attached Seventh Amended Exhibit A and allow it to go into immediate effect. Dated this 24th day of March, 2005. l~ Mary S. son Stoel Rives, LLP Attorneys for Qwest Corporation REVISIONS TO EXHIBIT "A" - Page 3 Boise-182344.1 0000-000 CERTIFICATE OF SERVICE I hereby certify that on this 11th day of February, 2005, I served the pleading titled REVISIONS TO EXHIBIT A" as follows: Jean D. Jewell, Secretary Idaho Public Utilities Commission 472 West Washington O. Box 83720 Boise, ill 83702 Telephone: (208) 334-0300 Facsimile: (208) 334-3762 iiewell~puc.state.id. Weldon Stutzman Deputy Attorney General Idaho Public Utilities Commission 472 West Washington Street O. Box 83720 Boise, ill 83702 Telephone: (208) 334-0300 Facsimile: (208) 334-3762 REVISIONS TO EXHIBIT "A" - Page 4 Boise-182344.1 0000-000 LXJ Hand DeliveryL-J U. S. MailL-J Overnight DeliveryL-J FacsimileL-J Email LXJ Hand DeliveryL-J U. S. MailL-J Overnight DeliveryL-J FacsimileL-J Email \ t Stacy L. ummers Legal Assistant to Mary S. Hobson Stoel Rives LLP Third Revision, Seventh Amended Exhibit A March 24, 2005 Exhibit A Idaho Resale Wholesale Wholesale Discount Discount Percentage Percentage Recurring Nonrecurring Charges Charges Wholesale Discount Rates Southern Idaho Basic Exchange Residential Line Service 18.25%18.25% Basic Exchange Business Line Service 18.25%18.25% IntraLATA Toll 18.25%18.25% 1.4 Package/Special Services (e., Centrex, Discounted Line/Feature Packages 18.25%18.25% ISDN, PBX-Trunks, DSS & UAS, Frame Relay Service, LAN, MegaBit and other ACS) Listings CO Features & Information Services 18.25%18.25% Private Line 18.25%18.25% Ooerator Services / Directory Assistance (OS/DA)18.25%18.25% Volume Packaged Services - High Volume Customers 65%65% Public Access Line (PAL) Service 00%00% Northern Idaho Basic Exchanae Residential Line Service 19.37%19.37% Basic Exchange Business Line Service / PBX 19.37%19.37% IntraLATA Toll 19.37%19.37% 2.4 Package/Special Services (e., Centrex, Discounted Line/Feature Packages,19.37%19.37% ISDN, PBX-Trunks, DSS & UAS, Frame Relay Service, LAN, MegaBit and other ACS) Listings CO Features & Information Services 19.37%19.37% Private Line 19.37%19.37% Ooerator Services / Directorv Assistance (OS/DA)19.37%19.37% Volume Packaaed Services - Hiah Volume Customers 87%87% Public Access Line (PAL) Service 00%00% Customer Transfer Charge (CTC) CTC for POTS Service Manual First Line $16. Each Additional Line $2. Mechanized First Line $0. Each Additional Line $0. CTC for Private Line Transoort Services First Circuit $38. Additional Circuit. per circuit same CSR $33. CTC for Advanced Communications Services, per Circuit $46. Interconnection Entrance Facilities Intentionallv Left Blank DS1 $103.$208. DS3 $524.42 $277. LIS EICT Per DS1 $0.$0. Per DS3 $0.$0. Direct Trunked Transport Intentionallv Left Blank DS1 (Recurrina Fixed per Mile) Over 0 to 8 Miles $37.$1, Over 8 to 25 Miles $37.$1. Over 25 to 50 Miles $37.$1. Over 50 Miles $37.$1. DS3 (Recurring Fixed per Mile) Over 0 to 8 Miles $257.$19.48 Over 8 to 25 Miles $260.49 $24. Over 25 to 50 Miles $260.$26.43 3.4 Over 50 Miles $259.$26. Multiplexina 7.4.DS1 to DSO $263.$193. Owest Idaho SGAT Third Revision Exhibit A 7th Amended March 24, 2005 Page 1 of 18 Exhibit A Idaho 7.4.DS3 to DS1 $304.$193. Trunk Nonrecurrina Charaes Intentionallv Left Blank DS1 Interface First Trunk $229. Each Additional Trunk $5.46 DS31nterface First Trunk $235. Each Additional Trunk $11. Exchanoe Service (EAS/Local\ Traffic End Office Call Termination Der Minute of Use $0.001343 ### Tandem Switched TransDort Per Minute of Use $0.000690 Tandem Transmission, Der Minute of Use fRecurrina Fixed oer Mile) Over 0 to 8 Miles $0.0004564 $0.0000367 Over 8 to 25 Miles $0.0004564 $0.0000367 Over 25 to 50 Miles $0.0004564 $0.0000367 3.4 Over 50 Miles $0.0004260 $0.0000144 Local Traffic-FCC-ISP Rate CaDs MOU as of June 14 2003. rate in effect until further FCC action $0.0007 Miscellaneous Charaes Expedite Charge (LIS Trunks)Qwest's Idaho Access Service Catalog Cancellation Charge (LIS Trunks)Qwest's Idaho Access Service Catalog Additional Testing (LIS Trunks)Qwest's Idaho Access Service Catalog Transit Traffic Local Transit (Local Transit Assumed Mileage = 7 Miles)See Tandem See Tandem Switching and Switching and Tandem Tandem Transmission Transmission Rates Above,Rates Above, IntraLATA Transit Toll (IntraLATA Transit Toll Assumed Mileage = 7 Miles)Qwest's Idaho Qwest's Idaho Access Service Access Service Catalog Catalog Jointly Provided Switched Access Qwest's Idaho Qwest's Idaho Access Service Access Service Catalog Catalog 9.4 Cateaorv 11 Mechanized Record Charge, per Record $0.0014877 Collocation All Collocation Plannina and Enaineerina Intentionallv Left Blank Cable Auament Quote Preparation Fee $1.284. Entrance Facilitv Standard Shared, Der Fiber $5.44 $616. Cross Connect Der Fiber $5.$722. ExDress Der Cable $88.$9009. Cable SDlicina Fiber - Per Set-$399. Per Fiber Scliced $37. 1.4 Power Usaae -48 Volt DC Power Usage. per Ampere. per Month 1.4.Power Plant Qwest Idaho SGAT Third Revision Exhibit A 7th Amended March 24, 2005 Page 2 of 18 Exhibit A Idaho 1.4.Power Plant - Less than 60 Ames $10. 1.4.Power Plant - Equal to or Greater Than 60 Amps $8.42 1.4.Power Usage 1.4.2: 1 Power Usaae 60 Ames or Less per Amp $2.47 1.4.Power Usaae More Than 60 Amps. per Amp $4. AC Power Feed AC Power Feed per Ame. per Month 120V $16. 208 V. Sinale Phase $27. 208 V Three Phase $48. 240 V Sinale Phase $32. 240 V Three Phase $55. 480 V. Three Phase $111. AC Power Feed per Foot per Month 20 Ame. Sinale Phase $0.0084 $7.43 20 Amo. Three Phase $0.0105 $9. 30 Ame. Sinale Phase $0.0091 $8. 2.4 30 Amo, Three Phase $0.0125 $11, 40 Ame. Sinale Phase $0.0107 $9.43 40 Ame. Three Phase $0.0147 $12. 50 Ame. Sinale Phase $0.0127 $11. 50 Amc, Three Phase $0.0177 $15. 60 Ame, Sinale Phase $0.0144 $12. 60 Amp. Three Phase $0.0204 $17. 100 Amp. Sinale Phase $0.0178 $15. 100 Ame. Three Phase $0.0277 $24.44 Inspector Labor. per Half Hour Reaular Hours Rate $28. After Hours Rate minimum 3 hours $37. Channel Reaeneration DS 1 Reaeneration $0.$0. DS3 Reaeneration $0.$0. Collocation Terminations Shared Access DSO Cable Placement per 100 Pair Block $0.2262 $208. Cable Placement per Termination $0.0090 $4. Cable per 100 Pair Block $0.3304 $304. Cable per Termination $0.0066 $4. Blocks. per 100 Pair Block $0.5730 $528.42 Blocks per Termination $0.0115 $8. Block Placement per 100 Pair Block $0.2381 $219. Block Placement per Termination $0.0048 $3. DS1 Cable Placement. per 28 DS1s $0.4111 $362. Cable Placement, per Termination $0.0442 $38. Cable. per 28 DS1s $0.3993 $351. Cable. per Termination $0.0429 $37. Panel per 28 DS1s $0.2742 $241. Panel per Termination $0.0330 $29. Panel Placement. per 28 DS 1 $0.0847 $74. Panel Placement, per Termination $0.0091 $8. DS3 Cable Placement per Termination $0.1521 $134. Cable. per Termination $0.2578 $227. Panel! Connector. per Termination $0.2625 $231. 3.4 Panel! Connector Placement per Termination $0.0204 $18. 1.4 Fiber Termination 1.4.Terminations per 12 Fibers $26.$1 513. 1.4.Additional Connector lif applicable)$0.$411. 1.4.Cable Rackina - Shared per 12 Fibers $26. 1.4.4 Cable Racking - Dedicated $1.433. Securitv Charae Per Emclovee, per Card $0. Qwest Idaho SGAT Third Revision Exhibit A 7th Amended March 24. 2005 Page 3 of 18 Exhibit A Idaho Card Access eer Emelovee eer Office $7. Central Office SecuritY Infrastructure ICB ICB Comeosite Clock Central Office Synchronization 10.Synchronization - Comeosite Clock eer Port $7. Intentionally Left Blank Seace Availabilitv Charae $313. Collocation Space Reservation Fee The charge will be 25% of the Nonrecurring Fee Collocation Scace action Administration Fee $1 107. Collocation Seace action Fee eer Square Foot $2. Virtual Collocation Plannina and Enaineerina Fees Quote Preearation Fee $3146.41 B,7 Maintenance Labor. eer Half Hour Reaular Hours Rate $29. After Hours Rate $39. Trainina Labor cer Half Hour Reaular Hours Rate $29. 2.4 Bav Seace Eauicment Bav. eer Shelf $4. 2.4.Virtual Scace Construction, Initial Bay Provided $20.$17749. 2.4.Each Additional Bay Seace $3.$2 854. Virtual Cable Rackina. eer Shelf $0.44 $384. Enaineerina Labor cer Half Hour Reaular Hours Rate $32. After Hours Rate $43. Installation Labor. eer Half Hour Reaular Hours Rate $31. After Hours Rate $41. Rent Floor Scace Lease eer Square Foot $2. Rent cer Shelf $4. Intentionally Left Blank Power Plant -48 DC Power Cable 20 Amp Power Feed $4.$3985.41 30 Ame Power Feed $5.$4537. 40 Ame Power Feed $6.$5 480.42 1.4 60 Ame Power Feed $11.$9 706. 100 Ame Power Feed $18.$16370. 200 Ame Power Feed $34.$30473. 300 Ame Power Feed $54.$47917. 400 Amp Power Feed $77.$68037. Caaeless Physical Collocation Plannina and Enaineerina Fee Quote Preearation Fee $3.146.41 Seace Construction and Site Preearation Site Preearation Fee ICB 2 Bavs $23.$20 603.40 Intentionally Left Blank 2.4 Intentionally Left Blank Scace Construction for Each Additional Bav $3.$2 854. Adiustment for Sinale Bay - Chance to Standard Desian . ($3,24\($2 854. DC Power Cable 20 Ame Power Feed $4.$3985.41 30 Ame Power Feed $5.$4 537. Qwest Idaho SGA T Third Revision Exhibit A 7th Amended March 24 2005 Page 4 of 18 Exhibit A Idaho 40 Ame Power Feed $6.$5.480.42 7.4 60 Ame Power Feed $11.$9.706. 100 Amp Power Feed $18.$16370. 200 Amp Power Feed $34.$30473. 300 Amp Power Feed $54.$47917. 400 Ame Power Feed $77.$68037. Floor Seace Lease eer SQuare Foot $2. Caaed Physical Collocation 8.4.Plannina and Enaineerina Fee 8.4.Quote Preearation Fee $3185.B 7 Seace Construction and Site Preearation 8.4.Site Preparation Fee ICE 8.4.Intentionally Left Blank 8.4.Intentionally Left Blank 8.4.2.4 Seace Construction 8.4.2.4.Caae Ue to 100 Sa. Ft.$38.$33927. 8.4.2.4.Cage - 101 Sa. Ft. to 200 Sa. Ft.$34.$301.13. 8.4.2.4.Caae - 201 Sa. Ft. to 300 Sa. Ft.$42.$37 154. 8.4.2.4.4 Cage - 301 Sa. Ft. to 400 SQ. Ft.$44.$38 922. 8.4.Intentionally Left Blank 8.4.Intentionally Left Blank 8.4.DC Power Cable 8.4.20 Amp Power Feed $5.$4 954. 8.4.30 Amp Power Feed $6.$5457. 8.4.40 Amp Power Feed $7.41 $6 526. 8.4.7.4 60 Amp Power Feed $12.$10772. 8.4.100 Ame Power Feed $19.$17.531. 8.4.200 Ame Power Feed ~37.~32 634. 8.4.300 Amp Power Feed $58.$51 315. 8.4.400 Ame Power Feed $82.$72861. 8.4.Space Construction - Fencing Credit 8.4.Caae Ue to 100 Sa. Ft.$10.oi)$5723, 8.4.Caae 101 - 200 Sa. Ft.$12.70)$7135, 8.4.Caae 201 - 300 Sa. Ft.$14.47\$8015. 8.4.3.4 Caae301 - 400 Sa. Ft.$16,15'$8 851, 8.4.Floor Seace Lease. eer Sauare Foot $2. 8.4.Intentionally Left Blank 8.4.Intentionally Left Blank 8.4.Intentionally Left Blank Groundina 8.4.2/0 AWG eer Foot $0.0097 $8. 8.4.1 /0 AWG eer Foot $0.0170 $14. 8.4.4 / 0 AWG. per Foot $0.0200 $17. 8.4.8.4 350 kcmil per Foot $0.0258 $22. 8.4.500 kcmil eer Foot $0.0299 $26. 8.4.750 kcmil eer Foot $0.0456 $40. Adiacent Collocation ICB Remote Collocation Physical & Virtual Remote Collocation Seace leer Standard Mounting Unit)$0.$665. FDI Terminations (per 25 Pair)$0.$484. Power Usaae Power Usaae 60 Ames or Less eer Ame $2.47 Power Usaae More Than 60 Ames eer Ame $4. 1.4 Quote Preearation Fee $1 064. Adiacent Remote Collocation Adjacent Remote Collocation (New)ICB Adjacent Remote Collocation (Existina) Space (per Standard Mountina Unit)$0.$665.47 FDI Terminations (eer 25 Pair)$0,$484. Qwest Idaho SGAT Third Revision Exhibit A 7th Amended March 24, 2005 Page 5 of 18 Exhibit A Idaho Power Usaae Power Usaae 60 AmDs or Less Der Amp $2.47 Power Usaae More Than 60 Amps, per Amp $4. 2.4 Quote PreDaration Fee $1 064. Additional Virtual Remote Collocation Elements Flat Charae Der Job $36. Enaineerina Rate, per Half Hour $35. Maintenance. Der Half Hour $29.40 3.4 Installation. Der Half Hour $29.40 Trainina, Der Half Hour $29.40 CLEC to CLEC Desian Enaineerina & Installation Flat Charae lDesian Enaineerina - No Cables)$634. Fiber Flat Charae $1 229. Cable Rackina, Per Foot DSO Der Foot. per Cable $0.11848 DS1 Der Foot. per Cable $0.13075 DS3 Der Foot. Der Cable $0.10234 2.4 Fiber, Der Foot Der Fiber $0.93313 Virtual Connections (if aDDlicable - Connections only: No cables) DSO Per 100 Connections)$194. DS1 Per 28 Connections)$91. DS3 Per 1 Connection)$5. 3.4 Fiber Connections Der Fiber SDliced $37. 7.4 Cable Hole (if Applicable)$386. CLEC to CLEC Cross Connection $201. Interconnection Distribution Frame nCDF) Collocation ICE ADDlication to Reauest Cancellation No Charae Microwave Collocation Under DeveloDment Intentionally Left Blank Intentionally Left Blank DC Power Reduction 13.Quote PreDaration Fee $703. 13.Power Reduction Less than 60 AmDs $494. 13.Power Reduction Eaual to 60 AmDs $706. 13.4 Power Reduction Greater than 60 Amps. per Amp $895. 13.Power On Off $621. 13.Batterv Distribution Fuse Board (BDFB) Rent $64. Collocation Transfer of ResDonsibilitv 14.Intentionally Left Blank 14.Assessment Fee $1 036. 14.Network Systems Administration Fee $1 586. Intentionally Left Blank 0 Unbundled Network Elements (UNEs) Interconnection Tie Pairs nTP) - Per Termination DSO $0. DS1 $1. DS3 $14. Unbundled LooDs Analoa LOODS See 9.2.4 Wire Voice Grade LOOD Zone 1 $15. Zone 2 $23. Zone 3 $40. Intentionally Left Blank Wire Voice Grade LooD Qwest Idaho SGA T Third Revision Exhibit A 7th Amended March 24, 2005 Page 6 of 18 Exhibit A Idaho Zone 1 $30. Zone 2 $46. Zone 3 $79.47 Nonloaded Loops See 9.2.4 Wire Nonloaded Loon Zone 1 $15. Zone 2 $23. Zone 3 $40. Intentionallv Left Blank Wire Nonloaded Loon Zone 1 $30. Zone 2 $46. Zone 3 $79.47 2.4 Loop Unloadina $9.A 8 Loop Conditionina $22.A 8 Diaital Capable Loops Basic Rate ISDN xDSL-1 Capable ADSL Compatible Loop See-9.2.4 Zone 1 $15. Zone 2 $23. Zone 3 $40. Intentionallv Left Blank DS1 Capable Loop See-9. Zone 1 $86.48 Zone 2 $86.46 Zone 3 $99. 3.4 DS3 Capable Loop See-9. 3.4.Zone 1 $941. 3.4.Zone 2 $955. 3.4,Zone 3 $1 264. OC - n Capable Loon See-9. OC -$924. OC -$1 314. OC - 48 $3 528. Wire Extension Technoloav $22. 2.4 Loop Installation Charges for 2 & 4 wire Analog Non-Loaded, ADSL Compatible, ISDN BRI See 9.1 & Capable and xDSL - I Capable Loons where conditionina is not required. Basic Installation 2.4.First $11. 2.4.Each Additional $6. Basic Installation with Performance Testing 2.4.First LooD $17. 2.4.Each Additional $8. Coordinated Installation with Cooperative Testing Project Coordinated Installation 2.4.First Loon $171. Each Additional $94. 2.4.4 Coordinated Installation without Cooperative Testing Project Coordinated Installation 2.4.4.First Loop $59. 2.4.4.Each Additional $53. 2.4.Basic Installation with Cooperative Testing 2.4.First Loop $142. 2.4.Each Additional $94. DS1 Loop Installation Charaes See 9. Basic Installation First LooD $128. Each Additional $99. Qwest Idaho SGAT Third Revision Exhibit A 7th Amended March 24, 2005 Page 7 of 18 Exhibit A Idaho Basic Installation with Performance Testing First Loop $279. Each Additional $212. Coordinated Installation with Cooperative Testing Project Coordinated Installation First Loop $316. Each Additional $222. 5.4 Coordinated Installation without Cooperative Testing Project Coordinated Installation 5.4.1 First Loop $135. Each Additional $106. Basic Installation with Cooperative Testing First Loop $272. Each Additional $195. DS3 Loop Installation Charges See 9.3.4 Basic Installation First Loop $128. Each Additional $99. Basic Installation with Performance Testina First Loop $279. Each Additional $212. Coordinated Installation with Cooperative Testing Project Coordinated Installation First Loop $316. Each Additional $222. Coordinated Installation without Cooperative Testing Project Coordinated Installation 6.4.First Loop $135. 6.4.Each Additional $106. Basic Installation with Cooperative Testing First Loop $272. Each Additional $195. OC - 3 48 Loop Installation Charges See 9. Basic Installation First Loop $128. Each Additional Loop $99. Basic Installation with Performance Testing First Loop $279. Each Additional Loop $212. Coordinated Installation with Cooperative Testing First Loop $316. Each Additional Loop $222.40 7.4 Coordinated Installation without Cooperative Testing 7.4.First Loop $135. 7.4.Each Additional Loop $106. Basic Installation with Cooperative Testing First Loop $272. Each Additional Loop $195. Private Line to Unbundled Loop Conversions $34. SublooD Wire Distribution Loop (Applies to both Analog and Nonloaded) First $107. Each Additional $29. First & Each Additional 2-Wire Distribution Loop Zone 1 $11. Zone 2 $16. Zone 3 $27. Intentionallv Left Blank Qwest Idaho SGAT Third Revision Exhibit A 7th Amended March 24, 2005 Page 8 of 18 Exhibit A Idaho Intra-Buildina Cable LooD. Per Pair $0. No DisDatch First $51. No DisDatch Each Additional $21. DisDatch First $98.1 ~ 3.4 DisDatch Each Additional $31. Feeder Looo 3.4.DS1 CaDable Feeder LooD First $310. Each Additional $221.11: 3.4.First & Each Additional DS1 CaDable Feeder LOOD Zone 1 $77 . 3.4.Zone 2 $77. 3.4.Zone 3 $90. MTE Terminal SublooD Access Sublooo MTE - POI Site Inventorv (Der request)$110.4~ MTE - POI Rearranaement of Facilities ICB MTE - POI Construction of New SPOI ICB Intentionallv Left Blank Field Connection Point lFCP) Feasibilitv Fee Quote PreDaration Fee $1 197. FCP Reclassification $463. Intentionallv Left Blank Intentionallv Left Blank Intentionallv Left Blank Construction Fee ICB Shared Services 9.4.Shared LOOD, Der LOOD $0.$33. 9.4.UNE - P Line SDlittina Basic Installation Charae for UNE-P Line SDlitting $33. 9.4.Looo Solittina 9.4.Basic Installation Charae for LOOD SDlittina $33. 9.4.4 ass Der Line Der Month $3. 9.4.Reclassification Charae ICB 9.4.SDlitter Shelf Charae $4.$503. 9.4.Solitter TIE Cable Connections SDlitter in the Common Area-Data to 410 block $3.$2 689. 9.4.SDlitter in the Common Area-Data direct to CLEC $3.$2850. 9.4.SDlitter on the IDF - Data to 410 Block $0.$834. 9.4.7.4 SDlitter on the IDF - Data direct to CLEC $1.$1 623.47 Solitter on the MDF-Data to 410 block $0.$861. 9.4.Solitter on the MDF - Data direct to CLEC $2.$1 922.42 9.4.Enaineerina $1.079. Network Interface Device lNID)$0.$52. Unbundled Dedicated Interoffice Transport (UDIT) DSO UDIT (Recurrina Fixed per Mile)$241. Over 0 to 8 Miles $24.$0. Over 8 to 25 Miles $24.$0. Over 25 to 50 Miles $24.$0. 1.4 Over 50 Miles $24.$0. DS1 UDIT fRecuffina Fixed per Mile)$284. Over 0 to 8 Miles $36.43 $3. Over 8 to 25 Miles $37.$3. Over 25 to 50 Miles $39.$1. 2.4 Over 50 Miles $37.$0. DS3 UDIT Recurrina Fixed Der Mile)$284. Over 0 to 8 Miles $238.$54. Over 8 to 25 Miles $242.$16. Qwest Idaho SGAT Third Revision Exhibit A 7th Amended March 24, 2005 Page 9 of 18 Exhibit A Idaho Over 25 to 50 Miles $223.$21. 3.4 Over 50 Miles $235.$14. 6.4 OC-3 UDIT fRecurrina Fixed De, Mile)$295. 6.4.Over 0 to 8 Miles $763.$36. 6.4.Over 8 to 25 Miles $763.$36. 6.4.Over 25 to 50 Miles $763.$36. 6.4.Over 50 Miles $763.$66. OC-12 UDIT fRecurrina Fixed De, Mile)$295. Over 0 to 8 Miles $2163.$72. Over 8 to 25 Miles $2 163.$72. Over 25 to 50 Miles $2163.$72. 5.4 Over 50 Miles $2163.$135. OC-48 UDIT fRecurrina Fixed De, Mile)$295. Over 0 to 8 Miles $4 420.$183. Over 8 to 25 Miles $4 420.$183. Over 25 to 50 Miles $4420.$183. 6.4 Over 50 Miles $4.420.$346. UDIT DSO Channel Performance DSO UDIT Low Side Channelization $13. DS1/ DSO Low Side Channelization $7.47 $191. UDIT Multiplexina (Stand Alone) DS1 to DSO $263.$238. DS3 to DS1 $304.$1.996. Extended Unbundled Dedicated Interoffice Transport DS1 E-UDIT $80.$339. DS3 E-UDIT $371.$347. OC-3 E-UDIT $819.$412. OC-12 E-UDIT $1 256.$427. OC-48 E-UDIT ~3 299.~413. Remote Node / Remote Port 10.OC-3 Remote Node 10.Remote Node $476. 10.DS 1 Remote Port $3.$198. 10.DS3 Remote Port $49.$198. 10.OC-12 Remote Node 10.Remote Node $894. 10.DS 1 Remote Port $12.$198. 10.DS3 Remote Port $33.$198. 10.OC-3 Remote Port $103.$198. 10.OC-48 Remote Node 10.Remote Node $3.207. 10.DS3 Remote Port $22.$198. 10.OC-3 Remote Port $121.$198. 10.3.4 OC-12 Remote Port $479.45 $198. UDIT Rearranaement 11.DSO Sinale Office $164. 11.DSO Dual Office $206. 11.Hiah Capacitv Sinale Office $221. 11.4 Hiah Capacitv Dual Office $249. Unbundled Dark Fiber lUDF\ Initial Records Inauirv fiR!) Simple $196. Complex $251. Field Verification and Quote Preparation (FVQP)$907, Field Verification (Enaineerina Verification\$297. 7.4 UDF - Sinale Strand UDF - Interoffice Facilitv (UDF-IOF) - Single Strand 7.4.Order Charge, per First Strand / Route / Order $492. 7.4.Order Charge Each Additional Strand / Same Route $255. 7.4.Fiber Transport. per Strand / Mile $50. 7.4.1.4 Termination Fixed, per Strand / Office / Termination $4. 7.4.Fiber Cross-Connect per Strand / Office $2.$19. Qwest Idaho SGAT Third Revision Exhibit A 7th Amended March 24, 2005 Page 10 of 18 Exhibit A Idaho UDF-Loop Charaes - Sinale Strand 7.4.Order Charge per First Strand Route Order $492. 7.4.Order Charge Each Additional Strand Same Route $255. Fiber Loop. per Strand Route $88. 7.4.Termination Fixed per Strand Office $4. 7.4.Termination, Fixed, per Strand Premise $3. Fiber Cross-Connect per Strand Office $2.$19. 7.4.Extended Unbundled Dark Fiber (E-UDF) - Sinale Strand Order Charae per First Strand Route Order $492, 7.4.Order Charae Each Additional Strand Same Route $255. 7.4,Fiber Transport per Route Strand $96, 7.4.Termination Fixed per Strand Office $4. 7.4.Termination Fixed per Strand Premise $3. Fiber Cross-Connect per Pair $2.$19. UDF - per Pair UDF-IOF Charaes - per Pair Order Charae per First Pair Route Order $492. Order Charae Each Additional Pair Same Route $255. Fiber Transport per Pair Mile $66. 1.4 Termination Fixed per Pair Office Termination $7. Fiber Cross-Connect, per Pair Office $4.43 $19. UDF-Loop Charges - per Pair Order Charae per First Pair Route Order $492. Order Charge, Each Additional-Pair Same Route $255. Fiber Loop, per Route per Pair $131. 2.4 Termination Fixed per Pair Office $7. Termination, Fixed per Pair Premise $6. Fiber Cross-Connect per Pair Office $3.$19. Extended Unbundled Dark Fiber (E-UDF) Order Charae per First Pair Route Order $492. Order Charae Each Additional-Pair Same Route $255. Fiber Transport per Route Per Pair $131. 3.4 Termination Fixed Per Pair Office $7. Termination Fixed Per Pair Premise $6. Fiber Cross-Connect, per Pair $3.$19. Dark Fiber Solice $602. Shared TransDort Per Minute of Use $0.001110 Unbundled Customer Controlled Rearrangement Element (UCCRE) DS1 Port ICB ICB DS3 Port ICB ICB Dial UP Access ICB 9.4 Attendant Access ICB Virtual Ports ICB Local Tandem Switching 10.DS1 Local Messaae Trunk Port per Order $187. 10.DS1 Trunk Group 10.First Trunk per Order $209. 10.Each Additional Trunk per Order $21. 10.Per Minute of Use $0.000690 Local Switching 11.Ports 11.Analoa Line Side Port 11.First Port $1.$10. 11.Each Additional Port $1.$5.49 11,Diaital Line Side Port (Supporting BRIISDN), First & Each Additional $12.$205. 11.Digital Trunk Ports 11.PBX DID Trunk Port, per DSO $2.$213. 11.DS1 Local Messaae Trunk Port $39.$205. 11.Message Trunk Group, First Trunk $176. 11.3.4 Message Trunk Group. Each Additional $37. Qwest Idaho SGA T Third Revision Exhibit A 7th Amended March 24, 2005 Page 11 of 18 Exhibit A Idaho 11.DS1 PRIISDN Trunk Port $198.$611. 11.1.4 DSO Analoa Trunk Port 11.1.4.First Port $14.$115. 11.1.4.Each Additional Port $14.$31. 11.Local Usaae. per Minute of Use $0.001343 11.Vertical Features 11.Basic Features 11.Account Codes - per System $77.41 11.AttendantAccess Line Der Station Line $1. 11.Audible Messaae Waitina $0. 11.Authorization Codes.- per System $231. 11.Automatic Line $0. 11.Automatic Route Selection - Common Eauipment. per System $2015. 11.Call Drop $0. 11.Call Exclusion - Automatic $0. 11.Call Exclusion - Manual !to.46 11.Call Forwardina: Busv Line Don't Answer Proarammable Service $11. 11.Call Forwardina: Don't Answer Call Forwardina Busy Customer $0. 11.Call Waitina Indication - per Timina State $0. 11.Centrex Common Eauipment 370. 11.Call Forwarding Busv Line - Incoming Only $20. 11.Call Forwardina Don't Answer Incomina Only $20. 11.CLASS - Continuous Redial $1. 11.CLASS - Last Call Return $1. 11.CLASS - Priority Callina $1. 11.CLASS - Selective Call Forwarding $1. 11.CLASS - Selective Call Reiection $1. 11.Direct Station Selection Busv Lamp Field, per Arranaement $0. 11.Directed Call Pickup with Barae-$13. 11.Directed Call PickuD without Barae-$13. 11.Distinctive Rina/Distinctive Call Waiting $27. 11.ExDensive Route Warning Tone, per System $49.48 11.Facility Restriction Level per System $30.44 11.Group Intercom $0, 11.Hot Line per Line $1. 11.Huntina: Multiposition Hunt Queuina $29. 11.Huntina: MultiDosition with Announcement in Queue $31. 11.Huntina: MultiDosition with Music in Queue $28. 11,ISDN Short Hunt $1. 11.Loudspeaker Pagina. per Trunk Group $183. 11.Make Busv Arranaements per Group $0. 11.Make Busv Arranaements per Line $0. 11.Messaae Center Der Main Station Line $0. 11.Messaae Waitina Visual $0. 11.Music On Hold per System $20. 11.Privacy Release $0.42 11.1.40 Querv Time $0. 11.1.41 Station Camp-On Service per Main Station $0. 11.1.42 Time of Dav Control for ARS per System $95.48 11.Time of Dav NCOS Update $0.41 11.1.44 Time of Dav Routina. Der Line $0.46 11.1.45 Trunk Verification from Desianated Station $0. 11.1.46 UCD in Hunt Group. per Line $0. 11.1.47 SMDR-P - Service Establishment Charge, Initial Installation $323. 11,1.48 SMDR-P - Archived Data $170. 11.Premium Port - Additional Charge $3.42 , 12 11.CMS - Svstem Establishment - Initial Installation $962. 11.CMS - System Establishment. SubseQuent Installation $481. 11.CMS - Packet Control Capability. per System $481. 11.2.4 Conference Calling - Meet Me $32. 11.Conference Callina - Preset $32. 11.Conference Callina - Station Dial (6-Wav)$47.48 11.CLASS Call Trace. per Occurrence $1. 11.SubseQuent Order Charae $12. 11.4 Local Switching - Market Based Rates These rates These rates are only available are only available in Zone 1 Wire in Zone 1 Wire Centers Centers Qwest Idaho SGAT Third Revision Exhibit A 7th Amended March 24, 2005 Page 12 of 18 Exhibit A Idaho Customized Routina 12.Development of Custom Line Class Code - Directory Assistance or Operator Services Routing $235. Only 12.Installation Charae Der Switch - Directorv Assistance or ODerator Service Routing Only $237. 12.All Other Custom Routina ICB ICB Common Channel Sianaiina/SS7 13.CCSAC STP Port $208.$368. 13.CCSAC ODtions Activation Charae 13.Basic Translations 13.First Activation. Der Order $100. 13.Each Additional Activation Der Order $8. 13.CCSAC ODtions Database Translations 13.First Activation Der Order $116. 13.Each Additional Activation, Der Order $53. 13.Sianal Formulation ISUP Der Call Set-UD Reauest $0.000524 13.4 Sianal Transoort ISUP oer Call Set-UD ReQuest $0.000176 13.Sianal TransDort TCAP. Der Data ReQuest $0.000019 13.Sianal Switchina ISUP, Der Call Set-UD ReQuest $0.000983 13.Sianal Switchina TCAP, Der Data Reauest $0.000837 Advanced Intelliaent Network lAIN) 14.AIN Customized Services (ACS)ICB 14.AIN Platform Access (APA)ICB ICB 14.AIN Querv Processina. Der Querv ICB Line Information Database (LlDB\ 15.LlDB Storace No Charae 15.Line Validation Administration System Access (LV AS) ICE 15,LlDB Line Record Initial Load 15.UD to 20 000 Line Records $2601. 15.Over 20 000 Line Records ICB 15.Mechanized Service Account UDdate. Der Addition or Update Processed 15.Individual Line Record Audit 15.2.4 Account Group Audit 15.ExDedited Reauest Charae for Manual UDdates 15.LlDB Querv Service oer Query $0.0008230 15.4 Fraud Alert Notification Der Alert No Charae 8XX Database Querv Service 16.Basic Querv. Der Querv $0.0130355 16.POTS Translation $0.00000048 16,Call Handlina & Destination Feature $0.00000145 ICNAM Per Querv $0.000768 Intentionallv Left Blank Construction Charaes ICB ICB Miscellaneous Charaes 20.Additional Enaineerina. Der Half Hour or fraction thereof 20.Additional Enaineerina - Basic $31. 20.Additional Enaineerina - Overtime $39. 20.Additional Labor Installation Der Half Hour or fraction thereof 20.Additional Labor Installation - Overtime $9. 20.Additional Labor Installation - Premium $18. 20.Additional Labor Other oer Half Hour or fraction thereof 20.Additional Labor Other - Basic $27. 20.Additional Labor Other - Overtime $36. 20.Additional Labor Other - Premium $46. 20.4 Testina and Maintenance. per Half Hour or fraction thereof 20.4.Testina and Maintenance - Basic $29.40 20.Testina and Maintenance - Overtime $38. Qwest Idaho SGAT Third Revision Exhibit A 7th Amended March 24, 2005 Page 13 of 18 Exhibit A Idaho 20.4.Testina and Maintenance - Premium $49. 20.Maintenance of Service per Half Hour or fraction thereof 20.Maintenance of Service - Basic $28. 20.Maintenance of Service - Overtime $36. 20.Maintenance of Service - Premium $46. 20.Additional Coooerative Accectance Testina, per Half Hour or fraction thereof 20.Additional Cooperative Accectance Testina - Basic $29.40 20.Additional Cooperative Accectance Testina - Overtime $39. 20.Additional Cooperative Accectance Testina Premium $49. 20.Nonscheduled Coooerative Testina. per Half Hour or fraction thereof 20.Nonscheduled Cooperative Testina - Basic $29. 20.Nonscheduled Cooperative Testina - Overtime $39. 20.Nonscheduled Cooperative Testina - Premium $49. 20.Nonscheduled Manual Testina per Half Hour or fraction thereof 20.Nonscheduled Manual Testing - Basic $29. 20.Nonscheduled Manual Testing - Overtime $39. 20.Nonscheduled Manual Testina - Premium $49, 20.Intentionallv Left Blank 20.Intentionallv Left Blank 20.Additional Disoatch $87. 20.Date Chance $10. 20.Desian Chance $73. 20,Excedite Charae ICB 20.Cancellation Charae ICB Channel Reaeneration 21.DS1 $0.$0. 21.DS3 $0,$0. Intentionallv Left Blank UNE Combinations 23.Intentionallv Left Blank 23.UNE-P Conversion Nonrecurrina Charaes 23.UNE-P POTS Centrex Analoa PBX Mechanized 23.First $0. 23.Each Additional $0. 23.UNE-P POTS Centrex PAL Analoa PBX. Manual 23.First $16. 23.Each Additional $2. 23.UNE-P PBX DID Trunks 23.First $28. 23.Each Additional $2P 23.2.4 UNE-P ISDN BRI 23.First $30. 23.2.4.Each Additional $2. 23.UNE-P ISDN PRI DSS per DS1 Facilitv $27. 23.UNE-P ISDN PRI DSS - per Trunk 23.First $28. 23.Each Additional $2. 23.UNE-P New Connection Nonrecurrina Charaes 23.UNE-P POTS Centrex Analoa PBX Mechanized 23.First $57. 23.Each Additional $15. 23.UNE-P POTS Centrex PAL. Analoa PBX. Manual 23.First $82. 23.Each Additional $18. 23.UNE - P PBX DID - per Trunk $15. Qwest Idaho SGAT Third Revision Exhibit A 7th Amended March 24, 2005 Page 14 of 18 Exhibit A Idaho 23.UNE - P ISDN BRI $272. 23.UNE - P Trunks 23.DSS Basic Trunk -In Only. Out Only. or Two 2-Wav $74. 23.DSS, ISDN PRI Advanced Trunk - In only w / DID & Hunting, or 2-$73.8.: Way w / DID, Hunting & Answer Supervision 23.DSS, ISDN PRI Advanced Trunk - Out Only w/Answer Supervision $74.4E 23.Facilities for UNE - P DSS UNE - P ISDN PRI 23.DS1 Loop Facilitv $279. 23.DS3 Loop Facilitv $279. 23.UNE - P PRI Configurations 23.UNE-P PRI Dedicated PRI 23 + D $596. 23.UNE-P PRI Dedicated PRI 24B $576. 23.UNE-P PRI Dedicated PRI 23B + Back-Up D Confiauration - 5E $575. 23.4 Miscellaneous UNE-P DID Trunks Charaes 23.4.UNE-P Comolex Translations Digits Outpulsed Change Signaling $15. 23.4.UNE-P DID Comolex Translations Signalina Change $35. 23.4.UNE-P DID Block Compromise $25. 23.UNE-P DID Group of 20 Numbers $31. 23.4.UNE-P DID Reserve SeQuential # Block $25. 23.4.UNE-P DID Reserve Nonseauential Telephone Numbers $23. 23.UNE-P DID Nonseauential Teleohone Numbers $33. 23.UNE - P Qwest DSL See applicable Qwest Retail Tariff, Catalog, or Price List 23.UNE Combinations - Loop MUX Combinations (LMC) 23.Interconnection Tie Pair (ITP), per Termination 23.DS1 $1. 23.DS3 $14. 23.Loop MUX 2-Wire Analoa 23.LMC 2-Wire Installation 23.First $225. 23.Each Additional $148. 23.Wire Analog Loop (uses rates from 9. 23.Zone 1 $15. 23.Zone 2 $23. 23.Zone 3 $40. 23.Loop MUX 4-Wire Analoa 23.LMC 4-Wire Installation 23.First $225. 23.Each Additional $148. 23.Wire Analog Loop (uses rates from 9. 23.Zone 1 $30. 23.Zone 2 $46. 23.Zone 3 $79.47 23.6.4 DS1 Loop MUX 23.6.4.LMC DS1 Loop Installation 23.6.4.First $285. 23.6.4.Each Additional $209. 23.6.4.DS1 Capable Loop (uses rates from 9. 23.6.4.Zone 1 $86.48 23.6.4.Zone 2 $86.46 23.6.4.Zone 3 $99. 23.Private Line to Loop MUX Conversion $34. 23.LMC Multiolexina 23.DS1 to DSO $263.$193. 23.DS3 to DS1 $304.$193. 23.DSO Channel Performance 23.DS1/ DSO Low Side Channelization $7.47 23.Enhanced Extended Loop (EEl) 23,EEL DSO 2-Wire Analoa Qwest Idaho SGAT Third Revision Exhibit A 7th Amended March 24, 2005 Page 15 of 18 Exhibit A Idaho 23.EEL 2-Wire Loop Installation 23.First $245. 23.Each Additional $182. 23.Wire Analoa Loop (uses rates from 9. 23.Zone 1 $15. 23.Zone 2 $23, 23.Zone 3 $40. 23.EEL DSO 4-Wire Analoa 23.EEL 4-Wire Loop Installation 23.First $245. 23.Each Additional $182. 23.Wire Analoa Loop (uses rates from 9. 23.Zone 1 $30. 23.Zone 2 $46. 23.Zone 3 $79.47 23,EEL DS1 23.EEL DS1 Loop Installation 23.First $300.4~ 23.Each Additional $225. 23.DS1 Capable Loop (uses rates from 9.3)' 23.Zone 1 86.48 23.Zone 2 86. 23.Zone 3 99, 23.7.4 EEL DS3 23.7.4.EEL DS3 Loop Installation 23.7.4.First $323. 23.7.4.Each Additional $248. 23.7.4.DS3 Capable Loop (uses rates from 9. 23.Zone 1 $941. 23.Zone 2 $955. 23.Zone 3 $1.264. 23.Intentionallv Left Blank 23.Private Line to EEL Conversion $34. 23.Intentionallv Left Blank 23.EEL Transport 23.DSO (Recurrina Fixed Der Mile) 23.Over 0 to 8 Miles $24.$0. 23.Over 8 to 25 Miles $24.$0. 23.Over 25 to 50 Miles $24.$0. 23.1.4 Over 50 Miles $24.$0. 23.DS1 (Recurrina Fixed Der Mile) 23.Over 0 to 8 Miles $36.43 $3. 23.Over 8 to 25 Miles $37.$3. 23.Over 25 to 50 Miles $39.$1. 23.2.4 Over 50 Miles $37.$0. 23.DS3 (Recurrina Fixed Der Mile) 23.Over 0 to 8 Miles $238.$54. 23.Over 8 to 25 Miles $242.$16. 23.Over 25 to 50 Miles $223.$21. 23.3.4 Over 50 Miles $235.$14. 23.Intentionallv Left Blank 23.EEL Multiplexina 23.10.DS1 to DSO $263.$246. 23.10.DS3 to DS1 $304.$246. 23.DSO Channel Performance 23.11.DSO Low Side Channelization $13. 23.11.DS1/ DSO Low Side Channelization $7.47 23.Concentration Capability ICB Unbundled Packet Switchina 24.Unbundled Packet Switch Customer Channel 24.DSLAM (and Splitter) Functionalitv $21. 24.Virtual Transport $3. Qwest Idaho SGAT Third Revision Exhibit A 7th Amended March 24, 2005 Page 16 of 18 Exhibit A Idaho 24.Customer Channel Shared Distribution Subloop $61. 24.Unbundled Packet Switch Interface Port 24.DS1 $158.$210. 24.DS3 $272.$210. 10.0 Ancillarv Services 10.Local Number Portabilitv 10.LNP Queries See FCC Tariff #1 Section 13 & 10.LNP Manaaed Cuts 10.Standard Manaaed Cuts, oer Person per Half Hour $26. 10.Overtime Managed Cuts per Person. per Half Hour $34. 10.Premium Manaaed Cuts, per Person Der Half Hour $42, 10.911/E911 10.911/ E911 No Charae No Charae 10.White Paaes Directorv Listinas. Facilitv Based Providers 10.Primarv Listina No Charae No Charae 10.Premium / Privacy Listings General General Exchange Tariff Exchange Tariff Rate, Less Rate, Less Wholesale Wholesale Discount Discount 10.Directorv Assistance. FacilitvBased Providers 10.4.Local Directorv Assistance per Call $0. 10.4.National Directorv Assistance, Der Call $0. 10.4.Call Brandina. Set- Uo and Recordina $35 000. 10.4.4 Loadina Brand oer Switch $500. 10.4.Call Completion Link. per Call $0.0893 10.Directorv Assistance List Information 10.Initial Database Load ner Listina ~O,025 10.Reload of Database per Listing $0.020 10.Dailv Updates. per Listina $0.250 10.5.4 One-time Set-Un Fee $73, 10.Media Charaes for File Deliverv 10.Electronic Transmission $0.0020 10.TaDes (charaes only aDDly if this is selected as the normal delivery medium for $30. 10.Shippina Charges (for tape deliverv)ICB 10.Toll and Assistance Ooerator Services. Facilitv Based Providers 10.Ootion A - Per Messaae 10.Ooerator Handled Callina Card $1.45 10.Machine Handled Calling Card $0. 10.Station Call $1. 10.1.4 Person Call $3. 10.Connect to Directorv Assistance $0. 10.Busv Line Verify. oer Call $0. 10.Busv Line Interruot $0. 10.Ooerator Assistance Der Call $0. 10.Ootion B - Per Ooerator Work Second and Comouter Handled Calls 10.Ooerator Handled oer Ooerator Work Second $0.02800 10.Machine Handled, per Call $0.25000 10.Call Branding, Set-Up & Recordina $10500. 10.2.4 Loadina Brand/Per Switch $800. 10.Access to Poles. Ducts. Conduits and Riahts of Wav (ROW) 10.Pole Inauirv Fee oer Inauirv $341. 10.Innerduct Inauirv Fee oer Inauirv $233. 10,ROW InQuirY Fee oer Inauirv $378. 10.7.4 ROW Document Preoaration Fee $122. 10.Field Verification Fee per Pole $20. 10.Field Verification Fee Der Manhole $190. 10,Planner Verification. Der Manhole $16. 10.Manhole Verification InsDector per Manhole $92. 10.Manhole Make-Readv InsDector Der Manhole $245. 10.Transfer of Responsibility $106. Qwest Idaho SGAT Third Revision Exhibit A 7th Amended March 24, 2005 Page 17 of 18 Exhibit A Idaho er Order $5. 12.$1.40 12.er Record $0.000419 12.4 See 9. 17.0 Bona Fide Re uest Process 17.Processin Fee $1 851. NOTES: Unless otherwise indicated, all rates are pursuant to Idaho Public Utilities Commission Dockets: A AT&T Arbitration Docket USW-96-, Order No 27738, effective September 17, 1998. B Cost Docket QWE-01-11, Order No. 29408 (January 5, 2004) rates effective January 5, 2004. # Voluntary Rate Reduction, Docket USW - T -00-, effective 6/10/02. Reductions reflected in the 5/24/02 Exhibit A. ## Second Voluntary Rate Reduction, Docket USW-00-, effective 6/7102. Reductions reflected in the 7/10/02 Exhibit A. ### Third Voluntary Rate Reduction, Docket USW-00-, effective 12/16/02, Reductions reflected in the 10/16/02 Exhibit A (1) TELRIC rates proposed in Cost Docket QWE-01-11 testimony filed on November 12, 2003. The case was bifurcated and the rates using this footnote are proposed in Phase 2 of the cost docket. (2) Market-based rates. (3) ICB, Individual Case Basis pricing. (4) The State of Idaho has retained the oversight on these rates. These rates are not under the jurisdiction of the FCC. (5) FCC ordered rates pursuant to the FCC's Order on Remand and Report and Order (Intercarrier Compensation for ISP-Bound Traffic) CC Docket 01-131 (FCC ISP Order), effective June 14 2001. (6) Effective August 1, 2003, Qwest will no longer bill the recurring and nonrecurring charges for Channel Regeneration. Qwest reserves the right to revert back to the contractual rate only after appropriate notice is given. (7) The preliminary Quote Preparation Fees (QPF) are included in the space construction charges. Upon completion of the collocation construction, the QPF will be credited to the final space construction charge for the virtual, caged or cageless collocation job. These engineering and planning charges are also included in the Virtual , Caged and Cageless Quote Preparation Fees. (8) Effective 11/04, Qwest will no longer perform Bridge Tap and/or Load Coil Removal (Conditioning) to facilitate provisioning of its Qwest Retail DSL offering. In order to permit CLECs to provision their own xDSL Capable Loops, Qwest in now re-instituting the charge to continue Conditioning for the 2/4-Wire Unbundled Loop, ADSL Compatible Unbundled Loop, ISDN (BRI) Capable Unbundled Loop, xDSL-1 Capable Unbundled Loop, Non-Commercial Line Sharing, Line Splitting, Non-Commercial Shared Distribution Loop and Loop Splitting, effective 3/14/05. Qwest cant bill the REC rate structure, but will bill customers the lower of the two rates. (9) Qwest is voluntarily reducing this rate in order to keep rate relationship with the Fiber Transport "per Pair" rate element. (10) Qwest has not implemented this UNE rate or charge in its billing system but reserves the right to assess such a charge in the Mure. (11) All technically feasible Vertical Switch Features are available with compatible unbundled switch ports. No monthly recurring charge applies for Basic Vertical Switch Features. Only basic Vertical Switch Features with nonrecurring charges are listed, Nonrecurring charges are applicable whenever a feature is added - whether on new installation, conversion, or change order activity. Vertical Switch Features not listed are included in the cost of the switch port and have a rate of zero for both recurring and nonrecurring charges. (12) The Premium Port monthly recurring charge applies in addition to the Analog or Digital Line Side Port recurring charges when Premium Features are ordered with analog or digital ports. Qwest Idaho SGAT Third Revision Exhibit A 7th Amended March 24, 2005 Page 18 of 18 Third Revision, Seventh Amended Exhibit A March 24, 2005 (Redlin e) Exhibit A Idaho Resale Wholesale Wholesale Discount Discount Percentage Percentage Recurring Nonrecurring Charges Charges Wholesale Discount Rates Southern Idaho Basic Exchange Residential Line Service 18.25%18.25% Basic Exchanae Business Line Service 18.25%18.25% IntraLATA Toll 18.25%18,25% 1.4 Package/Special Services (e., Centrex, Discounted Line/Feature Packages,18.25%18.25% ISDN, PBX-Trunks, DSS & UAS, Frame Relay Service, LAN, MegaBit and other ACS) Listinas CO Features & Information Services 18.25%18.25% Private Line 18.25%18.25% Ocerator Services / Directorv Assistance (OS/DA)18.25%18.25% Volume Packaged Services - High Volume Customers 65%65% Public Access Line (PAL) Service 00%00% Northern Idaho Basic Exchanae Residential Line Service 19.37%19.37% Basic Exchange Business Line Service / PBX 19.37%19.37% IntraLATA Toll 19.37%19.37% 2.4 Package/Special Services (e., Centrex, Discounted Line/Feature Packages,19.37%19,37% ISDN, PBX-Trunks, DSS & UAS, Frame Relay Service, LAN, MegaBit and other ACS) Listinas CO Features & Information Services 19.37%19.37% Private Line 19.37%19.37% Ocerator Services / Directorv Assistance (OS/DA)19.37%19.37% Volume Packaged Services - High Volume Customers 87%87% Public Access Line (PAL) Service 00%00% Customer Transfer Charae (CTC) CTC for POTS Service Manual First Line $16. Each Additional Line $2. Mechanized First Line $0. Each Additional Line $0. CTC for Private Line Transport Services First Circuit $38. Additional Circuit per circuit same CSR $33. CTC for Advanced Communications Services per Circuit $46. Interconnection Entrance Facilities Intentionally Left Blank DS1 $103.$208. DS3 $524.42 $277. LIS EICT Per DS1 $0.$0. Per DS3 $0.$0. Direct Trunked Transport Intentionally Left Blank DS1 (Recu"ina Fixed oer Mile) Over 0 to 8 Miles $37.$1. Oyer 8 to 25 Miles $37.$1. Over 25 to 50 Miles $37.$1, Oyer 50 Miles $37.$1. DS3 (Recurring Fixed per Mile) Oyer 0 to 8 Miles $257.$19.48 Over 8 to 25 Miles $260.49 $24. Over 25 to 50 Miles $260.$26.43 3.4 Over 50 Miles $259.$26. Multiplexina 7.4.DS1 to DSO $263.$193. Qwest Idaho SGAT Third Revision Exhibit A 7th Amended March 24. 2005 9th /l.memled February 11, 2005 Page 1 of 18 Exhibit A Idaho 7.4.DS3 to DS1 $304.$193. Trunk Nonrecurrina Charaes Intentionallv Left Blank DS1 Interface First Trunk $229.40 Each Additional Trunk $5.46 DS3 Interface First Trunk $235. Each Additional Trunk $11. Exchanae Service IEAS/Locan Traffic End Office Call Termination ner Minute of Use $0.001343 ### Tandem Switched TransDort, Per Minute of Use $0.000690 Tandem Transmission, Der Minute of Use (Recurrina Fixed oer Mile) Over 0 to 8 Miles $0.0004564 $0.0000367 Over 8 to 25 Miles $0.0004564 $0.0000367 Over 25 to 50 Miles $0.0004564 $0.0000367 3.4 Over 50 Miles $0.0004260 $0.0000144 Local Traffic-FCC-ISP Rate CaDs MOU as of June 14 2003 rate in effect until further FCC action $0.0007 Miscellaneous Charaes Expedite Charge (LIS Trunks)Qwest's Idaho Access Service Catalog Cancellation Charge (LIS Trunks)Qwest's Idaho Access Service Catalog Additional Testing (LIS Trunks)Qwest's Idaho Access Service Catalog Transit Traffic Local Transit (Local Transit Assumed Mileage = 7 Miles)See Tandem See Tandem Switching and Switching and Tandem Tandem Transmission Transmission Rates Above,Rates Above, IntraLATA Transit Toll (IntraLATA Transit Toll Assumed Mileage = 7 Miles)Qwest's Idaho Qwest's Idaho Access Service Access Service Catalog Catalog Jointly Provided Switched Access Qwest's Idaho Qwest's Idaho Access Service Access Service Catalog Catalog 9.4 Cateaorv 11 Mechanized Record Charae, Der Record $0.0014877 Collocation All Collocation Plannina and Enaineerina Intentionallv Left Blank Cable Auament Quote PreDaration Fee $1.284. Entrance Facilitv Standard Shared. Der Fiber $5.44 $616. Cross Connect Der Fiber $5.$722. Exnress, Der Cable $88.$9009. Cable Snlicina Fiber - Per Set-$399. Per Fiber SDliced $37. 1.4 Power Usaae 1.4.-48 Volt DC Power Usaae Der Amnere ner Month 1.4.Power Plant Qwest Idaho SGAT Third Revision Exhibit A 7th Amended March 24, 2005 6tt:l /\moAaoEi FebRlary 11, 2005 Page 2 of 18 Exhibit A Idaho 1.4.Power Plant - Less than 60 Amps $10. 1.4.Power Plant - Equal to or Greater Than 60 Amps $8.42 Power Usaae Power Usaae 60 Ames or Less eer Amp $2.47 1.4.Power Usaae More Than 60 Amps, per Amp $4. AC Power Feed AC Power Feed per Amp, per Month 120V $16. 208 V Sinale Phase $27. 208 V Three Phase $48. 1.4 240 V Single Phase $32. 240 V Three Phase $55. 480 V Three Phase $111. AC Power Feed eer Foot eer Month 20 Ame, Sinale Phase $0.0084 $7.43 20 Ame. Three Phase $0.0105 $9. 30 Amp, Sinale Phase $0.0091 $8. 2.4 30 Ame. Three Phase $0.0125 $11. 40 Ame. Sinale Phase $0.0107 $9. 40 Ame Three Phase $0.0147 $12. 50 Ame Slnale Phase $0.0127 $11. 50 Ame Three Phase $0.0177 $15, 60 Ame. Single Phase $0.0144 $12. 60 Amp. Three Phase $0.0204 $17. 100 Ame. Sinale Phase $0.0178 $15. 100 Ame, Three Phase $0.0277 $24.44 Inseector Labor eer Half Hour Reaular Hours Rate $28. After Hours Rate minimum 3 hours $37. Channel Reaeneration DS1 Reaeneration $0.$0. DS3 Reaeneration $0.$0. Collocation Terminations Shared Access DSO Cable Placement eer 100 Pair Block $0.2262 $208. Cable Placement eer Termination $0.0090 $4. Cable eer 100 Pair Block $0.3304 $304. 1.4 Cable per Termination $0.0066 $4. Blocks. eer 100 Pair Block $0.5730 $528.42 Blocks eer Termination $0.0115 $8. Block Placement eer 100 Pair Block $0.2381 $219. Block Placement eer Termination $0.0048 $3. DS1 Cable Placement, per 28 DS 1 $0.4111 $362. Cable Placement, per Termination $0.0442 $38. Cable eer 28 DS1s $0.3993 $351. 2.4 Cable eer Termination $0.0429 $37. Panel eer 28 DS1s $0.2742 $241. Panel eer Termination $0,0330 $29. Panel Placement, per 28 DS1s $0.0847 $74. Panel Placement, per Termination $0.0091 $8. DS3 Cable Placement per Termination $0.1521 $134. Cable. eer Termination $0.2578 $227. Panel! Connector. eer Termination $0.2625 $231. 3.4 Panel! Connector Placement eer Termination $0.0204 $18. Fiber Termination 1.4.1 Terminations, eer 12 Fibers $26.$1.513. 1.4.Additional Connector lif aeelicable)$0.47 $411. Cable Rackina - Shared, eer 12 Fibers $26. 1.4.4 Cable Racking - Dedicated $1.$1,433. Securitv Charae Per Emelovee eer Card $0. Qwest Idaho SGAT Third Revision Exhibit A 7th Amended March 24. 2005 6th !\memlee FeBRJ31)' 11 , 2005 Page 3 of 18 Exhibit A Idaho Card Access. per Emplovee per Office $7. Central Office Securitv Infrastructure ICB ICB Composite Clock Central Office Synchronization 10.Synchronization - Composite Clock per Port $7.44 Intentionally Left Blank Space Availabilitv Charae $313. Collocation Space Reservation Fee The charge will 25% of the Nonrecurring Fee Collocation Space Option Administration Fee $1 107. Collocation Space Option Fee per SQuare Foot $2. Virtual Collocation Plannina and Enaineerina Fees Quote Preparation Fee $3146.B 7 Maintenance Labor. per Half Hour Reaular Hours Rate $29. After Hours Rate $39. Trainina Labor per Half Hour Reaular Hours Rate $29. 2.4 Bav Soace 2.4.Eauipment Bav. per Shelf $4. 2.4.Virtual Space Construction Initial Bav Provided $20.$17749. 2.4;3 Each Additional Bav Space $3.$2 854. 2.4.4 Virtual Cable Rackina, per Shelf $0.44 $384. Enaineerina Labor. per Half Hour Reaular Hours Rate $32. After Hours Rate $43. Installation Labor oer Half Hour Reaular Hours Rate $31. After Hours Rate $41. Rent Floor Space Lease per SQuare Foot $2:70 Rent per Shelf $4. Intentionally Left Blank Power Plant -48 DC Power Cable 20 Amp Power Feed $4.$3985.41 30 Amo Power Feed $5.$4537. 40 Amo Power Feed $6.$5 480.42 1.4 60 Amp Power Feed $11.$9 706. 100 Amp Power Feed $18.$16370. 200 Amp Power Feed $34.$30473, 300 Amp Power Feed $54.$47917. 400 Amp Power Feed $77.$68037. Caaeless Physical Collocation Plannina and Enaineerina Fee Quote Preparation Fee $3146.41 Space Construction and Site Preparation Site Preparation Fee ICB 2 Bavs $23.$20.603.40 Intentionally Left Blank Intentionally Left Blank Space Construction for Each Additional Bav $3.$2 854. Adjustment for Sinale Bav - Chance to Standard Design ($3,($2 854, DC Power Cable 20 Amp Power Feed $4.$3985.41 30 Amp Power Feed $5.$4537. Qwest Idaho SGAT Third Revision Exhibit A 7th Amended March 24. 2005 etA .I\mon8o8 Fo9FUary 11, 2005 Page 4 of 18 Exhibit A Idaho 40 Amp Power Feed $6.$5 480.42 7.4 60 Amp Power Feed $11.$9.706. 100 Amp Power Feed $18.$16.370. 200 Ame Power Feed $34.$30.473. 300 Ame Power Feed $54.$47917. 400 Ame Power Feed $77.$68037. Floor Seace Lease per Sauare Foot $2. Caned Physical Collocation Plannina and Enaineerinn Fee 8.4.Quote Preparation Fee $3 185.B 7 Space Construction and Site Preparation 8.4.Site Preearation Fee ICE 8.4.Intentionallv Left Blank Intentionallv Left Blank 8.4.2.4 Space Construction 8.4.2.4.Caae UP to 100 Sa. Ft.$38.$33.927. 8.4.2.4.Caae - 101 Sa. Ft. to 200 Sa. Ft.$34.$30.113. 8.4.Caae - 201 Sa. Ft. to 300 Sa. Ft.$42.$37.154. 2.4.4 Cage - 301 Sa. Ft. to 400 Sa. Ft.$44.$38 922. 8.4.Intentionallv Left Blank Intentionallv Left Blank DC Power Cable 8.4.20 Amp Power Feed $5.$4 954. 8.4.30 Ame Power Feed $6.$5457. 8.4.40 Ame Power Feed $7.41 $6 526. 7.4 60 Ame Power Feed $12.$10772. 8.4.100 Amp Power Feed $19.$17 531. 8.4.200 Amo Power Feed $37.$32 634. 8.4.300 Ame Power Feed $58.$51 315. 8.4.400 Amp Power Feed $82.$72861. Seace Construction - Fencing Credit Caae UP to 100 Sa. Ft.$10,$5723, Caae 101 - 200 Sa. Ft.$12.$7 135, 8.4.Caae 201 - 300 Sa. Ft.$14,$8 015, 8.4.3.4 Caae 301 - 400 Sa. Ft.$16.$8 851, 8.4.4 Floor Seace Lease eer Sauare Foot $2. Intentionallv Left Blank 8.4.Intentionallv Left Blank Intentionallv Left Blank 8.4.Groundina 8.4.2/0 AWG. per Foot $0.0097 $8. 1 /0 AWG. eer Foot $0.0170 $14. 4 / 0 AWG eer Foot $0.0200 $17. 8.4 350 kcmil eer Foot $0.0258 $22. 8.4.500 kcmil per Foot $0.0299 $26. 8.4.750 kcmil. per Foot $0.0456 $40. Adjacent Collocation ICB Remote Collocation Phvsical & Virtual Remote Collocation Seace leer Standard Mountina Unit)$0.$665.47 FDI Terminations leer 25 Pair)$0.$484. Power Usaoe Power Usaae 60 Amos or Less. per Amp $2. Power Usaae More Than 60 Amps, per Amp $4. 1.4 Quote Preparation Fee $1 064. Adjacent Remote Collocation Adiacent Remote Collocation lNew)ICB Adiacent Remote Collocation lExistina) Space leer Standard Mountina Unit)$0.$665.47 FDI Terminations leer 25 Pair)$0.$484. Qwest Idaho SGAT Third Revision Exhibit A 7th Amended March 24. 2005 etA /'-mended FeBruary 11 , 2005 Page 5 of 18 Exhibit A Idaho Power Usaae Power Usage 60 Amps or Less per Amp $2.47 Power Usage More Than 60 Amps per Amp $4. 2.4 Quote Preparation Fee $1 064. Additional Virtual Remote Collocation Elements Flat Charae per Job $36. Enaineerina Rate per Half Hour $35. Maintenance per Half Hour $29.40 3.4 Installation per Half Hour $29.40 Training. per Half Hour $29.40 CLEC to CLEC Desian Enaineerina & Installation Flat Charge (Design Engineering - No Cables)$634. Fiber Flat Charge $1 229. Cable Rackina. Per Foot. DSO per Foot per Cable $0.11848 DS1 per Foot per Cable $0.13075 DS3 per Foot per Cable $0.10234 2.4 Fiber. per Foot. per Fiber $0.93313 Virtual Connections (if applicable - Connections only: No cables) DSO Per 100 Connections)$194. DS1 Per 28 Connections)$91. DS3 Per 1 Connection)$5. 3.4 Fiber Connections per Fiber Spliced $37. 7.4 Cable Hole (if Applicable)$386. CLEC to CLEC Cross Connection $201. Interconnection Distribution Frame (lCDF) Collocation ICE! Application to Reauest Cancellation No Charge Microwave Collocation Under Development Intentionally Left Blank Intentionallv Left Blank DC Power Reduction 13.Quote Preparation Fee $703. 13.Power Reduction Less than 60 Amps $494. 13.Power Reduction Equal to 60 Amps $706. 13.4 Power Reduction Greater than 60 Amps per Amp $895. 13.Power On Off $621. 13.Batterv Distribution Fuse Board lBDFB) Rent $64. Collocation Transfer of Responsibilitv 14.Intentionally Left Blank 14.Assessment Fee $1.036. 14.Network Systems Administration Fee $1 586. Intentionallv Left Blank 0 Unbundled Network Elements tUNEs) Interconnection Tie Pairs (lTP) - Per Termination DSO $0. DS1 $1. DS3 $14. Unbundled Loops Analoa Loops See 9.2.4 Wire Voice Grade Loop Zone 1 $15. Zone 2 $23. Zone 3 $40. Intentionally Left Blank Wire Voice Grade Loop Qwest Idaho SGAT Third Revision Exhibit A 7th Amended March 24. 2005 etA ,, 2QQ5 Page 6 of 18 Exhibit A Idaho Zone 1 $30. Zone 2 $46. Zone 3 $79.47 Nonloaded LooDs See 9. Wire Nonloaded LooD Zone 1 $15. Zone 2 $23. Zone 3 $40. Intentionallv Left Blank Wire Nonloaded LooD Zone 1 $30. Zone 2 $46. Zone 3 $79. 2.4 Loon Unloadina $9.A 8 LooD Conditionina $22.A 8 Diaital Canable Loons Basic Rate ISDN xDSL-1 Capable ADSL Compatible Loon See-9.2.4 Zone 1 $15. Zone 2 $23. Zone 3 $40. Intentionallv Left Blank DS1 Canable Loop See-9. Zone 1 $86.48 Zone 2 $86.46 Zone 3 $99. 3.4 DS3 CaDable Loop See-9. 3.4.Zone 1 $941. 3.4.Zone 2 $955. 3.4,Zone 3 $1 264. DC - n CaDable Loop See-9. DC-$924. DC - 12 $1 314. DC-$3,528. Wire Extension Technoloav $22. Loop Installation Charges for 2 & 4 wire Analog Non-Loaded, ADSL Compatible, ISDN BRI See 9.1 & CaDable and xDSL - I CaDable Loops where conditionina is not reQuired. 2.4.Basic Installation 2.4.First $11. 2.4.Each Additional $6. Basic Installation with Performance Testing 2.4.First LooD $17. 2.4.Each Additional $8. Coordinated Installation with Cooperative Testing Project Coordinated Installation 2.4.First Loop $171. Each Additional $94. 2.4.4 Coordinated Installation without Cooperative Testing Project Coordinated Installation 2.4.4.First Loop $59. 4.4.Each Additional $53. 2.4.Basic Installation with Cooperative Testina 2.4.First Loop $142. 2.4.Each Additional ~94. DS1 LooD Installation Charges See 9. Basic Installation First Loop $128. Each Additional $99. Qwest Idaho SGAT Third Revision Exhibit A 7th Amended March 24. 2005 9th Amendes FebR,mfIJ 11 , 2995 Page 7 of 18 Exhibit A Idaho Basic Installation with Performance Testina First LooD $279. Each Additional $212. Coordinated Installation with Cooperative Testing Project Coordinated Installation First LooD $316. Each Additional $222.40 5.4 Coordinated Installation without Cooperative Testing Project Coordinated Installation First LOOD $135. 5.4.Each Additional $106. Basic Installation with CooDerative Testina First LOOD $272. Each Additional $195. DS3 LOOD Installation Charaes See 9.3.4 Basic Installation First LooD $128. Each Additional $99. Basic Installation with Performance Testina First LOOD $279. Each Additional $212. Coordinated Installation with Cooperative Testing Project Coordinated Installation First LooD $316. Each Additional $222. 6.4 Coordinated Installation without Cooperative Testing Project Coordinated Installation 6.4.First LooD $135. 6.4.Each Additional $106. Basic Installation with CooDerative Testina First LoOD $272. Each Additional S195. OC - 3, 12, 48 LoOD Installation Charaes See 9. Basic Installation First LOOD $128. Each Additional LOOD $99. Basic Installation with Performance Testina 9.2.First Loop $279. Each Additional Loon $212. Coordinated Installation with Cooperative Testina First LooD $316. Each Additional LooD $222.40 7.4 Coordinated Installation without Cooperative Testina 7.4.First LooD $135. Each Additional Loon $106. Basic Installation with CooDerative Testing First LooD $272. Each Additional LooD $195. Private Line to Unbundled LOOD Conversions $34. SubioOD Wire Distribution LooD (ADDlies to both Analoa and Nonloaded) First $107. Each Additional $29. First & Each Additional 2-Wire Distribution LooD Zone 1 $11. Zone 2 $16. Zone 3 $27. Intentionallv Left Blank Qwest Idaho SGAT Third Revision Exhibit A 7th Amended March 24, 2005 etA /\meRses February 11 , 2005 Page 8 of 18 Exhibit A Idaho Intra-Building Cable Loop. Per Pair $0. No Dispatch First $51. No Dispatch Each Additional $21. Dispatch First $98. DisDatch Each Additional $31. Feeder Loop 3.4.DS1 Capable Feeder Loop 3.4.First $310. 3.4.Each Additional $221. First & Each Additional DS1 CaDable Feeder LooD 3.4.Zone 1 $77. 3.4.Zone 2 $77. 3.4.Zone 3 $90. MTE Terminal SubioOD Access SublooD MTE - POI Site InventorY (Der reQuest)$110. MTE - POI Rearranaement of Facilities ICB MTE - POI Construction of New SP~ I ICB Intentionallv Left Blank Field Connection Point (FCP) Feasibilitv Fee Quote PreDaration Fee 197. FCP Reclassification $463. Intentionally Left Blank Intentionallv Left Blank Intentionally Left Blank Construction Fee ICB Shared Services 9.4.Shared Loop, per LooD $0.$33. UNE - P Line Splittina 9.4.Basic Installation Charae for UNE-P Line Splittina $33. 9.4.LooD SDlittina 9.4.Basic Installation Charae for LooD SDlittina $33. 9.4.4 ass per Line. per Month $3. 9.4.Reclassification Charae ICB SDlitter Shelf Charae $4.$503. 9.4.SDlitter TIE Cable Connections 9.4.SDlitter in the Common Area--Data to 410 block $3.$2689. 9.4.Splitter in the Common Area-Data direct to CLEC $3.$2 850. 9.4.Splitter on the IDF - Data to 410 Block $0.$834. 9.4.7.4 Splitter on the IDF - Data direct to CLEC $1.$1 623.47 9.4.Splitter on the MDF-Data to 410 block $0.$861. 9.4.SDlitter on the MDF - Data direct to CLEC $2.$1 922.42 9.4.Enoineerina $1 079. Network Interface Device (NID)$0.$52. Unbundled Dedicated Interoffice TransDort (UDIT\ DSO UDIT fRecurrina Fixed Der Mile)$241. Over 0 to 8 Miles $24.$0. Over 8 to 25 Miles $24.$0. Over 25 to 50 Miles $24.$0. 1.4 Over 50 Miles $24.$0. DS1 UDIT fRecurrina Fixed Der Mile)$284. Over 0 to 8 Miles $36.43 $3. Over 8 to 25 Miles $37.$3. Over 25 to 50 Miles $39.$1. 2.4 Over 50 Miles $37.$0. DS3 UDIT Recurrina Fixed oer Mile)$284. Over 0 to 8 Miles $238.$54. Over 8 to 25 Miles $242.$16. Qwest Idaho SGAT Third Revision Exhibit A 7th Amended March 24. 2005 eth Amended Felm:lary 11 , 2005 Page 9 of 18 Exhibit A Idaho Over 25 to 50 Miles $223.$21. 3.4 Over 50 Miles $235.$14. 6.4 OC-3 UDIT (Recurring Fixed Der Mile)$295. 6.4.Over 0 to 8 Miles $763.$36. 6.4.Over 8 to 25 Miles $763.$36. 6.4.Over 25 to 50 Miles $763.$36. 6.4.4 Over 50 Miles $763.$66. OC-12 UDIT (Recurring Fixed Der Mile)$295. Over 0 to 8 Miles $2163.$72. Over 8 to 25 Miles $2163.$72. Over 25 to 50 Miles $2163.$72. Over 50 Miles $2163.$135. OC-48 UDIT (Recurrina Fixed Der Mile)$295. Over 0 to 8 Miles $4420.$183. Over 8 to 25 Miles $4420.$183. Over 25 to 50 Miles $4,420.$183. 6.4 Over 50 Miles $4,420.$346. UDIT DSO Channel Performance DSO UDIT Low Side Channelization $13. DS1/ DSO Low Side Channelization $7.47 $191. UDIT MultiDlexina (Stand Alone) DS1 to DSO $263.$238. DS3 to DS1 $304.$1 996. Extended Unbundled Dedicated Interoffice TransDort DS1 E-UDIT $80,$339. DS3 E-UDIT $371.$347. OC-3 E-UDIT $819.$412. 9.4 OC-12 E-UDIT $1 256.$427. OC-48 E-UDIT $3 299.$413. Remote Node / Remote Port 10.OC-3 Remote Node 10.Remote Node $476. 10.DS 1 Remote Port $3.$198. 10.DS3 Remote Port $49.$198. 10.OC-12 Remote Node 10.Remote Node $894. 10.DS1 Remote Port $12.$198. 10.DS3 Remote Port $33.$198. 10.2.4 OC-3 Remote Port $103.$198. 10.OC-48 Remote Node 10.Remote Node $3.207. 10.DS3 Remote Port $22.$198. 10.OC-3 Remote Port $121.$198. 10.OC-12 Remote Port $479.45 $198. UDIT Rearranaement 11.DSO Single Office $164.40 11.DSO Dual Office $206. 11.Hiah Capacitv Sinale Office $221 . 11.Hiah Capacitv Dual Office $249. Unbundled Dark Fiber CUDF) Initial Records Inauirv OR!) Simple $196. Complex $251. Field Verification and Quote Preparation CFVQP)$907. Field Verification (Engineerina Verification)$297. UDF - Sinale Strand UDF - Interoffice Facilitv (UDF-IOF) - Sinale Strand 7.4.Order Charae per First Strand / Route / Order $492. 7.4.Order Charae Each Additional Strand / Same Route $255. 7.4.Fiber TransDort Der Strand / Mile $50. 7.4.1.4 Termination Fixed Der Strand / Office / Termination $4. 7.4.Fiber Cross-Connect Der Strand / Office $2.$19. Qwest Idaho SGAT Third Revision Exhibit A 7th Amended March 24. 2005 €ItA .'\mendeEl February 11 , 2eDI')Page 10 of 18 Exhibit A Idaho 1.4.UDF-Loop Charaes - Sinale Strand 1.4.Order Charae per First Strand Route Order $492. 1.4.Order Charae Each Additional Strand Same Route $255. Fiber LooD. Der Strand Route $88. 1.4.2.4 Termination Fixed Der Strand Office $4. Termination Fixed Der Strand Premise $3. 1.4.Fiber Cross-Connect Der Strand Office $2.$19. 1.4.Extended Unbundled Dark Fiber (E-UDF) - Sinale Strand 1.4.Order Charae. Der First Strand Route Order $492. 1.4.Order Charae Each Additional Strand Same Route $255. 1.4.Fiber TransDort Der Route Strand $96. 1.4.3.4 Termination Fixed Der Strand Office $4. 1.4.Termination Fixed. per Strand Premise $3. 1.4.Fiber Cross-Connect Der Pair $2.$19. UDF - Der Pair UDF-IOF Charaes - Der Pair Order Charae per First Pair Route Order $492. Order Charae Each Additional Pair Same Route $255. Fiber TransDort Der Pair Mile $66. 1.4 Termination Fixed Der Pair Office Termination $1. Fiber Cross-Connect Der Pair Office $4.43 $19. UDF-Loop Charaes - per Pair Order Charae. Der First Pair Route Order $492. Order Charae, Each Additional-Pair Same Route $255. Fiber LooD. Der Route Der Pair $131. 2.4 Termination Fixed Der Pair Office $1. Termination Fixed Der Pair Premise $6. Fiber Cross-Connect per Pair Office $3.$19. Extended Unbundled Dark Fiber (E-UDF) Order Charae Der First Pair Route Order $492. Order Charae, Each Additional-Pair Same Route $255. Fiber Transaort aer Route Per Pair $131. 3.4 Termination Fixed Per Pair Office $1. Termination Fixed Per Pair Premise $6. Fiber Cross-Connect Der Pair $3.$19, Dark Fiber Salice $602. Shared TransDort Per Minute of Use $0.001110 Unbundled Customer Controlled Rearranaement Element (UCCRE\ DS1 Port ICB ICB DS3 Port ICB ICB Dial Up Access ICB Attendant Access ICB Virtual Ports ICB Local Tandem Switchina 10.DS1 Local Messaae Trunk Port Der Order $181. 10.DS1 Trunk GrouD 10.First Trunk Der Order $209. 10.Each Additional Trunk Der Order $21. 10.Per Minute of Use $0.000690 Local Switchina 11.Ports 11.Analoa Line Side Port 11,First Port $1.$10. 11.Each Additional Port $1.$5.49 11.Digital Line Side Port (Supportina BRIISDN\, First & Each Additional $12.$205. 11.Diaital Trunk Ports 11.PBX DID Trunk Port, per DSO $2.43 $213. 11.DS1 Local Messaae Trunk Port $39.$205. 11.Message Trunk Group, First Trunk $116. 11.3.4 Messaae Trunk GrouD. Each Additional $31. Owest Idaho SGAT Third Revision Exhibit A 1th Amended March 24. 2005 6th J\meAsed February 11 , 2005 Page 11 of 18 Exhibit A Idaho 11.DS1 PRIISDN Trunk Port $198.$611.49 11.DSO Analoa Trunk Port 11.1.4.First Port $14.$115. 11.Each Additional Port $14,$31. 11.Local Usage. per Minute of Use $0.001343 11.Vertical Features 11.Basic Features 11.Account Codes - oer System $77.41 11.Attendant Access Line per Station Line $1. 11.Audible Messaae Waiting $0. 11.1.4 Authorization Codes - per System $231. 11.Automatic Line $0. 11.Automatic Route Selection - Common Equipment, per System $2015. 11.Call Droo $0. 11.Call Exclusion - Automatic $0. 11.Call Exclusion - Manual $0. 11.Call Forwardinn: Busv Line / Don t Answer Proarammable Service $11, 11.Call Forwardina: Don't Answer / Call Forwardina Busv Customer $0. 11.Call Waitina Indication - per Timina State $0. 11.Centrex Common Eauipment $1 ,370. 11.Call Forwardina Busv Line - Incoming Only $20. 11.Call Forwardina Dont Answer Incomina Only $20. 11.CLASS - Continuous Redial $1. 11.CLASS - Last Call Return $1. 11.CLASS - PrioritY Calling $1. 11.CLASS - Selective Call Forwarding $1. 11.CLASS - Selective Call Rejection $1. 11.Direct Station Selection / Busv Lamp Field, per Arranaement $0. 11.Directed Call Pickup with Barae-$13. 11.Directed Call Pickup without Barae-$13. 11.Distinctive Rina/Distinctive Call Waitina $27. 11.ExDensive Route Warning Tone Der Svstem $49. 11.Facilitv Restriction Level per System $30. 11.GrouD Intercom $0. 11.Hot Line oer Line $1. 11.Huntina: Multioosition Hunt Queuina $29. 11.Huntina: Multiposition with Announcement in Queue $31. 11.Huntina: MultiDosition with Music in Queue $28. 11.ISDN Short Hunt $1. 11,Loudsoeaker Paaina, per Trunk Group $183, 11.Make Busv Arranaements per Group $0. 11.Make Busv Arranaements per Line $0. 11.Messaae Center per Main Station Line $0. 11.Messaae Waitina Visual $0. 11.Music On Hold. Der System $20. 11.Privacv Release $0.42 11.Querv Time $0. 11.1.41 Station Camo-On Service per Main Station $0. 11.1.42 Time of Dav Control for ARS per System $95.48 11.1.43 Time of Dav NCOS Update $0.41 11.1.44 Time of Dav Routina per Line $0.46 11,1.45 Trunk Verification from Desianated Station $0. 11.1.46 UCD in Hunt GrouD. oer Line $0. 11.1.47 SMDR-P - Service Establishment Charge, Initial Installation $323. 11.1.48 SMDR-P - Archived Data $170. 11.Premium Port. Additional Charae $3.42 B, 12 11.CMS - Svstem Establishment - Initial Installation $962. 11.CMS - Svstem Establishment Subsequent Installation $481. 11.CMS - Packet Control CapabilitY. per System $481. 11.2.4 Conference Calling - Meet Me $32. 11.Conference Callina - Preset $32. 11.Conference Callina - Station Dial (6-Wav)$47.48 11.CLASS Call Trace. per Occurrence $1.43 11.Subsequent Order Charae $12. 11.4 Local Switching - Market Based Rates These rates These rates are only available are only available in Zone 1 Wire in Zone 1 Wire Centers Centers Qwest Idaho SGAT Third Revision Exhibit A 7th Amended March 24. 2005 6th /\mem1od FeBFl:Jal)' 11 , 2005 Page 12 of 18 Exhibit A Idaho Customized Routina 12.Development of Custom Line Class Code - Directory Assistance or Operator Services Routing $235. Only 12.Installation Charge cer Switch - Directorv Assistance or Ocerator Service Routina Onlv $237. 12.All Other Custom Routina ICB ICB Common Channel Sianaiina/SS7 13.CCSAC STP Port $208.$368.44 13.CCSAC Octions Activation Charae 13.Basic Translations 13.First Activation Der Order $100. 13.Each Additional Activation Der Order $8. 13.CCSAC Octions Database Translations 13.First Activation cer Order $116. 13.Each Additional Activation, cer Order $53. 13.Sianal Formulation ISUP cer Call Set-Uc Reauest $0.000524 13.4 Sianal Transcort ISUP cer Call Set-UD Reauest $0.000176 13.Sianal TransDort TCAP Der Data ReQuest $0.000019 13.Signal Switching. ISUP cer Call Set-UD ReQuest $0.000983 13.Sianal Switchina. TCAP. cer Data Reauest $0.000837 Advanced IntelliGent Network fAIN\ 14.AIN Customized Services IACS\ICB 14.AIN Platform Access IAPA\ICB ICB 14.AIN Query Processing. Der Querv ICB Line Information Database fLIDB\ 15.LlDB Storace No Charae 15.Line Validation Administration Svstem Access ILVAS\ICE 15.LlDB Line Record Initial Load 15.Uc to 20 000 Line Records $2.601. 15.Over 20 000 Line Records ICB 15.Mechanized Service Account UDdate. Der Addition or UDdate Processed 15.Individual Line Record Audit 15.2.4 Account Grouc Audit 15.Excedited Reauest Charae for Manual Ucdates 15.LlDB Querv Service cer Querv $0.0008230 15.Fraud Alert Notification cer Alert No Charae 8XX Database Query Service 16.Basic Querv. cer Query $0.0130355 16.POTS Translation $0.00000048 16.Call Handlina & Destination Feature $0.00000145 ICNAM Per Querv $0.000768 Intentionally Left Blank Construction CharGes ICB ICB Miscellaneous CharGes 20.Additional Enaineerina. cer Half Hour or fraction thereof 20.Additional Enaineerina - Basic $31. 20.Additional Enoineerino - Overtime $39. 20.Additional Labor Installation. cer Half Hour or fraction thereof 20,Additional Labor Installation - Overtime $9. 20.Additional Labor Installation - Premium $18. 20.Additional Labor Other. cer Half Hour or fraction thereof 20.Additional Labor Other - Basic $27. 20,Additional Labor Other - Overtime $36. 20.Additional Labor Other - Premium $46. 20.4 Testing and Maintenance cer Half Hour or fraction thereof 20.4.Testing and Maintenance - Basic $29.40 20.4.Testina and Maintenance - Overtime $38. Qwest Idaho SGA T Third Revision Exhibit A 7th Amended March 24. 2005 eth /\moRaoa fol;)I:\;Jary 11, 20gB Page 13 of 18 Exhibit A Idaho 20.4.Testing and Maintenance - Premium $49. 20.Maintenance of Service, per Half Hour or fraction thereof 20.Maintenance of Service - Basic $28. 20.Maintenance of Service - Overtime $36. 20.Maintenance of Service - Premium $46. 20.Additional Cooperative Acceptance Testing, per Half Hour or fraction thereof 20.Additional Cooperative Acceptance Testing - Basic $29. 20.Additional Cooperative Acceptance Testina - Overtime $39. 20.Additional Cooperative Acceptance Testina - Premium $49. 20.Nonscheduled Cooperative Testing, per Half Hour or fraction thereof 20.Nonscheduled Cooperative Testing - Basic $29. 20.Nonscheduled Cooperative Testina - Overtime $39. 20.Nonscheduled Cooperative Testina - Premium $49. 20.Nonscheduled Manual Testing, per Half Hour or fraction thereof 20.Nonscheduled Manual Testing - Basic $29.40 20.Nonscheduled Manual Testing - Overtime $39. 20.Nonscheduled Manual Testina - Premium $49. 20.Intentionallv Left Blank 20.Intentionallv Left Blank 20.Additional Dispatch $87. 20.Date Chanae $10. 20.Desian Chanae $73. 20.Expedite Charae ICB 20.Cancellation Charge ICB Channel Reaeneration 21.DS1 $0.$0. 21.DS3 $0.$0. Intentionally Left Blank UNE Combinations 23.Intentionallv Left Blank 23.UNE-P Conversion Nonrecurrina Charaes 23.UNE-P POTS Centrex Analoa PBX Mechanized 23.First $0. 23.Each Additional $0. 23.UNE-P POTS Centrex PAL Analog PBX Manual 23.First $16. 23.Each Additional $2. 23.UNE-P PBX DID Trunks 23.First $28. 23.Each Additional $2. 23.2.4 UNE-P ISDN BRI 23.2.4.First $30. 23.2.4.Each Additional $2. 23.UNE-P ISDN PRI, DSS per DS1 Facility $27. 23.UNE-P ISDN PRI DSS - per Trunk 23.First $28. 23.Each Additional $2. 23.UNE-P New Connection Nonrecurrina Charaes 23.UNE-P POTS Centrex Analoa PBX Mechanized 23.First $57. 23.Each Additional $15. 23.UNE-P POTS Centrex PAL Analog PBX, Manual 23.First $82. 23.Each Additional $18. 23.UNE - P PBX DID - per Trunk $15. Qwest Idaho SGAT Third Revision Exhibit A 7th Amended March 24, 2005 6th Amended February 11 , 2995 Page 14 of 18 Exhibit A Idaho 23.UNE - P ISDN BRI $272. 23.UNE - P Trunks 23.DSS Basic Trunk - In Onlv. Out Onlv. or Two 2-Wav $74. 23.DSS, ISDN PRI Advanced Trunk - In only w DID & Hunting, or 2-$73. Way w DID, Hunting & Answer Supervision 23.DSS, ISDN PRI Advanced Trunk - Out Only w/Answer Supervision $74.4€ 23,Facilities for UNE - P DSS, UNE - P ISDN PRI 23.DS1 Loop Facilitv $279. 23.DS3 Loop Facilitv $279. 23.UNE - P PRI Confiaurations 23.UNE-P PRI Dedicated PRI 23 + D $596. 23.UNE-P PRI Dedicated PRI 24B $576. 23.UNE-P PRI Dedicated PRI 23B + Back-Up D Configuration - 5E $575. 23.4 Miscellaneous UNE-P DID Trunks Charges 23,UNE-P Complex Translations Diaits Outpulsed Chance Sianalina $15. 23.4.UNE-P DID Complex Translations Sianalina Chance $35. 23.4.UNE-P DID Block Compromise $25. 23.4.4 UNE-P DID Group of 20 Numbers $31. 23.4.UNE-P DID Reserve SeQuential # Block $25. 23.4.UNE-P DID Reserve Nonseauential Telephone Numbers $23. 23.4.UNE-P DID Nonseauential Telephone Numbers $33. 23.UNE - P Qwest DSL See applicable Qwest Retail Tariff, Catalog, or Price List 23.UNE Combinations - Loop MUX Combinations (LMC) 23.Interconnection Tie Pair (lTP), per Termination 23.DS1 $1. 23.DS3 $14. 23.Loop MUX 2-Wire Analoa 23.LMC 2-Wire Installation 23.First $225. 23.Each Additional $148. 23.Wire Analog Loop (uses rates from 9. 23.Zone 1 $15. 23.Zone 2 $23. 23.Zone 3 $40. 23.Loop MUX 4-Wire Analoa 23.LMC 4-Wire Installation 23.First $225. 23.Each Additional $148. 23.Wire Analoa Loop (uses rates from 9. 23.Zone 1 $30. 23.Zone 2 $46. 23.Zone 3 $79.47 23.6.4 DS1 Loop MUX 23.LMC DS1 Loop Installation 23.6.4.First $285. 23.Each Additional $209. 23.DS1 Capable Loop (uses rates from 9. 23.6.4.Zone 1 $30,70-. $86.48 23.Zone 2 $86.46 23.6.4.Zone 3 $79A+- $99. 23.Private Line to Loop MUX Conversion $34. 23.LMC Multiplexina 23.DS1 to DSO $263.$193. 23.DS3to DS1 $304.$193. 23.DSO Channel Performance 23.DS1/ DSO Low Side Channelization $7.47 23.Enhanced Extended Loop (EEL) 23.EEL DSO 2-Wire Analoa Qwest Idaho SGAT Third Revision Exhibit A 7th Amended March 24. 2005 €itA "-meRded FebfUary 11, 2005 Page 15 of 18 Exhibit A Idaho 23.EEL 2-Wire Loop Installation 23.First $245. 23.Each Additional $182. 23.Wire Analog Loop (uses rates from 9, 23.Zone 1 $15. 23.Zone 2 $23. 23.Zone 3 $40. 23.EEL DSO 4-Wire AnaloQ 23.EEL 4-Wire Loop Installation 23.First $245. 23.Each Additional $182. 23.Wire Analog Loop (uses rates from 9. 23.Zone 1 $30. 23.Zone 2 $46. 23.Zone 3 $79.47 23.EEL DS1 23.EEL DS1 Loop Installation 23.First $300.4~ 23.Each Additional $225. 23.DS1 Capable Loop (uses rates from 9. 23.Zone 1 86.48 23.Zone 2 86.46 23.Zone 3 99. 23.7.4 EEL DS3 23.EEL DS3 Loop Installation 23.7.4.First $323. 23.7.4.Each Additional $248. 23.7.4.DS3 Capable LooD (uses rates from 9,3.4\ 23.Zone 1 $941. 23.7.4.Zone 2 $955. 23.7.4.Zone 3 $1 264. 23.Intentionally Left Blank 23.Private Line to EEL Conversion $34. 23.Intentionallv Left Blank 23.EEL TransDort 23.DSO (Recurring Fixed per Mile) 23.Over 0 to 8 Miles $24.$0. 23.Over 8 to 25 Miles $24.$0. 23.Over 25 to 50 Miles $24.$0. 23.1.4 Over 50 Miles $24.$0. 23.DS1 (Recurrina Fixed Der Mile) 23.Over 0 to 8 Miles $36.$3. 23.Over 8 to 25 Miles $37.$3. 23.Over 25 to 50 Miles $39.$1. 23.2.4 Over 50 Miles $37.$0. 23.DS3 (Recurrina Fixed Der Mile) 23.Over 0 to 8 Miles $238.$54. 23.Over 8 to 25 Miles $242.$16. 23.Over 25 to 50 Miles $223.$21. 23.3.4 Over 50 Miles $235,$14. 23.Intentionallv Left Blank 23.EEL Multiplexina 23.10.DS1 to DSO $263.$246. 23.10.DS3 to DS1 $304.$246. 23.DSO Channel Performance 23.11.DSO Low Side Channelization $13. 23.11.DS1/ DSO Low Side Channelization $7.47 23.Concentration Capability ICB Unbundled Packet Switchina 24.Unbundled Packet Switch Customer Channel 24.DSLAM (and Splitter) Functionality $21. 24.Virtual TransDort $3. Qwest Idaho SGAT Third Revision Exhibit A 7th Amended March 24; 2005 eth /\meAEleEi February 11 2005 Page 16 of 18 Exhibit A Idaho 24,Customer Channel Shared Distribution Subloop $61. 24.Unbundled Packet Switch Interface Port 24.DS1 $158.$210.3!: 24.DS3 $272.$210.3!: 10.0 Ancillary Services 10.Local Number Portability 10.LNP Queries See FCC Tariff #1 Section 13 & 10.LNP Managed Cuts 10.Standard Managed Cuts. per Person per Half Hour $26. 10.Overtime Manaaed Cuts per Person per Half Hour $34. 10.Premium Manaaed Cuts per Person per Half Hour $42. 10.911/E911 10,911 / E911 No Charge No Charge 10.White Pages Directorv Listings. Facility Based Providers 10.Primarv Listina No Charae No Charge 10.Premium / Privacy Listings General General Exchange Tariff Exchange Tariff Rate, Less Rate, Less Wholesale Wholesale Discount Discount 10.Directorv Assistance Facilitv Based Providers 10.4.Local Directory Assistance per Call $0. 10.National Directory Assistance. per Call $0. 10.4.Call Brandina, Set- UP and Recordina $35000. 10.4.4 Loadina Brand per Switch $500, 10.4.Call Completion Link per Call $0.0893 10.Directorv Assistance List Information 10.Initial Database Load per Listina $0.025 10.Reload of Database per Listina $0.020 10.Dailv Updates per Listina $0.250 10.One-time Set-Up Fee $73. 10.Media Charges for File Delivery 10.Electronic Transmission $0.0020 10.Tapes (charges only apply if this is selected as the normal delivery medium for $30. 10.Shippina Charaes (for tape deliverv)ICB 10.Toll and Assistance ODerator Services Facilitv Based Providers 10,Option A - Per Message 10.Operator Handled Calling Card $1.45 10.Machine Handled Calling Card $0. 10.Station Call $1. 10.Person Call $3. 10.Connect to Directorv Assistance $0. 10.Busv Line Verify. per Call $0. 10.Busv Line Interrupt $0. 10.Operator Assistance per Call $0. 10.Option B - Per Operator Work Second and Computer Handled Calls 10.Operator Handled per Operator Work Second $0.02800 10.Machine Handled per Call $0.25000 10.Call Brandina. Set-Up & Recordina $10500. 10.Loading Brand/Per Switch $800. 10.Access to Poles Ducts Conduits and Rights of Way (ROW) 10.Pole Inauirv Fee. per Inauirv $341. 10.Innerduct Inauirv Fee per Inauirv $233. 10.ROW Inauirv Fee per Inauirv $378. 10.ROW Document Preparation Fee $122. 10.Field Verification Fee per Pole $20.4 10.Field Verification Fee per Manhole $190. 10.Planner Verification per Manhole $16. 10.Manhole Verification Inspector per Manhole $92. 10,Manhole Make-Readv Inspector per Manhole $245. 10.Transfer of Responsibility $106. Qwest Idaho SGA T Third Revision Exhibit A 7th Amended March 24. 2005 etA Amended FeBruary 11, 2005 Page 17 of 18 Exhibit A Idaho er Order $5. $1.4012. 12.$0.000419 12.4 See 9. 17.0 Bona Fide Re uest Process 17.Processin Fee $1 851. NOTES: Unless otherwise indicated, all rates are pursuant to Idaho Public Utilities Commission Dockets: A AT&T Arbitration Docket USW-96-, Order No 27738, effective September 17 1998. B Cost Docket QWE-01-, Order No. 29408 (January 5, 2004) rates effective January 5,2004. # Voluntary Rate Reduction, Docket USW-00-, effective 6/10/02. Reductions reflected in the 5/24/02 Exhibit A. ## Second Voluntary Rate Reduction, Docket USW-00-, effective 6/7/02. Reductions reflected in the 7/10/02 Exhibit A. ### Third Voluntary Rate Reduction, Docket USW-00-, effective 12/16/02, Reductions reflected in the 10/16/02 Exhibit A (1) TELRIC rates proposed in Cost Docket QWE-01-11 testimony filed on November 12, 2003. The case was bifurcated and the rates using this footnote are proposed in Phase 2 of the cost docket. (2) Market-based rates. (3) ICB, Individual Case Basis pricing. (4) The State of Idaho has retained the oversight on these rates. These rates are not under the jurisdiction of the FCC. (5) FCC ordered rates pursuant to the FCC's Order on Remand and Report and Order (Intercarrier Compensation for ISP-Bound Traffic) CC Docket 01-131 (FCC ISP Order), effective June 14, 2001. (6) Effective August 1, 2003, Qwest will no longer bill the recurring and nonrecurring charges for Channel Regeneration. Qwest reserves the right to revert back to the contractual rate only after appropriate notice is given. (7) The preliminary Quote Preparation Fees (QPF) are included in the space construction charges. Upon completion of the collocation construction, the QPF will be credited to the final space construction charge for the virtual, caged or cageless collocation job. These engineering and planning charges are also included in the Virtual, Caged and Cageless Quote Preparation Fees. (8) Effective 11/04, Qwest will no longer perform Bridge Tap and/or Load Coil Removal (Conditioning) to facilitate provisioning of its Qwest Retail DSL offering. In order to permit CLECs to provision their own xDSL Capable Loops, Qwest in now re-instituting the charge to continue Conditioning for the 2/4-Wire Unbundled Loop, ADSL Compatible Unbundled Loop, ISDN (BRI) Capable Unbundled Loop, xDSL-1 Capable Unbundled Loop, Non-Commercial Line Sharing, Line Splitting, Non-Commercial Shared Distribution Loop and Loop Splitting, effective 3/14/05. Qwest cant bill the REC rate structure, but will bill customers the lower of the two rates. (9) Qwest is voluntarily reducing this rate in order to keep rate relationship with the Fiber Transport "per Pair" rate element. (10) Qwest has not implemented this UNE rate or charge in its billing system but reserves the right to assess such a charge in the future. (11) All technically feasible Vertical Switch Features are available with compatible unbundled switch ports. No monthly recurring charge applies for Basic Vertical Switch Features. Only basic Vertical Switch Features with nonrecurring charges are listed. Nonrecurring charges are applicable whenever a feature is added - whether on new installation, conversion, or change order activity. Vertical Switch Features not listed are included in the cost of the switch port and have a rate of zero for both recurring and nonrecurring charges. (12) The Premium Port monthly recurring charge applies in addition to the Analog or Digital Line Side Port recurring charges when Premium Features are ordered with analog or digital ports. Qwest Idaho SGAT Third Revision Exhibit A 7th Amended March 24. 2005 etA Amended FeBruary 11, 2005 Page 18 of 18