Loading...
HomeMy WebLinkAbout200502143rd Revision 6th Amendment Exhibit A SGAT.pdfSTOEL~ R (i', C V 1- t~ i" 1 L c.. . 101 S. Capitol Boulevard, Suite 1900 Boise, Idaho 83702 main 208.389.9000 fax 208.389.9040 www.stoel.com 1un~ fEa P~i q: rt ATTORNEYS AT LAW ;,; iC-z1 UT\L f lEg COt~t~lSSlON February 11 , 2005 MARYS. HOBSON Direct (208) 387-4277 mshobson~stoe1.com VIA HAND DELIVERY Jean D. Jewell, Secretary Idaho Public Utilities Commission 472 West Washington O. Box 83720 Boise, ill 83702 Re:Docket #QWE- T -03- Dear Ms. Jewell: Enclosed for filing with this Commission on behalf of Qwest Corporation is an original and seven (7) copies of the REVISED EXHIBIT A. Please contact me if you have any questions concerning the enclosed. Thank you for your assistance in this matter. Very truly yours At11 fftJh- Mary S.llobson :blg Enclosures Oregon Washington California Boise-181339.10029164-00098 Utah Idaho Mary S. Hobson (ISB #2142) Stoel Rives LLP 101 South Capitol Boulevard - Suite 1900 Boise, ill 83702 Telephone: (208) 387~4277 Facsimile: (208) 389-9040 mshobson~stoel.com E!\lED " ' r ~ L tJ. IT) .......... zrmSFEB 1 I PJ~1 4: 12 . ;lO P t; r.1 i C UTILiTIES CO 1 ;" (" ' , iJ01 n Adam L. Sherr (WSBA #25291) Qwest 1600 ih Avenue - Room 3206 Seattle, W A 98191 Telephone: (206) 398-2507 Facsimile: (206) 343-4040 adam.sherr~qwest.com BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF QWEST CORPORATION'S REVISIONS TO ITS STATEMENT OF GENERALLY AVAILABLE TERMS AND CONDITIONS (SGAT) PURSUANT TO 47 U.C. ~ 252(1) CASE NO. QWE-03- REVISED EXHIBIT " Qwest Corporation ("Qwest"), by and through its undersigned attorneys, files the attached Third Revision, Sixth Amended Exhibit A dated February 11 , 2005 ("Sixth Amended Exhibit A" ). The Sixth Amended Exhibit A reflects the prices for unbundled network elements (UNEs) ordered by the Commission in Case No. QWE-Ol-ll and is otherwise identical to the version of Exhibit A now in effect, with the exception of a small number of minor changes discussed below and shown on the "redline" version of the Sixth Amended Exhibit A, which is provided herewith for the convenience of the Commission. Among the changes reflected in the Sixth Amended Exhibit A are changes to the footnotes. Note (1 J was revised to simply to clarify the cost docket process that preceded some REVISED EXHIBIT "A" - Page 1 Boise-166469.1 0029164-00098 of the existing prices. Note (8) explains that the charges for loop unloading and conditioning found in section 9.2.4 and 9.5 were re-instated although, because of difficulties with billing the rates as structured, Qwest will simply bill customers the lowest rate. The Commission should also be aware that in addition to the change to the note in the Sixth Amended Exhibit A CLECs are being notified of this change in a separate process. The remaining changes in the Sixth Amended Exhibit A are all in the form of clarifications and do not affect the prices or availability of the elements listed. For example, for twelve of the elements listed on Exhibit A the phrase "Recurring Fixed & per Mile" has been added to the headings to better explain the price elements. The other changes, all of which are depicted on the redline version, are of a similar nature. Qwest respectfully requests that the Commission accept the attached Sixth Amended Exhibit A and allow it to go into effect in the normal course. Dated this 11 th day of February, 2005. Mary S obson Stoel Rives, LLP Attorneys for Qwest Corporation REVISED EXHIBIT" A" - Page 2 Boise-166469.1 0029164-00098 CERTIFICATE OF SERVICE I hereby certify that on this 11 th day of February, 2005, I served the REVISED EXHIBIT" A" as follows: Jean D. Jewell, Secretary Idaho Public Utilities Commission 472 West Washington O. Box 83720 Boise, ill 83702 Telephone: (208) 334-0300 Facsimile: (208) 334-3762 11 ewell~puc. state .id. us L1LJ Hand DeliveryL-J U. S. MailL-J Overnight DeliveryL-J FacsimileL-J Email Weldon Stutzman Deputy Attorney General Idaho Public Utilities Commission 472 West Washington Street O. Box 83720 Boise, ill 83702 Telephone: (208) 334-0300 Facsimile: (208) 334-3762 LXJ Hand DeliveryL-J U. S. MailL-J Overnight DeliveryL-J FacsimileL-J Email ~~~~ Brandi L. Gearhart, PLS Legal Assistant to Mary S. Hobson Stoel Rives LLP REVISED EXHIBIT" A" - Page 3 Boise-166469.1 0029164-00098 Exhibit A Idaho Resale Wholesale Wholesale Discount Discount Percentage Percentage Recurring Nonrecurring Charges Charges Wholesale Discount Rates Southern Idaho Basic Exchanae Residential Line Service 18.25%18.25% Basic ExchanQe Business Line Service 18.25%18.25% IntraLATA Toll 18.25%18.25% 1.4 Package/Special Services (e., Centrex, Discounted Line/Feature Packages,18.25%18.25% ISDN, PBX-Trunks, DSS & UAS, Frame Relay Service, LAN, MegaBit and other ACS) ListinQs CO Features & Information Services 18.25%18.25% Private Line 18.25%18.25% ODerator Services / Directorv Assistance (OS/DA)18.25%18.25% Volume Packaaed Services - Hiah Volume Customers 65%65% Public Access Line (PAl) Service 00%00% Northern Idaho Basic,ExchanQe Residential Line Service 19.37%19.37% Basic Exchanae Business Line Service / PBX 19.37%19.37% IntraLATA Toll 19.37%19.37% 2.4 Package/Special Services (e., Centrex, Discounted Line/Feature Packages,19.37%19.37% ISDN, PBX-Trunks, DSS & UAS, Frame Relay Service, LAN, MegaBit and other ACS) Listinas CO Features & Information Services 19.37%19.37% Private Line 19.37%19.37% ODerator Services / Directorv Assistance (OSIDA)19.37%19.37% Volume Packaaed Services - Hiah Volume Customers 87%87% Public Access Line (PAl) Service 00%00% Customer Transfer Charge (CTC) CTC for POTS Service Manual First Line $16. Each Additional Line $2. Mechanized First Line $0. Each Additional Line $0. CTC for Private Line TransDort Services First Circuit $38. Additional Circuit Der circuit same CSR $33. CTC for Advanced Communications Services Der Circuit $46. Interconnection Entrance Facilities Intentionallv Left Blank DS1 $103.$208. DS3 $524.42 $277. LIS EICT Per DS1 $0.$0. Per DS3 $0.$0. Direct Trunked Transoort Intentionallv Left Blank DS1 fRecurrina Fixed Der Mile) Over 0 to 8 Miles $37.$1. Over 8 to 25 Miles $37.$1. Over 25 to 50 Miles $37.$1. 3.4 Over 50 Miles $37.$1. DS3 (Recurrina Fixed Der Mile) Over 0 to 8 Miles $257.$19.48 Over 8 to 25 Miles $260.49 $24. Over 25 to 50 Miles $260.$26.43 3.4 Over 50 Miles $259.$26. Multiolexina 7.4.DS1 to DSO $263.$193. Owest Idaho SGAT Third Revision Exhibit A 6th Amended February 11, 2005 Page 1 of 18 Exhibit A Idaho DS3 to DS1 $304.$193. Trunk Nonrecurrina CharGes Intentionallv Left Blank DS1 Interface First Trunk $229.40 Each Additional Trunk $5.46 DS3 Interface First Trunk $235. Each Additional Trunk $11. Exchanae Service lEAS/Locan Traffic End Office Call Termination. per Minute of Use $0.001343 ### Tandem Switched Transport. Per Minute of Use $0.000690 Tandem Transmission, per Minute of Use (Recurrina Fixed oer Mile) Over 0 to 8 Miles $0.0004564 $0.0000367 Over 8 to 25 Miles $0.0004564 $0.0000367 Over 25 to 50 Miles $0.0004564 $0.0000367 3.4 Over 50 Miles $0.0004260 $0.0000144 Local Traffic-FCC-ISP Rate CaDs MOU as of June 14 2003 rate in effect until further FCC action $0.0007 Miscellaneous CharGes Expedite Charge (LIS Trunks)Qwest's Idaho Access Service Catalog Cancellation Charge (LIS Trunks)Qwest's Idaho Access Service Catalog Additional Testing (LIS Trunks)Qwest's Idaho Access Service Catalog Transit Traffic Local Transit (Local Transit Assumed Mileage = 7 Miles)See Tandem See Tandem Switching and Switching and Tandem Tandem Transmission Transmission Rates Above.Rates Above. IntraLATA Transit Toll (IntraLATA Transit Toll Assumed Mileage = 7 Miles)Qwest's Idaho Qwest's Idaho Access Service Access Service Catalog Catalog Jointly Provided Switched Access Qwest's Idaho Qwest's Idaho Access Service Access Service Catalog Catalog 9.4 Cateaorv 11 Mechanized Record CharQe, per Record $0.0014877 Collocation All Collocation Plannina and Enaineerina Intentionallv Left Blank Cable Auament Quote Preparation Fee $1 284. Entrance Facilitv Standard Shared per Fiber $5.44 $616. Cross Connect. per Fiber $5.$722. Exoress. per Cable $88.$9009. Cable SolicinQ Fiber - Per Set-$399. Per Fiber Spliced $37. 1.4 Power Usaae -48 Volt DC Power Usaae per Amoere per Month 1.4.Power Plant Qwest Idaho SGAT Third Revision Exhibit A 6th Amended February 11, 2005 Page 2 of 18 Exhibit A Idaho 1.4.Power Plant - Less than 60 Amps $10. Power Plant - Equal to or Greater Than 60 Amps $8. 1.4.Power Usaae 1.4.Power Usaae 60 Amps or Less per Amp $2.47 Power Usaae More Than 60 Amps per Amp $4. AC Power Feed AC Power Feed per Amp. per Month 120V $16. 208 V Sinale Phase $27. 208 V Three Phase $48. 1.4 240 V Sinale Phase $32. 240 V Three Phase $55. 480 V Three Phase $111. AC Power Feed. per Foot, per Month 20 Amp. Sinale Phase $0.0084 $7.43 20 Amp. Three Phase $0.0105 $9. 30 Amp. Sinale Phase $0.0091 $8. 2.4 30 Amp. Three Phase $0.0125 $11. 40 Amp. Sinale Phase $0.0107 $9.43 40 Amp. Three Phase $0.0147 $12. 50 Amp, Sinale Phase $0.0127 $11. 50 Amp, Three Phase $0.0177 $15. 60 Amp, Sinale Phase $0.0144 $12. 60 Amp. Three Phase $0.0204 $17. 100 Amp. Sinale Phase $0.0178 $15. 100 Amp. Three Phase $0.0277 $24.44 Inspector Labor per Half Hour Reaular Hours Rate $28. After Hours Rate minimum 3 hours $37. Channel Regeneration DS1 Reaeneration $0.$0. DS3 Reaeneration $0.$0. Collocation Terminations Shared Access DSO Cable Placement per 100 Pair Block $0.2262 $208. Cable Placement per Termination $0.0090 $4. Cable per 100 Pair Block $0.3304 $304. 1.4 Cable per Termination $0.0066 $4. Blocks per 100 Pair Block $0.5730 $528.42 Blocks per Termination $0.0115 $8. Block Placement per 100 Pair Block $0.2381 $219. Block Placement per Termination $0.0048 $3. DS1 Cable Placement. per 28 DS1s $0.4111 $362. Cable Placement, per Termination $0.0442 $38. Cable per 28 DS1s $0.3993 $351. 2.4 Cable per Termination $0.0429 $37. Panel per 28 DS1s $0.2742 $241. Panel per Termination $0.0330 $29. Panel Placement, per 28 DS1s $0.0847 $74. Panel Placement. per Termination $0.0091 $8. DS3 Cable Placement per Termination $0.1521 $134. Cable per Termination $0.2578 $227. Panel! Connector per Termination $0.2625 $231. 3.4 Panel! Connector Placement per Termination $0.0204 $18. 1.4 Fiber Termination 1.4.Terminations per 12 Fibers $26.$1 513. Additional Connector (if applicable)$0.47 $411. 1.4.Cable Racking - Shared. per 12 Fibers $26.47 4.4 Cable Racking - Dedicated $1.433. Security Charae Per Emplovee per Card $0. Owest Idaho SGAT Third Revision Exhibit A 6th Amended February 11 . 2005 Page 3 of 18 Exhibit A Idaho Card Access Der EmDloyee Der Office $7. Central Office SecuritY Infrastructure ICB ICB ComDosite Clock Central Office Synchronization 10.Synchronization - ComDosite Clock Der Port $7.44 Intentionally left Blank SDace Ayailability CharQe $313. Collocation Space Reservation Fee The charge will 25% of the Nonrecurring Fee Collocation SDace Oction Administration Fee $1 107. Collocation SDace ODtion Fee. Der SQuare Foot $2. Virtual Collocation PlanninQ and Enaineerina Fees Quote PreDaration Fee $3,146.41 Maintenance labor Der Half Hour ReQular Hours Rate $29. After Hours Rate $39. TraininQ labor Der Half Hour ReQular Hours Rate $29. 2.4 Bay SDace 2.4.EauiDment Bay, per Shelf $4. 2.4.Virtual Space Construction Initial Bay Provided $20.$17749. 2.4.Each Additional Bay Space $3.$2 854. 2.4.Virtual Cable RackinQ, Der Shelf $0.44 $384. EnQineerina labor Der Half Hour Reaular Hours Rate $32. After Hours Rate $43. Installation labor Der Half Hour ReQular Hours Rate $31. After Hours Rate $41. Rent Floor Space lease per SQuare Foot $2. Rent. per Shelf $4. Intentionally left Blank Power Plant -48 DC Power Cable 20 Amp Power Feed $4.$3985.41 30 Amp Power Feed $5.$4537. 40 AmD Power Feed $6.$5 480.42 1.4 60 AmD Power Feed $11.$9 706. 100 AmD Power Feed $18.$16 370. 200 AmD Power Feed $34.$30,473. 300 Amc Power Feed $54.$47,917. 400 Amp Power Feed $77.$68,037. Caaeless Physical Collocation Plannina and EnQineerinQ Fee Quote Preparation Fee $3146.41 Space Construction and Site PreDaration Site Preparation Fee ICB 2 Bays $23.39 $20 603.40 Intentionally left Blank 2.4 Intentionally left Blank SDace Construction for Each Additional Bay $3.$2 854. Adiustment for Sinale Bay - ChanQe to Standard DesiQn ($3.24\($2 854. DC Power Cable 20 Amp Power Feed $4.$3985.41 30 AmD Power Feed $5.537. Qwest Idaho SGAT Third Reyision Exhibit A 6th Amended February 11, 2005 Page 4 of 18 Exhibit A Idaho 40 Arne Power Feed $6.$5480.42 60 AITlD Power Feed $11.$9 706. 100 Amp Power Feed $18.$16370. 200 Amp Power Feed $34.$30473. 300 Amp Power Feed $54.$47917. 400 Arne Power Feed $77.$68 037. Floor Space Lease per Sauare Foot $2. Caged Physical Collocation 8.4.Plannina and Enaineerina Fee 8.4.Quote Preparation Fee $3,185. 8.4.Space Construction and Site Preparation 8.4.Site Preparation Fee ICE 8.4.Intentionally Left Blank 8.4.Intentionally Left Blank 8.4.2.4 Space Construction 8.4.2.4.Caae Ue to 100 Sa. Ft.$38.$33927. 8.4.Caae - 101 Sa. Ft. to 200 Sa. Ft.$34.$30 113. 8.4.2.4.Caae - 201 SQ. Ft. to 300 SQ. Ft.$42.$37154. 8.4.2.4.4 Caae - 301 SQ. Ft. to 400 Sq. Ft.$44.$38 922. Intentionally Left Blank 8.4.Intentionally Left Blank 8.4.DC Power Cable 20 Arne Power Feed $5.$4 954. 8.4.30 Amp Power Feed $6.$5457. 8.4.40 Amp Power Feed $7.41 $6 526. 7.4 60 Amp Power Feed $12.$10772. 8.4.100 Arne Power Feed $19.$17 531. 8.4.200 Arne Power Feed $37.$32 634. 8.4.300 Amp Power Feed $58.$51 315. 8.4.400 Amp Power Feed $82.$72861. 8.4.Space Construction - Fencing Credit 8.4.Caae Up to 100 SQ. Ft.$10.$5,723. 8.4.Caae 101 - 200 Sa. Ft.$12.$7135. 8.4.Caae 201 - 300 Sa. Ft.$14.47 $8015. 8.4.3.4 Caae 301 - 400 Sa. Ft.$16.$8,851. 8.4.4 Floor Space Lease per Sauare Foot $2. 8.4.Intentionallv Left Blank 8.4.Intentionally Left Blank 8.4.Intentionally Left Blank 8.4.Groundina 8.4.2/0 AWG per Foot $0.0097 $8. 8.4.1/0 AWG per Foot $0.0170 $14. 8.4.4/0 AWG per Foot $0.0200 $17. 8.4.8.4 350 kcmil. per Foot $0.0258 $22. 8.4.500 kcmil per Foot $0.0299 $26. 8.4.750 kcmil per Foot $0.0456 $40. Adiacent Collocation ICB Remote Collocation Physical & Virtual Remote Collocation Space (eer Standard Mountina Unit)$0.$665.47 FDI Terminations (eer 25 Pair)$0.$484. Power Usaae Power Usaae 60 Ames or Less per Amp $2.47 Power Usaae More Than 60 Amps per Amp $4. 1.4 Quote Preparation Fee $1 064. Adiacent Remote Collocation Adjacent Remote Collocation (New)ICB Adjacent Remote Collocation (Existina) Space (per Standard Mountina Unit)$0.$665. FDI Terminations (eer 25 Pair)$0.$484. Qwest Idaho SGAT Third Revision Exhibit A 6th Amended February 11 , 2005 Page 5 of 18 Exhibit A Idaho Power Usaae Power Usaae 60 Amos or Less oer Amo $2.47 Power Usaae More Than 60 Amos, oer Amo $4. 2.4 Quote Precaration Fee $1 064. Additional Virtual Remote Collocation Elements Flat Charoe cer Job $36. Enoineerina Rate oer Half Hour $35. Maintenance. cer Half Hour $29. 3.4 Installation. cer Half Hour $29.40 Trainina, cer Half Hour $29.40 CLEC to CLEC Desian Enaineerina & Installation Flat Charae (Desian Enaineerina - No Cables)$634. Fiber Flat Charae $1 229. Cable Rackina. Per Foot DSO cer Foot cer Cable $0.11848 DS1 cer Foot oer Cable $0.13075 DS3 cer Foot oer Cable $0.10234 2.4 Fiber oer Foot oer Fiber $0.93313 Virtual Connections (if acclicable - Connections only: No cables) DSO Per 100 Connections)$194. DS1 Per 28 Connections)$91. DS3 Per 1 Connection)$5. 3.4 Fiber Connections oer Fiber Soliced $37. Cable Hole (if Acclicable)$386. CLEC to CLEC Cross Connection $201. Interconnection Distribution Frame lICDF\ Collocation ICE Application to ReQuest Cancellation No Charae Microwave Collocation Under Develocment Intentionallv Left Blank Intentionallv Left Blank DC Power Reduction 13.Quote Precaration Fee $703. 13.Power Reduction Less than 60 Amos $494.45 13.Power Reduction Eaual to 60 Amos $706. 13.4 Power Reduction Greater than 60 Ames cer Amo $895. 13.Power On Off $621. 13.Batterv Distribution Fuse Board (BDFB) Rent $64. Collocation Transfer of Responsibilitv 14.Intentionally Left Blank 14.Assessment Fee $1 036. 14.Network Systems Administration Fee $1.586. Intentionally Left Blank 0 Unbundled Network Elements tUNEs) Interconnection Tie Pairs (lTP) - Per Termination DSO $0. DS1 $1. DS3 $14. Unbundled LOODS Analoa Loocs See 9.2.4 Wire Voice Grade Looo Zone 1 $15. Zone 2 $23. Zone 3 $40. Intentionally Left Blank Wire Voice Grade Looc Qwest Idaho SGAT Third Revision Exhibit A 6th Amended February 11 , 2005 Page 6 of 18 Exhibit A Idaho Zone 1 $30. Zone 2 $46. Zone 3 $79.47 Nonloaded Loops See 9.2.4 Wire Nonloaded LOOD Zone 1 $15. Zone 2 $23. Zone 3 $40. Intentionallv Left Blank Wire Nonloaded LOOD Zone 1 $30. Zone 2 $46. Zone 3 $79.47 2.4 Loop Unloadina $9.A 8 Loop Conditionina $22.A 8 Diaital Capable Loops Basic Rate ISDN xDSL-1 Capable ADSL Compatible Loop See-9.2.4 Zone 1 $15. Zone 2 $23. Zone 3 $40. Intentionally Left Blank DS1 Capable Loop See-9. Zone 1 $86.48 Zone 2 $86.46 Zone 3 $99. DS3 Capable Loop See-9. 3.4.Zone 1 $941. 3.4.Zone 2 $955. 3.4.Zone 3 $1 264. OC - n Capable Loop See-9. OC-$924. OC -$1 314. OC-$3 528. Wire Extension Technology $22. 2.4 Loop Installation Charges for 2 & 4 wire Analog Non-Loaded, ADSL Compatible, ISDN BRI See 9.1 & Capable and xDSL - I Capable Loops where conditionina is not required. 2.4.Basic Installation 2.4.First $11. 2.4.Each Additional $6. 2.4.Basic Installation with Performance Testina 2.4.First Loop $17. Each Additional $8. Coordinated Installation with Cooperative Testing Project Coordinated Installation 2.4.First Loop $171. 2.4.Each Additional $94. 2.4.4 Coordinated Installation without Cooperative Testing Project Coordinated Installation 4.4.First Loop $59. 2.4.4.Each Additional $53. 2.4.Basic Installation with Cooperative Testina 2.4.First Loop $142. 2.4.Each Additional $94. DS1 Loop Installation Charaes See 9. Basic Installation First Loop $128. Each Additional $99. awest Idaho SGAT Third Revision Exhibit A 6th Amended February 11, 2005 Page 7 of 18 Exhibit A Idaho Basic Installation with Performance Testina First LOOD $279. Each Additional $212. Coordinated Installation with Cooperative Testing Project Coordinated Installation First LOOD $316. Each Additional $222. 5.4 Coordinated Installation without Cooperative Testing Project Coordinated Installation 5.4.First LOOD $135. 5.4.Each Additional $106. Basic Installation with Cooperative Testina First LOOD $272. Each Additional $195. DS3 LOOD Installation Charaes See 9. Basic Installation First LOOD $128. Each Additional $99. Basic Installation with Performance Testina First LOOD $279. Each Additional $212. Coordinated Installation with Cooperative Testing Project Coordinated Installation First LOOD $316. Each Additional $222.40 6.4 Coordinated Installation without Cooperative Testing Project Coordinated Installation 6.4.First LOOD $135. 6.4.Each Additional $106. Basic Installation with Cooperative Testina First LOOD $272. Each Additional $195. OC - 3, 12, 48 Loop Installation Charaes See 9. Basic Installation First LooD $128. Each Additional LoOD $99. Basic Installation with Performance Testina First Loop $279. Each Additional Loon $212. Coordinated Installation with Cooperative Testina First LOOD $316. Each Additional LOOD $222.40 7.4 Coordinated Installation without Cooperative Testina 7.4.First LOOD $135. 7.4.Each Additional Loon $106. Basic Installation with Cooperative Testina First LOOD $272.24 Each Additional LOOD $195. Private Line to Unbundled Loop Conversions $34. SubioOD Wire Distribution LooD (ADDlies to both Analoa and Nonloaded) First $107. Each Additional $29. First & Each Additional 2-Wire Distribution LOOD Zone 1 $11. Zone 2 $16. Zone 3 $27. Intentionallv Left Blank awest Idaho SGAT Third Revision Exhibit A 6th Amended February 11, 2005 Page 8 of 18 Exhibit A Idaho Intra-Buildina Cable LooD, Per Pair $0. No DisDatch First $51. No Dispatch, Each Additional $21. DisDatch First $98. 3.4 DisDatch Each Additional $31. 3.4 Feeder LooD 3.4.DS1 CaDable Feeder LooD 3.4.First $310. 3.4.Each Additional $221. 3.4.First & Each Additional DS1 Capable Feeder Loop 3.4.Zone 1 $77. 3.4.Zone 2 $77. 3.4.Zone 3 $90. MTE Terminal SublooD Access Subloop MTE - POI Site Inventory (per request)$110. MTE - POI RearranQement of Facilities ICB MTE - POI Construction of New SPOI ICB Intentionallv Left Blank Field Connection Point (FCP) Feasibility Fee Quote Preparation Fee 197. FCP Reclassification $463. Intentionallv Left Blank Intentionallv Left Blank Intentionally Left Blank Construction Fee 1GB Shared Services 9.4.Shared Loop, per Loop $0.$33. 9.4.UNE - P Line SDlittina Basic Installation Charae for UNE-P Line SDlittina $33.71: 9.4.LooD SDlittina 9.4.Basic Installation Charae for LooD SDlittina $33.7!: 9.4.4 OSS, per Line per Month $3. 9.4.Reclassification CharQe 1GB 9.4.Splitter Shelf CharQe $4.$503.7;0 9.4.SDlitter TIE Cable Connections 9.4.SDlitter in the Common Area-Data to 410 block $3.$2689. 9.4.SDlitter in the Common Area-Data direct to CLEC $3.$2 850. 9.4.Splitter on the IDF - Data to 410 Block $0.$834. 9.4.Splitter on the IDF - Data direct to CLEC $1.$1 623.47 9.4.Splitter on the MDF-Data to 410 block $0.$861. 9.4.SDlitter on the MDF - Data direct to CLEC $2.$1 922.42 9.4.Enaineerina $1 079. Network Interface Device (NID)$0.$52. Unbundled Dedicated Interoffice TransDort CUDITI DSO UDIT (Recurrina Fixed oer Mile)$241. Over 0 to 8 Miles $24.$0. Over 8 to 25 Miles $24.$0. Over 25 to 50 Miles $24.$0. 1.4 Over 50 Miles $24.$0. DS1 UDIT (Recurrina Fixed oer Mile)$284. Over 0 to 8 Miles $36.43 $3. Over 8 to 25 Miles $37.$3. Over 25 to 50 Miles $39.$1. 2.4 Over 50 Miles $37.$0. DS3 UDIT Recurring Fixed per Mile)$284. Over 0 to 8 Miles $238.$54. Over 8 to 25 Miles $242.$16. Qwest Idaho SGAT Third Revision Exhibit A 6th Amended February 11 , 2005 Page 9 of 18 Exhibit A Idaho Over 25 to 50 Miles $223.$21. 3.4 Over 50 Miles $235.$14. OC-3 UDIT (Recurring Fixed per Mile)$295. Over 0 to 8 Miles $763.$36. 6.4.Over 8 to 25 Miles $763.$36. 6.4.Over 25 to 50 Miles $763.$36. 6.4.4 Over 50 Miles $763.$66. OC-12 UDIT (Recurring Fixed per Mile)$295. Over 0 to 8 Miles $2.163.$72. Over 8 to 25 Miles $2.163.$72. Over 25 to 50 Miles $2163.$72. Over 50 Miles $2 163.$135. OC-48 UDIT (Recurring Fixed per Mile)$295. Over 0 to 8 Miles $4 420.$183. Over 8 to 25 Miles $4 420.$183. Over 25 to 50 Miles $4 420.$183. 6.4 Over 50 Miles $4 420.$346. UDIT DSO Channel Performance DSO UDIT Low Side Channelization $13. DS1/ DSO Low Side Channelization $7.$191. UDIT MultiplexinQ (Stand Alone) DS1 to DSO $263.$238. DS3 to DS1 $304.$1.996. Extended Unbundled Dedicated Interoffice Transport DS1 E-UDIT $80.$339. DS3 E-UDIT $371.$347. OC-3 E-UDIT $819.$412. OC-12 E-UDIT $1 256.$427. OC-48 E-UDIT $3 299.9;413. Remote Node / Remote Port 10.OC-3 Remote Node 10.Remote Node $476. 10.DS 1 Remote Port $3.$198. 10.DS3 Remote Port $49.$198. 10.OC-12 Remote Node 10.Remote Node $894. 10.DS1 Remote Port $12.$198. 10.DS3 Remote Port $33.$198. 10.2.4 OC-3 Remote Port $103.$198. 10.OC-48 Remote Node 10.Remote Node $3207. 10.DS3 Remote Port $22.$198. 10.OC-3 Remote Port $121.$198. 10.3.4 OC-12 Remote Port $479.$198. UDIT Rearranaement 11.DSO Sinale Office $164.40 11.DSO Dual Office $206. 11.HiQh Capacity SinQle Office $221. 11.4 HiQh Capacity Dual Office $249. Unbundled Dark Fiber (UDF) Initial Records Inauirv OR!) Simple $196. Complex $251. Field Verification and Quote Preparation (FVQP)$907. Field Verification (EnQineerinQ Verification)$297. 7.4 UDF - SinQle Strand 7.4.UDF - Interoffice Facility (UDF-IOF) - Sinale Strand 7.4.Order Charae per First Strand / Route / Order $492. Order Charae Each Additional Strand / Same Route $255. 7.4.Fiber Transport per Strand / Mile $50. 1.4 Termination Fixed per Strand / Office / Termination $4. Fiber Cross-Connect per Strand / Office $2.$19. Qwest Idaho SGAT Third Revision Exhibit A 6th Amended February 11 , 2005 Page 10 of 18 Exhibit A Idaho 7.4.UDF-Loop CharQes - SinQle Strand 7.4.Order CharQe. per First Strand Route Order $492. 7.4.Order CharQe Each Additional Strand Same Route $255. Fiber Loop. per Strand Route $88. 7.4.2.4 Termination Fixed per Strand Office $4. Termination Fixed per Strand Premise $3. Fiber Cross-Connect per Strand Office $2.$19. 7.4.Extended Unbundled Dark Fiber (E-UDF) - SinQle Strand Order CharQe per First Strand Route Order $492. 7.4.Order CharQe Each Additional Strand Same Route $255. 7.4.Fiber Transcort per Route Strand $96. 7.4.3.4 Termination Fixed per Strand Office $4. Termination. Fixed per Strand Premise $3. Fiber Cross-Connect. per Pair $2.$19. UDF - per Pair UDF-IOF Charaes - per Pair Order Charae per First Pair Route Order $492. Order Charae Each Additional Pair Same Route $255. Fiber Transport per Pair Mile $66. 1.4 Termination Fixed per Pair Office Termination $7. Fiber Cross-Connect per Pair Office $4.43 $19. UDF-Loop CharQes - per Pair Order CharQe per First Pair Route Order $492. Order CharQe, Each Additional-Pair Same Route $255. Fiber Looc. per Route per Pair $131. Termination, Fixed per Pair Office $7. Termination. Fixed per Pair Premise $6. Fiber Cross-Connect per Pair Office $3.$19. Extended Unbundled Dark Fiber (E-UDF) Order CharQe per First Pair Route Order $492. Order CharQe, Each Additional-Pair Same Route $255. Fiber Transcort per Route Per Pair $131. 3.4 Termination Fixed Per Pair Office $7. Termination Fixed Per Pair Premise $6. Fiber Cross-Connect. per Pair $3.$19. Dark Fiber Sol ice $602. Shared Transport Per Minute of Use $0.001110 Unbundled Customer Controlled Rearranaement Element IUCCRE\ DS1 Port ICB ICB DS3 Port ICB ICB Dial Up Access ICB 9.4 Attendant Access ICB Virtual Ports ICB Local Tandem SwitchinG 10.DS1 Local Messaae Trunk Port per Order $187. 10.DS1 Trunk Group 10.First Trunk. per Order $209. 10.Each Additional Trunk per Order $21. 10.Per Minute of Use $0.000690 Local SwitchinG 11.Ports 11.AnaloQ Line Side Port 11.First Port $1.$10. 11.Each Additional Port $1.$5.49 11.DiQital Line Side Port (SupportinQ BRIISDN), First & Each Additional $12.$205. 11.DiQital Trunk Ports 11.PBX DID Trunk Port, per DSO $2.43 $213. 11.DS1 Local MessaQe Trunk Port $39.$205. 11.Message Trunk Group, First Trunk $176. 11.3.4 MessaQe Trunk Grouc, Each Additional $37. Qwest Idaho SGA T Third Revision Exhibit A 6th Amended February 11, 2005 Page 11 of 18 Exhibit A Idaho 11.DS1 PRIISDN Trunk Port $198.$611.49 11.DSO Analoa Trunk Port 11.1.4.First Port $14.$115. 11.1.4.Each Additional Port $14.$31. 11.local Usaae eer Minute of Use $0.001343 11.Vertical Features 11.Basic Features 11.Account Codes - eer System $77.41 11.Attendant Access Line. eer Station Line $1. 11.Audible Messaae Waitina $0. 11.1.4 Authorization Codes - eer System $231. 11.Automatic Line $0. 11.Automatic Route Selection - Common Eauiement. eer System $2015. 11.Call Droe $0. 11.Call Exclusion - Automatic $0. 11.Call Exclusion - Manual $0.46 11.Call Forwardina: Busy Line Don't Answer Proarammable Service $11. 11.Call ForwardinQ: Dont Answer Call ForwardinQ Busy Customer $0. 11.Call WaitinQ Indication - per Timing State $0. 11.Centrex Common EQuipment 370. 11.Call Forwardina Busy Line - Incomina Only $20. 11.Call Forwardina Don t Answer Incomina Only $20. 11.CLASS - Continuous Redial $1. 11.CLASS - last Call Return $1. 11.CLASS - Priority CallinQ $1. 11.CLASS - Selective Call ForwardinQ $1. 11.CLASS - Selective Call Rejection $1. 11.Direct Station Selection Busy lamp Field. per ArranQement $0. 11.Directed Call Pickue with Barae-$13. 11.Directed Call Pickue without Barae-$13. 11.Distinctive RinQ/Distinctive Call Waitina $27. 11.Expensive Route WarninQ Tone. per System $49. 11.Facility Restriction level per System $30.44 11.Groue Intercom $0. 11.Hot Line eer Line $1. 11.Huntina: Multieosition Hunt Queuina $29. 11.Hunting: Multiposition with Announcement in Queue $31. 11.HuntinQ: Multiposition with Music in Queue $28. 11.ISDN Short Hunt $1. 11.loudseeaker Paaina. per Trunk Group $183. 11.Make Busv Arranaements eer Groue $0. 11.Make Busv Arranaements eer Line $0. 11.Messaae Center eer Main Station Line $0. 11.Messaae Waitina Visual $0. 11.Music On Hold eer System $20. 11.Privacy Release $0.42 11.Query Time $0. 11.1.41 Station Came-On Service per Main Station $0. 11.1.42 Time of Dav Control for ARS eer System $95.48 11.1.43 Time of Dav NCOS Uedate $0.41 11.1.44 Time of Dav Routina. eer Line $0.46 11.1.45 Trunk Verification from Desianated Station $0. 11.1.46 UCD in Hunt Group. per Line $0. 11.1.47 SMDR-P - Service Establishment Charge Initial Installation $323. 11.1.48 SMDR-P - Archived Data $170. 11.Premium Port - Additional Charge $3.42 Bo 12 11.CMS - Svstem Establishment - Initial Installation $962. 11.CMS - System Establishment SubseQuent Installation $481. 11.CMS - Packet Control Capability. per System $481. 11.2.4 Conference Calling - Meet Me $32. 11.Conference Calling - Preset $32. 11.Conference Callina - Station Dial (6-Way)$47.48 11.CLASS Call Trace. per Occurrence $1.43 11.SubseQuent Order Charae $12. 11.4 local Switching - Market Based Rates These rates These rates are only available are only available in Zone 1 Wire in Zone 1 Wire Centers Centers Qwest Idaho SGAT Third Revision Exhibit A 6th Amended February 11 , 2005 Page 12 of 18 Exhibit A Idaho Customized Routina 12.Development of Custom Line Class Code - Directory Assistance or Operator Services Routing $235. Only 12.Installation Charae. cer Switch - Directory Assistance or Ocerator Service RoutinQ Onlv $237. 12.All Other Custom Routine ICB ICB Common Channel Sianaiina/SS7 13.CCSAC STP Port $208.$368.44 13.CCSAC Ootions Activation Charae 13.Basic Translations 13.First Activation cer Order $100. 13.Each Additional Activation. cer Order $8. 13.CCSAC Ootions Database Translations 13.First Activation, oer Order $116. 13.Each Additional Activation, cer Order $53. 13.Sienal Formulation ISUP cer Call Set-Uc Reauest $0.000524 13.4 Sianal Transoort. ISUP. cer Call Set-Uc Reauest $0.000176 13.Sianal Transoort TCAP oer Data Reauest $0.000019 13.Sianal Switchina. ISUP, oer Call Set-Un Reauest $0.000983 13.Sianal Switchina TCAP, oer Data Reauest $0.000837 Advanced Intelliaent Network CAIN) 14.AIN Customized Services lACS)ICB 14.AIN Platform Access tAPA)ICB ICB 14.AIN Querv Processina. cer Querv ICB Line Information Database ILl DB) 15.LlDB Storace No CharQe 15.Line Validation Administration Svstem Access CLVAS)ICE 15.LlDB Line Record Initial Load 15.Uo to 20 000 Line Records $2601. 15.Over 20 000 Line Records ICB 15.Mechanized Service Account Uodate oer Addition or Ucdate Processed 15.Individual Line Record Audit 15.2.4 Account Grouo Audit 15.Excedited Reauest CharQe for Manual Ucdates 15.LlDB Querv Service. cer Query $0.0008230 15.4 Fraud Alert Notification oer Alert No Charae 8XX Database Querv Service 16.Basic Query. cer Query $0.0130355 16.POTS Translation $0.00000048 16.Call Handlina & Destination Feature $0.00000145 ICNAM Per Querv $0.000768 Intentionally Left Blank Construction Charaes ICB ICB Miscellaneous Charaes 20.Additional Enaineerina, oer Half Hour or fraction thereof 20.Additional Enaineerina - Basic $31. 20.Additional Enaineerina - Overtime $39. 20.Additional Labor Installation, cer Half Hour or fraction thereof 20.Additional Labor Installation - Overtime $9. 20.Additional Labor Installation - Premium $18. 20.Additional Labor Other. cer Half Hour or fraction thereof 20.Additional Labor Other - Basic $27. 20.Additional Labor Other - Overtime $36. 20.Additional Labor Other - Premium $46. 20.4 Testina and Maintenance, oer Half Hour or fraction thereof 20.Testina and Maintenance - Basic $29. 20.4.Testina and Maintenance - Overtime $38. Qwest Idaho SGAT Third Revision Exhibit A 6th Amended February 11, 2005 Page 13 of 18 Exhibit A Idaho 20.4.Testina and Maintenance - Premium $49.. B 20.Maintenance of Service. per Half Hour or fraction thereof 20.Maintenance of Service - Basic $28. 20.Maintenance of Service - Overtime $36. 20.Maintenance of Service - Premium $46. 20.Additional Cooperative Acceptance Testino. per Half Hour or fraction thereof 20.Additional Cooperative Acceptance Testino - Basic $29.40 20.Additional Cooperative Acceptance Testing - Overtime $39. 20.Additional Cooperative Acceptance Testina - Premium $49. 20.Nonscheduled Cooperative Testina. Der Half Hour or fraction thereof 20.Nonscheduled Cooperative Testino - Basic $29.40 20.Nonscheduled Cooperative Testino - Overtime $39. 20.Nonscheduled Cooperative Testino - Premium $49. 20.Nonscheduled Manual Testina. Der Half Hour or fraction thereof 20.Nonscheduled Manual Testina - Basic $29.40 20.Nonscheduled Manual Testing - Overtime $39. 20.Nonscheduled Manual Testino - Premium $49. 20.Intentionally Left Blank 20.Intentionally Left Blank 20.Additional Dispatch $87. 20.Date Chance $10. 20.Desian Chanoe $73. 20.Expedite Charge ICB 20.Cancellation Charge ICB Channel Reaeneration 21.DS1 $0.$0. 21.DS3 $0.$0. Intentionally Left Blank UNE Combinations 23.Intentionallv Left Blank 23.UNE-P Conversion Nonrecurring Charges 23.UNE-P POTS Centrex Analoo PBX. Mechanized 23.First $0. 23.Each Additional $0. 23.UNE-P POTS Centrex PAL Analoa PBX Manual 23.First $16. 23.Each Additional $2. 23.UNE-P PBX DID Trunks 23.First $28. 23.Each Additional $2. 23.2.4 UNE-P ISDN BRI 23.2.4.First $30. 23.2.4.Each Additional $2. 23.UNE-P ISDN PRI DSS Der DS1 Facility $27. 23.UNE-P ISDN PRI DSS - per Trunk 23.First $28. 23.Each Additional $2. 23.UNE-P New Connection Nonrecurrina Charaes 23.UNE-P POTS Centrex Analoa PBX Mechanized 23.First $57. 23.Each Additional $15. 23.UNE-P POTS Centrex PAL Analoo PBX. Manual 23.First $82. 23.Each Additional $18. 23.UNE - P PBX DID - per Trunk $15. Owest Idaho SGAT Third Revision Exhibit A 6th Amended February 11, 2005 Page 14 of 18 Exhibit A Idaho 23.3.4 UNE - P ISDN BRI $272. 23.UNE - P Trunks 23.DSS Basic Trunk -In Onlv. Out Onlv, or Two 2-Wav $74. 23.DSS, ISDN PRI Advanced Trunk - In only w / DID & Hunting, or 2-$73. Way w / DID, Hunting & Answer Supervision 23.DSS, ISDN PRI Advanced Trunk - Out Only w/Answer Supervision $74.4€ 23.Facilities for UNE - P DSS. UNE - P ISDN PRI 23.DS1 LOOD Facility $279. 23.DS3 LooD Facilitv $279. 23~3.UNE - P PRI ConfiQurations 23.UNE-P PRI Dedicated PRI 23 + D $596. 23.UNE-P PRI Dedicated PRI 24B $576. 23.UNE-P PRI Dedicated PRI 23B + Back-UD D Confiauration - 5E $575. 23.4 Miscellaneous UNE-DID Trunks Charaes 23.4.UNE-P ComDlex Translations Diaits OutDulsed ChanQe SiQnalinQ $15. 23.4.UNE-P DID ComDlex Translations SiQnalinQ ChanQe $35. 23.UNE-P DID Block ComDromise $25. 23.4.4 UNE-P DID GrouD of 20 Numbers $31. 23.UNE-P DID Reserve SeQuential # Block $25. 23.4.UNE-P DID Reserve Nonseauential TeleDhone Numbers $23. 23.4.UNE-P DID Nonseauential TeleDhone Numbers $33. 23.UNE - P Owest DSL See applicable Owest Retail Tariff, Catalog, or Price List 23.UNE Combinations - LOOD MUX Combinations (LMC) 23.Interconnection Tie Pair lITPt Der Termination 23.DS1 $1. 23.DS3 $14. 23.LOOD MUX 2-Wire AnaloQ 23.LMC 2-Wire Installation 23.First $225. 23.Each Additional $148. 23.Wire Analoa LOOD 23.Zone 1 $15. 23.Zone 2 $23. 23.Zone 3 $40. 23.Looo MUX 4-Wire Analoa 23.LMC 4-Wire Installation 23.First $225. 23.Each Additional $148. 23.Wire AnaloQ LOOD 23.Zone 1 $30. 23.Zone 2 $46. 23.Zone 3 $79.47 23.DS1 LOOD MUX 23.6.4.LMC DS1 LOOD Installation 23.6.4.First $285. 23.6.4.Each Additional $209. 23.6.4.DS1 CaDable LooD 23.6.4.Zone 1 $30. 23.Zone 2 $46. 23.Zone 3 $79.47 23.Private Line to LOOD MUX Conversion $34. 23.LMC MultiDlexinQ 23.DS1 to DSO $263.$193. 23.DS3 to DS1 $304.$193. 23.DSO Channel Performance 23.DS1/ DSO Low Side Channelization $7. 23.Enhanced Extended LOOD (EEl) 23.EEL DSO 2-Wire Analoa Owest Idaho SGAT Third Revision Exhibit A 6th Amended February 11 , 2005 Page 15 of 18 Exhibit A Idaho 23.EEL 2-Wire Loop Installation 23.First $245. 23.Each Additional $182. 23.Wire Analoa LOOD 23.Zone 1 $15. 23.Zone 2 $23. 23.Zone 3 $40. 23.EEL DSO 4-Wire Analoa 23.EEL 4-Wire LOOD Installation 23.First $245. 23.Each Additional $182. 23.Wire AnaloQ Loop 23.Zone 1 $30. 23.Zone 2 $46. 23.Zone 3 $79.47 23.EEL DS1 23.EEL DS1 LOOD Installation 23.First $300.49 23.Each Additional $225. 23.DS1 Capable Loop 23.Zone 1 86.48 23.Zone 2 86.46 23.Zone 3 99. 23.7.4 EEL DS3 23.7.4.EEL DS3 Loop Installation 23.7.4.First $323. 23.Each Additional $248. 23.7.4.DS3 Capable LOOD 23.7.4.Zone 1 $941. 23.Zone 2 $955. 23.7.4.Zone 3 $1,264. 23.Intentionally Left Blank 23.Priyate Line to EEL Conversion $34. 23.Intentionally Left Blank 23.EEL Transport 23.DSO (Recumna F~ed DerM~) 23.Over 0 to 8 Miles $24.$0. 23.Over 8 to 25 Miles $24.$0. 23.Over 25 to 50 Miles $24.$0. 23.1.4 Over 50 Miles $24.$0. 23.DS1 (Recumng Fixed per Mile) 23.Over 0 to 8 Miles $36.43 $3. 23.Over 8 to 25 Miles $37.$3. 23.Over 25 to 50 Miles $39.$1. 23.2.4 Over 50 Miles $37.$0. 23.DS3 (Recumna Fixed Der Mile) 23.Oyer 0 to 8 Miles $238.$54. 23.Over 8 to 25 Miles $242.$16. 23.Over 25 to 50 Miles $223.$21. 23.3.4 Oyer 50 Miles $235.$14. 23.Intentionally Left Blank 23.EEL MultiDlexina 23.10.DS1 to DSO $263.$246. 23.10.DS3to DS1 $304.$246. 23.DSO Channel Performance 23.11.DSO Low Side Channelization $13. 23.11.DS1/ DSO Low Side Channelization $7.47 23.Concentration Capability ICB Unbundled Packet Switching 24.Unbundled Packet Switch Customer Channel 24.DSLAM land SDlItter) Functionality $21. 24.Virtual TransDort $3. awest Idaho SGAT Third Revision Exhibit A 6th Amended February 11, 2005 Page 16 of 18 Exhibit A Idaho 24.Customer Channel Shared Distribution SublooD $61. 24.Unbundled Packet Switch Interface Port 24.DS1 $158.$210. 24.DS3 $272.$210. 10.0 Ancillarv SerVices 10.Local Number PortabilitY 10.LNP Queries See FCC Tariff #1 Section 13 & 10.LNP Manaaed Cuts 10.Standard Manaaed Cuts per Person per Half Hour $26. 10.Overtime Manaaed Cuts Der Person Der Half Hour $34. 10.Premium Manaaed Cuts Der Person Der Half Hour $42. 10.911/E911 10.9111 E911 No Charae No Charae 10.White Paaes Directorv Listinas Facilitv Based Providers 10.Primarv Listina No Charae No Charae 10.Premium Privacy Listings General General Exchange Tariff Exchange Tariff Rate, Less Rate, Less Wholesale Wholesale Discount Discount 10.Directorv Assistance Facilitv Based Providers 10.Local Directorv Assistance. per Call $0. 10.4.National Directorv Assistance per Call $0. 10.Call Brandina. Set- Uo and Recordina $35.000. 10.4.4 Loadina Brand per Switch $500. 10.4.Call ComDletion Link Der Call $0.0893 10.Directorv Assistance List Information 10.Initial Database Load Der Listina $0.025 10.Reload of Database. per Listina $0.020 10.Dailv Updates per Listina $0.250 10.5.4 One-time Set-Up Fee $73. 10.Media Charaes for File Deliverv 10.Electronic Transmission $0.0020 10.Tapes (charaes onlv aDDlv if this is selected as the normal deliverY medium for $30. 10.Shiooina Charaes (for tape deliverv)ICB 10.Toll and Assistance Ooerator Services Facilitv Based Providers. 10.Ootion A - Per Messaae 10.Operator Handled Callina Card $1.45 10.Machine Handled Callina Card $0. 10.Station Call $1. 10.1.4 Person Call $3. 10.Connect to Directorv Assistance $0. 10.Busv Line Verify. Der Call $0. 10.Busy Line InterruDt $0. 10.Operator Assistance. per Call $0. 10.Ootion B - Per Operator Work Second and Computer Handled Calls 10.Operator Handled per Operator Work Second $0.02800 10.Machine Handled per Call $0.25000 10.Call Brandina. Set-UD & Recordina $10500. 10.2.4 Loadina Brand/Per Switch $800. 10.Access to Poles Ducts Conduits and Riahts of Wav (ROW' 10.Pole InQuirY Fee Der InQuirY $341. 10.Innerduct InQuirY Fee Der InQuirY $233. 10.ROW Inauirv Fee. per InQuirY $378.8 ( 10.7.4 ROW Document Preparation Fee $122. 10.Field Verification Fee per Pole $20.4 10.Field Verification Fee per Manhole $190. 10.Planner Verification. per Manhole $16. 10.Manhole Verification Inspector per Manhole $92. 10.Manhole Make-Readv InsDector per Manhole $245. 10.Transfer of Responsibility $106. Qwest Idaho SGAT Third Revision Exhibit A 6th Amended February 11 , 2005 Page 17 of 18 Exhibit A Idaho er Order $5. $1.4012. 12.$0.000419 12.4 See 9. 17.0 Bona Fide Re uest Process 17.Processin Fee $1 851. NOTES: Unless otherwise indicated, all rates are pursuant to Idaho Public Utilities Commission Dockets: A AT&T Arbitration Docket USW-96-, Order No 27738, effective September 17 1998. B Cost Docket OWE-01-, Order No. 29408 (January 5 2004) rates effective January 5 2004. # Voluntary Rate Reduction, Docket USW-00-, effective 6/10/02. Reductions reflected in the 5/24/02 Exhibit A. ## Second Voluntary Rate Reduction, Docket USW-00-, effective 6/7/02. Reductions reflected in the 7/10/02 Exhibit A. ### Third Voluntary Rate Reduction, Docket USW-00-, effective 12/16/02, Reductions reflected in the 10/16/02 Exhibit A (1) TELRIC rates proposed in Cost Docket OWE-01-11 testimony filed on November 12, 2003. The case was bifurcated and the rates using this footnote are proposed in Phase 2 of the cost docket. (2) Market-based rates. (3) ICB, Individual Case Basis pricing. (4) The State of Idaho has retained the oversight on these rates. These rates are not under the jurisdiction of the FCC. (5) FCC ordered rates pursuant to the FCC's Order on Remand and Report and Order (Intercarrier Compensation for ISP-Bound Traffic) CC Docket 01-131 (FCC ISP Order), effective June 14, 2001. (6) Effective August 1, 2003, Owest will no longer bill the recurring and nonrecurring charges for Channel Regeneration. Owest reserves the right to revert back to the contractual rate only after appropriate notice is given. (7) The preliminary Quote Preparation Fees (OPF) are included in the space construction charges. Upon completion of the collocation construction, the OPF will be credited to the final space construction charge for the virtual, caged or cageless collocation job. These engineering and planning charges are also included in the Virtual, Caged and Cageless Quote Preparation Fees. (8) Effective 11/04, Owest will no longer perform Bridge Tap and/or Load Coil Removal (Conditioning) to facilitate provisioning of its Owest Retail DSL offering. In order to permit CLECs to provision their own xDSL Capable Loops, Owest is now re-instituting the charge to continue Conditioning for the 2/4-Wire Unbundled Loop, ADSL Compatible Unbundled Loop, ISDN (BRI) Capable Unbundled Loop, xDSL-1 Capable Unbundled Loop, Non-Commercial Line Sharing, Line Splitting, Non-Commercial Shared Distribution Loop and Loop Splitting, effective 3/14/05. Owest can t bill the REC rate structure, but will bill customers the lower of the two rates. (9) Owest is voluntarily reducing this rate in order to keep rate relationship with the Fiber Transport "per Pair" rate element. (10) Owest has not implemented this UNE rate or charge in its billing system but reserves the right to assess such a charge in the future. (11) All technically feasible Vertical Switch Features are available with compatible unbundled switch ports. No monthly recurring charge applies for Basic Vertical Switch Features. Only basic Vertical Switch Features with nonrecurring charges are listed. Nonrecurring charges are applicable whenever a feature is added - whether on new installation, conversion, or change order activity. Vertical Switch Features not listed are included in the cost of the switch port and have a rate of zero for both recurring and nonrecurring charges. (12) The Premium Port monthly recurring charge applies in addition to the Analog or Digital Line Side Port recurring charges when Premium Features are ordered with analog or digital ports. Owest Idaho SGAT Third Revision Exhibit A 6th Amended February 11 , 2005 Page 18 of 18 Exhibit A Idaho Resale Wholesale Wholesale Discount Discount Percentage Percentage Recurring Nonrecurring Charges Charges Wholesale Discount Rates Southern Idaho Basic Exchanae Residential Line Service 18.25%18.25% Basic Exchanae Business Line Service 18.25%18.25% IntraLATA Toll 18.25%18.25% Package/Special Services (e., Centrex, Discounted Line/Feature Packages 18.25%18.25% ISDN, PBX-Trunks, DSS & UAS, Frame Relay Service, LAN, MegaBit and other ACS) ListinQs. CO Features & Information Services 18.25%18.25% Private Line 18.25%18.25% Ocerator Services / Directorv Assistance (OS/DA)18.25%18.25% Volume Packaaed Services - Hiah Volume Customers 65%65% Public Access Line (PAl) Service 00%00% Northern Idaho Basic Exchanae Residential Line Service 19.37%19.37% Basic Exchanae Business Line Service / PBX 19.37%19.37% IntraLATA Toll 19.37%19.37% 2.4 Package/Special Services (e., Centrex, Discounted Line/Feature Packages,19.37%19.37% ISDN, PBX-Trunks DSS & UAS, Frame Relay Service, LAN, MegaBit and other ACS) Listinas CO Features & Information Services 19.37%19.37% Private Line 19.37%19.37% Ocerator Services / Directorv Assistance lOS/DA)19.37%19.37% Volume Packaaed Services - Hiah Volume Customers 87%87% Public Access Line (PAl) Service 00%00% Customer Transfer Charae (CTC) CTC for POTS Service Manual First Line $16. Each Additional Line $2. Mechanized First Line $0. Each Additional Line $0. CTC for Private Line Transcort Services First Circuit $38. Additional Circuit oer circuit same CSR $33. CTC for Advanced Communications Services, cer Circuit $46. Interconnection Entrance Facilities Intentionally Left Blank DS1 $103.$208. DS3 $524.$277. LIS EICT Per DS1 $0.$0. Per DS3 $0.$0. Direct Trunked Transoort Intentionally Left Blank DS1 (RecurrinG Fixed Der Mile) Over 0 to 8 Miles $37.$1. Over 8 to 25 Miles $37.$1. Over 25 to 50 Miles $37.$1. 3.4 Over 50 Miles $37.$1. DS3 (RecurrinG Fixed ner Mile) Over 0 to 8 Miles $257.$19.48 Over 8 to 25 Miles $260.49 $24. Over 25 to 50 Miles $260.$26.43 3.4 Over 50 Miles $259.$26. Multiolexina 7.4.DS1 to DSO $263.$193. Owest Idaho SGAT Third Revision Exhibit A 6th Amended February 11. 2005 5th Amended April 26, 2994 Page 1 of 18 Exhibit A Idaho 7.4.DS3 to DS1 $304.$193. Trunk Nonrecurrina Charges Intentionallv Left Blank DS1 Interface First Trunk $229.40 Each Additional Trunk $5.46 DS3 Interface First Trunk $235. Each Additional Trunk $11. Exchanae Service IEAS/Locan Traffic End Office Call Termination oer Minute of Use $0.001343 ### Tandem Switched Transoort. Per Minute of Use $0.000690 Tandem Transmission, oer Minute of Use (Recurrina Fixed ner Mile) Over 0 to 8 Miles $0.0004564 $0.0000367 Over 8 to 25 Miles $0.0004564 $0.0000367 Over 25 to 50 Miles $0.0004564 $0.0000367 3.4 Over 50 Miles $0.0004260 $0.0000144 Local Traffic-FCC-ISP Rate CaDs M G 1::1. o~ e A 4;-2 1:1 Ae-.4 3;..20 0 4 $(,), 0007 MOU as of June 14 2003 rate in effect until further FCC action $0.0007 Miscellaneous Charaes Expedite Charge (LIS Trunks)Qwest's Idaho Access Service Catalog Cancellation Charge (LIS Trunks)Qwest's Idaho Access Service Catalog Additional Testing (LIS Trunks)Qwest's Idaho Access Service Catalog Transit Traffic Local Transit (Local Transit Assumed Mileage = 7 Miles)See Tandem See Tandem Switching and Switching and Tandem Tandem Transmission Transmission Rates Above.Rates Above. IntraLATA Transit Toll (IntraLATA Transit Toll Assumed Mileage = 7 Miles)Qwest's Idaho Qwest's Idaho Access Service Access Service Catalog Catalog Jointly Provided Switched Access Qwest's Idaho Qwest's Idaho Ncst's Idaho Access Service Access Service Access Service Catalog Catalog Cateaorv 11 Mechanized Record Charae, oer Record $0.0014877 Collocation All Collocation Plannina and Enaineerina I ntention all v Left Blank Cable Auament Quote Preoaration Fee $1.284. Entrance Facilitv Standard Shared oer Fiber $5.$616. Cross Connect. oer Fiber $5.$722. Exoress oer Cable $88.$9009. Cable Solicina Fiber - Per Set-$399. Per Fiber Soliced $37. 1.4 Power Usaae 1.4.-48 Volt DC Power Usaae oer Amoere oer Month Qwest Idaho SGAT Third Revision Exhibit A 6th Amended Februarv 11. 2005 5tf:1/\moAsoEi /\pril 26, 2001 Page 2 of 18 Exhibit A Idaho 1.4.Power Plant 1.4.Power Plant - Less than 60 Amos $10. Power Plant - Equal to or Greater Than 60 Amps $8. Power Usaae 1.4.Power Usaae 60 Amns or Less ner Amn $2.47 1.4.Power Usaae More Than 60 Amcs, cer Amc $4. AC Power Feed AC Power Feed oer Amo. oer Month 120V $16. 208 V. Sinale Phase $27. 208 V. Three Phase $48. 1.4 240 V. Sinale Phase $32. 240 V Three Phase $55. 480 V Three Phase $111. AC Power Feed cer Foot cer Month 20 Amc. Sinale Phase $0.0084 $7.43 20 Amc. Three Phase $0.0105 $9. 30 Amo. Sinale Phase $0.0091 $8. 2.4 30 Amo. Three Phase $0.0125 $11. 40 Amo. Sinale Phase $0.0107 $9.43 40 Amc. Three Phase $0.0147 $12. 50 Amc. Sinale Phase $0.0127 $11. 50 Amc. Three Phase $0.0177 $15. 60 Amo. Sinale Phase $0.0144 $12. 60 Amo. Three Phase $0.0204 $17. 100 Amo. Sinale Phase $0.0178 $15. 100 Amo. Three Phase $0.0277 $24.44 Inscector Labor. cer Half Hour Reaular Hours Rate $28. After Hours Rate. minimum 3 hours $37. Channel Reaeneration DS1 Reaeneration $0.$0. DS3 Reaeneration $0.$0. Collocation Terminations Shared Access DSO Cable Placement oer 100 Pair Block $0.2262 $208. Cable Placement oer Termination $0.0090 $4. Cable oer 100 Pair Block $0.3304 $304. 1.4 Cable oer Termination $0.0066 $4. Blocks oer 100 Pair Block $0.5730 $528.42 Blocks Der Termination $0.0115 $8. Block Placement. cer 100 Pair Block $0.2381 $219. Block Placement. cer Termination $0.0048 $3. DS1 Cable Placement oer 28 DS1s $0.4111 $362. Cable Placement ner Termination $0.0442 $38. Cable ner 28 DS1 $0.3993 $351. 2.4 Cable cer Termination $0.0429 $37. Panel cer 28 DS1s $0.2742 $241. Panel cer Termination $0.0330 $29. Panel Placement oer 28 DS1s $0.0847 $74. Panel Placement oer Termination $0.0091 $8. DS3 Cable Placement oer Termination $0.1521 $134. Cable oer Termination $0.2578 $227. Panel! Connector. oer Termination $0.2625 $231. 3.4 Panel! Connector Placement, Der Termination $0.0204 $18. Fiber Termination 1.4.Terminations ner 12 Fibers $26.$1 513. 1.4.Additional Connector (if anDlicableT $0.47 $411. 1.4.Cable Rackina - Shared ner 12 Fibers $26.47 1.4.4 Cable Racking - Dedicated $1.$1,433. SecuritY Charae awest Idaho SGAT Third Revision Exhibit A 6th Amended February 11. 2005 5th /\menEleEll\prii 26, 2QO4 Page 3 of 18 Exhibit A Idaho Per Employee per Card $0. Card Access per Employee per Office $7. Central Office SecuritY Infrastructure ICB ICB Composite Clock Central Office Synchronization 10.Synchronization - Composite Clock per Port $7.44 Intentionally Left Blank Space Availabilitv Charae $313. Collocation Space Reservation Fee The charge will be 25% of the Nonrecurring Fee Collocation Space Option Administration Fee $1.107. Collocation Space Option Fee per Square Foot $2. Virtual Collocation Plannina and Enaineerina Fees Quote Preparation Fee $3146.41 Maintenance Labor. per Half Hour Reaular Hours Rate $29. After Hours Rate $39. Trainina Labor per Half Hour Reaular Hours Rate $29. Bay Space 2.4.Eauipment Bav. per Shelf $4. 2.4.Virtual Space Construction Initial Bav Provided $20.$17749. 2.4.Each Additional Bav Space $3.$2 854. 2.4.4 Virtual Cable Rackina. per Shelf $0.44 $384. Enaineerina Labor per Half Hour Reaular Hours Rate $32. After Hours Rate $43. Installation Labor per Half Hour Reaular Hours Rate $31. After Hours Rate $41. Rent Floor Space Lease per Square Foot $2. Rent per Shelf $4. Intentionally Left Blank Power Plant -48 DC Power Cable 20 Amo Power Feed $4.$3.985.41 30 Amp Power Feed $5.$4.537. 40 Amp Power Feed $6.$5.480.42 1.4 60 Ame Power Feed $11.$9 706. 100 Ame Power Feed $18.$16370. 200 Ame Power Feed $34.$30473. 300 Ame Power Feed $54.$47.917. 400 Ame Power Feed $77.$68.037. Caaeless Physical Collocation Plannina and Enaineerina Fee Quote Preparation Fee $3146.41 Space Construction and Site Preparation Site Preparation Fee ICB 2 Bavs $23.$20.603.40 Intentionally Left Blank Intentionally Left Blank Space Construction for Each Additional Bav $3.$2 854. Adiustment for Sinale Bay - Chance to Standard Desian ($3.24 \($2 854. DC Power Cable 20 Ame Power Feed $4.$3985.41 Qwest Idaho SGAT Third Revision Exhibit A 6th Amended Februarv 11. 2005 5th /\meAaea /\pril 26, 2001 Page 4 of 18 Exhibit A Idaho 30 Amp Power Feed $5.$4.537. 40 Amp Power Feed $6.$5 480.42 7.4 60 Amp Power Feed $11.$9 706. 100 Amp Power Feed $18.$16370. 200 Amp Power Feed $34.$30473. 300 Amp Power Feed $54.$47917. 400 Amp Power Feed $77.$68037. Floor SDace Lease Der Sauare Foot $2. Caaed Physical Collocation 8.4.Planninn and Enaineerina Fee Quote Preparation Fee $3.185. 8.4.Space Construction and Site Preparation 8.4.Site PreDaration Fee ICE Intentionally Left Blank 8.4.Intentionally Left Blank SDace Construction 8.4.2.4.Caae UP to 100 Sa. Ft.$38.$33927. 8.4.CaQe - 101 Sa. Ft. to 200. Sa. Ft.$34.$30 113. 8.4.2.4.CaQe - 201 Sa. Ft. to 300 Sa. Ft.$42.$37154. 8.4.2.4.CaQe - 301 Sa. Ft. to 400 Sa. Ft.$44.$38,922. Intentionally Left Blank Intentionally Left Blank DC Power Cable 20 Amp Power Feed $5.$4 954. 8.4.30 Amp Power Feed $6.$5457. 8.4.40 Amp Power Feed $7.41 $6 526. 8.4.7.4 60 Amp Power Feed $12.$10772. 8.4.100 Amp Power Feed $19.$17531. 8.4.200 AmD Power Feed $37.$32 634. 8.4.300 AmD Power Feed $58.$51.315. 8.4.400 AmD Power Feed $82.$72.861. 8.4.Space Construction - FencinQ Credit 8.4.Caae UP to 100 Sa. Ft.1$10.07\723. 8.4.Caae 101 - 200 Sa. Ft.$12.$7 135. 8.4.Caae 201 - 300 Sa. Ft.$14.47)$8 015. 8.4.Caae 301 - 400 Sa. Ft.$16.15)$8 851. 8.4.4 Floor SDace Lease Der Sauare Foot $2. 8.4.Intentionally Left Blank 8.4.Intentionallv Left Blank 8.4.Intentionallv Left Blank 8.4.Groundina 8.4.2/0 AWG per Foot $0.0097 $8. 1 /0 AWG per Foot $0.0170 $14. 8.4.4/0 AWG per Foot $0.0200 $17. 8.4 350 kcmil , per Foot $0.0258 $22. 8.4.500 kcmil, per Foot $0.0299 $26. 8.4.750 kcmil per Foot $0.0456 $40. Adiacent Collocation ICB Remote Collocation Physical & Virtual Remote Collocation SDace IDer Standard MountinQ Unit)$0.$665. FDI Terminations (per 25 Pair)$0.$484. Power Usaae Power Usaae 60 Amps or Less. per Amp $2. Power Usaae More Than 60 Amps per AmD $4. 1.4 Quote Preparation Fee $1 064. Adiacent Remote Collocation Adjacent Remote Collocation INew)ICB Adjacent Remote Collocation (Existina) Space (per Standard Mountina Unit)$0.$665. Qwest Idaho SGAT Third Revision Exhibit A 6th Amended February 11. 2005 at'" /\meAElea April 26 2091 Page 5 of 18 Exhibit A Idaho FDI Terminations lDer 25 paiM $0.$484. Power Usaae Power Usaae 60 Ames or Less ner Amn $2.47 Power Usaae More Than 60 Ames, eer Arne $4. Quote Preearation Fee $1.064. Additional Virtual Remote Collocation Elements Flat Charae eer Job $36. Enaineerina Rate, eer Half Hour $35. Maintenance. eer Half Hour $29.40 3.4 Installation. eer Half Hour $29.40 Trainina, ner Half Hour $29.40 CLEC to CLEC Desian Enaineerina & Installation Flat Charae (Desian Enaineerina - No Cables)$634. Fiber Flat Charae $1 229. Cable Rackina Per Foot DSO Der Foot eer Cable $0.11848 DS1 ner Foot eer Cable $0.13075 DS3 ner Foot eer Cable $0.10234 Fiber eer Foot, eer Fiber $0.93313 Virtual Connections (if aeelicable - Connections only: No cables) DSO Per 100 Connections)$194. DS1 Per 28 Connections)$91. DS3 Per 1 Connection)$5. 3.4 Fiber Connections, per Fiber SDliced $37. Cable Hole lif ADDlicable)$386. CLEC to CLEC Cross Connection $201. Interconnection Distribution Frame lICDF) Collocation 1GB ADDlication to Reauest Cancellation No Charae Microwaye Collocation Under DeveloDment Intentionally Left Blank Intentionally Left Blank DC Power Reduction 13.Quote PreDaration Fee $703. 13.Power Reduction Less than 60 Ames $494.45 13.Power Reduction Eaual to 60 Ames $706. 13.4 Power Reduction Greater than 60 Ames eer Arne $895. 13.Power On Off $621. 13.Batterv Distribution Fuse Board lBDFB) Rent $64. Collocation Transfer of ResDonsibilitv 14.Intentionally Left Blank 14.Assessment Fee $1.036. 14.Network Systems Administration Fee $1.586. Intentionally Left Blank 0 Unbundled Network Elements tUNEs) Interconnection Tie Pairs nTP) - Per Termination DSO $0. DS1 $1. DS3 $14. Unbundled Loons Analoa Loons See 9.2.4 Wire Voice Grade LoOD Zone 1 $15. Zone 2 $23. Zone 3 $40. Intentionally Left Blank Qwest Idaho SGAT Third Revision Exhibit A 6th Amended Februarv 11. 2005 5th /\m9Aa9a /\pril 26, 2001 Page 6 of 18 Exhibit A Idaho Wire Voice Grade Looo Zone 1 $30. Zone 2 $46. Zone 3 $79.47 Nonloaded Looos See 9.2.4 Wire Nonloaded LOOD Zone 1 $15. Zone 2 $23. Zone 3 $40. Intentionallv Left Blank Wire Nonloaded Looo Zone 1 $30. Zone 2 $46. Zone 3 $79. 2.4 Loop Unloadina $9.A 8 Looo Conditionina $22.A 8 Diaital Caoable Looos Basic Rate ISDN xDSL-1 Caoable ADSL Comoatible Looo See-9. Zone 1 $15. Zone 2 $23. Zone 3 $40. Intentionallv Left Blank DS1 Caoable Looo See-9. Zone 1 $86. Zone 2 $86.46 Zone 3 $99. 3.4 DS3 Capable LOOD See-9. Zone 1 $941. 3.4.Zone 2 $955. 3.4.Zone 3 $1 264. OC - n Caoable Looo See-9. OC-$924. OC - 12 $1.314. OC - 48 $3.528. Wire Extension Technoloav $22. 2.4 Loop Installation Charges for 2 & 4 wire Analog Non-Loaded, ADSL Compatible, ISDN BRI See 9.1 & Caoable and xDSL - I Caoable Looos where conditionina is not reQuired. 2.4.Basic Installation 2.4.First $11. 2.4.Each Additional $6. 2.4.Basic Installation with Performance Testina 2.4.First Looo $17. Each Additional $8. 2.4.Coordinated Installation with Cooperative Testing Project Coordinated Installation 2.4.First Looo $171. Each Additional $94. 2.4.4 Coordinated Installation without Cooperative Testing Project Coordinated Installation 4.4.First Looo $59. 2.4.Each Additional $53. 2.4.Basic Installation with Cooperative Testina 2.4.First Looo $142. 2.4.Each Additional $94. DS1 Looo Installation Charaes See 9. Basic Installation First Looo $128. Each Additional $99. Owest Idaho SGAT Third Revision Exhibit A 6th Amended Februarv 11. 2005 5th /\moA8o8 April 26, 2004 Page 7 of 18 Exhibit A Idaho Basic Installation with Performance Testina First Looo $279. Each Additional $212. Coordinated Installation with Cooperative Testing Project Coordinated Installation First LOOD $316. Each Additional $222.40 5.4 Coordinated Installation without Cooperative Testing Project Coordinated Installation First Looo $135. 5.4.Each Additional $106. Basic Installation with CooDerative Testina First LOOD $272. Each Additional $195. DS3 LOOD Installation Charaes See 9.3.4 Basic Installation First Looo $128. Each Additional $99. Basic Installation with Performance Testina First Looo $279. Each Additional $212. Coordinated Installation with Cooperative Testing Project Coordinated Installation First Looo $316. Each Additional $222. 6.4 Coordinated Installation without Cooperative Testing Project Coordinated Installation 6.4.First LOOD $135. Each Additional $106. Basic Installation with Coooerative Testina First Looo $272. Each Additional ~195. OC - 3 48 Looo Installation Charaes See 9. Basic Installation First LOOD $128. Each Additional LOOD $99. Basic Installation with Performance Testina First Looo $279. Each Additional Loon $212. Coordinated Installation with Coooerative Testina First LOOD $316. Each Additional LOOD $222.40 7.4 Coordinated Installation without Coooerative Testina First LOOD $135. 7.4.Each Additional LOOD $106. Basic Installation with Coooerative Testina First LOOD $272. Each Additional LOOD $195. Private Line to Unbundled Looo Conversions $34. SubioOD Wire Distribution LOOD lADDlies to both Analoa and Nonloaded\ First $107. Each Additional $29. First & Each Additional 2-Wire Distribution Looo Zone 1 $11. Zone 2 $16. Zone 3 $27. Intentionallv Left Blank Owest Idaho SGAT Third Revision Exhibit A 6th Amended February 11. 2005 5tA /\meRaea !'.pril 2€1, 2004 Page 8 of 18 Exhibit A Idaho Intra-Building Cable LOOD. Per Pair $0. No DisDatch First $51. No DisDatch Each Additional $21. DisDatch First $98. 3.4 DisDatch Each Additional $31. Feeder LOOD 3.4.DS1 Capable Feeder LOOD 3.4.First $310. 3.4.Each Additional $221. 3.4.First & Each Additional DS1 Capable Feeder LOOD Zone 1 $77. 3.4.Zone 2 $77. 3.4.Zone 3 $90. MTE Terminal SubioOD Access SubioOD MTE - POI Site Inventory (Der request)$110. MTE - POI Rearrangement of Facilities ICB MTE - POI Construction of New SPOI ICB Intentionallv Left Blank Field Connection Point (FCP) Feasibilitv Fee Quote Preparation Fee $1,197. FCP Reclassification $463. Intentionallv Left Blank Intentionallv Left Blank Intentionally Left Blank Construction Fee ICB Shared Services 9.4.Shared LOOD, Der LOOD $0.$33. 9.4.UNE - P Line Splitting 9.4.Basic Installation Charge for UNE-P Line Splitting $33. 9.4.LOOD Splitting 9.4.Basic Installation Charge for LOOD Splitting $33. 9.4.OSS, Der Line, Der Month $3. 9.4.Reclassification Charge ICB 9.4.Splitter Shelf Charge $4.$503. 9.4.Splitter TIE Cable Connections 9.4.Splitter in the Common Area--Data to 410 block $3.$2.689. Splitter in the Common Area-Data direct to CLEC $3.$2850. 9.4.SDlitter on the IDF - Data to 410 Block $0.$834. 9.4.7.4 Splitter on the IDF - Data direct to CLEC $1.$1 623. 9.4.Splitter on the MDF-Data to 410 block $0.$861. 9.4.Splitter on the MDF - Data direct to CLEC $2.$1 922.42 9.4.Engineering $1 079. Network Interface Device eNID)$0.$52. Unbundled Dedicated Interoffice Transport (UDITI DSO UDIT (RecurrinG Fixed Der Mile)$241. Over 0 to 8 Miles $24.$0. Over 8 to 25 Miles $24.$0. Over 25 to 50 Miles $24.$0. 1.4 Over 50 Miles $24.$0. DS1 UDIT (Recurrina Fixed Der Mile!$284. Over 0 to 8 Miles $36.$3. Over 8 to 25 Miles $37.$3. Over 25 to 50 Miles $39.$1. Over 50 Miles $37.$0. DS3 UDIT RecurrinG Fixed Der Mile)$284. Over 0 to 8 Miles $238.$54. Qwest Idaho SGAT Third Revision Exhibit A 6th Amended February 11. 2005 etA /\momJoa April 26, 2994 Page 9 of 18 Exhibit A Idaho Over 8 to 25 Miles $242.$16. Over 25 to 50 Miles $223.$21. 3.4 Over 50 Miles $235.$14. OC-3 UDIT (Recurrina Fixed Der Mile)$295. Over 0 to 8 Miles $763.$36. 6.4.Over 8 to 25 Miles $763.$36. 6.4.Over 25 to 50 Miles $763.$36. 4.4 Over 50 Miles $763.$66. OC-12 UDIT (Recurrina Fixed Der Mile)$295. Over 0 to 8 Miles $2163.$72. Over 8 to 25 Miles $2 163.$72. Over 25 to 50 Miles $2 163.$72. 5.4 Over 50 Miles $2163.$135. OC-48 UDIT (Recurrina Fixed Der Mile!$295. Over 0 to 8 Miles $4,420.$183. Over 8 to 25 Miles $4,420.$183. Over 25 to 50 Miles $4,420.$183. 6.4 Over 50 Miles $4 420.$346. UDIT DSO Channel Performance DSO UDIT Low Side Channelization $13. DS1/ DSO Low Side Channelization $7.47 $191. UDIT Multiplexina (Stand Alone) DS1 to DSO $263.$238. DS3to DS1 $304.$1 996. Extended Unbundled Dedicated Interoffice Transport DS1 E-UDIT $80.$339. DS3 E-UDIT $371.$347. OC-3 E-UDIT $819.$412. 9.4 OC-12 E-UDIT $1.256.$427. OC-48 E-UDIT $3 299.$413. Remote Node / Remote Port 10.OC-3 Remote Node 10.Remote Node $476. 10.DS 1 Remote Port $3.$198. 10.DS3 Remote Port $49.$198. 10.OC-12 Remote Node 10.Remote Node $894. 10.DS1 Remote Port $12.$198. 10.DS3 Remote Port $33.$198. 10.2.4 OC-3 Remote Port $103.$198. 10.OC-48 Remote Node 10.Remote Node $3.207. 10.DS3 Remote Port $22.$198. 10.OC-3 Remote Port $121.$198. 10.3.4 OC-12 Remote Port $479.45 $198. UDIT Rearranaement 11.DSO Sinale Office $164.40 11.DSO Dual Office $206. 11.Hiah Capacity Sinale Office $221. 11.4 Hiah Capacity Dual Office $249. Unbundled Dark Fiber lUDF) Initial Records Inauirv fiR!) Simcle $196. Complex $251. Field Verification and Quote Preparation lFVQP)$907. Field Verification lEnaineerina Verification)$297. 7.4 UDF - Sinale Strand 7.4.UDF - Interoffice Facility lUDF-IOF) - Sinale Strand Order Charae per First Strand / Route / Order $492. 7.4.Order Charae Each Additional Strand / Same Route $255. 7.4.Fiber Transcort cer Strand / Mile $50. 1.4 Termination Fixed cer Strand / Office / Termination $4. Qwest Idaho SGAT Third Revision Exhibit A 6th Amended Februarv 11. 2005 5tt:1 !\monaea /\pril 26, 2004 Page 10 of 18 Exhibit A Idaho 7.4.Fiber Cross-Connect per Strand Office $2.$19. 7.4.UDF-Loop Charges - Single Strand 7.4.Order Charge Der First Strand Route Order $492. 7.4.Order Charae Each Additional Strand Same Route $255. 7.4.Fiber Loop, per Strand Route $88. 2.4 Termination, Fixed per Strand Office $4. 7.4.Termination, Fixed per Strand Premise $3. 7.4.Fiber Cross-Connect Der Strand Office $2.$19. 7.4.Extended Unbundled Dark Fiber (E-UDF) - Sinale Strand 7.4.Order Charge, per First Strand Route Order $492. 7.4.Order Charge, Each Additional Strand Same Route $255. 7.4.Fiber Transport per Route Strand $96. 7.4.3.4 Termination Fixed Der Strand Office $4. 7.4.Termination Fixed Der Strand Premise $3. 7.4.Fiber Cross-Connect Der Pair $2.$19. UDF - per Pair UDF-IOF Charges - per Pair Order Charge per First Pair Route Order $492. Order Charae Each Additional Pair Same Route $255. Fiber Transport, per Pair Mile $66. 1.4 Termination, Fixed per Pair Office Termination $7. Fiber Cross-Connect per Pair Office $4.43 $19. UDF-LoOD Charges - Der Pair Order Charge Der First Pair Route Order $492. Order Charge Each Additional-Pair Same Route $255. Fiber LooD. Der Route Der Pair $131. 2.4 Termination Fixed Der Pair Office $7. Termination Fixed, per Pair Premise $6. Fiber Cross-Connect, per Pair Office $3.$19. Extended Unbundled Dark Fiber (E-UDF) Order Charge Der First Pair Route Order $492. Order Charge Each Additional-Pair Same Route $255. Fiber TransDort Der Route Per Pair $131. 3.4 Termination Fixed Per Pair Office $7. Termination Fixed Per Pair Premise $6. Fiber Cross-Connect Der Pair $3.$19. Dark Fiber Splice $602. Shared TransDort Per Minute of Use $0.001110 Unbundled Customer Controlled RearranGement Element (UCCRE) DS1 Port ICB ICB DS3 Port ICB ICB Dial Uo Access ICB 9.4 Attendant Access ICB Virtual Ports ICB Local Tandem SwitchinG 10.DS1 Local Messaae Trunk Port per Order $187. 10.DS1 Trunk GrouD 10.First Trunk per Order $209. 10.Each Additional Trunk per Order $21. 10.Per Minute of Use $0.000690 Local Switching 11.Ports 11.Analog Line Side Port 11.First Port $1.$10. 11.Each Additional Port $1.$5.49 11.Diaital Line Side Port (Supportina BRIISDN), First & Each Additional $12.$205. 11.Diaital Trunk Ports 11.PBX DID Trunk Port, per DSO $2.43 $213. 11.DS1 Local Messaae Trunk Port $39.$205. 11.Message Trunk Group, First Trunk $176. Qwest Idaho SGAT Third Revision Exhibit A 6th Amended February 11. 2005 5tA /\moREloEl /\pril 26, 2001 Page 11 of 18 Exhibit A Idaho 11.Messaae Trunk Graue, Each Additional $37. 11.DS1 PRIISDN Trunk Port $198.$611. 11.1.4 DSO Analoa Trunk Port 11.First Port $14.$115. 11.1.4.Each Additional Port $14.$31. 11.Local Usaae eer Minute of Use $0.001343 11.Vertical Features 11.Basic Features 11.Account Codes - eer Svstem $77.41 11.Attendant Access Line oer Station Line $1. 11.Audible Messaae Waitina $0. 11.1.4 Authorization Codes - eer Svstem $231. 11.Automatic Line $0. 11.Automatic Route Selection - Common Eauiement, eer Svstem $2 015. 11.Call Droo $0. 11.Call Exclusion - Automatic $0. 11.Call Exclusion - Manual SO.46 11.Call Forwardina: Busv Line / Don't Answer Pronrammable Service S11. 11.Call Forwardina: Don't Answer / Call Forwardina Busv Customer $0. 11.Call Waitina Indication - eer Timina State $0. 11.Centrex Common Eauiement $1,370.2!: 11.Call Forwardina Busv Line - Incomina Onlv $20. 11.Call Forwardina Don't Answer Incomina Onlv $20. 11.CLASS - Continuous Redial $1. 11.CLASS - Last Call Return $1. 11.CLASS - Prioritv Callina $1. 11.CLASS - Selective Call Forwardina $1. 11.CLASS - Selective Call Reiection $1. 11.Direct Station Selection / Busv Lame Field, eer Arranaement $0. 11.Directed Call Pickuo with Barce-$13. 11.Directed Call Pickuo without Barce-$13. 11.Distinctive Rina/Distinctive Call Waitina $27. 11.Exeensive Route Warnina Tone eer Svstem $49.48 11.Facilitv Restriction Level, eer Svstem $30. 11.Groue Intercom $0. 11.Hot Line, eer Line $1. 11.Huntina: Multioosition Hunt Queuina $29. 11.Huntina: Multieosition with Announcement in Queue $31. 11.Huntina: Multioosition with Music in Queue $28. 11.ISDN Short Hunt $1. 11.Loudsoeaker Paaina. oer Trunk Grauo $183. 11.Make Busv Arranaements ner Groun $0. 11.Make Busv Arranaements eer Line $0. 11.Messaae Center. eer Main Station Line $0. 11.Messaae Waitina Visual $0. 11.Music On Hold eer Svstem $20. 11.Privacv Release $0.42 11.1.40 Querv Time $0. 11.1.41 Station Came-On Service. eer Main Station $0. 11.1.42 Time of Dav Control for ARS eer Svstem $95.48 11.Time of Dav NCOS Uedate $0.41 11.1.44 Time of Dav Routina. eer Line $0.46 11.1.45 Trunk Verification from Desianated Station $0. 11.UCD in Hunt Grouo. oer Line $0. 11.1.47 SMDR-P - Service Establishment Charce Initial Installation $323. 11.1.48 SMDR-P - Archived Data $170. 11.Premium Port - Additional Charae $3.42 Bo 12 11.CMS - Svstem Establishment - Initial Installation $962. 11.CMS - Svstem Establishment SubseQuent Installation $481. 11.CMS - Packet Control Caoabillt\i ner Svstem $481. 11.2.4 Conference Callina - Meet Me $32. 11.Conference Callina - Preset $32. 11.Conference Callina - Station Dial l6-Wav)$47. 11.CLASS Call Trace. per Occurrence $1. 11.SubseQuent Order Charae $12. 11.4 Local Switching - Market Based Rates These rates These rates are only available are only available in Zone 1 Wire in Zone 1 Wire Centers Centers Qwest Idaho SGA T Third Revision Exhibit A 6th Amended Februarv 11. 2005 5th ,Page 12 of 18 Exhibit A Idaho Customized Routina 12.Development of Custom Line Class Code - Directory Assistance or Operator Services Routing $235. Only 12.Installation CharQe. per Switch - Directorv Assistance or Operator Service Routirio Only $237. 12.All Other Custom Routina ICB 1GB Common Channel Sianaiina/SS7 13.CCSAC STP Port $208.$368. 13.CCSAC Options Activation Charae 13.Basic Translations 13.First Activation oer Order $100. 13.Each Additional Activation oer Order $8. 13.CCSAC Options Database Translations 13.First Activation. per Order $116. 13.Each Additional Activation, oer Order $53. 13.SiQnal Formulation ISUP. oer Call Set-Up Reauest $0.000524 13.Sienal Transoort ISUP oer Call Set-Uo Reauest $0.000176 13.Sianal Transoort TCAP oer Data Reauest $0.000019 13.Sianal Switchina. ISUP oer Call Set-Uo Reauest $0.000983 13.Sianal Switchina. TCAP oer Data Reauest $0.000837 Advanced Intelligent Network (AIN\ 14.AIN Customized Services (ACS\1GB 14.AIN Platform Access (APA)1GB 1GB 14.AIN Querv Processina. oer Querv 1GB Line Information Database (LlDB\ 15.LlDB Storace No CharQe 15.Line Validation Administration Svstem Access (LVAS\ICE 15.LlDB Line Record Initial Load 15.Uo to 20 000 Line Records $2601. 15.Over 20 000 Line Records 1GB 15.Mechanized Service Account Uodate oer Addition or Uodate Processed 15.Individual Line Record Audit 15.2.4 Account Grouo Audit 15.Exoedited Reauest Charae for Manual Uodates 15.LlDB Querv Service oer Querv $0.0008230 15.4 Fraud Alert Notification. per Alert No CharQe 8XX Database Querv Service 16.Basic Querv. per Querv $0.0130355 16.POTS Translation $0.00000048 16.Call Handlina & Destination Feature $0.00000145 ICNAM Per Querv $0.000768 Intentionally Left Blank Construction Charges 1GB 1GB Miscellaneous Charges 20.Additional EnQineerina. oer Half Hour or fraction thereof 20.Additional Enaineerina - Basic $31. 20.Additional Enaineerina - Overtime $39. 20.Additional Labor Installation oer Half Hour or fraction thereof 20.Additional Labor Installation - Overtime $9. 20.Additional Labor Installation - Premium $18. 20.Additional Labor Other oer Half Hour or fraction thereof 20.Additional Labor Other - Basic $27. 20.Additional Labor Other - Overtime $36. 20.Additional Labor Other - Premium $46. 20.4 Testina and Maintenance oer Half Hour or fraction thereof 20.4.Testina and Maintenance - Basic $29.40 Qwest Idaho SGAT Third Revision Exhibit A 6th Amended Februarv 11. 2005 5th Amended April 26, 2004 Page 13 of 18 Exhibit A Idaho 20.4.Testina and Maintenance - Overtime $38. 20.4.Testina and Maintenance - Premium $49. 20.Maintenance of Service cer Half Hour or fraction thereof 20.Maintenance of Service - Basic $28. 20.Maintenance of Service - Overtime $36. 20.Maintenance of Service - Premium $46. 20.Additional Coocerative Accectance Testina, cer Half Hour or fraction thereof 20.Additional Coocerative Accectance Testina - Basic $29. 20.Additional Coocerative Accectance Testina - Overtime $39. 20.Additional Coocerative Accectance Testina - Premium $49. 20.Nonscheduled Cooperative Testino. per Half Hour or fraction thereof 20.Nonscheduled Cooperative Testino - Basic $29.40 20.Nonscheduled Cooperative Testina - Overtime $39. 20.Nonscheduled Cooperative Testina - Premium $49. 20.Nonscheduled Manual Testina. cer Half Hour or fraction thereof 20.Nonscheduled Manual Testino - Basic $29. 20.Nonscheduled Manual Testino - Overtime $39. 20.Nonscheduled Manual Testina - Premium $49. 20.Intentionallv Left Blank 20.Intentionally Left Blank 20.Additional Dispatch $87. 20.Date Chance $10. 20.Desian Chance $73. 20.Excedite Charae ICB 20.Cancellation Charoe ICB Channel Reaeneration 21.DS1 $0.$0. 21.DS3 $0.$0. Intentionallv Left Blank UNE Combinations 23.Intentionally Left Blank 23.UNE-P Conversion Nonrecurrino Charoes 23.UNE-P POTS Centrex Analoo PBX Mechanized 23.First $0. 23.Each Additional $0. 23.UNE-P POTS Centrex PAL Analoa PBX Manual 23.First $16. 23.Each Additional $2. 23.UNE-P PBX DID Trunks 23.First $28. 23.Each Additional $2. 23.2.4 UNE-P ISDN BRI 23.2.4.First $30. 23.Each Additional $2. 23.UNE-P ISDN PRI DSS cer DS1 Facilitv $27.9:3 23.UNE-P ISDN PRI DSS - cer Trunk 23.First $28. 23.Each Additional $2. 23.UNE-P New Connection Nonrecurrino Charoes 23.UNE-P POTS Centrex Analoa PBX. Mechanized 23.First $57. 23.Each Additional $15. 23.UNE-P POTS Centrex PAL Analoa PBX Manual 23.First $82. 23.Each Additional $18. 23.UNE - P PBX DID - cer Trunk $15. Qwest Idaho SGAT Third Revision Exhibit A 6th Amended Februarv 11. 2005 5th /\moA8o8 /\Wil 26, 2001 Page 14 of 18 Exhibit A Idaho 23.3.4 UNE - P ISDN BRI $272. 23.UNE - P Trunks 23.DSS Basic Trunk - In Onlv. Out Onlv. or Two 2-Wav $74. 23.DSS, ISDN PRI Advanced Trunk - In only w / DID & Hunting, or 2-$73. Way w / DID, Hunting & Answer Supervision 23.DSS, ISDN PRI Advanced Trunk - Out Only w/Answer Supervision $74.4€ 23.Facilities for UNE - P DSS UNE - P ISDN PRI 23.DS1 LOOD Facilitv $279. 23.DS3 LOOD Facilitv $279. 23.UNE - P PRI Confiaurations 23.UNE-P PRI Dedicated PRI 23 + D $596. 23.UNE-P PRI Dedicated PRI 24B $576. 23.UNE-P PRI Dedicated PRI 23B + Back-UD D Confiauration - 5E $575. 23.4 Miscellaneous UNE-P DID Trunks Charges 23.4.UNE-P ComDlex Translations Diaits OutDulsed Chance Sianalina $15. 23.UNE-P DID ComDlex Translations Sianalina Chance $35. 23.4.UNE-P DID Block Comoromise $25. 23.4.4 UNE-P DID GrouD of 20 Numbers $31. 23.4.UNE-P DID Reserve SeQuential # Block $25. 23.UNE-P DID Reserve Nonseauential TeleDhone Numbers $23. 23.4.UNE-P DID Nonseauential TeleDhone Numbers $33. 23.UNE - P Owest DSL See applicable Owest Retail Tariff, Catalog, or Price List 23.UNE Combinations - LOOD MUX Combinations ILMC) 23.Interconnection Tie Pair(ITPt Der Termination 23.DS1 $1. 23.DS3 $14. 23.LOOD MUX 2-Wire Analoa 23.LMC 2-Wire Installation 23.First $225. 23.Each Additional $148. 23.Wire Analoa LOOD 23.Zone 1 $15. 23.Zone 2 $23. 23.Zone 3 $40. 23.LOOD MUX 4-Wire Analoa 23.LMC 4-Wire Installation 23.First $225. 23.Each Additional $148. 23.Wire Analoa LooD 23.Zone 1 $30. 23.Zone 2 $46. 23.Zone 3 $79. 23.6.4 DS1 LooD MUX 23.6.4.LMC DS1 LooD Installation 23.First $285. 23.6.4.Each Additional $209. 23.6.4.DS1 CaDable LooD 23.6.4.Zone 1 $30. 23.6.4.Zone 2 $46. 23.6.4.Zone 3 $79.47 23.Private Line to LOOD MUX Conversion $34. 23.LMC MultiDlexina 23.bMG-DS1 to DSO $263.$193. 23.bMG DS3 to DS1 $304.$193. 23.DSO Channel Performance 23.DS1/ DSO~ Low Side Channelization $7.47 23.Enhanced Extended LOOD (EEl) Owest Idaho SGAT Third Revision Exhibit A 6th Amended Februarv 11. 2005 5th /\meRE:lea J\pril 29, 2001 Page 15 of 18 Exhibit A Idaho 23.EEL DSO 2-Wire Analoa 23.EEL 2-Wire LOOD Installation 23.First $245. 23.Each Additional $182. 23.Wire Analoa LooD 23.Zone 1 $15. 23.Zone 2 $23. 23.Zone 3 $40. 23.EEL DSO 4-Wire Analoa 23.EEL 4-Wire LOOD Installation 23.First $245. 23.Each Additional $182. 23.Wire Analoa LOOD 23.Zone 1 $30. 23.Zone 2 $46. 23.Zone 3 $79.47 23.EEL DS1 23.EEL DS1 LOOD Installation 23.First $300. 23.Each Additional $225. 23.DS1 Capable LOOD 23.Zone 1 86.48 23.Zone 2 86.46 23.Zone 3 99. 23.7.4 EEL DS3 23.7.4.EEL DS3 LOOD Installation 23.7.4.First $323. 23.7.4.Each Additional $248. 23.7.4.DS3 CaDable LOOD 23.7.4.Zone 1 $941. 23.7.4.Zone 2 $955. 23.7.4.Zone 3 $1 264. 23.Intentionally Left Blank 23.Private Line to EEL Conversion $34. 23.Intentionally Left Blank 23.EEL TransDort 23.DSO (Recuffina Fixed oer Mile) 23.Over 0 to 8 Miles $24.$0. 23.Over 8 to 25 Miles $24.$0. 23.Over 25 to 50 Miles $24.$0. 23.1.4 Over 50 Miles $24.$0. 23.DS1 (Recurrina Fixed oer Mile) 23.Over 0 to 8 Miles $36.43 $3. 23.Over 8 to 25 Miles $37.$3. 23.Over 25 to 50 Miles $39.$1. 23.2.4 Over 50 Miles $37.$0. 23.DS3 (Recurrina Fixed oer Mile) 23.Over 0 to 8 Miles $238.$54. 23.Over 8 to 25 Miles $242.$16. 23.Over 25 to 50 Miles $223.$21. 23.3.4 Over 50 Miles $235.$14. 23.Intentionally Left Blank 23.EEL MultiDlexina 23.10.DS1 to DSO $263.$246. 23.10.DS3to DS1 $304.$246. 23.DSO Channel Performance 23.11.DSO Low Side Channelization $13. 23.11.DS1/ DSO-M1J.X. Low Side Channelization $7.47 23.Concentration Capability ICB Unbundled Packet Switching 24.Unbundled Packet Switch Customer Channel 24.DSLAM (and Splitter) Functionalitv $21. Qwest Idaho SGAT Third Revision Exhibit A 6th Amended February 11, 2005 5th /\menaea April 26, 20Q1 Page 16 of 18 Exhibit A Idaho 24.Virtual Transoort $3. 24.Customer Channel Shared Distribution Sublooo $61. 24.Unbundled Packet Switch Interface Port 24.DS1 $158.$210. 24.DS3 $272.$210. 10.0 Ancillarv Services 10.Local Number Portability 10.LNP Queries See FCC Tariff #1 Section 13 & 10.LNP Manaaed Cuts 10.Standard Manaaed Cuts per Person per Half Hour $26. 10.Overtime Manaaed Cuts per Person per Half Hour $34. 10.Premium Manaaed Cuts. per Person per Half Hour $42. 10.911/E911 10.9111 E911 No Charae No Charae 10.White Pages Directorv Listinas Facilitv Based Providers 10.Primary Listina No Charae No Charae 10.Premium Privacy Listings General General Exchange Tariff Exchange Tariff Rate, Less Rate, Less Wholesale Wholesale Discount Discount 10.Directorv Assistance. Facilitv Based Providers 10.4.Local Directorv Assistance per Call $0. 10.National Directorv Assistance per Call $0. 10.Call Brandina. Set- Uo and Recordina $35 000. 10.4.4 Loadina Brand per Switch $500. 10.Call Completion Link per Call $0.0893 10.Directorv Assistance List Information 10.Initial Database Load ner Listina $0.025 10.Reload of Database per Listina $0.020 10.Dailv Updates per Listina $0.250 10.5.4 One-time Set-Up Fee $73. 10.Media Charaes for File Deliverv 10.Electronic Transmission $0.0020 10.Taoes (charaes onlv aoolv ifthis is selected as the normal delivery medium for $30. 10.Shiooina Charaes (for tape delivery)ICB 10.Toll and Assistance Operator Services Facilitv Based Providers 10.Option A - Per Messaae 10.Operator Handled Callina Card $1.45 10.Machine Handled Callina Card $0. 10.Station Call $1. 10.1.4 Person Call $3. 10.Connect to Directorv Assistance $0. 10.Busv Line Verify. per Call $0. 10.Busv Line Interrupt $0. 10.Operator Assistance per Call $0. 10.Ootion B - Per Operator Work Second and Computer Handled Calls 10.Operator Handled. per Operator Work Second $0.02800 10.Machine Handled per Call $0.25000 10.Call Brandina. Set-Up & Recordina $10500. 10.2.4 Loadina Brand/Per Switch $800. 10.Access to Poles Ducts Conduits and Riahts of Wav CROW\ 10.Pole Inquiry Fee, per Inquiry $341. 10.Innerduct Inquiry Fee, per Inquiry $233. 10.ROW Inquiry Fee, per Inquiry $378. 10.7.4 ROW Document Preparation Fee $122. 10.Field Verification Fee per Pole $20.4 10.Field Verification Fee per Manhole $190. 10.Planner Verification per Manhole $16. Qwest Idaho SGAT Third Revision Exhibit A 6th Amended Februarv 11. 2005 etA AmeRaea /\pril 26, 2994 Page 17 of 18 Exhibit A Idaho 10. 10. 10. 10. 10. 10. 10. $2. $0. er Order $5. 12.$1.40 12.$0.000419 12.4 See 9. 17.0 Bona Fide Re uest Process 17.Processin Fee $1 851. NOTES: Unless otherwise indicated, all rates are pursuant to Idaho Public Utilities Commission Dockets: A AT&T Arbitration Docket USW-96-, Order No 27738, effective September 17, 1998. B Cost Docket QWE-01-11 , Order No. 29408 (January 5 2004) rates effective January 5, 2004. # Voluntary Rate Reduction, Docket USW-00-, effective 6/10/02. Reductions reflected in the 5/24/02 Exhibit A. #If. Second Voluntary Rate Reduction, Docket USW-00-, effective 6/7102. Reductions reflected in the 7/10/02 Exhibit A. ### Third Voluntary Rate Reduction, Docket USW-T -00-, effective 12/16/02, Reductions reflected in the 10/16/02 Exhibit A (1) TELRIC rates proposed in Cost Docket QWE-01-testimony filed on November 12, 2003. The case was bifurcated and the rates usina this footnote are proposed in Phase 2 of the cost docket. (2) Market-based rates. (3) ICB, Individual Case Basis pricing. (4) The State of Idaho has retained the oversight on these rates. These rates are not under the jurisdiction of the FCC. (5) FCC ordered rates pursuant to the FCC's Order on Remand and Report and Order (Intercarrier Compensation for ISP-Bound Traffic) CC Docket 01-131 (FCC ISP Order), effective June 14, 2001. (6) Effective August 1, 2003, Qwest will no longer bill the recurring and nonrecurring charges for Channel Regeneration. Qwest reserves the right to revert back to the contractual rate only after appropriate notice is given. (7) The preliminary Quote Preparation Fees (QPF) are included in the space construction charges. Upon completion of the collocation construction, the QPF will be credited to the final space construction charge for the virtual, caged or cageless collocation job. These engineering and planning charges are also included in the Virtual, Caged and Cageless Quote Preparation Fees. f8l The Cable Unlo3ding .' Bridge T3p Removal eharge docs not 3pply until further notice. fill Effective 11/04. Qwest will no lon!:!er perform Bridae Tap and/or Load Coil Removal CConditionin!:!) to facilitate provisionin!:! of its Qwest Retail DSL offerin!:!. In order to permit CLECs to provision their own xDSL Capable Loops. Qwest is now re-institutin!:! the char!:!e to continue Conditionina for the 2/4-Wire Unbundled Loop. ADSL Compatible Unbundled Loop. ISDN CBRI) Capable Unbundled Loop. xDSL-1 Capable Unbundled Loop. Non-Commercial Line Sharin!:!. Line Splittin!:!. Non-Commercial Shared Distribution Loop and Loop Splittin!:!. effective 3/14/05. Qwest cant bill the REC rate structure. but will bill customers the lower of the two rates. (9) Qwest is voluntarily reducing this rate in order to keep rate relationship with the Fiber Transport "per Pair" rate element. (10) Qwest has not implemented this UNE rate or charge in its billing system but reserves the right to assess such a charge in the future. (11) All technically feasible Vertical Switch Features are available with compatible unbundled switch ports. No monthly recurring charge applies for Basic Vertical Switch Features. Only basic Vertical Switch Features with nonrecurring charges are listed. Nonrecurring charges are applicable whenever a feature is added - whether on new installation, conversion, or change order activity. Vertical Switch Features not listed are included in the cost of the switch port and have a rate of zero for both recurring and nonrecurring charges. (12) The Premium Port monthly recurring charge applies in addition to the Analog or Digital Line Side Port recurring charges when Premium Features are ordered with analog or digital ports. Qwest Idaho SGAT Third Revision Exhibit A 6th Amended Februarv 11. 2005 etA /\moAEloEi /\pril 26, 2004 Page 18 of 18