Loading...
HomeMy WebLinkAbout20150715Amendment.pdfJuly 14,2015 t1J'*r1:-,,,-i-t i_;i..! ,i 1 :-.. r./ I Z0l$ JUL tS pt{ 2: h3 Ii.i,ii,t,, i I jT ll-lTi [-5 i]it i,'j:,,,i l..j i i ( ir Wa Overnight delivery Jean Jewell, Secretary Idaho Public Utilities Commission 472 W est Washington Steet P.O. Box 83720 Boise, Idaho 83720-007 4 Re: Case No.: QWE-T-02-08 Application for Approval of Amendment to Interconnection Agreement Dear Ms. Jewell: Enclosed for filing are an original and two (2) copies of the DC Power Measurement Amendment to the Interconnection Agreement between Qwest Corporation dba Centurylink QC and Level 3 Communications, LLC for the State of Idatro. CenturyLink respectfully requests that this matter be placed on the Commission Decision Meeting Agenda for expedited approval. Please contact me if you have any questions concerning the enclosed. Thank you for your assistance in this matter. Sincerely, /iea Enclosure(s) cc: Service List {H CenturyLink' 15OO 7* Avenue, Room 1506 Seattle, Washington 98191 Tel:20G733-5236 Email: iosie.addinaton@centurvlink.com www.centurylink.com Lisa A. Anderl (WSBA#1 3236) CenturyLink 1600 7th Ave, Room 1506 Seattle, Washington 98191 Telephone: (206) 345 -l 57 4 li sa. anderl @c enturylink. com BEF'ORE THE IDAHO APPLICATION OF QWEST PUBLIC UTILITIES COMMISSION CASE NO.: QWE-T-02-08 APPLICATION FOR APPROVAL OF AMENDMENT TO INTERCONNECTION AGREEMENT ,.Q CORPORATION dba CENTURYLINK QC F'OR APPROVAL OF AN AMENDMENT TO INTERCONNECTION AGREEMENT WITH LEVEL 3 COMMUNICATIONS, LLC PURSUANT To 47 U.S.C. $2s2(e) AppLICATToN FoR AppRoval or AUSNoMENT To INTERCoNNECTIoN AcnrEupxr LEVEL 3 CoMMUNICATIoNS, LLC - Page I Qwest Corporation dba CenturyLink QC hereby files this Application for Approval of Amendment to the Interconnection Agreement ("Amendment") which was approved by the Idaho Public Utilities Commission on May 22,2002 (the "Agreement"). The Amendment with Level 3 Communications, LLC ("Level 3") is submitted herewith. This Amendment was reached through voluntary negotiations without resort to mediation or arbitration and is submitted for approval pursuant to Section 252(e) of the Communications Act of 1934, as amended by the Telecommunications Act of 1996 (the 'oAct"). Section 252(e)(2) of the Act directs that a state Commission may reject an amendment reached through voluntary negotiations only if the Commission finds that: the amendment (or portion(s) thereof) discriminates against a telecommunications carrier not a party to this agreement; or the implementation of such an amendment (or portion) is not consistent with the public interest, convenience and necessity. CenturyLink 1600 7m Ave., Suite 1506 Seattle, WA 98191 Telephone: (206) 398-2500 CenturyLink respectfully submits this Amendment provides no basis for either of these findings, and, therefore requests that the Commission approve this Amendment expeditiously. This Amendment is consistent with the public interest as identified in the pro-competitive policies of the State of Idaho, the Commission, the United States Congress, and the Federal Communications Commission. Expeditious approval of this Amendment will enable Level 3 to interconnect with CenturyLink facilities and to provide customers with increased choices among local telecommunications services. CenturyLink further requests that the Commission approve this Amendment without a hearing. Because this Amendment was reached through voluntary negotiations, it does not raise issues requiring a hearing and does not concern other parties not a party to the negotiations. Expeditious approval would further the public interest. Respectfully submitted this l4th day of July,2Ol5. CENTURYLINK Lisa A. Anderl Attorney for Qwest Corporation dba CenturyLink QC AppT-TcerIoN FoR APPRoVAL oF AMENDMENT TO INrencouNecrroN AcRrrurNr Lsvel 3 CovrrrtuNIcerloNs, LLC - Page 2 CenturyLink 1600 76 Ave., Suite 1506 Seattle, WA 98191 Telephone: (206) 398-2500 CERTIFICATE OF SERVICE I hereby certify that on this 14m day of July,2Ol5,I served the foregoing APPLICATION FOR APPROVAL OF AMENDMENT TO THE INTERCONNECTION AGREEMENT upon all parties of record in this matter as follows: Jean Jewell, Secretary Idaho Public Utilities Commission 47 2 W est Washington Street P.O. Box 83720 Boise, Idaho 83720-0074 jj ewell@puc. state. id.us Gary Black VP- Carrier Relations Level 3 Communications, L.L.C. 1025 Eldorado Boulevard Broomfield, Colorado 80021 Hand Delivery U. S. MailXX Overnight Delivery Facsimile Email Hand DeliveryXX U. S. Mail Overnight Delivery Facsimile Email APPLICATIoN ron AppnovAl OF AMENDMENT TO INrENCOr.rNrCrrcN AcREEMENT Lrvrl3 CouuttNtcerloNs, LLC - Page 3 CenturyLink 1600 76 Ave., suite 1506 Seattle, WA 98191 Telephone: (206) 398-2500 DocuSign Envelope lD: 17F 1OF'lF-2585-4657-BC1 F-EA6DFF7DC7EE DC Power Measurement Amendment to the lnterconnection Agreement between Qwest Gorporation dba GenturyLink QC andiiil. i:l- t] Fij 2: L3 Level 3 Communications, LLG for the State of ldaho l'"il.il.,'ir:. This is an Amendment ("Amendment") to the lnterconnection Agreement between Qwest Corporation dba CenturyLink QC ("CenturyLink"), a Colorado corporation, and Level 3 Communications, LLC ('CLEC"). CenturyLink and CLEC shall be known jointly as the "Parties". RECITALS WHEREAS, the Parties entered into an lnterconnection Agreement ("Agreement") for service in the state of ldaho which was approved by the Commission on May 22,2002; and WHEREAS, the Parties desire to amend the Agreement further under the terms and conditions contained herein. AGREEMENT NOW THEREFORE, in consideration of the mutual terms, covenants and conditions contained in this Amendment and other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, the Parties agree as follows: Amendment Terms The Agreement is hereby amended by adding terms, conditions and rates for Collocation DC Power Measurement as set forth in Attachment 1 to this Amendment, attached hereto and incorporated herein by this reference. Effective Date This Amendment shall be deemed effective upon approval by the Commission, or by being permitted to go into effect by operation of law; however, the Parties may agree to implement the provisions of this Amendment upon execution. To accommodate this need, CLEC must generate, if necessary, an updated Customer Questionnaire. ln addition to the Questionnaire, all system updates will need to be completed by CenturyLink. CLEC will be notified when all system changes have been made. Actual order processing may begin once these requirements have been met. Additionally, CenturyLink shall implement any necessary billing changes within two (2) billing cycles after the latest execution date of this Amendment, with a true-up back to the latest execution date of this Amendment by the end of the second billing cycle. The Parties agree that so long as CenturyLink implements the billing changes and the true-up as set forth above, CLEC's bills shall be deemed accurate and adjusted without error for adjustments made, pursuant to this Amendment, for purposes of performance measurements. June 23, 20lslkjclDc Power Measurement Amd/Level 3/lD Amendment to CDS-020301 -0020 DocuSign Envelope lD: 17FlOF1F-2585-4657-BC1 F-EAODFFTDCTEE Further Amendments Except as modified herein, the provisions of the Agreement shall remain in full force and effect. The provisions of this Amendment, including the provisions of this sentence, may not be amended, modified or supplemented, and waivers or consents to departures from the provisions of this Amendment may not be given without the written consent thereto by both Parties' authorized representative. No waiver by any Party of any default, misrepresentation, or breach of warranty or covenant hereunder, whether intentional or not, will be deemed to extend to any prior or subsequent default, misrepresentation, or breach of warranty or covenant hereunder or affect in any way any rights arising by virtue of any prior or subsequent such occurrence. Entire Aqreement The Agreement as amended (including the documents referred to herein) constitutes the full and entire understanding and agreement between the Parties with regard to the subjects of the Agreement as amended and supersedes any prior understandings, agreements, or representations by or between the Parties, written or oral, to the extent they relate in any way to the subjects of the Agreement as amended. The Parties intending to be legally bound have executed this Amendment as of the dates set forth below, in multiple counterparts, each of which is deemed an original, but all of which shall constitute one and the same instrument. Level 3 Gommunications, LLC Qwest Corporation dba CenturyLink QC Garv Black Name Printed/Typed VP-Carrier Relations Title 6/2s/zOLs June 23, 2015lK1clDC Power Measurement Amd/Level 3/lD Amendment to CDS-020301 -0020 Signature L. T. Christensen Name Printed/Typed Director - Wholesale Contracts Title 6/2s/20Ls Date C68BD57it54--. Signature DocuSign Envelope lD: 17F'l 0F'lF -2585-4657-BC 1 F-EAODFFTDCTEE ATTACHMENT 1 Collocation DC Power Measurement Section 8.0 - COLLOCATION 8.2.1.30 Optional DC Power Measurement. CLEC will order DC power to meet its needs with a twenty (20) amperes (amp) per feed minimum. lf CLEC orders more than sixty (60) amps, CenturyLink typically terminates such feed on a power board. lf CLEC orders sixty (60) amps or less, the power feed typically terminates at a battery distribution fuse board (BDFB). No power measurements are performed at a BDFB. Therefore, for sixty (60) amps or less, the power usage rate is based on CLEC ordered amps. For power feeds of greater than sixty (60) amps terminated at the power board, CenturyLink will measure usage on a semi-annual basis if CLEC orders Optional DC Power Measurement. CenturyLink will also take a reading within thirty (30) Days of a written request by CLEC. CenturyLink will perform a maximum of four (4) readings per year for a particular Collocation site. Until the routine semi-annual reading or until such time that CenturyLink makes a reading based on a written request, CenturyLink will bill CLEC based on the amount of power ordered. Based on the reading, CenturyLink will adjust the new monthly usage rate to CLEC's actual usage rate on a going forward basis. 8.3 Rate Elements 8.3.1 Rate Elements - All Collocation 8.3.1.6 -48 Volt DC Power Usage Charge. Provides -48 volt DC power to CLEC collocated equipment and is fused at one hundred twenty-five percent (125o/o) of the request. The -48 volt DC Power Usage Charge applies to the quantity of -48 volt capacity specified by CLEC in its order on a per ampere (amp) basis. There is a one (1) amp minimum charge for -48 volt DC power usage. 8.3.1.6.1 Optional -48 Volt DC Power Usage Charge is available for orders of greater than sixty (60) amps. lf CLEC orders Optional DC Power Measurement, CenturyLink will initially apply the -48 Volt DC Power Usage Charge from Exhibit A to the quantity of power ordered by CLEC. CenturyLink will determine the actual usage at the power board as described in Section 8.2.1.30. CenturyLink will adjust the monthly usage rate based upon the actual usage on a going forward basis. There is a one (1) amp minimum charge for -48 volt DC power usage. June 23, 2015lkjclDc Power Measurement Amd/Level 3/lD Amendment to CDS-020301 -0020