Loading...
HomeMy WebLinkAbout20140131Amendment.pdfCENTURYLINK 'I 600 7th Avenue, Room 1 506 Seattle, Washington 98191 (206) 733-s178 Facsimile (206) 343-4040 Maura E. Petercon Paralegal Regulatory Law January 29,2014 sITdTrrv Centurylink' Via Overnight delivery Jean Jewell, Secretary Idaho Public Utilities Commission 472 W est Washinglon Steet P.O. Box 83720 Boise, Idaho 83720-007 4 Re: Case No.: QWE-T-02-8 Application for Approval Amendment to Interconnection Agreement Dear Ms. Jewell: Enclosed for filing are an original and three (3) copies of the Application for Approval of the Amendment to the Interconnection Agreement. CenturyLink respectfully requests that this matter be placed on the Commission Decision Meeting Agenda for expedited approval. Please contact me if you have any questions conceming the enclosed. Thank you for your assistance in this matter. Sincerely, MEP/jga Enclosurecc: Andrea Pierantozzi Lisa A. Anderl (WSBA#I3236) CenturyLink 1600 7th Ave, Room 1506 Seattle, WA 98191 Telephone: (206) 398-2504 Facsimile: (206) 343 -4040 lisa. anderl @centurylink. com BEFORE THE APPLICATION OF QWEST CORPORATION dba CENTURYLINK QC FOR APPROVAL OF A}[ INTERCONNECTION AGREEMENT PURSUAIIT TO 47 U.S.C. $252(e) IDAHO PUBLIC UTILITIES COMMISSION i'l l' ! 'r i_,,' i: CASE NO.: QWE-T-02-8 APPLICATION FOR APPROVAL OF AMENDMENT TO THE INTERCONNECTION AGREEMENT Qwest Corporation dba CenturyLink QC ("CenturyLink") hereby files this Application for Approval of the DC Power Reduction Amendment to the Interconnection Agreernent between Qwest Corporation dba Centukrylink QC and Level 3 Communications LLC for the State of Idaho ("Amendment") which was approved by the Idaho Public Utilities Commission on May 22,2002 (the "Agreement"). The Amendment with Level 3 Communications LLC ("Level 3") is submitted herewith. This Amendment was reached through voluntary negotiations without resort to mediation or arbitration and is submitted for approval pursuant to Section 252(e) of the Communications Act of 1934, as amended by the Telecommunications Act of 1996 (the "Act"). Section 252(e)(2) of the Act directs that a state Commission may reject an amendment reached through voluntary negotiations only if the Commission finds that: the amendment (or portion(s) thereof) discriminates against a telecommunications carrier not a party to this AppucaTloN FoR Appnoval oF AMENDMENT To THE INTERCoNNECTIoN AcREBUBNT _ Lnvrr 3 CoUTTIUNICATIONS LLC Page I agreement; or the implernentation of such an amendment (or portion) is not consistent with the public interest, convenience and necessity. CenturyLink respectfully submits this Amendment provides no basis for either of these findings, and, therefore requests that the Commission approve this Amendment expeditiously. This Amendment is consistent with the public interest as identified in the pro-competitive policies of the State of Idaho, the Commission, the United States Congress, and the Federal Communications Commission. Expeditious approval of this Amendment will enable Level3 to interconnect with CenturyLink facilities and to provide customers with increased choices among local telecommunications services. CenturyLink further requests that the Commission approve this Amendment without a hearing. Because this Amendment was reached through voluntary negotiations, it does not raise issues requiring a hearing and does not concern other parties not a party to the negotiations. Expeditious approval would further the public interest. Respectfully submitted this day of January,2014. APPLICATIoN FoR AppRoval OF AMENDMENT To Tgn INTnncoNNECTIoN AcRBeuBuT - LPVET- 3 CoUUUNICATIONS LLC CENTURYLINK Lisa A. Anderl on dba CenturyLink QC Page2 CERTIFICATE OT' SERVICE I hereby certiff that on this 30tr day of January,20l4,I served the foregoing ApplrcnrroN FoRAppRovAL or AurxpMENT To rHE lxtrncoxNEcTroN AcnnnvrnNT upon all parties of record in this matter as follows: Jean Jewell, Secretary Idaho Public Utilities Commission 47 2 W est Washington Steet P.O. Box 83720 Boise, Idaho 83720-0074 ij ewell@puc. state.id.us Andrea Pierantozzi VP - Voice Product Management Level 3 Communications LLC 1025 Eldorado Boulevard Broomfield, Colorado 80021 Hand Delivery U. S. Mail)O( Overnight Delivery Facsimile Email )c( Hand Delivery U. S. Mail Overnight Delivery Facsimile Email APPLICATION Ton AppROVAL OF ANmwoNTSNT To THE INTERCoNNECTIoN AcRBpIapNT -Lpvet. 3 CoMMUNTcATToNS LLC Page 3 DocuSign Envelope lD: C1624682-5A99-438A-8405-9942C7F6328D DC Power Reduction Amendment to the lnterconnection Agreement between Qwest Corporation dba GenturyLink QC and Leve! 3 Communications LLC for the State of ldaho This is an Amendment ("Amendment") to the lnterconnection Agreement between Qwest Corporation dba CenturyLink QC ("CenturyLink"), a Colorado corporation, and Level 3 Communications LLC ("CLEC"). CenturyLink and CLEC shall be known jointly as the "Parties". RECITALS WHEREAS, the Parties entered into an lnterconnection Agreement ("Agreement") for service in the state of ldaho which was approved by the Commission; and WHEREAS, the Parties desire to amend the Agreement further under the terms and conditions contained herein. AGREEMENT NOW THEREFORE, in consideration of the mutual terms, covenants and conditions contained in this Amendment and other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, the Parties agree as follows: Amendment Terms The Agreement is hereby amended by adding terms, conditions and rates for Power Reduction as set forth in Attachment 1 and Exhibit A, to this Amendment, attached hereto and incorporated herein by this reference. Effective Date This Amendment shall be deemed effective upon approval by the Commission; however, the Parties may agree to implement the provisions of this Amendment upon execution. To accommodate this need, CLEC must generate, if necessary, an updated Customer Questionnaire. ln addition to the Questionnaire, all system updates will need to be completed by CenturyLink. CLEC will be notified when all system changes have been made. Actual order processing may begin once these requirements have been met. Additionally, CenturyLink shall implement any necessary billing changes within two (2) billing cycles after the latest execution date of this Amendment, with a true-up back to the latest execution date of this Amendment by the end of the second billing cycle. The Parties agree that so long as CenturyLink implements the billing changes and the true-up as set forth above, the CLEC's bills shall be deemed accurate and adjusted without error. January 1 6, 201 4lkjclLevel 3/lD DC Power Reduction Amd to CDS-020301-0020 DocuSign Envelope lD: C1624682-5A99-438A-B40$9942C7F6328D Further Amendments Except as modified herein, the provisions of the Agreement shall remain in full force and effect. The provisions of this Amendment, including the provisions of this sentence, may not be amended, modified or supplemented, and waivers or consents to departures from the provisions of this Amendment may not be given without the written consent thereto by both Parties' authorized representative. No waiver by any Party of any default, misrepresentation, or breach of warranty or covenant hereunder, whether intentional or not, will be deemed to extend to any prior or subsequent default, misrepresentation, or breach of warranty or covenant hereunder or affect in any way any rights arising by virtue of any prior or subsequent such occurrence. Entire Asreement The Agreement as amended (including the documents referred to herein) constitutes the full and entire understanding and agreement between the Parties with regard to the subjects of the Agreement as amended and supersedes any prior understandings, agreements, or representations by or between the Parties, written or oral, to the extent they relate in any way to the subjects of the Agreement as amended. The Parties intending to be legally bound have executed this Amendment as of the dates set forth below, in multiple counterparts, each of which is deemed an original, but all of which shall constitute one and the same instrument. Level 3 Communications LLC Qwest Corporation dba CenturyLink QG 06ESFC88BDErtEf... t- T0t*,tt^** Signature L. T. Christensen Name PrintediTyped Director - Wholesale Contracts Title L/23/20L4 /*Dcu$tsnrd BE | 1.rr," .. Q,r^^nq, Signature Andrea Pieranlozzi Name Printed/Typed VP- Voice Product Manaqement Title L/23/20L4 January 1 6, 2O1 4lkjclLevel 3/lD DC Power Reduction Amd to CDS-020301-0020 DocuSign Envelope lD: C1 6246B2-5A99-43BA-8405-9942C7F6328D ATTACHMENT 1 Section 8.0 - COLLOCATION 8.2 Terms and Conditions 8.2.1 Terms and Conditions - AII Gollocation January 1 6, 20'l 4l$clLevel 3/l D DC Power Reduction Amd to CDS-020301-0020 ATTACHMENT 1 8.2.1.30 Optional DC Power Measurement. CLEC willorder DC powerto meet its needs with a twenty (20) amperes (amp) per feed minimum. lf CLEC orders more than sixty (60) amps, CenturyLink typically terminates such feed on a power board. lf CLEC orders sixty (60) amps or less, the power feed typically terminates at a battery distribution fuse board (BDFB). No power measurements are performed at a BDFB. Therefore, for sixty (60) amps or less, the power usage rate is based on CLEC ordered amps. For power feeds of greater than sixty (60) amps terminated at the power board, CenturyLink will measure usage on a semi-annual basis if CLEC orders Optional DC Power Measurement. CenturyLink will also take a reading within thirty (30) Days of a written request by CLEC. CenturyLink will perform a maximum of four (4) readings per year for a particular Collocation site. Until the routine semi-annual reading or until such time that CenturyLink makes a reading based on a written request, CenturyLink will bill CLEC based on the amount of power ordered. Based on the reading, CenturyLink will adjust the new monthly usage rate to CLEC's actual usage rate on a going forward basis. 8.2.1.32 DC Power Reduction, Restoration, and Deactivation. DC Power Reduction With Reservation allows CLEC to reserve a fuse or breaker position on the power board or battery distribution fuse board (BDFB) when reducing a secondary power feed to zero. CLEC will pay a monthly power maintenance charge to retain the existing power cabling and fuse position for future power augment requests or until such time as CLEC notifies CenturyLink it wishes to discontinue the option. DC Power Reduction Without Reservation allows CLEC to reduce the ordered amps on a primary or secondary feed to a minimum of twenty (20) amps. DC Power Off allows CLEC to deactivate their secondary power feed and remove it from the power distribution point (e.9., BDFB or power board). A primary power feed with a minimum of 20 Amps, must be maintained in each collocation at all times, with the exception of Adjacent Collocation, Common Area Splitter Collocation, Facility Connected Collocation, and ICDF Collocation. Adjacent Collocation, Common Area Splitter Collocation, Facility Connected Collocation, and ICDF Collocation do not have a minimum DC power requirement. 8.2.1.32.1 Applications for DC Power Reduction/Restoration/Deactivation may be submitted only for Collocation sites that have been completed and accepted by CLEC, otherwise CLEC should follow standard change or augment procedures including the applicable rates for changes or augments. On the DocuSign Envelope lD: C1 6246B2-5A99-43BA-8405-9942C7F6328D ATTACHMENT 1 Collocation Application, CLEC should indicate that it is a request for DC Power Reduction/Restoration/Deactivation and identify the specific power feeds. CenturyLink will notify CLEC of any deficiencies in the Collocation Application, within ten (10) Days of receipt. A quotation for the DC Power Reduction/Restoration/Deactivation will be provided to CLEC within twenty-five (25) Days. The quoted nonrecurring charges will be honored for thirty (30) Days from the quotation. CLEC payment of all quoted nonrecurring charges constitutes acceptance and CenturyLink will then perform the work. lf CLEC accepts the quotation within seven (7) Days, CenturyLink shall complete the DC Power Reduction within ninety (90) Days of receipt of the Collocation Application. lf CLEC accepts the quotation after seven (7) Days, CenturyLink shall complete the DC Power Reduction within ninety (90) Days of receipt of CLEC's acceptance. 8.2.1.32.2 CLEC assumes all responsibility for outages or impacts to CLEC services and equipment due to the reduction in DC power. Restoration of the DC power is contingent upon the desired power and fuse availability. 8.2.1.32.3 Before submitting a Collocation Application requesting DC Power Reduction/Restoration/Deactivation, CLEC's financial obligations for the Collocation site must be current, with the exception of formally disputed charges. Billing to CLEC will be revised to reflect the reduced/restored/eliminated DC power upon receipt of payment of the quoted charges effective back to the date of acceptance by CenturyLink of the Gollocation Application. 8.2.1.32.4 lf a shortage of fuse positions is imminent, CenturyLink will notify CLEC of the need to exercise its option to reuse the power feed and fuse, or relinquish the fuse position for use by another CLEC or CenturyLink. Upon receipt of such notification, CLEC must request restoration of the secondary power feed to at least twenty (20) amps or return the fuse position to CenturyLink within thirty (30) Days. 8.3 Rate Elements Rate elements for Collocation are included in Exhibit A. 8.3.1 Rate Elements - All Gollocation 8.3.1.6 -48 Volt DC Power Usage Charge. Provides -48 volt DC power to CLEC collocated equipment and is fused at one hundred twenty-five percent (125%) of the request. The -48 volt DC Power Usage Charge applies to the quantity of -48 volt capacity specified by CLEC in its order on a per ampere (amp) basis. There is a one (1) amp minimum charge for -48 volt DC power usage. 8.3.1.6.1 Optional -48 Volt DC Power Usage Charge is available for January 1 6, 201 4lkjclLevel 3/lD DC Power Reduction Amd to CDS-020301-0020 DocuSign Envelope lD: C16246B2-5A99-438A-840$9942C7F6328D January 1 6, 20l 4lkiclLevel 3/l D DC Power Reduction Amd to CDS-020301-0020 ATTACHMENT 1 orders of greater than sixty (60) amps. lf CLEC orders Optional DC Power Measurement, CenturyLink will initially apply the -48 Volt DC Power Usage Charge from Exhibit A to the quantity of power ordered by CLEC. CenturyLink will determine the actual usage at the power board as described in Section 8.2.1.30. CenturyLink will adjust the monthly usage rate based upon the actual usage on a going forward basis. There is a one (1) amp minimum charge for -48 volt DC power usage. 8.3.1.6.2 Power Plant per Amp. Provides plant infrastructure to support the -48 volt DC power to CLEC collocated equipment. Power plant is built to support the amount of DC power usage ordered by CLEC and may be reduced with a power reduction request. 8.3.1.19 DC Power Reduction Restoration and Deactivation Rates: CLEC will be charged the applicable nonrecurring Quote Preparation Fee (QPF) or Engineering and Design Fee and the DC Power Reduction or DC Power Restoration fee per Collocation request. Nonrecurring charges associated with the work required to reduce the fuse or breaker size, rewiring the power lead at the power source or relocation of the power feed will be on an ICB basis. When power is restored, nonrecurring charges will be assessed on an ICB basis for the work required to restore the power utilizing standard power rate elements for power usage, labor and cabling charges. CLEC will be charged a nonrecurring charge for moves between the battery distribution fuse board and the power board (for location changes) necessary for DC power reduction/restoration. When Power is turned off or deactivated on a secondary power feed nonrecuning charges (i.e., Power off) will be assessed for the work required to disconnect the power feed from the power distribution point. A recurring power maintenance charge is associated with the option to hold the power infrastructure for a secondary feed for potentialfuture use by CLEC. The recuning charge will terminate on the date a restoration job completes for the power feed or CLEC returns the fuse position to CenturyLink. lf CenturyLink is unable to provide the requested power restoration of the held feed(s) due to exhaustion of power capacity, CenturyLink will refund all Power Maintenance Charges collected since the reservation was accepted. OocuSign Envelope lD: C1 624682-5AgS43BA-8405-9942C7F6328D Exhibit A ldaho Amendment Notes Recurring Recurri.E P6tr illle Non" Recu.ring vmft -!=mcoEo z1c! S.0lCollocation 8.1 lC Power Reduction and Resloraiion I131 Power Rcalrclion 131 ildia Preoaralion Fee oer C)flice s703 7 8.13.1.2 )ower Reduction. wilh or without Reservation. oer Feed Set ).13.1.2.1 -ess Than 60 Amos $494.41 B 1.13.1.2.2 :oual To 60 Amos $706.9't B 3reater Than 60 Amos s8s5.31 B 13 ner Feed Sel oer Secondaru Feed s621 't.4 | (:haroe lReseruation (;haroe) oer Fuse Sel s64 i.'13.1.5 -ocation Chanoe from Power Board to BDFB CB J 13.2 )ower Restoration \.13 2 1 uote Preoeration Fee. Der Office s703.7(B .^nliac t^ P;m.ru f, qa.^nd.ru Fci 13 2 2 'l lPower Resioration wilh Reseruation 132 ? 1 ess Than 60 Amns s4c4 I 1 1.13.2.2.1.2 rual To 60 Amos $706.91 12 t.13.2.2.1.3 ireater Than 60 Amos s895.31 12 13 2 2.2 >ower Restoration wilhout Reseruation CB 12 1a2a d.alidn Chande from Power Board io BDFB 3 B lost Dmket OWE-T-o1-1 1 Order No. 29408 (Januarv 5. 2004) rates effective Januarv 5. 2004 3 CB. lndividual Case Basis oricino. 't2 Rates not addressed in Cost Docket (estimated TELRIC Page 1 of I