HomeMy WebLinkAbout20040105Order No 29408.pdfOffice of the Secretary Service Date January 5, 2004 BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF DETERMINING PRICES FOR UNBUNDLED NETWORK ELEMENTS (UNE) IN QWEST CORPORATION'S STATEMENT OF GENERALLY AVAILABLE TERMS (SGA T). CASE NO. QWE-Ol- ORDER NO. 29408 This case was opened in June 2001 to establish prices for Qwest's unbundled network elements (UNEs). The federal Telecommunications Act of 1996 requires incumbent local exchange carriers to provide "nondiscriminatory access to (their) network elements on an unbundled basis at any technically feasible point on rates, terms, and conditions that are just reasonable, and nondiscriminatory," and state commissions are authorized to establish UNE prices that comply with the Act. 47 US.c. ~ 252(c)(3). A Bell Operating Company, such as Qwest Corporation, may include its UNE prices in a Statement of Generally Available Terms (SGA T), setting forth the terms and conditions by which it will comply with the requirements of Section 252. 47 D.C. ~ 252(f). UNE prices are to be based on a total element long-run incremental cost (TELRIC) methodology. In response to a Motion filed by Qwest, the Commission issued Order No. 28748 on June 12, 2001, establishing this proceeding, which included informal workshops to facilitate discussions and possible agreement on prices for specific Qwest UNEs. The first workshop convened on June 23, 2001. On November 12, 2003, Qwest filed a Motion for Approval of Negotiated Rates asking the Commission to approve numerous UNE prices identified in Attachment A to Qwest's Motion.Qwest states in its Motion that a number of intervenors participated in the first workshop, but did not actively participate beyond the initial phases. According to Qwest's Motion, Staff and Qwest "continued an extensive dialogue culminating in the negotiated rates that are represented in Attachment A to this Motion." Qwest Motion p. 3. The attachment is included as Attachment A to this Order. Qwest asked that the Commission process its request for approval of the identified UNE prices by Modified Procedure. The Commission on December 4 2003, issued a Notice of Request for Approval of Negotiated Rates and Notice of Modified Procedure, establishing a comment period regarding Qwest's Motion for Approval of the Negotiated UNE Rates. During ORDER NO. 29408 the comment period, which ended on December 26, 2003, written comments were filed only by the Commission Staff. In its Motion, Qwest stated that "as the workshop process continued, it became clear that only a portion of the UNEs that are reflected in Qwest's SGAT were the subject of significant controversy between Qwest and the Staff." Qwest Motion p. 3. Qwest identified the controversial UNEs as those most often purchased by competing carriers "and those that made up the product known as unbundled network element-platform, or 'UNE-'" Qwest Motion pp. 3-4. For many of the other UNE prices, according to Qwest's Motion , " Qwest and Staff found that it was feasible to reach a negotiated price founded on Qwest's cost studies , but modified by using variant input in the models or, in some cases, reduced to bring them closer to results ordered in other Qwest jurisdictions." Qwest Motion p. 4. In its written comments, Staff concurred with Qwest's representation that the UNE prices contained in Attachment A are not controversial. Staff stated these UNEs "do not generate controversy because they are typically products that are either not frequently ordered, or products with rates that are consistent with the rates charged by Qwest and other Bell Operating Companies in other states.Staff also stated that the rates in Attachment A "were based on a total element long-run incremental cost (TELRIC) methodology, using inputs to the models that Staff considers to be within an acceptable range of reasonableness. Based on the record presented, the Commission has determined that it is appropriate to approve the UNE prices contained in Attachment A. It is uncontroverted that the UNE prices identified in Attachment A are derived from a TELRIC methodology, and that they are similar if not identical to UNE prices charged by Qwest in its other operating states. The Commission finds the UNE prices in Attachment A to be just, reasonable and nondiscriminatory, and therefore approves them for inclusion in Qwest's SGAT. ORDER IT IS HEREBY ORDERED that the unbundled network element prices identified in Attachment A to this Order are approved. ORDER NO. 29408 DONE by Order of the Idaho Public Utilities Commission at Boise, Idaho this J. day of January 2004. 1J~\ MARSHA H. SMITH, COMMISSIONER ~~€- NNIS S. AN , C MMISSIONER ATTEST: ~ill D. Jewell Commission Secretary vld/O:QWETO 111- ws4 ORDER NO. 29408 IDAHO ATTACHMENT A NEGOTIATED RATES PRICES AGREED UPON BY STAFF AND QWEST ~~~~r~~1 0 Resale Wholesale Discount 1 Wholesale Discount Rates Southern Idaho 1.1 Basic Exchanoe Residence Service 18.25% Basic Exchanoe Business Service 18.25% Toll 18.25% Packaged/Special Services (e.g.. Centrex. Discounted Line/Feature Packages. ISDN. PBX-Trunks. DSS & UAS. Frame Relav Service. LAN. MeoaBit and other ACS)18.25% Ustinos CO Features and Information Services 18.25% Private Une 18.25% Ooerator Services / Directorv Assistance IOSIDA 18.25% Public Access Une PAL Service 00% Volume Packaoed Services - Hioh-Volume Customers 65% Northern Idaho Basic Exchanoe Residence Service 19.37% Basic Exchanoe Business Service 19.37% Toll 19.37% Packaged/Special Services (e.. Centrex. Discounted Line/Feature Packages. ISDN. PBX-Trunks. DSS & UAS. Frame Relay Service. LAN. MegaBit and other ACS)19.37% Listinas CO Features and Information Services 19.37% Private Une 19.37% Ooerator Services / Directorv Assistance OSIDA)19.37% Public Access Line PAll Service 00% Volume Packaoed Services - Hioh-Volume Customers 87% 2 Customer Transfer Charce (CTCI CTC for POTS Service First Line (Mechanized $0. Each Additional Une (Mechanizedl 50. First Une (Manual $16. Each Additional Une (Manual 52. CTC for Private Une Transoort Services First Circuit $38. Additional Circui . oar Circuit Same CSR $33. CTC for Advanced Communications Services. oar Circuit $46. 0 Interconnection 1 Entrance Facilities DS1 $103.$208. DS3 $524.$277.73 2 US EICT PerDS1 $0.$0. Per DS3 $0.$0. 3 Direct Trunked Transnort DS1"OverO to 8 Miles 537.$1. DS1 Over 8 to 25 Miles $37.$1. DS1 Over 25 to 50 Miles 537.$1. DS1 Over 50 Miles $37.$1. DS3 Over 0 to 8 Miles 5257.19. DS3 Over 8 to 25 Miles $260.24. DS3 Over 25 to 50 Miles $260.26. DS3 Over 50 Miles $259.26. :~i1;~~;lff2JE0fiJ~'~~ii~~~~~,:0ia, ~:;., ..~.~...- "....;' \~EI,8~( ~~' S~~ B~~~ifdj ~j r~~l~~~~:I,j ~J,;"T'Y;l~jgFJ !,jY1~~~f~~ffJ. ~:,,;k/'~iMlI;JJtl 4 Multlolexlno DS3 to DS1 S304.S193. DS1 to DSO $263.5193. 5 Trunk Nonrecurrlnn Charnes DS1 Interface First Trunk 5229. DS1 Interface Each Additional Trunk $5. DS3 Interface First Trunk $235. 5.4 DS3 Interface Each Additional Trunk $11. 6 Exchance Service lEAS/Local! Traffic End Office Call Termination per Minute of Use Tandem Switched Transoort 6..Tandem Switchino. oar Minute of Use Docket No. QWE-T -01. ATTACHMENT A ORDER NO. 29408 CASE NO. QWE-01- PAGE 1 OF 14 IDAHO ATTACHMENT A NEGOTIATED RATES PRICES AGREED UPON BY STAFF AND QWEST t,.. \\'i "IiIit"."'X"" '"'- . ~!mf~7" /!II . :; "~, . 6..Tandem Transmission. eer Minute of Use Over 0 to 8 Miles $0.0004564 $0.0000367 Over 8 te 25 Miles $0.0004564 $0.0000367 Over 25 to 50 Miles $0.0004564 $0.0000367 Over 50 Miles $0.0004260 50.0000144 7 Local Trafflc-FCC-ISP Rate Cans MOU for 6 mo. June 14-Dec. 13 2001 N/A MOU for 18 mo. Dec. 14 2001..June 132003 N/A MOU for 36 mo. June 14 2003..June 13 2006 $0.0007 8 Miscellaneous Charaes Exeedite Charne LIS Trunksl Qwesfs Idahe Access Service CatalDO Cancellation Charne LIS Trunks\Qwesfs Idaho Access Service CatalDO Additional Testinc IllS Trunks Qwesfs Idaho Access Service CatalDO Construction Charnes ICB ICB 9 Transit Traffic Local Transit See Tandem Switching and Tandem Transmission Rates Above Local Transit Assumed Mileaae 7 Miles Intra LATA Toll See Qwesfs Idaho Access Service CatalDO IntraLATA Toll Assumed Mileaoe 7 Miles JoinUv Provided Swijched Access See Owesfs Idaho Access Service Catalog Catennrv 11 Mechanized Record Charne. eer Record $0.0014877 0 Collocation 1 All Collocation Collocation Entrance Facilitv Standard Shared eer Fiber 55.$616. Cross Connect eer Fiber $5.$722. Exeress eer Cable $88.$9009. Cable Snlicinn Fiber. Per Set-$399. Per Fiber Snliced $37. 1.3 -48 Volt DC Power Usaoe. ner Am"ere. "er Month Pewer Plant Less Than 60 Am"s. "er Ame $10. Power Plant Greater Than or Eoual to 60 Amos. oar Ame $8. Power Usaoe Less Than or Eoual te 60 Ames. eer Ame $2. Power Usaae Greater Than 60 Amos. eer Ame $4. Power Reduction Quote Pre=ration Fee $703. Power Reduction Less Than 60 Amns $494. Power Reduction Eoual to 60 Amns 5706. Power Reduction Greater Than 60 Amos $895. Power On / Off $621. BDFB Rent $64. AC Power Feed AC Power Feed - "ar Am". ner Month 120V $16. 208 V Sinole Phase $27. 208 V Three Phase $48. 240 V Sinole Phase $32. 240 V Three Phase 555. 480 V Three Phase $111. AC Power Feed - ner Foot. ner Month 20 Am" Sinole Phase $0.0084 57. 20 Arn". Three Phase 0105 59. 30 Am". Sin,,1e Phase 0091 $8. 30 Am". Three Phase 0125 11. 40 Am". SinaJe Phase 0107 40 Arno. Three Phase 0147 12. 50 Arno. Sinole Phase 0127 11. 50 Amn Three Phase 0177 15. 60 Amn Sinnle Phase 0144 12. 60 Amn Three Phase 0204 17. 100 Am" Sinale Phase 0178 15. 100 Am". Three Phase $0.0277 24. Inseeclor Labor. oer Half Hour Reaular Hours Rate $28. After Hours Rate (minimum 3 hours I $37. Docket No. QWE-T-O1- ATTACHMENT A ORDER NO. 29408 CASE NO. QWE-01- PAGE 2 OF 14 IDAHO ATTACHMENT A NEGOTIATED RATES PRICES AGREED UPON BY STAFF AND QWEST ~'~i.I 1M"""""' ""'-"'"""", ?ii- :.,;:~~, ~lt!,~I'i.~\&J, ~~ ~ '-- '~...,," Collocation Terminations DSO Cable Placement "er 100 Pair Block 50.2262 $208. Cable Placement "er Termination 50.0090 $4. Cable "er 100 Pair Block $0.3304 5304. Cable "er Termination $0.0066 $4. Blocks ner 100 Pair Block $0.5730 $528.42 Blocks "er Termination $0.0115 58. Block Placement oar 100 Pair Block $0.2381 5219. Block Placement Der Termination $0.0048 $3. DS1 Cable Placement Der 28 DS1s $0.4111 $362. Cable Placement Der Termination $0.0442 $38. Cable oar 28 DS1s 50.3993 $351. Cable DerTermination $0.0429 $37. Panel "er 28 DS1s $0.2742 $241. Panel Der Termination $0.0330 $29. Panel Placement ner 28 DS1s $0.0847 $74. Panel Placement oar Termination $0.0091 $8. DS3 Cable Placement Der Termination $0.1521 $134. Cable oar Termination $0.2578 $227. Connector ner Termination $0.2625 $231. Connector Placement ""r Termination $0.0204 $18. OCn oCn Terminations Der 12 Fibers $26.$1513. oCn Additional Connector if aDDlicable $0.$411. oCn Cable Rackina - Shared leer 12 fibers)$26. oCn Cable Rackin!)- Dedicated $1.$1 433. SecuritY Per Emnlovee Per Card 50. Card Access "er Em"lovee- "er Office $7. Central Office SecuritY Infrastructure ICB ICB Central Office Clock SYnchronization SYnchronization - Cornoosite Oock. Der Port $7. 10 ScaceAvailabilitvCharoe $313. Collocation SDace Reservation Fee The charge will be 25% of the Nonrecurring 12 Collocation S"ace ODtion Administration Fee $1107. Collocation SDace O"tion Fee ner SDuare Foot $2. 14 Collocation Cable AuDment QPF 51 284. 2 Virtual Collocation Quote PreDaration Fee 53146. Eoui"ment Bav - Recurrino. ""r Shelf $4. Bav SDace VIrtual Scace Construction Initial Bav Provided $20.$17 749. Each Additional Bav SDace $3.$2 854. VIrtual Cable Rackino. Der Shelf $0.5384. 2.4 Maintenance Labor ...... Half Hour Reaular Hours Rate 529. After Hours Rate 539. Trainina Labor. Der Half Hour Reoular Hours Rate 529. Ennineerin" Labor oar Half Hour Reaular Hours Rate $32. After Hours Rate $43. Installation Labor. oar Half Hour Reoular Hours Rate $31. After Hours Rate $41. Rent Floor SDace Lease. Der SQuare Foot $2. Rent ner Shelf $4. --lev DC Power Cable 20A Power Feed $3985. Docket No. QWE-T-Q1- ATTACHMENT A ORDER NO. 29408 CASE NO. QWE-01- PAGE 3 OF 14 IDAHO ATTACHMENT A NEGOTIATED RATES PRICES AGREED UPON BY STAFF AND QWEST ~ ", , i~lli!~~:~ _.,~ .'" .?..~ 'fi:""'""" ""'" " ,"!;i.. ~~~., 30APowerFeed $5.15 $4537.40A Power Feed $6.22 $5 480.60A Power Feed $11.02 $9706.100A Power Feed $18.58 -$16370.200A Power Feed $34.59 $30 473.300A Power Feed $54.39 $47917.400A Power Feed $77.23 $68037. 3 Caneless Phvslcal Collocation Quote Preparation Fee. per Collocation $3146.41 Site Preparation Fee ICB S"ace Construction 2 Bavs $23.$20 603.40 ustment for Each Additional Bav Per Bav Ad'ustment for Sinole Bav - Channe to Standard Desinn $3. ($3. $2854. ---rr2 854. DC Power Cable 20A Power Feed 30A Power Feed 40A Power Feed 60A Power Feed 100A Power Feed 200A Power Feed 300A Power Feed 400A Power Feed $4. $5. $6. $11. $18. $34. $54. $77.23 $3985. $4 537. $5480. $9 706. 516370. $30473. $47917. '68037. 3.4 Floor Snace lease nAr ~uare Foot $2. 4 Ca"ed Phvslcal Collocation Quote Pre"aration Fee. Per Collocation $3185. Site PreDaration Fee ICB 8.4.SDace Construction Caoe - Uo to 100 So. Ft. Caae -101 So. Ft. to 200 So. Ft. Cane - 201 So. Ft. to 300 Sa. Ft. Cane - 301 So. Ft. to 400 Sn. Ft. $38. $34.18. $42. $44. $33927. $30113. $37154. $38 922. Snace Construction - Fencinn Credit Caoe - U" to 100 So. Ft. Caoe-101-200So. Ft Caae - 201 - 300 So. Ft Caoe - 301 - 400 So. Ft $10. $12. $14. $16. $5723. $7.135. $8.015. $8.851.38 DC Power Cable 20A Power Feed 30A Power Feed 40A Power Feed 60A Power Feed 100A Power Feed 200A Power Feed 300A Power Feed 400A Power Feed $5. $6. $7. $12. $19. $37. $58. $82. $4 954. $5457. $6526. $10772. $17531. $32 634. $51 315. '72 861. 8.4.Floor Snace lease nAr Snuare Foot $2. 8.4.Groundino - Caoe #2 AWG - aer Foot 1/0 AWG - oar Foot 4/0 AWG - oer Foot 350 kcmil- per Foot 500 kcmil - per Foot 150 kcmil - ner Foot $0.0097 $0.0170 $0.0200 $0.0258 $0.0299 $0.0456 $8.52 $14. $17. $22. $26. $40. 5 Adlacent Collocation ICB 6 Remote Collocation Phvsical Remote Collocation Quote Preparation Fee Space (oer Standard Mountino Unit! FDI Terminations (oer binder orouol Power Adjacent Remote Collocation (New Adjacent Remote Collocation (Existinn\ $0. $0. See Collocation Rates ICB See Physical Remote Collocation $1 064. $665. $484. Virtual Remote Collocation Space FDI Terminations leer binder croup) $0. $0. '665.47 $484. Docket No. QWE-T -01- ATTACHMENT A ORDER NO. 29408 CASE NO. QWE-01- PAGE 4 OF 14 IDAHO ATl'ACHMENT A NEGOTIATED RATES PRICES AGREED UPON BY STAFF AND QWEST '"M~'" C ', Power ee oca nates Flat CharGe ner Job $36. Enoineerinn Rate ner Half Hour $35. Maintenance. ner Half Hour $29.40Installation. Der Half Hour $29. Trainino Der Half Hour $29. 7 CLEC-to.cLEC Flat Charoe CDesiDn EnoineerinQ - No Cables $634. Fiber Flat Charoe $1 229. Cable Rackina DSO. cer Foot.er Cable $0.11848 DS1. cer Fool rCable SO.13075 DS3. cer Foot.rCable $0.10234 Fiber. cer Foot er Fiber SO.93313 Virtual Connections (if acclicable - Connections Onlv' No Cables DSO Coer 100 Connections $194.DS1 Icor 28 Connectionsl 591. DS3 (oar 1 Connectionl $5.Fiber Connections - per fiber spliced $37. 7.4 Cable Hole (if Acclicable $386. CLEC to CLEC Cross-Connection $201. 8 ICDF Collocation ICB 9 Cancellation Decommission / Transfer of Resnonslbllltv Cancellation Decommission No Charoe Transfer of Resnnnsibilitv Assessment Fee $1 036. Network SYStems Administration Fee $1 586. 10 Microwave Entrance Facility Under Develocment 0 Unbundled Network Elements IUNEsl 1 Interconnection Tie Pairs ITP -Per Termination DSO $0. DS1 $1. DS3 $14. 9.2 Unbundled Loons Analco Looos Wire Voice Grade Zone 1 Zone 2 Zane 3 Wire Unbundled Loop Grooming Wire Voice Grade Zone 1 Zone 2 Zone 3 9.2.4-Wire Unbundled Loop Grooming Non-loaded L"""" wlre Non-loaded Loop 2.2.+wire Non-Ioaded Loop Cabte Unloadlna / Bridae Tac Removal Dinltal Ca""bte LOODS Basic Rate ISDN / xDSL-1 Ca""ble / ADSL Com""tible Loon Zone 1 Zone 2 Zone 3 DS1 Cacable Looc Zone 1 Zone 2 Docket No. QWE-T.Q1- ATTACHMENT A ORDER NO. 29408 CASE NO. QWE-01- PAGE 5 OF 14 IDAHO ATTACHMENT A NEGOTIATED RATES PRICES AGREED UPON BY STAFF AND QWEST :-" "'~.~ 1~~l,.fi.' ,i1!;s,1~li Zone 3 DS3 Caoable Loon Zone 1 Zone 2 Zone 3 oCn CaDable Loon OC- OC- OC-48 $1 314. $3 528. Wire Extension Technoloov Wire Extension Technology Unbundled Loop Grooming- Incremental Charoe Loop Installation Charges for 2 & 4 Wire Analog / Non - Loaded. ISDN BRI Capable. xDSL - I Capable. and ADSL Compatible Loop where conditioning is not required. Basic Installation First Lnnn Each Additional Basic Installation with Performance Testin'l First LOOD Each Additional Coordinated Installation with Cooperative Testing / Project Coordinated Installation First Lnnn Each Additional Coordinated Installation without Cooperative Testing / Projecl Coordinated Installation First Loon Each Additional Basic Installation with CooDerative Testino First Loon Each Additional DS1/ DS3/ OC-3/ OC-12/ OC-48 LOOD Installation Charaes Basic Installation First Loon Each Additional $128. $99. Basic Installation with Performance TestinG First Loon Each Additional $279. $212. Coordinated Installation with Cooperative Testing / Project Coordinated Installation First Loon Each Additional $316. $222.40 Coordinated Installation without Cooperative Testing / Projecl Coordinated Installation First Loon Each Additional 1135. 1106. Basic Installation with ::oonamtive Testina FIrst Loon Each Additional $272. $195. Private Une to Unbundled Loon Conversions $34. 3 Sublooo 1 2-Wire Distribution Loco Each Additional, 2-Wire Distribution Loop (applies to both analog and norHoadedl Zone 1 Zone 2 Zone 3 2 Intra-Buildin Cable Loco Intra-Buildin Cable - No Disoatch First Intra-Buildin Cable - No Disoatch Each Additional Intra-Buildin Cable - Disoatch First Intra-Buildina Cable - Disoatch Each Additional DS1 Caoable Feeder Lnnn Each Additional DS1 Canable Feeder LooD Zone 1 Docket No. OWE-T-O1- ATTACHMENT A ORDER NO. 29408 CASE NO. QWE-01- PAGE 6 OF 14 IDAHO ATTACHMENT A NEGOTIATED RATES PRICES AGREED UPON BY STAFF AND QWEST ~~~ -"'f 1mD1~;1'.""' :,,, ,:"' , m." "",-~~~."",:...... .t",i\\1iii Zone 2 Zone 3 MTE Terminal SublooD Access Sublooo MTE - POI Site Inventorv IDer reouesll MTI= - PC I Rearranoement of Facilities MTE - POI Construction of New SPOI Trouble Isolation CharQe Field Connection Point Feasibilitv Fee / Quote Pre""ration Fee FCP Reclassification Construction Fee ICB 4 LIne Sharlna Shared Looo. oer Looo October 2 2003 thru October 1 2004 (25% of loon rate I October 2 2004 thru October 1 2005 (25% of loon rate I October 2 2005 thru October 1 2006 75% oflooD rate\ OSS - ner Une. Der Month Reclassification Charge Snliller Shelf CharDe Snliller TIE Cable Connections Soliller in the Common Area - Data to 410 Block $3.$2689. Soliller in the Common Area - Data Direct to CLEC $3.$2850. SolilleronthelDF- Data to 410 Block $0.$834. Soliller on the IDF - Data Direct to CLEC $1.$1 623. Snliller on the MDF - Data t0410 Block $0.$861.91 Snliller on the MDF - Data Direcl to CLEC $2.$1 922.42 EnoineerinD $1079. 5 Network Interface Device NIDI $52. :r. 6 Unbundled Dedicated Interoffice Transnort CUDITI DSO UDIT $241. Over 0 to 8 Miles $24.$0. Over 8 to 25 Miles $24.$0. Over 25 to 50 Miles $24.$0. Over 50 Miles $24.$0. DS1 UDIT $284. Over 0 to 8 Miles $36.43 Over 8 to 25 Miles $37.$3. Over 25 to 50 Miles $39.$1. Over 50 Miles $37.$0. DS3 UDIT $284. Over 0 to 8 Miles 5238.54. Over 8 to 25 Miles $242.16. Over 25 to 50 Miles $223.21. Over 50 Miles $235.14. OC-3 UDIT $295. OV9r 0 to 8 Miles 763.36. Over 8 to 25 Miles 763.i36. Over 25 to 50 Miles 763.36. Over 50 Miles 763.066. OC-12 UDIT $295. Over 0 to 8 Miles 2 163.72. Over 8 to 25 Miles 2163.72. Over 25 to 50 Miles 2163.72. Over 50 Miles 2163.135. OC48 UDIT $295. Over 0 to 8 Miles 420.183. Over 8 to 25 Miles 420.183. Over 25 to 50 Miles 420.183, Over 50 Miles 420.346. UDIT DSO Low Side Channel Performance Docket No. QWE-T-O1- ATTACHMENT A ORDER NO. 29408 CASE NO. QWE-01- PAGE 7 OF 14 IDAHO ATTACHMENT A NEGOTIATED RATES PRICES AGREED UPON BY STAFF AND QWEST_fl"""'C' (!~""~~."" _!i\!1~~~~Jlli ~";. ~'\'~~ _;rti/i~&_c~iij';t "~ . '""" . ' i~f.;:~f~A~!':~~~7 ' ~~~' .f.,, ~" ~~i1~ . ~t:~f~,.~i;f!I~;i."",,"9~1'J~ ",,;;~,,;t, . ,;,.. ~~~r~DSO Low Side Channelization $13. DS1/ DSO MUX Low Side Channelization $7.47 $191. UDIT Multiolexino DS3 to DS1 $304.$1 996. DS1 to DSO $263.$238. Extended Unbundled Dedicated Interoffice Transport DS1 E-UDIT $80.$339. DS3 E-UDIT $371.5347. OC-3 E-UDIT $819.$412. Remote Node $476. DS1 Remote Port $3.$198.88 DS3 Remote Port $49.$198.88 OC-12 E-UDIT $1.256.$427. Remote Node $894. DS1 Remote Port $12.5198. DS3 Remote Port $33.$198. OC-3 Remote Port $103.$198. OC-48 E-UDIT $3.299.$413. Remote Node 207. DS3 Remote Port $22.$198. OC-3 Remote Port $121.$198. OC-12 Remote Port $479.$198. 10 UDIT Rearranoement DSO Sinole Office $164. DSO Dual Office $206. UDIT HiCao Sinole Office $221. UDIT HiCao Dual Office $249. 7 Unbundled Dark Fiber UDA UDF-Interoffice Facilitv (lOF\ - Sinole Strand Order Charoe oer First Strand / Route / Order $492. Order Charoe Each Additional Strand / Same Route $255. Termina~on Fixed oer Strand / Office / Termination $4. Fiber TransDort. Der Mile / Strand $72. Fiber Cross-Connect. Der Strand / Office $2.$19. UDF-Loon Charoes - Sinole Strand Order Charoe oer First Strand / Route / Order $492. Order Charoe Each Additional Strand / Same Route $255. Termination Fixed ner Strand / Office $4. Termination Fixed ner Strand / Prem $3. Fiber Looa. oer Route / Strand $88. Fiber Cross-Connect. oer Strand / Office $2.$19. Extended Unbundled Dark Fiber lE-UDF\ - Sinole Strand Order Charoe Der First Strand / Route / Order $492. Order Charoe Each Additional Strand / Same Route $255. Termination Fixed ""r Strand / Office $4. Termination Fixed ner Strand / Prem $3. Fiber LOoo. ner Route / Strand $96. Fiber Cross-COOnect. ner Strand / Office $2.$19. Initial Records Inouirv IRI SimDle 5196. Comnlex $251. Field Verification and Quote Prenaration FVQPI $907. Field Verification Enoineerino Verification !:297. UDF-IOF Charaes - Pair Order Charoe. oar First Pair / Route / Order $492. Order Charoe Each Additional Pair / Same Route $255. Termination FIXed oar Pair / Office /Termination 57. Fiber Transnnrt ...... Mile Pair !:66. Fiber Cross-COOnect oar Pair / Office $19. UDF-Looa Charoes - Pair Order Charne oer First Pair / Route / Order $492. Order Charoe Each Additional Pair / Same Route 5255. Termination FIXed oar Pair / Office 57. Termination Fixed car Pair / Prem 56. Fiber Looa. car Route / Pair 5131. Fiber Cross-Connect Per Pair / Office $3.$19. Extended Unbundled Dark Fiber (E-UDF\ - Pair Order Charoe ner First Pair / Route / Order $492. Order Charoe Each Additional Pair / Same Route $255. Docket No. QWE-T.Q1- ATTACHMENT A ORDER NO. 29408 CASE NO. QWE-01- PAGE 8 OF 14 IDAHO ATTACHMENT A NEGOTIATED RATES PRICES AGREED UPON BY STAFF AND QWEST i".""k" t'Jii" ~:lt~&f~~A'i11~'" ~ . "h . , ~:~., ' Termination Fixed oer Pair Office $7. Termination Fixed oer Pair / Prem $6. Fiber Transom!. oer Route / Pair $131. Fiber Cross-Connect oer Pair/Office $3.$19. Dark Fiber Solice $602. 8 Shared Transnort Per Minute of Use 9 Unbundled Customer Controlled Rearranaement Element (UCCRE DS1 Port ICB ICB DS3 Port ICB ICB Dial Un Access 1GB Attendant Access ICB Virtual Ports ICB 10 Local Tandem Swllchlno 10.DS1 Local Messaoe Trunk Port - Per Order 10.2 DS1 Trunk Groun First Trunk - Per Order 10.3 DS1 Trunk Grouo - Each Additional - Per Order 10.4 Per Minute of Use 11 Local Swltchlnn - TELRIC Based Rates 11.Anal"" Line Side Pnrt First Anal"" Line Side Pnrt Each Additional 11.Dioital Une Side Port ISunnorlinn BRIISDN\ First and Each Additional $12.$205. 11.Dinital Trunk Ports DS1 Local Messaoe Trunk Port Messaoe Trunk Grauo. First Trunk $176. Messane Trunk Grouo. Each Additional $37. DS1 PRIISDN Trunk Port $198.$611. DID / PBX Trunk Port. Der DSO $2.$213. 11.DSO Anal"" Trunk Port First Port $14.$115. Each Additional Port $14.$31. 11.Local Usaoe. Der Minute of Use 11.Vertical Features 11.1 Basic Features Account Codes - Der SyStem $77. Attendant Access Une - oar Station Une $1. Audible Messaoe Waitina $0. Authorization Codes - oer System $231. Automatic Une $0. Automatic Route Selection - Common EauiD. Der SyStem $2,015. Call Draa $0. Call Exclusion - Automatic $0. Call Exclusion - Manual $0. Call Forwarding: Busy Une/Don t Answer Programmable Svc. Establishment $11. CF Dont Answer/CF Busv Customer Praarammable - Der Line $0. Cali Waitino Indication - oer TImina State $0. Centrex Common Emlinment CFBL - Incomino OnlY $20. CFDA - Incomino OnlY $20. CLASS - Continuous Redial CLASS - Last Call Retum CLASS - PrioritY CaRina CLASS - Selective Call Forwardino ClASS - Selective Call ReiAdion Dir Sta SeVBusv Lamn Ad oer Arranaement Directed Call PickuD with Baroe-in 13. Directed Can PickUD without Baroe~n 13. Distinctive Rina/Distinctive Call Waitina 27. Excensive Route Wamlna Tooe- oer SYStem Facility Restriction Level - oer SyStem 30. Groun Intercom $0. Hot Une - oer Une Huntinn: Multinosition Hunt Queuina 29. Huntino: Multinosition with Announcement in Queue 31. Huntina: Multinosition with Music in Queue 28. ISDN Short Hunt Loudsoeaker Panino - ""r Trunk Groun $183. Make Busv Arranoements - oar Groun $0. Make Busv Arranoements - oar Une 50. Messaoe Center - Der Main Station Une $0. Messane Waitino Visual 50. Music On Hold - Der SyStem 520. Privacy Release 50. Docket No. QWE-H)1- ATTACHMENT A ORDER NO. 29408 CASE NO. QWE-01- PAGE 9 OF 14 IDAHO ATTACHMENT A NEGOTIATED RATES PRICES AGREED UPON BY STAFF AND QWEST 1~:i~1Wg~;l~'j 'P' , , 'f~)i,~i;~:~J'.lbi:' Querv TIme $0. Slation Camo-Qn Service - per Main Station $0. TIme of Dav Control for ARS - per Svstem $95.48 Time of Dav NCOS Update $0.41 Time of Dav Routino - per Line $0. Trunk Verification from Designated Station $0. UCD in Hunt Groun - oer Line $0. SMDR-P - Service Establishment Charge, Initial Installation $323. SMDR-P - Archived Data $170. 11.2 Premium Port - Additional Charoe 53. CMS - SYStem Establishment - Initial Installation $962. CMS - SYStem Establishment - Subseauent Installation $481. CMS - Packet Control Caoabilitv, oer SYStem $481. Conference Callino - Meet Me $32. Conference Callino - Preset $32.24' Conference Callina - Station Dial 6-wav)$47.48 11.CLASS Call Trace, per Occurrence $1. 11.7 SubseQuent Order Charoe $12. 12 Local Switchlno - Market Based Rates 13 Customized Routlno 13.Development of Custom Une Oass Code - Directory Assistance or Ooerator Services Routine Onlv $235. 13.2 Installation Charge, per Switch - Directory Assistance or Operator Service Routing Only $237. 13.3 All Other Custom Routino ICB ICB 14 Common Channel Sinnallno/SS7 14.CCSAC STP Port $208.$368. 14.2 CCSAC Oetions Activation Charae Basic Translations First Activation, per Order $100. Each Additional Activation, per Order $8. CCSAC Ontions Database Translations First Activation, oer Order $116. Each Additional Activation, ner Order $53. 14.3 Sional Formulation ISUP, ner Call Set-Un Reouest $0.000524 14.4 Sional Transoort ISUP. oer Call Set-Un Renuest $0.000176 14.5 Sional Transoort TCAP. oar Data Reouest $0.000019 14.6 SiGnal Switchino. ISUP. oer Call Set-$0.000983 14.7 Sinnal SwitchinG. TCAP. oer Data Reouest $0.000837 15 Advanced Intellinent Network fAiNI 15.AIN Customized Services (ACSI ICB 15.2 ,AIN Platform Access APA I ICB ICB 15.3 AIN Querv Processino. ner Querv ICB 16 LIne Information Database UDBI 16.LlDB Storaoe No Charae 16.2 Une Validation Administration SYStem Access CLVAS ICB LlDB/ICNAM Une Record Initial Load Un to 20 000 Une Records $2601. Over 20 000 Une Records ICB Mechanized Service Account Unri;lte ner Addition or Uooate ICB Individual Une Record Audit ICB Account Grouo Audit ICB Exnedited Reauest Charne for Manuall.lDdates ICB 16.3 LIDB Querv Service. oar Querv 50.0008230 16.4 Fraud Alert Notification. oer Alert No Cherne 17 8XX Database Querv Service 17.Basic Querv. oar Querv $0.0130355 17.2 POTS Translation 50.00000048 17 ,3 Call Handlino & Destination Feature $0.00000145 18 ICNAM Per Querv $11000768 Docket No. QWE-T-O1- ATTACHMENT A ORDER NO. 29408 CASE NO. QWE-01- PAGE 10 OF 14 IDAHO NEGOTIATED RATES PRICES AGREED UPON BY STAFF AND QWEST ATTACHMENT A I'~".)",r,'~ ~! -~ ~" ~'i"ifff'~' ;~'r~t:l.~;~$~:~~ 1m, ; ' ~., ' j ~~jt""",, !!';&~#, !ti,Q;';'.'~rl,19 Construction Charaes 1GB ICB 20 Miscellaneous Charaes . Per 1/2 hour or fraction thereof . Additional Ennineerinn,Basic $31. . Additional Enaineerinn - Overtime $39. . Additional Labor Installation - Overtime $9. . Additional Labor Installation - Premium $18. . Additional Labor Other - Basic $27.70- . Additional Labor Other - Overtime $36. . Additional Labor Other - Premium $46. . Testina and Maintenance - Basic $29. . Testino and Maintenance - Overtime $38. . Testina and Maintenance - Premium $49. . Maintenance of Service - Basic $28. . Maintenance of Service Overtime $36. . Maintenance of Service - Premium $46. . Additional Coooerativ9 Acceotance Testina Basic $29. . Additional Cnnnerative Acceotance Testino - Overtime $39. . Additional C".nnnerative Acceotance Testina Premium $49. . NonScheduled Coo""rative Testina - Basic $29. . NonScheduled Coonerative Testina,Overtime $39. . NonScheduled Coonerative Testino - Premium $49. . NonScheduled Manual Testinn - Basic $29. . NonScheduled Manual Testina - Overtime $39. . NonScheduled Manual Testina - Premium $49. Additional Disoatch $87. Date Chanoe $10. Desian Channe $73. Exnedile Cherne ICB Cancellation Cherne ICB 21 Reserved for Future Use 22 UNE Combinations 22.UNE - P Une Snlittino Basic Installation Charoe for UNE:-P Line SDlittino 22.UNE-P Conversion Non-Recurrina Charoes UNE-P POTS, Centrex, Analoo PBX Mechanized First $0. Each Additional $0. UNE-P POTS, Centrex, PAL, Analoo PBX, Manual First $16. Each Additional $2. UNE-P PBX DID Trunks First Each Additional UNE-P ISDN BRI First Each Additional UNE-P ISDN PRI DSS ""r DS1 Facility UNE-P ISDN PRI DSS - ner Trunk First Each Additional 22.UNE-P New Connection Non-Recurrina Charaes UNE-P POTS Centrex, Analoo PBx. Mechanized First Each Additional UNE-P POTS Centrex PAL Analoo PBx. Manual FIrst Each Additional UNE-P PBX DID - oer Trunk UNE-P 2B+D BRIISDN UNE-P Trunks DSS Basic Trunk - In Onlv Out Onlv. or Two Wav DSS, ISDN PRI Adv. Trunk - In Only w/DID & Hunting, or Two Way wIDID, Hunting & Answer Supervision DSS ISDN PRI Adv. Trunk - Out Onlv w/Answer SuDervisior UNE-P DID Trunks UNE-P Complex Translations Digits Outpulsed Change Sionaling Docket No. QWE-T~1- ATTACHMENT A ORDER NO. 29408 CASE NO. QWE-01- PAGE 11 OF 14 IDAHO ATTACHMENT A NEGOTIATED RATES PRICES AGREED UPON BY STAFF AND QWEST ""' ~-r~ - . :~1 . """'~;;' l'J! UNE-P DID Comolex Translations Sionalino ChanCle UNE-P DID Block Comnromise UNE-P DID Grouo of 20 Numbers UNE-P DID Reserve Seouential # Block UNE-P DID Reserve Nonseouential TNs UNE-P DID Nonseouential TNs Facilities for UNE-P DSS UNE.P ISDN PRI DS1 Loop Facility DS3 Loop Facility UNE-P PRI Confl"urallons UNE-P PRI Dedicated PRI 23B + D UNE-P PRI Dedicated PRI 24B UNE-P PRI Dedicated PRI 23B + Back-Up D Configuration - 22.UNE-P with Owest DSL 22.UNE Combinations - LOOD MUX Combinations LMC\ 22.rTP DS1/ DS3 See Section 9. 22.Loon MUX 214 Wire Analoo. First Loon MUX 214 Wire Analoo, Each Additional 22.DS1 LoaD MUx. First DS1 LoaD MUX Each Additional 22.5.4 Private Une to Loop MUX Conversion $34. 22.LMC DS1 to DSO Multiplexer $263.$193. LMC DS3 to DS1 Multiplexer $304.$193. 22.DS1/DSO Low Side Channelization 22.Enhanced Extended Loon (EEL 22.EEL LInk EEL DSO 2-Wire Analoo. First EEL DSO 2-Wire Each Additional EEL DSO 4-Wire Analoo, First EEL DSO 4-Wire Each Additional EEL DS1 EEL DS1 Each Additional EEL DS3 EEL DS3 Each Additional EEL OC-3 OC-12 and OC-48 22.Private Line to EEL-Conversion $34. f1f h,'?;J~11l; ::- ~~t'3::;:~;):~~i~0'~l0r~'iN~r1:j:(iI1Hi;e\;~~~~~1~fJ;~i!jli1~, ;;; j. riff~~~ir;:.~:\,:, q r i:fT~2TI1RiIy~1 k;'~;~~t~;~J 2ji?~iiJ. ~~F)'~ ~V~r~ri, 22.EEL Trans DSO DS1 DS3 OC-3 OC-12 OC-48 Docket No. QWE-T'()1- ATTACHMENT A ORDER NO. 29408 CASE NO. QWE-01- PAGE 12 OF 14 IDAHO ATTACHMENT A NEGOTIATED RATES PRICES AGREED UPON BY STAFF AND QWEST _..~~j 22.EEL Multiolexino DS1 to DSO $263. DS3 to DS1 $304. 22.EEL DSO Channel Performance DSO Low Side Channelization DS1IDSO MUX, Low Side Channelization 22.Concentration Canabilitv Unbundled Packet Swltchlna 23.Unbundled Packet Switch Customer Channel DSLAM and Solitter\ Functionalitv Virtual Transoort 23.2 Customer Channel Shared Distribution Sublooo 23.3 Unbundled Packet Switch Interface Port DS1 DS3 LooD SDllttlna 24.Interconnection TIE Pairs CITP 24.2 OSS Charoes 24.3 Basic Installation Charne for Looo Solittina 24.4 Trouble Isolation Charne 24.5 Additional Testino 24.6 POTS Solitter Collocation' Reclassification Charae Enaineerina 24.7 Solitter TIE Cable Connections Snlitter in the Common Area - Data to 410 Block Snlitter in the Common Area - Data Direct to CLEC Snlitteron the IDF - Data t0410 Block Snlitter on the IDF - Data Direct to CLEC Snlitter on the MDF - Data to 410 Block Snlitter on the MDF - Data Direct to CLEC 10.0 Ancillarv Services 10.1 Local Number PortabIlItY 10.LNP Queries See FCC Tariff #1 Section 20.1 & 20. 10.2 LNP Manaoed Cuts Standard Menaned Cuts. oer Person. oer 1/2 Hour $26. Overtime Manaoed Cuts ""r Person oer 1/2 Hour $34. Premium Menaned Cuts ner Person ner 1/2 Hour $42. 10.2 911/E911 No Charae 10.3 White Paaes Dlrectorv Llstlnas Facllltv Based Providers 10.Primarv Ustino No Charae 10.2 PremiumlPrivacy Ustings General Exchange Tariff Rate, less wholesale discount 10.4 Dlrectorv, Assistance Facllltv Based Providers 10.4.Local Directorv Assistance Per Call $0. 10.2 National Directorv Assistance ner Call $0. 10.3 Call Brandina. Set- Uo and Recordino $35 000. 10.4 Loadino Brand Per Brand $500. 10.5 Call Comoletion Unk, oar Call SO.0893 10.5 Dlrectorv Assistance LIst Information 10.Initial Database Load ner Listinn $0.025 10.2 Reload of Database ner Listino $0.020 10.3 Dailv Undates, ner Listinn $0.025 10.4 One-time Set-Un Fee (ner hour 573. 10.5 Media Charaes for File Deliverv Electronic Transmission 50.0020 Tapes (charges only apply if this is selected as the normal deliverv medium for dailv uodates) (oer taoel $30. Shiooino Charaes (for taoe deliverv)ICB 10.6 Toll and Assistance Onerator Services Facllltv Based Providers Docket No. QWE-T -01- ATTACHMENT A ORDER NO. 29408 CASE NO. QWE-01- PAGE 13 OF 14 IDAHO ATTACHMENT A NEGOTIATED RATES PRICES AGREED UPON BY STAFF AND QWEST tJ' .:..,-:'-' '.."",, 1f; 10.1 O"tlon A - Per Messaoe Ooerator Handled Callino Card $1. Machine Handled Callino Card $0. Station Call 51. Person Call $3. Connect to Directorv Assistance $0. Busv Une VerilY ner Call $0. Bus" Line IntelTUnt $0. Onerator Assistance ner Call $0. 10.2 Ontlon B - Per Onerator Work Second and Comnuter Handled Calls Onerator Handled, oar Onerator Work Second $0.0280 Machine Handled. oar Call $0.2500 Call Brandin Set-Un & Recordinn $10500. Loadinn Brand. oer Brand $800. 10.7 Access to Poles Ducts Conduits and Rlnhts of Wav 10.Pole Inouirv Fee, per Inauirv 10.2 Innerduct Innuirv Fee. per Inouirv 10.3 ROW IMUirli Fee, per Inouirv 10.4 ROW Document Prenaration Fee 10.5 Field Verification Fee ner Pole 10.6 Field Verification Fee, ner Manhole 10.7 Planner Verification, ner Manhole 10.8 Manhole Verification Insoector. oar Manhole 10.9 Manhole Make-Readv Insoactor, ner Manhole 10.1C Transfer of Resoonsibilitv 10.11 Pole Attachment Fee. oar Fool per Year $2. Urban 2003 2004 2005 Non-Urban 2003 2004 2005 10.1:; Innerduct Occupancy Fee. oer Foot. oer Year $0. 10.12 Access Anreement Consideration ~10. 10.14 Make Readv ICB 12.0 Oneratlonal SUDDort Svstems 12.1 Develooment and Enhancements. oer Order $5. 12.2 Onnolnn Maintenance. ner Order $1.40 12.3 Dallv Usane Record File. ner Record $0.000419 12.4 Trouble Isolation Charaes See Misc. 17.0 Bona Fide Renuest Process 17.1 Processlnn Fee $1851. NOTES: Rates found in FCC Tariff #1. The preliminary engineering and planning costs are included in the caged and cageless space construction charges. These engineering and planning charges are also included in ihe caged and cageless quote preparation fees. Upon completion of the collocation construction. whichever quote preparation fee (QPF) has been applied will serve as a credit against the final space construction charge for the collocation Job. ICB - Individual Case Basis pricing. All technically feasible Vertical Switch Features are available with compatible unbundled switch ports. No monthly recurring charge applies for Basic Vertical Switch Features because the cost of those features are included in the cost of the switch port. Only Basic Vertical Switch Features with nonrecurring charges are listed in the SGA T Exhibit A. Nonrecurring charges are applicable whenever a feature is added - whether on new installation, conversion, or change order activity. Vertical Switch Features notlisted have no incremental nonrecurring charge associated with them. The Premium Port monthly recurring charge applies in addition to the Analog or Digital Une Side Port recurring charges when Premium Features are ordered with analog or digital ports. The State of Idaho has retained oversight of these rates. These rates are not under the jurisdiction of the FCC. Docket No. QWE.T~1- ATTACHMENT A ORDER NO. 29408 CASE NO. QWE-01- PAGE 14 OF 14