HomeMy WebLinkAbout20040105Order No 29408.pdfOffice of the Secretary
Service Date
January 5, 2004
BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
IN THE MATTER OF DETERMINING
PRICES FOR UNBUNDLED NETWORK
ELEMENTS (UNE) IN QWEST
CORPORATION'S STATEMENT OF
GENERALLY AVAILABLE TERMS (SGA T).
CASE NO. QWE-Ol-
ORDER NO. 29408
This case was opened in June 2001 to establish prices for Qwest's unbundled network
elements (UNEs). The federal Telecommunications Act of 1996 requires incumbent local
exchange carriers to provide "nondiscriminatory access to (their) network elements on an
unbundled basis at any technically feasible point on rates, terms, and conditions that are just
reasonable, and nondiscriminatory," and state commissions are authorized to establish UNE
prices that comply with the Act. 47 US.c. ~ 252(c)(3). A Bell Operating Company, such as
Qwest Corporation, may include its UNE prices in a Statement of Generally Available Terms
(SGA T), setting forth the terms and conditions by which it will comply with the requirements of
Section 252. 47 D.C. ~ 252(f). UNE prices are to be based on a total element long-run
incremental cost (TELRIC) methodology. In response to a Motion filed by Qwest, the
Commission issued Order No. 28748 on June 12, 2001, establishing this proceeding, which
included informal workshops to facilitate discussions and possible agreement on prices for
specific Qwest UNEs. The first workshop convened on June 23, 2001.
On November 12, 2003, Qwest filed a Motion for Approval of Negotiated Rates
asking the Commission to approve numerous UNE prices identified in Attachment A to Qwest's
Motion.Qwest states in its Motion that a number of intervenors participated in the first
workshop, but did not actively participate beyond the initial phases. According to Qwest's
Motion, Staff and Qwest "continued an extensive dialogue culminating in the negotiated rates
that are represented in Attachment A to this Motion." Qwest Motion p. 3. The attachment is
included as Attachment A to this Order.
Qwest asked that the Commission process its request for approval of the identified
UNE prices by Modified Procedure. The Commission on December 4 2003, issued a Notice of
Request for Approval of Negotiated Rates and Notice of Modified Procedure, establishing a
comment period regarding Qwest's Motion for Approval of the Negotiated UNE Rates. During
ORDER NO. 29408
the comment period, which ended on December 26, 2003, written comments were filed only by
the Commission Staff.
In its Motion, Qwest stated that "as the workshop process continued, it became clear
that only a portion of the UNEs that are reflected in Qwest's SGAT were the subject of
significant controversy between Qwest and the Staff." Qwest Motion p. 3. Qwest identified the
controversial UNEs as those most often purchased by competing carriers "and those that made
up the product known as unbundled network element-platform, or 'UNE-'" Qwest Motion
pp. 3-4. For many of the other UNE prices, according to Qwest's Motion
, "
Qwest and Staff
found that it was feasible to reach a negotiated price founded on Qwest's cost studies , but
modified by using variant input in the models or, in some cases, reduced to bring them closer to
results ordered in other Qwest jurisdictions." Qwest Motion p. 4. In its written comments, Staff
concurred with Qwest's representation that the UNE prices contained in Attachment A are not
controversial. Staff stated these UNEs "do not generate controversy because they are typically
products that are either not frequently ordered, or products with rates that are consistent with the
rates charged by Qwest and other Bell Operating Companies in other states.Staff also stated
that the rates in Attachment A "were based on a total element long-run incremental cost
(TELRIC) methodology, using inputs to the models that Staff considers to be within an
acceptable range of reasonableness.
Based on the record presented, the Commission has determined that it is appropriate
to approve the UNE prices contained in Attachment A. It is uncontroverted that the UNE prices
identified in Attachment A are derived from a TELRIC methodology, and that they are similar if
not identical to UNE prices charged by Qwest in its other operating states. The Commission
finds the UNE prices in Attachment A to be just, reasonable and nondiscriminatory, and
therefore approves them for inclusion in Qwest's SGAT.
ORDER
IT IS HEREBY ORDERED that the unbundled network element prices identified in
Attachment A to this Order are approved.
ORDER NO. 29408
DONE by Order of the Idaho Public Utilities Commission at Boise, Idaho this J.
day of January 2004.
1J~\
MARSHA H. SMITH, COMMISSIONER
~~€-
NNIS S. AN , C MMISSIONER
ATTEST:
~ill
D. Jewell
Commission Secretary
vld/O:QWETO 111- ws4
ORDER NO. 29408
IDAHO ATTACHMENT A
NEGOTIATED RATES
PRICES AGREED UPON BY STAFF AND QWEST
~~~~r~~1
0 Resale Wholesale
Discount
1 Wholesale Discount Rates
Southern Idaho
1.1 Basic Exchanoe Residence Service 18.25%
Basic Exchanoe Business Service 18.25%
Toll 18.25%
Packaged/Special Services (e.g.. Centrex. Discounted
Line/Feature Packages. ISDN. PBX-Trunks. DSS & UAS.
Frame Relav Service. LAN. MeoaBit and other ACS)18.25%
Ustinos CO Features and Information Services 18.25%
Private Une 18.25%
Ooerator Services / Directorv Assistance IOSIDA 18.25%
Public Access Une PAL Service 00%
Volume Packaoed Services - Hioh-Volume Customers 65%
Northern Idaho
Basic Exchanoe Residence Service 19.37%
Basic Exchanoe Business Service 19.37%
Toll 19.37%
Packaged/Special Services (e.. Centrex. Discounted
Line/Feature Packages. ISDN. PBX-Trunks. DSS & UAS.
Frame Relay Service. LAN. MegaBit and other ACS)19.37%
Listinas CO Features and Information Services 19.37%
Private Une 19.37%
Ooerator Services / Directorv Assistance OSIDA)19.37%
Public Access Line PAll Service 00%
Volume Packaoed Services - Hioh-Volume Customers 87%
2 Customer Transfer Charce (CTCI
CTC for POTS Service
First Line (Mechanized $0.
Each Additional Une (Mechanizedl 50.
First Une (Manual $16.
Each Additional Une (Manual 52.
CTC for Private Une Transoort Services
First Circuit $38.
Additional Circui . oar Circuit Same CSR $33.
CTC for Advanced Communications Services. oar Circuit $46.
0 Interconnection
1 Entrance Facilities
DS1 $103.$208.
DS3 $524.$277.73
2 US EICT
PerDS1 $0.$0.
Per DS3 $0.$0.
3 Direct Trunked Transnort
DS1"OverO to 8 Miles 537.$1.
DS1 Over 8 to 25 Miles $37.$1.
DS1 Over 25 to 50 Miles 537.$1.
DS1 Over 50 Miles $37.$1.
DS3 Over 0 to 8 Miles 5257.19.
DS3 Over 8 to 25 Miles $260.24.
DS3 Over 25 to 50 Miles $260.26.
DS3 Over 50 Miles $259.26.
:~i1;~~;lff2JE0fiJ~'~~ii~~~~~,:0ia,
~:;., ..~.~...- "....;'
\~EI,8~(
~~'
S~~ B~~~ifdj ~j r~~l~~~~:I,j ~J,;"T'Y;l~jgFJ !,jY1~~~f~~ffJ. ~:,,;k/'~iMlI;JJtl
4 Multlolexlno
DS3 to DS1 S304.S193.
DS1 to DSO $263.5193.
5 Trunk Nonrecurrlnn Charnes
DS1 Interface First Trunk 5229.
DS1 Interface Each Additional Trunk $5.
DS3 Interface First Trunk $235.
5.4 DS3 Interface Each Additional Trunk $11.
6 Exchance Service lEAS/Local! Traffic
End Office Call Termination per Minute of Use
Tandem Switched Transoort
6..Tandem Switchino. oar Minute of Use
Docket No. QWE-T -01.
ATTACHMENT A
ORDER NO. 29408
CASE NO. QWE-01-
PAGE 1 OF 14
IDAHO ATTACHMENT A
NEGOTIATED RATES
PRICES AGREED UPON BY STAFF AND QWEST
t,.. \\'i "IiIit"."'X""
'"'-
. ~!mf~7" /!II .
:; "~, .
6..Tandem Transmission. eer Minute of Use
Over 0 to 8 Miles $0.0004564 $0.0000367
Over 8 te 25 Miles $0.0004564 $0.0000367
Over 25 to 50 Miles $0.0004564 $0.0000367
Over 50 Miles $0.0004260 50.0000144
7 Local Trafflc-FCC-ISP Rate Cans
MOU for 6 mo. June 14-Dec. 13 2001 N/A
MOU for 18 mo. Dec. 14 2001..June 132003 N/A
MOU for 36 mo. June 14 2003..June 13 2006 $0.0007
8 Miscellaneous Charaes
Exeedite Charne LIS Trunksl Qwesfs Idahe Access Service CatalDO
Cancellation Charne LIS Trunks\Qwesfs Idaho Access Service CatalDO
Additional Testinc IllS Trunks Qwesfs Idaho Access Service CatalDO
Construction Charnes ICB ICB
9 Transit Traffic
Local Transit See Tandem Switching and Tandem Transmission Rates
Above
Local Transit Assumed Mileaae 7 Miles
Intra LATA Toll See Qwesfs Idaho Access Service CatalDO
IntraLATA Toll Assumed Mileaoe 7 Miles
JoinUv Provided Swijched Access See Owesfs Idaho Access Service Catalog
Catennrv 11 Mechanized Record Charne. eer Record $0.0014877
0 Collocation
1 All Collocation
Collocation Entrance Facilitv
Standard Shared eer Fiber 55.$616.
Cross Connect eer Fiber $5.$722.
Exeress eer Cable $88.$9009.
Cable Snlicinn
Fiber. Per Set-$399.
Per Fiber Snliced $37.
1.3 -48 Volt DC Power Usaoe. ner Am"ere. "er Month
Pewer Plant Less Than 60 Am"s. "er Ame $10.
Power Plant Greater Than or Eoual to 60 Amos. oar Ame $8.
Power Usaoe Less Than or Eoual te 60 Ames. eer Ame $2.
Power Usaae Greater Than 60 Amos. eer Ame $4.
Power Reduction
Quote Pre=ration Fee $703.
Power Reduction Less Than 60 Amns $494.
Power Reduction Eoual to 60 Amns 5706.
Power Reduction Greater Than 60 Amos $895.
Power On / Off $621.
BDFB Rent $64.
AC Power Feed
AC Power Feed - "ar Am". ner Month
120V $16.
208 V Sinole Phase $27.
208 V Three Phase $48.
240 V Sinole Phase $32.
240 V Three Phase 555.
480 V Three Phase $111.
AC Power Feed - ner Foot. ner Month
20 Am" Sinole Phase $0.0084 57.
20 Arn". Three Phase 0105 59.
30 Am". Sin,,1e Phase 0091 $8.
30 Am". Three Phase 0125 11.
40 Am". SinaJe Phase 0107
40 Arno. Three Phase 0147 12.
50 Arno. Sinole Phase 0127 11.
50 Amn Three Phase 0177 15.
60 Amn Sinnle Phase 0144 12.
60 Amn Three Phase 0204 17.
100 Am" Sinale Phase 0178 15.
100 Am". Three Phase $0.0277 24.
Inseeclor Labor. oer Half Hour
Reaular Hours Rate $28.
After Hours Rate (minimum 3 hours I $37.
Docket No. QWE-T-O1-
ATTACHMENT A
ORDER NO. 29408
CASE NO. QWE-01-
PAGE 2 OF 14
IDAHO ATTACHMENT A
NEGOTIATED RATES
PRICES AGREED UPON BY STAFF AND QWEST
~'~i.I 1M"""""'
""'-"'"""",
?ii-
:.,;:~~,
~lt!,~I'i.~\&J,
~~ ~ '-- '~...,,"
Collocation Terminations
DSO
Cable Placement "er 100 Pair Block 50.2262 $208.
Cable Placement "er Termination 50.0090 $4.
Cable "er 100 Pair Block $0.3304 5304.
Cable "er Termination $0.0066 $4.
Blocks ner 100 Pair Block $0.5730 $528.42
Blocks "er Termination $0.0115 58.
Block Placement oar 100 Pair Block $0.2381 5219.
Block Placement Der Termination $0.0048 $3.
DS1
Cable Placement Der 28 DS1s $0.4111 $362.
Cable Placement Der Termination $0.0442 $38.
Cable oar 28 DS1s 50.3993 $351.
Cable DerTermination $0.0429 $37.
Panel "er 28 DS1s $0.2742 $241.
Panel Der Termination $0.0330 $29.
Panel Placement ner 28 DS1s $0.0847 $74.
Panel Placement oar Termination $0.0091 $8.
DS3
Cable Placement Der Termination $0.1521 $134.
Cable oar Termination $0.2578 $227.
Connector ner Termination $0.2625 $231.
Connector Placement ""r Termination $0.0204 $18.
OCn
oCn Terminations Der 12 Fibers $26.$1513.
oCn Additional Connector if aDDlicable $0.$411.
oCn Cable Rackina - Shared leer 12 fibers)$26.
oCn Cable Rackin!)- Dedicated $1.$1 433.
SecuritY
Per Emnlovee Per Card 50.
Card Access "er Em"lovee- "er Office $7.
Central Office SecuritY Infrastructure ICB ICB
Central Office Clock SYnchronization
SYnchronization - Cornoosite Oock. Der Port $7.
10 ScaceAvailabilitvCharoe $313.
Collocation SDace Reservation Fee The charge will be 25% of the Nonrecurring
12 Collocation S"ace ODtion Administration Fee $1107.
Collocation SDace O"tion Fee ner SDuare Foot $2.
14 Collocation Cable AuDment QPF 51 284.
2 Virtual Collocation
Quote PreDaration Fee 53146.
Eoui"ment Bav - Recurrino. ""r Shelf $4.
Bav SDace
VIrtual Scace Construction Initial Bav Provided $20.$17 749.
Each Additional Bav SDace $3.$2 854.
VIrtual Cable Rackino. Der Shelf $0.5384.
2.4 Maintenance Labor ...... Half Hour
Reaular Hours Rate 529.
After Hours Rate 539.
Trainina Labor. Der Half Hour
Reoular Hours Rate 529.
Ennineerin" Labor oar Half Hour
Reaular Hours Rate $32.
After Hours Rate $43.
Installation Labor. oar Half Hour
Reoular Hours Rate $31.
After Hours Rate $41.
Rent
Floor SDace Lease. Der SQuare Foot $2.
Rent ner Shelf $4.
--lev DC Power Cable
20A Power Feed $3985.
Docket No. QWE-T-Q1-
ATTACHMENT A
ORDER NO. 29408
CASE NO. QWE-01-
PAGE 3 OF 14
IDAHO ATTACHMENT A
NEGOTIATED RATES
PRICES AGREED UPON BY STAFF AND QWEST
~ ", ,
i~lli!~~:~
_.,~ .'" .?..~
'fi:""'"""
""'" "
,"!;i..
~~~.,
30APowerFeed $5.15 $4537.40A Power Feed $6.22 $5 480.60A Power Feed $11.02 $9706.100A Power Feed $18.58 -$16370.200A Power Feed $34.59 $30 473.300A Power Feed $54.39 $47917.400A Power Feed $77.23 $68037.
3 Caneless Phvslcal Collocation
Quote Preparation Fee. per Collocation $3146.41
Site Preparation Fee ICB
S"ace Construction
2 Bavs $23.$20 603.40
ustment for Each Additional Bav Per Bav
Ad'ustment for Sinole Bav - Channe to Standard Desinn
$3.
($3.
$2854.
---rr2 854.
DC Power Cable
20A Power Feed
30A Power Feed
40A Power Feed
60A Power Feed
100A Power Feed
200A Power Feed
300A Power Feed
400A Power Feed
$4.
$5.
$6.
$11.
$18.
$34.
$54.
$77.23
$3985.
$4 537.
$5480.
$9 706.
516370.
$30473.
$47917.
'68037.
3.4 Floor Snace lease nAr ~uare Foot $2.
4 Ca"ed Phvslcal Collocation
Quote Pre"aration Fee. Per Collocation $3185.
Site PreDaration Fee ICB
8.4.SDace Construction
Caoe - Uo to 100 So. Ft.
Caae -101 So. Ft. to 200 So. Ft.
Cane - 201 So. Ft. to 300 Sa. Ft.
Cane - 301 So. Ft. to 400 Sn. Ft.
$38.
$34.18.
$42.
$44.
$33927.
$30113.
$37154.
$38 922.
Snace Construction - Fencinn Credit
Caoe - U" to 100 So. Ft.
Caoe-101-200So. Ft
Caae - 201 - 300 So. Ft
Caoe - 301 - 400 So. Ft
$10.
$12.
$14.
$16.
$5723.
$7.135.
$8.015.
$8.851.38
DC Power Cable
20A Power Feed
30A Power Feed
40A Power Feed
60A Power Feed
100A Power Feed
200A Power Feed
300A Power Feed
400A Power Feed
$5.
$6.
$7.
$12.
$19.
$37.
$58.
$82.
$4 954.
$5457.
$6526.
$10772.
$17531.
$32 634.
$51 315.
'72 861.
8.4.Floor Snace lease nAr Snuare Foot $2.
8.4.Groundino - Caoe
#2 AWG - aer Foot
1/0 AWG - oar Foot
4/0 AWG - oer Foot
350 kcmil- per Foot
500 kcmil - per Foot
150 kcmil - ner Foot
$0.0097
$0.0170
$0.0200
$0.0258
$0.0299
$0.0456
$8.52
$14.
$17.
$22.
$26.
$40.
5 Adlacent Collocation ICB
6 Remote Collocation
Phvsical Remote Collocation
Quote Preparation Fee
Space (oer Standard Mountino Unit!
FDI Terminations (oer binder orouol
Power
Adjacent Remote Collocation (New
Adjacent Remote Collocation (Existinn\
$0.
$0.
See Collocation Rates
ICB
See Physical Remote Collocation
$1 064.
$665.
$484.
Virtual Remote Collocation
Space
FDI Terminations leer binder croup)
$0.
$0.
'665.47
$484.
Docket No. QWE-T -01-
ATTACHMENT A
ORDER NO. 29408
CASE NO. QWE-01-
PAGE 4 OF 14
IDAHO ATl'ACHMENT A
NEGOTIATED RATES
PRICES AGREED UPON BY STAFF AND QWEST
'"M~'" C
', Power ee oca nates
Flat CharGe ner Job $36.
Enoineerinn Rate ner Half Hour $35.
Maintenance. ner Half Hour $29.40Installation. Der Half Hour $29.
Trainino Der Half Hour $29.
7 CLEC-to.cLEC
Flat Charoe CDesiDn EnoineerinQ - No Cables $634.
Fiber Flat Charoe $1 229.
Cable Rackina
DSO. cer Foot.er Cable $0.11848
DS1. cer Fool rCable SO.13075
DS3. cer Foot.rCable $0.10234
Fiber. cer Foot er Fiber SO.93313
Virtual Connections (if acclicable - Connections Onlv' No Cables
DSO Coer 100 Connections $194.DS1 Icor 28 Connectionsl 591.
DS3 (oar 1 Connectionl $5.Fiber Connections - per fiber spliced $37.
7.4 Cable Hole (if Acclicable $386.
CLEC to CLEC Cross-Connection $201.
8 ICDF Collocation ICB
9 Cancellation Decommission / Transfer of Resnonslbllltv
Cancellation
Decommission No Charoe
Transfer of Resnnnsibilitv
Assessment Fee $1 036.
Network SYStems Administration Fee $1 586.
10 Microwave Entrance Facility Under
Develocment
0 Unbundled Network Elements IUNEsl
1 Interconnection Tie Pairs ITP -Per Termination
DSO $0.
DS1 $1.
DS3 $14.
9.2 Unbundled Loons
Analco Looos
Wire Voice Grade
Zone 1
Zone 2
Zane 3
Wire Unbundled Loop Grooming
Wire Voice Grade
Zone 1
Zone 2
Zone 3
9.2.4-Wire Unbundled Loop Grooming
Non-loaded L""""
wlre Non-loaded Loop
2.2.+wire Non-Ioaded Loop
Cabte Unloadlna / Bridae Tac Removal
Dinltal Ca""bte LOODS
Basic Rate ISDN / xDSL-1 Ca""ble / ADSL Com""tible Loon
Zone 1
Zone 2
Zone 3
DS1 Cacable Looc
Zone 1
Zone 2
Docket No. QWE-T.Q1-
ATTACHMENT A
ORDER NO. 29408
CASE NO. QWE-01-
PAGE 5 OF 14
IDAHO ATTACHMENT A
NEGOTIATED RATES
PRICES AGREED UPON BY STAFF AND QWEST
:-" "'~.~
1~~l,.fi.' ,i1!;s,1~li
Zone 3
DS3 Caoable Loon
Zone 1
Zone 2
Zone 3
oCn CaDable Loon
OC-
OC-
OC-48
$1 314.
$3 528.
Wire Extension Technoloov
Wire Extension Technology Unbundled Loop Grooming-
Incremental Charoe
Loop Installation Charges for 2 & 4 Wire Analog / Non - Loaded. ISDN
BRI Capable. xDSL - I Capable. and ADSL Compatible Loop where
conditioning is not required.
Basic Installation
First Lnnn
Each Additional
Basic Installation with Performance Testin'l
First LOOD
Each Additional
Coordinated Installation with Cooperative Testing / Project
Coordinated Installation
First Lnnn
Each Additional
Coordinated Installation without Cooperative Testing / Projecl
Coordinated Installation
First Loon
Each Additional
Basic Installation with CooDerative Testino
First Loon
Each Additional
DS1/ DS3/ OC-3/ OC-12/ OC-48 LOOD Installation Charaes
Basic Installation
First Loon
Each Additional
$128.
$99.
Basic Installation with Performance TestinG
First Loon
Each Additional
$279.
$212.
Coordinated Installation with Cooperative Testing / Project
Coordinated Installation
First Loon
Each Additional
$316.
$222.40
Coordinated Installation without Cooperative Testing / Projecl
Coordinated Installation
First Loon
Each Additional
1135.
1106.
Basic Installation with ::oonamtive Testina
FIrst Loon
Each Additional
$272.
$195.
Private Une to Unbundled Loon Conversions $34.
3 Sublooo
1 2-Wire Distribution Loco
Each Additional, 2-Wire Distribution Loop (applies to both analog and
norHoadedl
Zone 1
Zone 2
Zone 3
2 Intra-Buildin Cable Loco
Intra-Buildin Cable - No Disoatch First
Intra-Buildin Cable - No Disoatch Each Additional
Intra-Buildin Cable - Disoatch First
Intra-Buildina Cable - Disoatch Each Additional
DS1 Caoable Feeder Lnnn
Each Additional DS1 Canable Feeder LooD
Zone 1
Docket No. OWE-T-O1-
ATTACHMENT A
ORDER NO. 29408
CASE NO. QWE-01-
PAGE 6 OF 14
IDAHO ATTACHMENT A
NEGOTIATED RATES
PRICES AGREED UPON BY STAFF AND QWEST
~~~
-"'f 1mD1~;1'.""'
:,,, ,:"' ,
m."
"",-~~~."",:......
.t",i\\1iii
Zone 2
Zone 3
MTE Terminal SublooD Access
Sublooo MTE - POI Site Inventorv IDer reouesll
MTI= - PC I Rearranoement of Facilities
MTE - POI Construction of New SPOI
Trouble Isolation CharQe
Field Connection Point
Feasibilitv Fee / Quote Pre""ration Fee
FCP Reclassification
Construction Fee ICB
4 LIne Sharlna
Shared Looo. oer Looo
October 2 2003 thru October 1 2004 (25% of loon rate I
October 2 2004 thru October 1 2005 (25% of loon rate I
October 2 2005 thru October 1 2006 75% oflooD rate\
OSS - ner Une. Der Month
Reclassification Charge
Snliller Shelf CharDe
Snliller TIE Cable Connections
Soliller in the Common Area - Data to 410 Block $3.$2689.
Soliller in the Common Area - Data Direct to CLEC $3.$2850.
SolilleronthelDF- Data to 410 Block $0.$834.
Soliller on the IDF - Data Direct to CLEC $1.$1 623.
Snliller on the MDF - Data t0410 Block $0.$861.91
Snliller on the MDF - Data Direcl to CLEC $2.$1 922.42
EnoineerinD $1079.
5 Network Interface Device NIDI $52.
:r.
6 Unbundled Dedicated Interoffice Transnort CUDITI
DSO UDIT $241.
Over 0 to 8 Miles $24.$0.
Over 8 to 25 Miles $24.$0.
Over 25 to 50 Miles $24.$0.
Over 50 Miles $24.$0.
DS1 UDIT $284.
Over 0 to 8 Miles $36.43
Over 8 to 25 Miles $37.$3.
Over 25 to 50 Miles $39.$1.
Over 50 Miles $37.$0.
DS3 UDIT $284.
Over 0 to 8 Miles 5238.54.
Over 8 to 25 Miles $242.16.
Over 25 to 50 Miles $223.21.
Over 50 Miles $235.14.
OC-3 UDIT $295.
OV9r 0 to 8 Miles 763.36.
Over 8 to 25 Miles 763.i36.
Over 25 to 50 Miles 763.36.
Over 50 Miles 763.066.
OC-12 UDIT $295.
Over 0 to 8 Miles 2 163.72.
Over 8 to 25 Miles 2163.72.
Over 25 to 50 Miles 2163.72.
Over 50 Miles 2163.135.
OC48 UDIT $295.
Over 0 to 8 Miles 420.183.
Over 8 to 25 Miles 420.183.
Over 25 to 50 Miles 420.183,
Over 50 Miles 420.346.
UDIT DSO Low Side Channel Performance
Docket No. QWE-T-O1-
ATTACHMENT A
ORDER NO. 29408
CASE NO. QWE-01-
PAGE 7 OF 14
IDAHO ATTACHMENT A
NEGOTIATED RATES
PRICES AGREED UPON BY STAFF AND QWEST_fl"""'C'
(!~""~~.""
_!i\!1~~~~Jlli ~";.
~'\'~~
_;rti/i~&_c~iij';t
"~ . '""" . '
i~f.;:~f~A~!':~~~7 '
~~~'
.f.,,
~"
~~i1~ . ~t:~f~,.~i;f!I~;i."",,"9~1'J~ ",,;;~,,;t,
. ,;,..
~~~r~DSO Low Side Channelization $13.
DS1/ DSO MUX Low Side Channelization $7.47 $191.
UDIT Multiolexino
DS3 to DS1 $304.$1 996.
DS1 to DSO $263.$238.
Extended Unbundled Dedicated Interoffice Transport
DS1 E-UDIT $80.$339.
DS3 E-UDIT $371.5347.
OC-3 E-UDIT $819.$412.
Remote Node $476.
DS1 Remote Port $3.$198.88
DS3 Remote Port $49.$198.88
OC-12 E-UDIT $1.256.$427.
Remote Node $894.
DS1 Remote Port $12.5198.
DS3 Remote Port $33.$198.
OC-3 Remote Port $103.$198.
OC-48 E-UDIT $3.299.$413.
Remote Node 207.
DS3 Remote Port $22.$198.
OC-3 Remote Port $121.$198.
OC-12 Remote Port $479.$198.
10 UDIT Rearranoement
DSO Sinole Office $164.
DSO Dual Office $206.
UDIT HiCao Sinole Office $221.
UDIT HiCao Dual Office $249.
7 Unbundled Dark Fiber UDA
UDF-Interoffice Facilitv (lOF\ - Sinole Strand
Order Charoe oer First Strand / Route / Order $492.
Order Charoe Each Additional Strand / Same Route $255.
Termina~on Fixed oer Strand / Office / Termination $4.
Fiber TransDort. Der Mile / Strand $72.
Fiber Cross-Connect. Der Strand / Office $2.$19.
UDF-Loon Charoes - Sinole Strand
Order Charoe oer First Strand / Route / Order $492.
Order Charoe Each Additional Strand / Same Route $255.
Termination Fixed ner Strand / Office $4.
Termination Fixed ner Strand / Prem $3.
Fiber Looa. oer Route / Strand $88.
Fiber Cross-Connect. oer Strand / Office $2.$19.
Extended Unbundled Dark Fiber lE-UDF\ - Sinole Strand
Order Charoe Der First Strand / Route / Order $492.
Order Charoe Each Additional Strand / Same Route $255.
Termination Fixed ""r Strand / Office $4.
Termination Fixed ner Strand / Prem $3.
Fiber LOoo. ner Route / Strand $96.
Fiber Cross-COOnect. ner Strand / Office $2.$19.
Initial Records Inouirv IRI
SimDle 5196.
Comnlex $251.
Field Verification and Quote Prenaration FVQPI $907.
Field Verification Enoineerino Verification !:297.
UDF-IOF Charaes - Pair
Order Charoe. oar First Pair / Route / Order $492.
Order Charoe Each Additional Pair / Same Route $255.
Termination FIXed oar Pair / Office /Termination 57.
Fiber Transnnrt ...... Mile Pair !:66.
Fiber Cross-COOnect oar Pair / Office $19.
UDF-Looa Charoes - Pair
Order Charne oer First Pair / Route / Order $492.
Order Charoe Each Additional Pair / Same Route 5255.
Termination FIXed oar Pair / Office 57.
Termination Fixed car Pair / Prem 56.
Fiber Looa. car Route / Pair 5131.
Fiber Cross-Connect Per Pair / Office $3.$19.
Extended Unbundled Dark Fiber (E-UDF\ - Pair
Order Charoe ner First Pair / Route / Order $492.
Order Charoe Each Additional Pair / Same Route $255.
Docket No. QWE-T.Q1-
ATTACHMENT A
ORDER NO. 29408
CASE NO. QWE-01-
PAGE 8 OF 14
IDAHO ATTACHMENT A
NEGOTIATED RATES
PRICES AGREED UPON BY STAFF AND QWEST
i".""k" t'Jii"
~:lt~&f~~A'i11~'" ~
. "h . ,
~:~., '
Termination Fixed oer Pair Office $7.
Termination Fixed oer Pair / Prem $6.
Fiber Transom!. oer Route / Pair $131.
Fiber Cross-Connect oer Pair/Office $3.$19.
Dark Fiber Solice $602.
8 Shared Transnort Per Minute of Use
9 Unbundled Customer Controlled Rearranaement Element (UCCRE
DS1 Port ICB ICB
DS3 Port ICB ICB
Dial Un Access 1GB
Attendant Access ICB
Virtual Ports ICB
10 Local Tandem Swllchlno
10.DS1 Local Messaoe Trunk Port - Per Order
10.2 DS1 Trunk Groun First Trunk - Per Order
10.3 DS1 Trunk Grouo - Each Additional - Per Order
10.4 Per Minute of Use
11 Local Swltchlnn - TELRIC Based Rates
11.Anal"" Line Side Pnrt First
Anal"" Line Side Pnrt Each Additional
11.Dioital Une Side Port ISunnorlinn BRIISDN\ First and Each Additional $12.$205.
11.Dinital Trunk Ports
DS1 Local Messaoe Trunk Port
Messaoe Trunk Grauo. First Trunk $176.
Messane Trunk Grouo. Each Additional $37.
DS1 PRIISDN Trunk Port $198.$611.
DID / PBX Trunk Port. Der DSO $2.$213.
11.DSO Anal"" Trunk Port
First Port $14.$115.
Each Additional Port $14.$31.
11.Local Usaoe. Der Minute of Use
11.Vertical Features
11.1 Basic Features
Account Codes - Der SyStem $77.
Attendant Access Une - oar Station Une $1.
Audible Messaoe Waitina $0.
Authorization Codes - oer System $231.
Automatic Une $0.
Automatic Route Selection - Common EauiD. Der SyStem $2,015.
Call Draa $0.
Call Exclusion - Automatic $0.
Call Exclusion - Manual $0.
Call Forwarding: Busy Une/Don t Answer Programmable Svc.
Establishment $11.
CF Dont Answer/CF Busv Customer Praarammable - Der Line $0.
Cali Waitino Indication - oer TImina State $0.
Centrex Common Emlinment
CFBL - Incomino OnlY $20.
CFDA - Incomino OnlY $20.
CLASS - Continuous Redial
CLASS - Last Call Retum
CLASS - PrioritY CaRina
CLASS - Selective Call Forwardino
ClASS - Selective Call ReiAdion
Dir Sta SeVBusv Lamn Ad oer Arranaement
Directed Call PickuD with Baroe-in 13.
Directed Can PickUD without Baroe~n 13.
Distinctive Rina/Distinctive Call Waitina 27.
Excensive Route Wamlna Tooe- oer SYStem
Facility Restriction Level - oer SyStem 30.
Groun Intercom $0.
Hot Une - oer Une
Huntinn: Multinosition Hunt Queuina 29.
Huntino: Multinosition with Announcement in Queue 31.
Huntina: Multinosition with Music in Queue 28.
ISDN Short Hunt
Loudsoeaker Panino - ""r Trunk Groun $183.
Make Busv Arranoements - oar Groun $0.
Make Busv Arranoements - oar Une 50.
Messaoe Center - Der Main Station Une $0.
Messane Waitino Visual 50.
Music On Hold - Der SyStem 520.
Privacy Release 50.
Docket No. QWE-H)1-
ATTACHMENT A
ORDER NO. 29408
CASE NO. QWE-01-
PAGE 9 OF 14
IDAHO ATTACHMENT A
NEGOTIATED RATES
PRICES AGREED UPON BY STAFF AND QWEST
1~:i~1Wg~;l~'j
'P'
, ,
'f~)i,~i;~:~J'.lbi:'
Querv TIme $0.
Slation Camo-Qn Service - per Main Station $0.
TIme of Dav Control for ARS - per Svstem $95.48
Time of Dav NCOS Update $0.41
Time of Dav Routino - per Line $0.
Trunk Verification from Designated Station $0.
UCD in Hunt Groun - oer Line $0.
SMDR-P - Service Establishment Charge, Initial Installation $323.
SMDR-P - Archived Data $170.
11.2 Premium Port - Additional Charoe 53.
CMS - SYStem Establishment - Initial Installation $962.
CMS - SYStem Establishment - Subseauent Installation $481.
CMS - Packet Control Caoabilitv, oer SYStem $481.
Conference Callino - Meet Me $32.
Conference Callino - Preset $32.24'
Conference Callina - Station Dial 6-wav)$47.48
11.CLASS Call Trace, per Occurrence $1.
11.7 SubseQuent Order Charoe $12.
12 Local Switchlno - Market Based Rates
13 Customized Routlno
13.Development of Custom Une Oass Code - Directory Assistance or
Ooerator Services Routine Onlv $235.
13.2 Installation Charge, per Switch - Directory Assistance or Operator
Service Routing Only $237.
13.3 All Other Custom Routino ICB ICB
14 Common Channel Sinnallno/SS7
14.CCSAC STP Port $208.$368.
14.2 CCSAC Oetions Activation Charae
Basic Translations
First Activation, per Order $100.
Each Additional Activation, per Order $8.
CCSAC Ontions Database Translations
First Activation, oer Order $116.
Each Additional Activation, ner Order $53.
14.3 Sional Formulation ISUP, ner Call Set-Un Reouest $0.000524
14.4 Sional Transoort ISUP. oer Call Set-Un Renuest $0.000176
14.5 Sional Transoort TCAP. oar Data Reouest $0.000019
14.6 SiGnal Switchino. ISUP. oer Call Set-$0.000983
14.7 Sinnal SwitchinG. TCAP. oer Data Reouest $0.000837
15 Advanced Intellinent Network fAiNI
15.AIN Customized Services (ACSI ICB
15.2 ,AIN Platform Access APA I ICB ICB
15.3 AIN Querv Processino. ner Querv ICB
16 LIne Information Database UDBI
16.LlDB Storaoe No Charae
16.2 Une Validation Administration SYStem Access CLVAS ICB
LlDB/ICNAM Une Record Initial Load
Un to 20 000 Une Records $2601.
Over 20 000 Une Records ICB
Mechanized Service Account Unri;lte ner Addition or Uooate ICB
Individual Une Record Audit ICB
Account Grouo Audit ICB
Exnedited Reauest Charne for Manuall.lDdates ICB
16.3 LIDB Querv Service. oar Querv 50.0008230
16.4 Fraud Alert Notification. oer Alert No Cherne
17 8XX Database Querv Service
17.Basic Querv. oar Querv $0.0130355
17.2 POTS Translation 50.00000048
17 ,3 Call Handlino & Destination Feature $0.00000145
18 ICNAM Per Querv $11000768
Docket No. QWE-T-O1-
ATTACHMENT A
ORDER NO. 29408
CASE NO. QWE-01-
PAGE 10 OF 14
IDAHO
NEGOTIATED RATES
PRICES AGREED UPON BY STAFF AND QWEST
ATTACHMENT A
I'~".)",r,'~
~! -~ ~"
~'i"ifff'~' ;~'r~t:l.~;~$~:~~ 1m,
; '
~., ' j ~~jt""",,
!!';&~#,
!ti,Q;';'.'~rl,19 Construction Charaes 1GB ICB
20 Miscellaneous Charaes
. Per 1/2 hour or fraction thereof
. Additional Ennineerinn,Basic $31.
. Additional Enaineerinn - Overtime $39.
. Additional Labor Installation - Overtime $9.
. Additional Labor Installation - Premium $18.
. Additional Labor Other - Basic $27.70-
. Additional Labor Other - Overtime $36.
. Additional Labor Other - Premium $46.
. Testina and Maintenance - Basic $29.
. Testino and Maintenance - Overtime $38.
. Testina and Maintenance - Premium $49.
. Maintenance of Service - Basic $28.
. Maintenance of Service Overtime $36.
. Maintenance of Service - Premium $46.
. Additional Coooerativ9 Acceotance Testina Basic $29.
. Additional Cnnnerative Acceotance Testino - Overtime $39.
. Additional C".nnnerative Acceotance Testina Premium $49.
. NonScheduled Coo""rative Testina - Basic $29.
. NonScheduled Coonerative Testina,Overtime $39.
. NonScheduled Coonerative Testino - Premium $49.
. NonScheduled Manual Testinn - Basic $29.
. NonScheduled Manual Testina - Overtime $39.
. NonScheduled Manual Testina - Premium $49.
Additional Disoatch $87.
Date Chanoe $10.
Desian Channe $73.
Exnedile Cherne ICB
Cancellation Cherne ICB
21 Reserved for Future Use
22 UNE Combinations
22.UNE - P Une Snlittino
Basic Installation Charoe for UNE:-P Line SDlittino
22.UNE-P Conversion Non-Recurrina Charoes
UNE-P POTS, Centrex, Analoo PBX Mechanized
First $0.
Each Additional $0.
UNE-P POTS, Centrex, PAL, Analoo PBX, Manual
First $16.
Each Additional $2.
UNE-P PBX DID Trunks
First
Each Additional
UNE-P ISDN BRI
First
Each Additional
UNE-P ISDN PRI DSS ""r DS1 Facility
UNE-P ISDN PRI DSS - ner Trunk
First
Each Additional
22.UNE-P New Connection Non-Recurrina Charaes
UNE-P POTS Centrex, Analoo PBx. Mechanized
First
Each Additional
UNE-P POTS Centrex PAL Analoo PBx. Manual
FIrst
Each Additional
UNE-P PBX DID - oer Trunk
UNE-P 2B+D BRIISDN
UNE-P Trunks
DSS Basic Trunk - In Onlv Out Onlv. or Two Wav
DSS, ISDN PRI Adv. Trunk - In Only w/DID & Hunting, or
Two Way wIDID, Hunting & Answer Supervision
DSS ISDN PRI Adv. Trunk - Out Onlv w/Answer SuDervisior
UNE-P DID Trunks
UNE-P Complex Translations Digits Outpulsed Change
Sionaling
Docket No. QWE-T~1-
ATTACHMENT A
ORDER NO. 29408
CASE NO. QWE-01-
PAGE 11 OF 14
IDAHO ATTACHMENT A
NEGOTIATED RATES
PRICES AGREED UPON BY STAFF AND QWEST
""'
~-r~
- .
:~1
. """'~;;'
l'J!
UNE-P DID Comolex Translations Sionalino ChanCle
UNE-P DID Block Comnromise
UNE-P DID Grouo of 20 Numbers
UNE-P DID Reserve Seouential # Block
UNE-P DID Reserve Nonseouential TNs
UNE-P DID Nonseouential TNs
Facilities for UNE-P DSS UNE.P ISDN PRI
DS1 Loop Facility
DS3 Loop Facility
UNE-P PRI Confl"urallons
UNE-P PRI Dedicated PRI 23B + D
UNE-P PRI Dedicated PRI 24B
UNE-P PRI Dedicated PRI 23B + Back-Up D Configuration -
22.UNE-P with Owest DSL
22.UNE Combinations - LOOD MUX Combinations LMC\
22.rTP DS1/ DS3 See Section 9.
22.Loon MUX 214 Wire Analoo. First
Loon MUX 214 Wire Analoo, Each Additional
22.DS1 LoaD MUx. First
DS1 LoaD MUX Each Additional
22.5.4 Private Une to Loop MUX Conversion $34.
22.LMC DS1 to DSO Multiplexer $263.$193.
LMC DS3 to DS1 Multiplexer $304.$193.
22.DS1/DSO Low Side Channelization
22.Enhanced Extended Loon (EEL
22.EEL LInk
EEL DSO 2-Wire Analoo. First
EEL DSO 2-Wire Each Additional
EEL DSO 4-Wire Analoo, First
EEL DSO 4-Wire Each Additional
EEL DS1
EEL DS1 Each Additional
EEL DS3
EEL DS3 Each Additional
EEL OC-3 OC-12 and OC-48
22.Private Line to EEL-Conversion $34.
f1f h,'?;J~11l;
::-
~~t'3::;:~;):~~i~0'~l0r~'iN~r1:j:(iI1Hi;e\;~~~~~1~fJ;~i!jli1~,
;;;
j. riff~~~ir;:.~:\,:, q r i:fT~2TI1RiIy~1 k;'~;~~t~;~J 2ji?~iiJ. ~~F)'~ ~V~r~ri,
22.EEL Trans
DSO
DS1
DS3
OC-3
OC-12
OC-48
Docket No. QWE-T'()1-
ATTACHMENT A
ORDER NO. 29408
CASE NO. QWE-01-
PAGE 12 OF 14
IDAHO ATTACHMENT A
NEGOTIATED RATES
PRICES AGREED UPON BY STAFF AND QWEST
_..~~j
22.EEL Multiolexino
DS1 to DSO $263.
DS3 to DS1 $304.
22.EEL DSO Channel Performance
DSO Low Side Channelization
DS1IDSO MUX, Low Side Channelization
22.Concentration Canabilitv
Unbundled Packet Swltchlna
23.Unbundled Packet Switch Customer Channel
DSLAM and Solitter\ Functionalitv
Virtual Transoort
23.2 Customer Channel Shared Distribution Sublooo
23.3 Unbundled Packet Switch Interface Port
DS1
DS3
LooD SDllttlna
24.Interconnection TIE Pairs CITP
24.2 OSS Charoes
24.3 Basic Installation Charne for Looo Solittina
24.4 Trouble Isolation Charne
24.5 Additional Testino
24.6 POTS Solitter Collocation'
Reclassification Charae
Enaineerina
24.7 Solitter TIE Cable Connections
Snlitter in the Common Area - Data to 410 Block
Snlitter in the Common Area - Data Direct to CLEC
Snlitteron the IDF - Data t0410 Block
Snlitter on the IDF - Data Direct to CLEC
Snlitter on the MDF - Data to 410 Block
Snlitter on the MDF - Data Direct to CLEC
10.0 Ancillarv Services
10.1 Local Number PortabIlItY
10.LNP Queries See FCC Tariff #1 Section 20.1 & 20.
10.2 LNP Manaoed Cuts
Standard Menaned Cuts. oer Person. oer 1/2 Hour $26.
Overtime Manaoed Cuts ""r Person oer 1/2 Hour $34.
Premium Menaned Cuts ner Person ner 1/2 Hour $42.
10.2 911/E911 No Charae
10.3 White Paaes Dlrectorv Llstlnas Facllltv Based Providers
10.Primarv Ustino No Charae
10.2 PremiumlPrivacy Ustings General Exchange Tariff Rate, less wholesale discount
10.4 Dlrectorv, Assistance Facllltv Based Providers
10.4.Local Directorv Assistance Per Call $0.
10.2 National Directorv Assistance ner Call $0.
10.3 Call Brandina. Set- Uo and Recordino $35 000.
10.4 Loadino Brand Per Brand $500.
10.5 Call Comoletion Unk, oar Call SO.0893
10.5 Dlrectorv Assistance LIst Information
10.Initial Database Load ner Listinn $0.025
10.2 Reload of Database ner Listino $0.020
10.3 Dailv Undates, ner Listinn $0.025
10.4 One-time Set-Un Fee (ner hour 573.
10.5 Media Charaes for File Deliverv
Electronic Transmission 50.0020
Tapes (charges only apply if this is selected as the normal
deliverv medium for dailv uodates) (oer taoel $30.
Shiooino Charaes (for taoe deliverv)ICB
10.6 Toll and Assistance Onerator Services Facllltv Based Providers
Docket No. QWE-T -01-
ATTACHMENT A
ORDER NO. 29408
CASE NO. QWE-01-
PAGE 13 OF 14
IDAHO ATTACHMENT A
NEGOTIATED RATES
PRICES AGREED UPON BY STAFF AND QWEST
tJ'
.:..,-:'-' '.."",,
1f;
10.1 O"tlon A - Per Messaoe
Ooerator Handled Callino Card $1.
Machine Handled Callino Card $0.
Station Call 51.
Person Call $3.
Connect to Directorv Assistance $0.
Busv Une VerilY ner Call $0.
Bus" Line IntelTUnt $0.
Onerator Assistance ner Call $0.
10.2 Ontlon B - Per Onerator Work Second and Comnuter Handled Calls
Onerator Handled, oar Onerator Work Second $0.0280
Machine Handled. oar Call $0.2500
Call Brandin Set-Un & Recordinn $10500.
Loadinn Brand. oer Brand $800.
10.7 Access to Poles Ducts Conduits and Rlnhts of Wav
10.Pole Inouirv Fee, per Inauirv
10.2 Innerduct Innuirv Fee. per Inouirv
10.3 ROW IMUirli Fee, per Inouirv
10.4 ROW Document Prenaration Fee
10.5 Field Verification Fee ner Pole
10.6 Field Verification Fee, ner Manhole
10.7 Planner Verification, ner Manhole
10.8 Manhole Verification Insoector. oar Manhole
10.9 Manhole Make-Readv Insoactor, ner Manhole
10.1C Transfer of Resoonsibilitv
10.11 Pole Attachment Fee. oar Fool per Year $2.
Urban
2003
2004
2005
Non-Urban
2003
2004
2005
10.1:; Innerduct Occupancy Fee. oer Foot. oer Year $0.
10.12 Access Anreement Consideration ~10.
10.14 Make Readv ICB
12.0 Oneratlonal SUDDort Svstems
12.1 Develooment and Enhancements. oer Order $5.
12.2 Onnolnn Maintenance. ner Order $1.40
12.3 Dallv Usane Record File. ner Record $0.000419
12.4 Trouble Isolation Charaes See Misc.
17.0 Bona Fide Renuest Process
17.1 Processlnn Fee $1851.
NOTES:
Rates found in FCC Tariff #1.
The preliminary engineering and planning costs are included in the caged and cageless space construction charges. These engineering and planning charges are
also included in ihe caged and cageless quote preparation fees. Upon completion of the collocation construction. whichever quote preparation fee (QPF) has been
applied will serve as a credit against the final space construction charge for the collocation Job.
ICB - Individual Case Basis pricing.
All technically feasible Vertical Switch Features are available with compatible unbundled switch ports.
No monthly recurring charge applies for Basic Vertical Switch Features because the cost of those features are included in the cost of the switch port. Only Basic
Vertical Switch Features with nonrecurring charges are listed in the SGA T Exhibit A. Nonrecurring charges are applicable whenever a feature is added - whether on
new installation, conversion, or change order activity. Vertical Switch Features notlisted have no incremental nonrecurring charge associated with them.
The Premium Port monthly recurring charge applies in addition to the Analog or Digital Une Side Port recurring charges when Premium Features are ordered with
analog or digital ports.
The State of Idaho has retained oversight of these rates. These rates are not under the jurisdiction of the FCC.
Docket No. QWE.T~1-
ATTACHMENT A
ORDER NO. 29408
CASE NO. QWE-01-
PAGE 14 OF 14