HomeMy WebLinkAbout20031205Million Exhibits.pdfMary S. Hobson , 1SB #2142
Stoel Rives LLP
101 S. Capitol Blvd., Suite 1900
Boise , 1D 83702 - 5958Telephone: (208) 389-9000Facsimile: (208) 389-9040
mshobson~stoel. com
Adam L. Sherr (WSBA #25291)
Qwest
1600 7th Avenue - Room 3206
Seattle, WA 98191Telephone: (206) 398-2507Facsimile: (206) 343-4040
asherr~qwest . com
Attorneys for Qwest Corporation
BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
IN THE MATTER OF DETERMINING PRICES
FOR UNBUNDLED NETWORK ELEMENTS (UNEs)
IN QWEST CORPORATION'S STATEMENT OF
GENERALLY AVAILABLE TERMS (SGAT)
CASE NO.
QWE-01-
EXHIBITS OF
Teresa K. Million
QWEST CORPORATION
November 12, 2003
Boise-I64098.1 0029164-00072
INDEX OF EXHIBITS
The following Exhibits are provided in CD format:
DESCRIPTION
Idaho Summary of Costs
Integrated Cost Model (ICM) (Study #7463)
EXHIBIT
No.
No.
Enhanced Nonrecurring Cost Study (ENRC) (Study #7461) No.
Hi-Cap LoopsjDS1 Feeder (Study #7469)
Subloop Distribution , Building Cable (Study #7470)
Dark Fiber (Study #7473)
Pole and Conduit At tachment
Direct CLEC to CLEC Interconnection (Study #7477)
Low Side Channel Performance (Study #7471)
Interconnection CLEC Service (ICNAM) (Study #7457)
CLASS Call Trace (Study #7449)
Unbundled Packet Switching (Study #7459)
OSS Development & Enhancements (Study #7451)
OSS Ongoing Operations (Study #7455)
Line Sharing -Collocation (Study #7485)
Line Sharing - OSS (Study #7453)
Collocation (Study #7465)
Space Availability Report (Study #7479)
Space Optioning (Study #7493)
OCn Terminations (Study #7489)
Cable Augment QPF (Study #7475)
Remote Terminal Collocation (Study #7483)
Power Reduction (Study #7487)
Transfer of Responsibility (Study #7481)
No.
No.
No.
No.
No.
No.
No. 10
No. 11
No. 12
No. 13
No. 14
No. 15
No. 16
No. 17
No. 18
No. 19
No. 20
No. 21
No. 22
No. 23
No. 24
CERTIFICATE OF SERVICE
I hereby certify that on this lth day of November, 2003, I served the DIRECT TESTIMONY
OF TERESA K. MILLION as follows:
Jean Jewell, Secretary
Idaho Public Utilities Commission
472 West Washington Street
O. Box 83720
Boise, ill 83720-0074
Phone: (208) 334-0300
Fax: (208) 334-3762
11 ewell~puc.state.id. us
Weldon Stutzman, Deputy Attorney General
Idaho Public Utilities Commission
472 West Washington Street
O. Box 83720
Boise, ill 83720-0074
Phone: (208) 334-0300
Fax: (208) 334-3762
wstutzm~puc.state.id.
A vista Communications of Idaho
422 West Riverside - Suite 100-Skywalk
Spokane, W A 99201
David Harmon
Mary B. Tribby
AT&T Law Department
1875 Lawrence Street - Suite 1401
Denver, CO 80202
Telephone: (303) 298-6494
Facsimile: (303) 298-6301
dsharmon~att.com
Ray Hendershot
GVNW Inc. / Management
O. Box 25969
Colorado Springs, CO 80936
Boise-164098.1 0029164-00072
--.2L. Hand Delivery
U. S. Mail
Overnight Delivery
Facsimile
Email
--.2L. Hand Delivery
U. S. Mail
Overnight Delivery
Facsimile
Email
Hand Delivery
--.2L. U. S. Mail
Overnight Delivery
Facsimile
Email
Hand Delivery
--.2L. U. S. Mail
Overnight Delivery
Facsimile
Email
Hand Delivery
--.2L. U. S. Mail
Overnight Delivery
Facsimile
Email
Molly O'Leary
Richardson & O'Leary
99 East State Street - Suite 200
O. Box 1849
Eagle, ill 83616
Telephone: (208) 938-7902
Facsimile: (208) 938-7904
mo 11 y(q),richardsonandolearv .com
Morgan W. Richards
Moffatt Thomas et al.
101 South Capitol Boulevard - 10th Floor
O. Box 829
Boise, ill 83701-0829
Lisa K. Strom
Davis Wright Tremaine
1300 SW 5th Avenue - Suite 2300
Portland, OR 97201
Telephone: (503) 241-2300
Facsimile: (503) 778-5299
Lance Tade, Director
Electric Lightwave, Inc.
4 Triad Center - Suite 200
Salt Lake City, UT 84180
Conley E. Ward
Givens Pursley LLP
277 North 6th Street - Suite 200
O. Box 2720
Boise, ill 83701
Telephone: (208) 388-1200
Facsimile: (208) 388-1300
cew~givenspursley .com
Boise-164098.1oo29164-00072
Hand Delivery
U. S. Mail
Overnight Delivery
Facsimile
Email
Hand Delivery
--.2L. U. S. Mail
Overnight Delivery
Facsimile
Email
Hand Delivery
U. S. Mail
Overnight Delivery
Facsimile
Email
Hand Delivery
--.2L. U. S. Mail
Overnight Delivery
Facsimile
Email
Hand Delivery
--.2L. U. S. Mail
Overnight Delivery
Facsimile
Email
~;/~
Brandi L. Gearhart, PLS
Legal Secretary to Mary S. Hobson
Stoel Rives LLP
IDAHO
SUMMARY OF COSTS
ECONOMIC LIVES; 11.18% COST OF MONEY0 Resale Wholesale
Discount
1 Wholesale Discount Rates
Southern Idaho
Basic Exchanne Residence Service 44%
Basic Exchanne Business Service 30%
Toll 14.88%
Packaged/Special Services (e.. Centrex, Discounted 68%
Une/Feature Packages, ISDN, PBX-Trunks, DSS & UAS.
Frame Relav Service. LAN. MeoaBit and other ACS\
Ustinas CO Features and Infonnation Services 32.85%
Private Une 84%
Ooerator Services / Directorv Assistance OS/DA \11.16%
Public Access Une PAll Service 00%
Volume Packaoed Services - Hiah-Volume Customers 65%
Northern Idaho
Basic Exchanae Residence Service 11%
Basic Exchanae Business Service 08%
Toll 21.32%
2.4 Packaged/Special Services (e.. Centrex, Discounted 90%
Une/Feature Packages. ISDN, PBX-Trunks, DSS & UAS
Frame Relay Service. LAN. MegaBit and other ACS)
Ustinos. CO Features and Information Services 38.13%
Private Une 87%
Ooerator Services / Directorv Assistance (OS/DA\10.98%
Public Access Une (PAll Service 00%
Volume Packaaed Services - Hinh-Volume Customers 87%
2 Customer Transfer Charae (CTC
CTC for POTS Service
First Une (Mechanized\~0.7461
Each Additional Une (Mechanized\$0.7461
First Une (Manuan ~16.7461
Each Additional Une Manual $2.7461
CTC for Private Une Transnnrt Services
First Circun $33.7461
Additional Circun oar Circuit Same CSR $33.7461
CTC for Advanced Communications Services, aer Circuit $51.7461
0 Interconnection
1 Entrance Facilities
DS1 $103.~208.7463/7461
DS3 $524.$277.73 7463/7461
2 LIS EICT
PerDS1 $0.~O.
Per DS3 $0.$0.
3 Direct Trunked Transnort
DS1 Over 0 t08 Miles 63.10.7463
DS1 Over 8 to 25 Miles 63.!10.7463
DS1 Over 25 to 50 Miles 63.10.7463
DS1 Over 50 Miles 56.7463
DS3 Over 0 to 8 Miles 95.114.7463
DS3 Over 8 to 25 Miles 95.114.7463
DS3 Over 25 to 50 Miles 95.! 114.7463
DS3 Over 50 Miles 28.16.7463
Multlnlexlno
DS3 to DS1 S342.$189.7463/7461
DS1 to DSO $297.'189.7463/7461
5 Trunk Nonrecurrlna Charoes
DS1 Interface First Trunk t229.40 7461
DS1 Interface Each Additional Trunk $..0;7461
DS3 Interface First Trunk $235.7461
DS3 Interface Each Additional Trunk $11.78 7461
6 Exchanoe Service IEAS/Local\ Traffic
End Office Call Termination, OAr Minute of Use $0.001555 7463
Tandem Switched Transnnrt
6..Tandem Switchina. oar Minute of Use $0.002420 7463
Exhibit No.
Case No. QWE-ToU1-
Teresa K. Million. Owest Corporation
1 of 14
IDAHO
SUMMARY OF COSTS
ECONOMIC LIVES; 11.18% COST OF MONEY
m~J~j);~it_'~~?~~J~; i n ~~%
~~~~j
1i~yJ;;i1~j!ii1~liIII. Iii 1~~~Willr': ~a~;;;'~d "~)~~11 ~H~ ~1:t1~~WJ i ~iiflE;f~~&$tm . f Z!' :s
,;~;~
!fJ1~~!;~i~~I~E~Rt~ ~~l '_C,~~~12f~iI~'~I~~1~~iflmll t"lf~1I,,j ~~i ~i ~1~1~1 ~?~~jjJf?tYJ81ift.1. ~li~~~~ iJ . k ;' i\R~~
6..Tandem Transmission. oar Minute of Use
OverOto 8 Miles 0005125 0000424 7463
Over 8 to 25 Miles 0005125 0000424 7463
Over 25 to 50 Miles 0005125 0000424 7463
Over 50 Miles 0004784 0000168 7463
7 Local Trafflc.fCC-ISP Rate Cans
MOU for 6 mo. June 14-Dec. 132001 N/A
MOU for 18 mo. Dec. 14 2001-June 13 2003 N/A
MOU for 36 mo. June 14 2003-June 13 2006 50.0007
8 Mlscellanoous Charaes
Exoedne Charae LIS Trunks)Qwesfs Idaho Access Service Catalan
Cancellation Charae (LIS Trunks Qwesfs Idaho Access Service Catalan
Additional Testino (LIS Trunks\Owesfs Idaho Access Service Catalan
Construction Charoes ICB ICB
9 Transit Traffic
Local Transn See Tandem Switching and Tandem Transmission Rates
Above
Local Transit Assumed Mileaae 7 Miles
IntraLATA Toll See Owesfs Idaho Access Service CatalDO
Intra LATA Toll Assumed Mileaoe 7 Miles
Jointiv Provided Swnched Access See Qwesfs Idaho Access Service Cataloo
Cate!lDrv 11 Mechanized Record Charoe. oar Record $0.0014877 7463
0 Collocation
1 All Collocation
Collocation Entrance Facilnv
Standard Shared oar Fiber $6.$603.7465
Cross Connect Der Fiber $6.S707.7465
Exoress Der Cable $105.$8819.7465
Cable Snlicina
Fiber - Per Set-$462.7465
Per Fiber Soliced $35.7465
-48 Volt DC Power Usa!le. oar Amoare. oar Month
Power Plant Less Than 60 AmDs. Der AmD $12.7465
Power Plant Greater Than or E!lual to 60 Amos. oar AmD $9.7465
Power Usaae Less Than or Equal to 60 Amns. oar Ama $2.7465
Power Usaae Greater Than 60 Amos. oar Ama $4.7465
1.4 Power Reduction
Quote Prenaration Fee $703.7487
Power Reduction Less Than 60 Amos S494.7487
Power Reduction Equal to 60 Amos $706.7487
Power Reduction Greater Than 60 AmDs S895.7487
Power On / Off $621.7487
BDFB Rent $64.7487
AC Power Feed
AC Power Feed - oar AmD. D9I" Month
120V 18.7465
208 V Sinale Phase 7465
208 V Three Phase 56.7465
240 V Sinole Phase 7465
240 V Three Phase 65.7465
480 V Three Phase 131.7465
AC Power Feed - ""r Fool oar Month
20 Ama. Sinale Phase 0084 7465
20 Amo. Three Phase 0105 7465
3OAm Sinole Phase 0091 58.02 7465
3OAm Three Phase 0125 11.7465
40Am Sinale Phase 0107 7465
40Am Three Phase 0147 12.7465
50 Amc Sin!lle Phase 0127 11.7465
50 Amn Three Phase 0177 15.7465
60 Amn. Sinale Phase 0144 12.7465
60 Amo. Three Phase 0204 17.7465
100 Amo. Sinole Phase 0178 15.7465
100 Amo. Three Phase 0277 24.7465
Insnector Labor ner Half Hour
Reaular Hours Rate 531.7465
After Hours Rate (minimum 3 hours 541.7465
Exhibit No.
Case No. QWE-T -01-
Teresa K. Million, Owest Corporation
2 of 14
IDAHO
SUMMARY OF COSTS
ECONOMIC LIVES; 11.18%COST OF MONEY
1.7 Collocation Terminations
DSO
Cable Placement MAr 100 Pair Block SO.2262 S208.7465
Cable Placement oar Termination SO.OO90 Te.7465
Cable oar 100 Pair Block $0.3304 $304.7465
Cable oar Termination SO.0066 ~6.7465
Blocks Mer 100 Pair Block $0.5730 ~528.42 7465
Blocks nAr Termination SO.0115 ~10.7465
Block Placement nAr 100 Pair Block $0.2381 ~219.7465
Block Placement nAr Termination $0.0048 7465
DS1
Cable Placement oar 28 DS1s SO.4111 $362.7465
Cable PlacemeniD8r Termination SO.O442 $38.7465
Cable oer 28 DS1s $0.3993 ~351.7465
Cable nAr Termination 0429 ~37.7465
Panel Mer 28 DS1s 2742 $241.7465
Panel nAr Termination 0330 S29.7465
Panel Placement MAr 28 DS1s 0847 S74.7465
Panel Placement nAr Termination 0091 58.02 7465
DS3
Cable Placement ""r Termination 1521 $134.7465
Cable nAr Termination 2578 $227.7465
Connector MAr Termination 2625 $231.7465
Connector Placement nAr Termination 0204 S18.7465
7.4 oCn
oCn Tenminations ""r 12 Fibers S26.~1 513.7489
oCn Additional Connector lif annlicable\$0.47 $411.7489
oCn Cable Rackina - Shared laer 12 fibers)$26.7489
oCn Cable Rackina - Dedicated $1.$1 433.7489
SecuritY
Per Emolovee Per Card $0.7465
Card Access oar Emnlo';-ee ""r Office $7.7465
Central Office Securitv Infrastructure ICB ICB
Central Office Clock Svnchronization
Svnchronization - Com"""ne Clock, aer Port $8.7465
10 Saace Availabilitv Charae $337.7479
11 Collocation Soace Reservation Fee The charge will be 25% of the Nonrecurring
12 Collocation S""ce Ontion Administration Fee ~1 107.7493
13 Collocation S""ce Ontion Fee nAr Snuare Foot $2.
14 ColiocationCableAuamentQPF ~1 375.7475
8.2 Virtual Collocation
Quote Prenaration Fee $4 195.7465
Enuinment Bav - Recurrinn ner Shelf $4.7465
Bav Soace
VirtualSDace Construction Initial Bav Provided S20.$17 749.7465
Each Additional Bav S""ce $3.$2854.7465
Virtual Cable Rackinn nAr Shelf $0.$.'VI4 7465
Maintenance labor nAr Half Hour
Reaular Hours Rate ~29.7465
After Hours Rate $"'9.7465
Traininn labor nAI' Half Hour
RAnular Hours Rate $29.7465
Enalneerina labor nAI' Half Hour
Reaular Hours Rate $32.7465
After Hours Rate $4"'7465
Installation labor ".;,: Half Hour
RAnular Hours Rate $31.7465
After Hours Rate $41.7465
Rent
Floor Snace Lease:DerSOuare Foot S3.7465
Rent nAI' Shelf $4.7465
-48V DC Power Cable
20A Power Feed S3985.41 7465
Exhibn No.
Case No. QWE-HJ1-
Teresa K. Million. Owest Corporation
30f14
IDAHO
SUMMARY OF COSTS
ECONOMIC LIVES; 11.18% COST OF MONEY
40A Power Feed $6.~5 480.7465
60A Power Feed $11.$9 706.7465
100A Power Feed $18.16370.7465
200A Power Feed $34.30 473.7465
300A Power Feed $54.7917.7465
400A Power Feed $77.23 68037.7465
3 Caneless Phvslcal Collocation
Quote PreDaration Fee. per Collocation $4 195.7465
Site Preoaration Fee ICB
S""ce Construction
2 Ba""$23.$20 603.7465
Ad'ustrnent for Each Additional Bav Per Bav $3.~2 854.7465
Ad'ustment for Sinale Bav - ChanGe to Standard Desinn 1$3.1$2.854.7465
DC Power Cable
20A Power Feed $3985.7465
30A Power Feed $5.$4537.7465
40A Power Feed $5480.7465
60A Power Feed 11.$9 706.7465
100A Power Feed 18.$16370.7465
200A Power Feed 34.~~O 473.7465
300A Power Feed 54.$47917.7465
400A Power Feed 77.$68037.7465
3.4 Floor Snace Lease. oer Souare Foot 53.7465
4 Caned Phvslcal Collocation
Quote PrEiDaration Fee. Per Collocation $4 592.7465
Sne Prenaration Fee ICB
8.4.Snace Construction
Cane - Unto 100 So. Ft.$38.51 . ~~3 927.7465
Cane - 101 Sa. Ft. to 200 SO. Ft.$34.$30113.7465
Cane - 201 !';no Ft. to 300 So. Ft.$42.$37154.7465
Cane - 301 Sa. Ft. to 400 So. Ft.$44.$38922.7465
Snace Construction - Fencina Credit
Cane - Un to 100 OIl. Ft.$5.$5.103.7465
Cane - 101 - 200 . Ft $7.$6362.7465
Cane - 201 - 300 . Ft $8.$7 146.7465
Cane - 301 - 400 )a. Ft $8.$7 892.7465
DC Power Cable
20A Power Feed $5.$4 954.7465
30A Power Feed 56.Ts 457.7465
40A Power Feed $7.$6 526.7465
60A Power Feed 512.'f.10 772.7465
100A Power Feed $19.$17531.7465
200A Power Feed 537.$32634.7465
300A Power Feed $58.~~1 315.7465
400A Power Feed 582.$72 861.7465
4.4 Floor Snace Lease. Der Souare Foot $3.7465
Groundinn - Caoe
#2 AWG - Mr Foot 0097
$/\
7465
1/0 AWG - oar Foot 0170 14.7465
4/0 AWG - oar Foot 0200 17.7465
350 kcmil - oar Foot 0258 22.7465
500 kcmil- oar Foot 0299 26.7465
750 kcmil - oar Foot 0456 7465
5 Adlacent Collocation ICB
6 Remote Collocation
Ph""ical Remote Collocation
Quote Pre""ration Fee $1 064.7483
S""ce I"", Standard Mountino Unil\SO.'f.665.7483
FDI Terminations leer binder arounl SO.'tAIIA 7483
Power See Collocation Rates
Ad;~cent Remote Collocation New!ICB
Adi~cent Remote Collocation Existina\See Physical Remote Collocation
Virtual Remote Collocation
Snace 50.'f.665.7483
FDI Terminations loer binder arouD\$0.$484.7483
Exhibil No.
Case No. QWE-T-O1-
Teresa K. Million. Owes! Corporation
4 of 14
IDAHO
SUMMARY OF COSTS
ECONOMIC LIVES; 11.18%COST OF MONEY
' power
" --"" .' ;~:
ee tion Rates
Flat CharGe Mer Job $37.7483
Ennineerinn Rate ner Half Hour ~33.7483
Maintenance. ner Half Hour $30.7483
Installation, oar Half Hour $30.7483
Trainina. ner Half Hour $30.7483
7 CLEC-Io.(;LEC
Flat Charae lDesian Ellnineerinn - No Cables)~634.7477
Fiber Flat Charne ~1 229.7477
Cable Rackina
DSO, ner Foot ner Cable $0.11848 7477
DS1. oar Foo~ oer Cable ~0.13075 7477
DS3. oar Foot. oer Cable ~0.10234 7477
Fiber. oer Foot oar Fiber ~0.93745 7477
Virtual Connections lif annlicable Connections Onlv: No Cables
DSO IrlAr 100 Connections!~194.7477
DS1 laer 28 Connections $91.7477
DS3 Iner 1 Connection!$5.7477
Fiber Connections - per fiber spliced See$35.Section 8.
7.4 Cable Hole lif ADolicablel t.u5.7477
CLEC to CLEC Cross-Connection ~201.7461
8 ICDF Collocation ICB
9 Cancellation Decommission Transfer of Resnonslbllltv
Cancellation QPF - Prorated jot
costs
DecommissIon No Charne
Transfer of Resnnnsibilm.
Assessment Fee ~1 036.07481
Network S""tems Administration Fee $1 586.7481
10 Microwave Entrance Facility Under
Develonment
0 Unbundled Network Elements tUNEs
1 Interconnection Tie Pairs 'lTp!- Per Termination
DSO $0.49 7465
DS1 $1.7465
DS3 $16.7465
2 Unbundled Loons
Analoo Looos
Wire Voice Grade
Zone 1 $21.7463
Zone 2 $34.7463
Zone 3 $59.7463
Wlre Unbundled Loon Groomina $2.7463
4-Wire Voice Grade
Zone 1 $43.7463
Zone 2 $69.7463
Zone 3 $118.7463
4-Wire Unbundled Lnnn Groomino ~5.7463
Non-loaded Loons
wire Non-loaded Loop See Section
4-w1re Non-loaded Loop See Section
Cable Unloadina / Bridae Tan Removal ~633.7461
Diaital Canable Lnnns
Basic Rate ISDN / xDSL-1 Ca""ble ADSL Comnatible Looo
Zone 1 $21.7463
Zone 2 $34.7463
Zone 3 $59.7463
DS1 CaDable LOOD
Zone 1 $115.7469
Zone 2 $119.7469
Exhibn No.
Case No, QWE-T~1-
Teresa K. Million. awes! Corporation
5 of 14
IDAHO
SUMMARY OF COSTS
ECONOMIC LIVES; 11.18"/0 COST OF MONEY
I' .
S126.
,..
Zone 3 7469
DS3 Caeable LooD
Zone 1 SB07.7469
Zone 2 $1058.7469
Zone 3 $1 369.7469
oCn Canable Loon
OC-3 $924.7469
OC-12 $1 370.7469
OC-48 S4 045.7469
Wire Extension Technol.v.v $5.7463
Wire Extension Technology Unbundled Loop Grooming -
Incremental CharGe $0.7463
Loop Installation Charges for 2 & 4 Wire Analog / Non - Loaded, ISDN
BRI Capable. xDSL - I Capable. and ADSL Compatible Loop where
conditioning is not required.
Basic Installation
First LoOo S84.7461
Each Additional $10.7461
Basic Installation wnh Performance Testina
First Lnnn ~190.7461
Each Additional ~133.7461
Coordinated Installation with Cooperative Testing Project
Coordinated Installation
First I nnn -:~231.7461
Each Additional ~133.7461
Coordinated Installation without Cooperative Testing / Projecl
Coordinated Installation
First Looo S91.7461
Each Additional Tn.57 7461
Basic Installation wnh C'.nonerative Testina
First Loon ~190.7461
Each Additional ~133.7461
DS1/ DS3/ OC-3/ OC-12/ OC-48 Looa Installation Charaes
Basic Installation
First Looo $161.7461
Each Additional $111.7461
Basic Installation with Performance Testina
First Loon ~297.7461
Each Additional S204.7461
Coordinated Installation with Cooperative Testing Project
Coordinated Installation
First Lnnn ~338.7461
Each Additional ~204.7461
Coordinated Installation without Cooperative Testing / Projecl
Coordinated Installation
First Lnnn ~170.7461
Each Additional ~120.7461
Basic Installation wnh Coooerative Testina
First Lnnn S297.7461
Each Additional S2O4.7461
Private Une to Unbundled Lnnn Conversions ~36.7461
3 Subloon
Wire Distribution Lnnn S107.7461
Each Additional 2-Wire Distribution Loop (applies to both analog and
non-loaded\$29.7461
Zone 1 S13.7470
Zone 2 $22.7470
Zone 3 $27.7470
Intra-Buildina Cable Looo 7470
Intra-Buildina Cable - No Disruotch First S51.7461
Intra-Buildino Cable - No DiSOatch Each Additional S21.7461
Intra-Buildinn Cable - Disnatch First $98.7461
Intra-BuildinG Cable - Disnatch Each Additional ~31.7461
DS1 Caruoble Feeder Loon ~310.7461
Each Additional DS1 CaDable Feeder Looe S221.7461
Zone 1 $99.7469
Exhibit No.
Case No. OWE-T-O1-
Teresa K. Million. Owest Corporation
6 of 14
IDAHO
SUMMARY OF COSTS
ECONOMIC LIVES; 11.18% COST OF MONEY
F3,~ ~~~8ii,~~K~i~~~:Ij~ 11~~.&filf~~;:BJDtJ~~~fJ i ~;~f:lif~~j!H,f~llij m:ih_;~J ~'ill; ~,I! I?~\i;~iftJ~ . ~!tT
:,
Jl~i;~~i;~m f~II
Zone 3 $110.7469
3.4 MTE Terminal Sublooo Access
Sublooo MTE - POI Sne Inventorv (oer reauest\~110.7461
MTE - POI Rearranoement of Facilities 1GB
MTE - POI Construction of New SPOI ICB
Trouble Isolation Charge See Misc.
Charaes
Field Connection Point
Feasibilitv Fee / Quote Preoaration Fee ~1 197.7461
FCP Reclassification td63.7461
Construction Fee 1GB
4 LIne Sharlna
Shared Looo. Der Looo ~33.7461
October 2 2003 thru October 1 2004 125% of 1000 rate \$7.
October 2 2004 thru October 1 2005 125% of Innn rate ~14.
October 2 2005 thru October 1 2006 75% of loon rate ~21.
OSS - oar Une. Der Month 7453
Reclassification CharGe ICB
9.4.4 Salitter Shelf Charae $4.~503.7485
Solilter TIE Cable Connections
Salilter in the Common Area - Data to 410 Block S2 689.7485
Salitter in the Common Area - Data Direct to CLEC S2850.7485
Salilter on the IDF - Data to 410 Block $834.7485
Solitter on the IDF - Data Direct to CLEC ~1 623.7485
Salitter on the MDF - Data to 410 Block ~861.7485
SDlItter on the MDF - Data Direct to CLEC $2.$1 922.7485
Enaineerina S1321.7485
5 Network Interface Device NIDI T71.7461
Zone 2 10347 7469
iJ~f~~Ii'l~lfil~llitIiljf~~~
~~~~.~~'
.~fill~
~~
~~~~~~~~jLJ ~~-(~~I;iJ
6 Unbundled Dedicated Interoffice TransDort IUDJTI
DSO UDIT $253.46 7461
Over 0 to 8 Miles $39.$0.7463
Over 8 to 25 Miles S39.$0.46 7463
Over 25 to 50 Miles $39.Te.46 7463
Over 50 Miles $39.$0.7463
DS1 UDIT $295.7461
Over 0 to 8 Miles $63.~10.7463
Over 8 to 25 Miles $63.46 $10.7463
Over 25 to 50 Miles S63.$10.7463
Over 50 Miles $56.$2.7463
DS3 UDIT $295.7461
Over 0 to 8 Miles ~395.$114.7463
Over 8to 25 Miles $395.$114.7463
Over 25 to 50 Miles $395.S114.7463
Over 50 Miles $328.S16.7463
OC-3 UDIT ~295.7461
Over 0 to 8 Miles $763.$36.7463
Over 8 to 25 Miles $763.~36.7463
Over 25 to 50 Miles S763.$36.7463
Over 50 Miles $763.$66.7463
OC-12 UDIT ~295.7461
Over 0 to 8 Miles $2 163.$72.7463
Over 8 to 25 Miles $2 163.~72.7463
Over 25 to 50 Miles $2 163.S72.7463
Over 50 Miles ~2 163.~135.7463
OC-48 UDIT $295.7461
Over 0 to 8 Miles $4 420.$183.7463
Over 8 to 25 Miles 54.420.5183.7463
Over 25 to 50 Miles $4.420.~183.7463
Over 50 Miles $4 420.~346.7463
.. "
",. ",,'1'11' . ,
UDIT DSO Low Side Channel Perfonnance
Exhibit No.
Case No. QWE-T-O1-
Teresa K. Million. Owest Corporation
7 of 14
IDAHO
~ .
SUMMARY OF COSTS
ECONOMIC LIVES; 11.18% COST OF MONEY
;'"
i~.j;.
DSO Low Side Channelization
DS11 DSO MUX Low Side Channelization
UDIT MultiolexinQ
DS3 to DS1
DS1 to DSO
Extended Unbundled Dedicated Interoffice Transoort
DS1 E-UDIT
DS3 E-UDIT
OC-3 E-UDIT
Remote Node
DS1 Remote Port
DS3 Remote Port
OC-12 E-UDIT
Remote Node
DS1 Remote Port
DS3 Remote Port
OC-3 Remote Port
OC-48 E-UDIT
Remote Node
DS3 Remote Port
OC-3 Remote Port
OC-12 Remote Port
10 UDIT RearranQement
DSO Sinale Office
DSO Dual Office
UDIT HiCao SinGle Office
UDIT HiCao Dual Office
7 Unbundled Dark Fiber IUDF\
1 UDF-Interoffice Facilitv ClOF) - SinGle Strand
Order Charae ""r First Strand Route Order
Order Charae Each Additional Strand / Same Route
Termination Fixed per Strand Office Termination
Fiber Transaort oar Mile Strand
Fiber Cross-Connect. oer Strand Office
UDF-Looo CharGes - SinGle Strand
Order CharQe, Der First Strand Route Order
Order CharQe Each Additional Strand Same Route
Termination Fixed ner Strand Office
Termination Fixed Der Strand Prem
Fiber Loon. oer Route Strand
Fiber Cross-Connect oar Strand Office
Extended Unbundled Dark Fiber E-UDF\ - Sinale Strand
Order CharQe. oer First Strand Route Order
Order CharGe Each Additional Strand Same Route
Termination Fixed oar Strand Office
Termination Fixed oar Strand Prem
Fiber Loon. oar Route Strand
Fiber Cross-Connect. oer Strand Office
Initial Records Innuirv IIR\)
Simale
Comalex
Field Verification and Quote Preoaration IFVQP
FI9Id Verification (EnQineerino Verification)
5 UDF-IOF Charoes - Pair
Order Charoe, oar FIrSt Pair Route Order
Order Charoe Each Additional Pair Same Route
Termination FIXed oar Pair Office Termination
Fiber Transoorl oar Mile Pair
Fiber Cross-Connect D9I" Pair Office
UDF-Loon Charaes - Pair
Order Charoe. oar FIrSt Pair Route / Order
Order Charae Each Additional Pair Same Route
Termination Fixed oar Pair / Office
Termination FIXed oar Pair Prem
Fiber Lonn nAI' Route Pair
Fiber Cross-Connect Per Pair Office
Extended Unbundled Dark Fiber E-UDF\ - Pair
Order Charoe oar Forst Pair Route Order
Order Char~e Each Additional Pair Same Route
""c
, -
$14.
$8.
$342.
$297.
$103.
$524.42
$924.
$533.
$4.
$55.
$1 370.
$1 003.
$14.
$37.
$116.
$4 045.
$3597.
$25.
$136.
$537.
$5.
$68.
$2.
$5.
$3.
$137.
$2.
$5.
$3.
$137.
$2.
512.
SBB.
S5.43
$10.
58.
$178.
$5.43
Cb
'. ,
,"'!'i.
"'~..,
$187.
$2 670.
$218.
$358.
$358.
$358.
$194.
$194.
$358.
$194.
$194.
$194.
$358.
$194.
$194.
$194.
$164.
$206.
$221.
$249.
$492.
$255.
$19.
$492.
$255.
$19.
$492.
$255.
$19.
$208.
$247.
5907.
5297.
5492.
5255.
519.
5492.
$255.
$19.
5492.
$255.
!I~~~ii;i'!fi;;
'"
~~ ~~)lfh)
7471
7471/7461
7463/7461
7463/7461
7463/7461
7463/7461
7463/7461
7463
7463/7461
7463/7461
7463/7461
7463
7463/7461
7463/7461
7463/7461
7463/7461
7463
7463/7461
7463/7461
746317461
7461
7461
7461
7461
7461
7461
7473
7473
7473/7461
7461
7461
7473
7473
7473
7473/7461
7461
7461
7473
7473
7473
7473/7461
7461
7461
7461
7461
7461
7461
7473
7473
747317461
7461
7461
7473
7473
7473
7473/7461
7461
7461
Exhibit No.
Case No. QWE-T~1-
Teresa K. Million. Qwest Corporation
8 of14
IDAHO
SUMMARY OF COSTS
ECONOMIC LIVES; 11.18% COST OF MONEY
;101f;?,~rfi;:
~'" ' '
:, t~~,,!,!):f!';
Termination Fixed per Pair / Office $10.38 7473
Termination Fixed per Pair / Prem $8.7473
Fiber Transaort aer Route / Pair $178.7473
Fiber Cross-Connect oar Pair/Office $5.$19.7473/7461
Dark Fiber Sollee $640.40 7461
8 Shared Transoort Per Minute of Use $0.001916 7463
9 Unbundled Customer Controlled Rearranoement ElementlUCCRE
DS1 Port ICB ICB
DS3 Port ICB ICB
Dial Ua Access ICB
9.4 Attendant Access ICB
Virtual Ports ICB
10 Local Tandem Swltchlno
10.DS1 Local Messaae Trunk Port - Per Order $187.7461
10.2 DS1 Trunk Group - First Trunk - Per Order $209.7461
10.3 DS1 Trunk Group - Each Additional- Per Order $21.7461
10.4 Per Minute of Use $0.002420 7463
11 Local Swltchlno - TELRIC Based Rates
11.Analoa Une Side Por1 First $2.$149.7463/7461
Analoa Line Side Por1 Each Additional $2.$92.7463/7461
11.Diaital Line Side Por1lSunaartina BRIISDNI. First and Each Additional $17.46 $218.7463/7461
11.Diaital Trunk Ports
DS1 Local Messaoe Trunk Por1 $39.$20~,33 7463/7461
Messaae Trunk Grouo. First Trunk $170.7461
Messaae Trunk Group. Each Additional $43.7461
DS1 PRIISDN Trunk Port $287.$598.7463/7461
DID / PBX Trunk Port aer DSO $2.$194.7463/7461
11.DSO Analoa Trunk Port $19.7463
First Por1 $122.7461
Each Additional Por1 $27.7461
11.Local Usage, per Minute of Use $0.001904 7463
11.Vertical Features
11.1 Basic Features
Account Codes - per SYStem $94.7461
Attendant Access Une - oer Station Line $1.15 7461
Audible Messaae Waiting $1.7461
Authorization Codes - per System $243.7461
Automatic Une $0.7461
Automatic Route Selection - Common Eauip. per SYStem $1 992.7461
Call Droo $0.7461
Call Exclusion - Automatic $1.7461
Call Exclusion - Manual $0.7461
Call Forwarding: Busy Une/Don t Answer Programmable Svc.
Establishment $20.7461
CF Dont Answer/CF Busv Customer Proarammable - per Une $1.7461
Call Waitino Indication - oer Timino State $1.7461
Centrex Common Eauiament $1 370.7461
CFBL -Incomina Onlv $35.7461
CFDA -Incoming OnlY $35.7461
CLASS - Continuous Redial 7461
CLASS - Last Call Retum 7461
CLASS - PrioritY Callino 7461
CLASS - Selective Call Forwardino 7461
CLASS - Selective Call Reection 7461
Dir Sta SellBusv Lamp Fld per Arranaement 7461
Directed Call Pickup with Barae-in 21.7461
Directed Call Pickup without Barae-in 21.7461
Distinctive Ring/Distinctive Call Waiting 48.7461
Exoensive Route Wamino Tone- oar SYStem 77.7461
Facilnv Restriction Level - oar SYStem 7461
Group Intercom 7461
Hot Une - per Une 7461
Huntina: MultiPOSition Hunt Queuina 35.7461
Huntina: MultiPOSition with Announcement in Queue 35.7461
Hunting: MultiPOSition with Music in Queue 35.7461
ISDN Short Hunt $1.7461
Loudsaeaker Paaina - oar Trunk Groun $186.7461
Make Busv Arranoements - oer Grouo $0.7461
Make Busv Arranaements - oer Une 7461
Messaae Center - per Main Station Une 7461
Message Waiting Visual 7461
Music On Hold - per System $30.7461
Privacv Release $0.7461
Exhibit No.
Case No, OWE-T-Q1-
Teresa K. Million. Owes! Corporation
90114
IDAHO
SUMMARY OF COSTS
ECONOMIC LIVES; 11.18'10 COST OF MONEY
~fi
. .. ,;~~ ?, ~
QuervTime 0.42 7461
Station Cama-On Service - oar Main Station ~0.7461
Time of Dav Control for ARS - oar SYStem $130.7461
TIme of Dav NCOS UOdate SO.7461
Time of Dav Routina-Der Line $0.7461
Trunk Verification from DeslOnated Station ~0.48 7461
UCD in Hunt Groun - ner Une $0.7461
SMDR-P - Service Establishment CharGe. Initial Installation $346.7461
SMDR-P - Archived Data $158.7461
11.6.2 Premium Port - Additional Charne $2.7463
CMS - SYStem Establishment - Initial Installation $962.7461
CMS - SYStem Establishment - Subseouent Installation $481.7461
CMS - Packet Control CaDabimv:Dei SyStem $481.7461
Conference Callina - Meet Me $44.7461
Conference Callina - Preset $44 . 54 7461
Conference Callina - Station Dial 6-wav\$47.7461
11.3 CLASS Call Trace oerOccurrence $1.7449
11.7 SubseauentOrderCharae $13.7461
12 Local Swltchlno . Market Based Rates
13 Customized Routlnn
13.1 Development of Custom Une Class Code - Directory Assistance or
Ooerator Services Routina Onlv $235.7461
13.2 Installation Charge. per Switch - Directory Assistance or Operator
Service Routing Only $237.7461
13.3 All Other Custom Routinn ICB ICB
14 Common Channel SinnallnnlSS7
14.1 CCSAC STP Por1 $273.$401.7463/7461
14.2 CCSAC Oations Activation Cha,"e
Basic Translations
First Activation. ner Order $105.7461
Each Additional Activation. nAr Order $9.7461
CCSAC Ontions Database Translations
First Activation, oar Order $124.7461
Each Additional Activation,DerOrder $54.7461
14.3 Sional Fonnulation ISUP""'r Call Set-Un Reauest ~0.0004582 7463
14.4 SiGnal Trans""" ISUP ""'r Call Set-Un Reauest $0.0001124 7463
14.5 SiGnal Transnnrt TCAP ner Data R""uest $0.0000428 7463
14.6 SiGnal SwitchinG ISUP MAr Call Set-$0.0009281 7463
14.7 SiGnal SwitchinG TCAP MAr Data R""uest $0.0008379 7463
15 Advanced Intelllaent Network lAIN!
15.1 AIN Customized Services lAcS)ICB
15.2 AIN Platform Access /APA\ICB ICB
15.3 AINQueNProcessinn ""'rQueN ICB
16 LIne Information Database IUDB
16.LlDB Storaae No Charae
16.Une Validation Administration S;';'tem Access ILVAS ICB
LlDBIICNAM Line Record Initial Load
Un to 20 000 Une Records ~2 601.
Over 20 000 Une Records ICB
Mechanized Service Account Uodate. oar Addition or Uodate ICB
Individual Line Record Audn ICB
Account Groun Audn ICB
Exoedited Reauest ChamA for Manual Uodates ICB
16.LlDB Querv Service, ""r QU;;;;;-0009172 7463
16.4 Fraud Alert Notification ""'r Alert No Charoe
17 8XX Database 011"'" Service
17.Basic Querv oar Querv ~0.018999 7463
17.2 POTS Translation $0.00000O61 7463
17.3, Call Handlina & Destination Feature $0.00000184 7463
18 ICNAM Per Due'"$0.000828 7457
Exhibit No.
Case No. QWE-T-D1-
Teresa K. Million. Owes! Corporation
10 of 14
IDAHO
SUMMARY OF COSTS
ECONOMIC LIVES; 11.18%COST OF MONEY
19 ConslructlonChar;:;-es 1GB 1GB
20 Miscellaneous Charaes
. Per 1/2 hour or fraction thereof
. Additional Ennineerinn Basic $32.7461
. Additional Ennineerinn. Overtime $43.7461
. Additional Labor Installation Overtime $14.7461
. Additional Labor Installation Premium $18.7461
. Additional Labor Other - Basic $29.7461
. Additional Labor Other Overtime $39.7461
. Additional Labor Other Premium $48.7461
. Testinaand Maintenance - Basic $29.7461
. Testinaand Maintenance-Overtime $39.7461
. Testinn and Maintenance - Premium $48.7461
. Maintenance of Service Basic $29.7461
. Maintenance of Service - Overtime $39.7461
. Maintenance of Service Premium $48.7461
. Additional t".nnnArative Accectance Testinc - Basic $29.7461
. Additional CnaaArative Acceotance Testinn - Overtime $39.7461
. Additiona~rative Accentance Testina - Premium $48.7461
. NonScheduled r-~rative Testina - Basic $29.7461
. NonScheduled r-~rative Testina - Overtime $39.7461
. NonScheduled """erative Testina. Premium $48.7461
. NonScheduled Manual Testino Basic $29.7461
. NonScheduled Manual Testina Overtime $39.7461
. NonScheduled Manual Testina - Premium $48.7461
Additional D;SDatch $123.7461
Date Channa $46.7461
Desinn ChanGe $98.7461
ExnArlite CharGe ICB
Cancellation CharGe ICB
9.21 Reserved for Future Use
9.22 UNE Combinations
22.UNE - P Une Sclittina
Basic Installation CharlIe for UNE-P Une Sclillino See Section 9.
22.2 UNE-P Conversion Non-Recurrino Charoes
UNE-P POTS, Centrex. Analna PBX. Mechanized
First $0.7461
Each Additional $0.7461
UNE-P POTS. Centrex. PAL. Analoo PBX. Manual
First $16.7461
Each Additional $2.7461
UNE-P PBX DID Trunks
First $28.7461
Each Additional $2.7461
UNE-P ISDN BRI
First $30.7461
Each Additional $2.7461
UNE-P ISDN PRI DSS oar DS1 Facililv $27.7461
UNE-P ISDN PRI DSS - nAr Trunk
First $28.7461
Each Additional $2.7461
22.3 UNE.f' New Connection Non-Recurrina Charnes
UNE.f' POTS Centrex Analoo PBX Mechanized
First $57.7461
Each Additional $15.7461
UNE-P POTS Centrex PAL Analoo PBx. Manual
First $82.7461
Each Additional $18.7461
UNE-P PBX DID - nAr Trunk $15.7461
UNE-P 2B+D BRIISDN $272.7461
UNE.f' Trunks
DSS Basic Trunk - In Onlv. Out Oniv. or Two Wa;;-$74.7461
DSS, ISDN PRI Adv. Trunk - In Only wIDID & Hunting, or
Two Way wIDID Huntina & Answer SunArvision $73.7461
DSS ISDN PRI Adv. Trunk - Out Only w/Answer SunArvisinl $74.7461
UNE.P DID Trunks
UNE-P Complex Translations Digits Outpulsed Change
SianalinQ $15.7461
Exhibit No.
Case No. QWE-T-O1-
Teresa K. Million. Qwest Corporation
11 of 14
IDAHO
SUMMARY OF COSTS
ECONOMIC LIVES; 11.18%COST OF MONEY
~W!
~~~
~'1~
':""'!..
i'&
~,"",:;,
UNE.f' DID Comnlex Translations Sionalino Chance $35.7461
UNE.f' DID Block Comnromise $25.7461
UNE-P DID Groun of 20 Numbers $31.7461
UNE.f' DID Reserve !':Anuential # Block $25.7461
UNE-P DID Reserve Nonsenuential TNs $23.7461
UNE-P DID NonsAOuential TNs $33.7461
Facilities for UNE.f' DSS UNE.f' ISDN PRI
DS1 Loop Facility See Section
DS3 Loop Facility See Section
UNE.p PRI ConflDuratlons
UNE-P PRI Dedicated PRI 23B + D $596.7461
UNE-P PRI Dedicated PRI 24B $576.7461
UNE.f' PRI Dedicated PRI 23B + Back-Up D Configuration -
$575.7461
22.4 UNE-P with Owest DSL See applicable
Owest retail tariff.
catalog, or price
list
22.5 UNE Combinations - Loon MUX CombinatIons LMC
22.ITP DS11 DS3 See Section 9.
22.Lnna MUX 2/4 Wire Analno First $225.7461
Lnna MUX 2/4 Wire Analm Each Additional $148.7461
22.DS1 I nnn MUY First $285.7461
DS1 Lnnn MUll Each Additional $209.7461
22.5.4 Private Une to Loop MUX Conversion See Section
23.
22.LMC DS1 to DSO Multiplexer See Section
$183.7461
LMC DS3 to DS1 Multiplexer See Section
$183.7461
22.DS1/DSO Low Side Channelization See Section 9.
22.6 Enhanced Extended Loon fEEL
22.EEL LInk
EEL DSO 2-Wire Analnn First See Section $245.7461
EEL DSO 2-Wire Each Additional $182.7461
EEL DSO 4-Wire Analno. First See Section $245.7461
EEL DSO 4-Wire Each Additional $182.7461
EEL DS1 See Section $300.7461
EEL DS1 Each Additional $225.7461
EEL DS3 See Section $323.7461
EEL DS3 Each Additional $248.7461
EEL OC-3 OC-12 and OC-48 SnAci:ol RAOuest SnAcial Reauest
22.Private Line to EEL.cooversion $36.7461
22.EEL Transnnrt
DSO See Section 9.
DS1 See Section 9.
DS3 See Section 9.
OC-3 See Section 9.
OC-12 See Section 9,
OC-48 See Section 9.
DS1 to DSO $246.92 II 7461
DS3 to DS1 $246.92 II 7461
Exhibn No.
Case No. OWE-TOO1-
Teresa K. Million. Owest Corporation
12of 14
IDAHO
SUMMARY OF CO~TS
ECONOMIC LIVES; 11.18% COST OF MONEY
:~~"
ii~~
22.EEL Multinlexinn
DS1 to DSO $297.7463
DS3 to DS1 $342.7463
22.EEL DSO Channel Performance
DSO Low Side Channelization See Section
DS1/DSO MUX. Low Side Channelization See Section
22.Concentration CaDabilitv ICB
Unbundled Packet Swltchl~
23.Unbundled Packet Switch Customer Channel
DSLAM land Snlitter Functionalitv $21.7459
Virtual Transnnrt $3.7459
23.2 Customer Channel Shared Distribution Sublooa S61.7461
23.3 Unbundled Packet Switch Interface Port
DS1 S158.~210.7459/7461
DS3 $272.$210.7459/7461
Loon Snllttlnn
24.Interconnection TIE Pairs IITP\See Section 9.
24.2 OSS Charaes See Section 9.
24.3 Basic Installation Charne for Lnnn Snlntinn See Section 9.
24.4 Trouble Isolation Charne See Misc.
24.5 Additional Testina See Misc.
24.6 POTS SDlitter Collocation
Reclassification Char()e ICB
Enaineerino See Section 9.4.
24.7 Snlitter TIE Cable Connections
Snlitter in the Common Area - Data to 410 Block See Section 9.4.
Snlitter in the Common Area - Data Direct to CLEC See Section 9.4.
Snlitter on the IDF - Data to 410 Block See Section 9.4.
Salitter on the IDF - Data Direct to CLEC See Section 9.
SDlitter on the MDF - Data to 410 Block See Section 9.4.
Solitter on the MDF - Data Direct to CLEC See Section 9.4.
10.0 Ancillarv Services
10.1 Local Number Portabllltv
10.1 LNP Queries See FCC Tariff #1 Section 20.1 & 20.
10.2 LNP Manaaed Cuts
Standard Manaaed Cuts -";;r Person ""r 1/2 Hour $26.7461
Overtime Manaaed Cuts ""r Person ""r 1/2 Hour $34.7461
Premium Mananed Cuts ""r Person nAr 1/2 Hour ~2.7461
10.2 911/E911 No CharGe
10.3 White Panes Dlrectorv LlstIOOs FaclliiV Based Providers
10.1 PrimarvLlstino No CharGe
10.2 Premium/Privacy listings General Exchange Tariff Rate, less wholesale discount
10A Dlrectnrv Assistance Facllltv Based Providers
10.Local Directarv Assistance Per Call SO.
10.2 National Directorv Assistance -;;or Call $0.
10.3 Call Brandino. Set- U;;-and Recordinn ~"5 000.
10.4 Loadinn Brand Per Brand ~o;nn
10.5 Call r.nmnIAlion link ...... Call $0.
10.5 Dlrectnrv Assistance list Information
10.Initial Database Load""" Llstina SO.0250
10.2 Reload of Database nAI" Llstiila SO.0200
10.3 Dailv UDdates, oar Llstina SO.OSOO
10.4 One-time Set-Uo Fee /NOr hourI ~77.44
10.5 Media Charnes for File DeliveN
Electronic Transmission $0.0020
Tapes (charges only apply if this is selected as the nonnal
deliverv medium for dailv uodates\ IDer taoel $30.
ShiDDino Charnes for 13"" deliverv\ICB
10.6 Toll and Assistance Onerator Services Facllltv Based Providers
Exhibit No.
Case No. QWE-T-D1-
Teresa K. Million, Owest Corporation
13 of 14
IDAHO
SUMMARY OF COSTS
ECONOMIC LIVES; 11.18%COST OF MONEY
~lr'~1i\1~~1~~1;q~~~&t~~E1~!rliJ~(!~f~'I~ll(~~jf4 (~~~~~;Jj~~~ ~~~~Itil~~~ 6~~it~J!i11 i !I~r~ml7iill.liJjj
10.1 OntlonA-PerMessaae
Oaerator Handled Callina Card $1.
Machine Handled Callina Card SO.
Station Call $1.
Person Call SJ.
Connect to Directorv Assistance $0.
Busv Une Verify. oar Call 'to.
Busv Une InterruDt ~0.
Onerator Assistance MAr Call $0.
10.Oatlon B - Per OOArator Work Second and Comnuter Handled Calls
ODerator Handled. oar Oaerator Work Second SO.0280
Machine Handled. OAr Call 2500
Call Brandino. Set-Uo & Recordino ~10 500.
loadino Brand. oer Brand ~800.
10.7 Access to Poles Ducts Conduits and Rlnhts ofWav
10.1 Pole Inauirv Fee. oar Inauirv 341.7461
10.2 Innerduct Innuirv Fee OAr Inauirv 233.7461
10.3 ROW Inauirv Fee, OAr Inouirv 378.7461
10.4 ROW Document Preoaration Fee 122.7461
10.5 Field Verification Fee. oar Pole 20.7461
10.6 Field Verification Fee. oar Manhole 190.7461
10.7 Planner Verification MAr Manhole 16.7461
10.8 Manhole Verification Insnector MAr Manhole 92.7461
10.9 Manhole Make-Readv InsOAClor oar Manhole 245.7461
10.1C Transfer of Resoonsibilitv 106.7461
10.11 Pole Attachment Fee, oer Foot. oer Year
Urban
2003 ~2.FCC Methodoloov
2004 $2.FCC Methodoloov
2005 $2.FCC Methodoloov
Non-Urban
2003 $3.FCC Methodoloov
2004 $3.FCC Methodoloov
2005 FCC Methodoloov
10.1~ Innerduct Occuoancv Fee. oer Foot. oerYear $0.FCC Methodoloov
10.12 Access AGreement Consideration ~10.
10.14 Make Readv ICB
12.0 Oaeratlonal Sunnort Svstems
12.1 Develonment and Enhancements, ner Order S5.
12.2 0000100 Maintenance. ner Order $1.7454
12.3 Dallv Usaoe Record File oer Record SO.OOO4190 7463
12.4 Trouble Isolation CharGes See Misc.
17.0 Bona Fide R=uest Process
17.1 Processlna Fee $1851.7461
NOTES:
Rates found in FCC Tariff #1.
Regional TElRIC based.
ICB - Individual Case Basis pricing.
The preliminary engineering and planning costs are included in the caged and cageless space construction charges. These engineering and planning charges are also included in
the caged and cageless quote preparation fees. Upon completion of the collocation construction. the quote preparation fee (QPF) will be credned to the final space construction
charge for the collocation job. The credit will apply to whichever QPF is applied.
Where the UNE loop is not connected to Owesfs switch port, the loop grooming rate will be added to, and billed with, the price of the loop UNE. For UNE loops that connect to
Owesfs switch port (i.e., UNE-P), the UNE-P price will not include loop grooming.
Where the UNE loop is not connected to Qwesfs switch port, and where 2-Wire Extension Technology is required. the incremental charge for 2-Wire Extension Technology-
Unbundled loop Grooming will be added to, and billed with. the price of the extension technology. The incremental charge recovers the additional loop grooming costs that are
incurred when extension technology is required. The rate is derived by subtracting the cost of 2-wire unbundled loop grooming (which applies to the purchase of the unbundled
loop) from the cost of 2-wire extension technology unbundled loop grooming ($2.90 - $2.05 = $0.85).
7 When distribution is purchased only for the purpose of campus wire. no recurring or nonrecurring charges will be assessed. This does not include collocation charges or FCP
The proposed recurring prices for Une Sharing are pursuant to the methodology established in the FCC's Triennial Review Order.
All technically feasible Vertical Switch Features are available with comoatible unbundled switch oorts.
10 No monthly recurring charge applies for Basic Vertical Switch Features. Only Basic Vertical Switch Features with nonrecurring charges are listed. Nonrecurring charges are
applicable whenever a feature is added - whether on new Installation. conversion. or change order activitY: Vertical Switch Features not listed are included in the port and have a
rate of $0 for both recurring and nonrecurring charges11 Monthly recurring charge applies, in addition to the Une Side Port recurring charge, for a Premium Port.
12 A special request is a request by the customer to perform something that is technically feasible but the process and pricing are not yet in place.13 Market- based rates.
14 The State of Idaho has retained oversight of these rates. These rates are not under the jurisdiction of the FCC.
15 Study No. 7451 reflects a cost of $11.38 for this element. However. Owest is voluntarily reducing the price to $5.00.
Exhibit No.
Case No. QWE-T~1-
Teresa K. Million. Owest Corporation
14 of 14