Loading...
HomeMy WebLinkAbout20040324Amendment.pdfF:ECEIVEO 'I CT\ : ,- ,_.~~. Mary S. Hobson (ISB# 2142) Stoel Rives LLP 101 South Capitol Boulevard - Suite 1900 Boise, ill 83702 Telephone: (208) 389-9000 Facsimile: (208) 389-9040 msho bson(~),stoel. com 'in!!! L.~ Q ...., :'fuU'! I hll t. ... jT!Li fiLS Cu'r :i"\(SSION Jenny Smith Electric Lightwave, Inc. 9260 East Stockton Boulevard Elk Grove, CA 95624 Telephone: (916) 686-3533 BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION JOINT APPLICATION OF QWEST CORPORATION AND ELECTRIC LIGHTWAVE, INe. FOR APPROVAL OF A WIRELINE INTERCONNECTION AGREEMENT PURSUANT TO 47 US. 9252(E) CASE NO.: USW-OO- APPLICATION FOR APPROVAL OF AMENDMENT TO THE INTERCONNECTION AGREEMENT Qwest Corporation ("Qwest") and Electric Lightwave, Inc. ("ELI") hereby jointly file this Application for Approval of Amendment to the Interconnection Agreement ("Amendment" which was approved by the Idaho Public Utilities Commission on October 11 , 2000, (the Agreement"). A copy ofthe Amendment is submitted herewith. This Amendment was reached through voluntary negotiations without resort to mediation or arbitration and is submitted for approval pursuant to Section 252(e) of the Communications Act of 1934, as amended by the Telecommunications Act of 1996 (the "Act" Section 252(e)(2) of the Act directs that a state Commission may reject an amendment reached through voluntary negotiations only if the Commission finds that: the amendment (or portiones) thereof) discriminates against a telecommunications carrier not a party to this agreement; or the implementation of such an amendment (or portion) is not consistent with the public interest, convenience and necessity. APPLICATION FOR APPROVAL OF AMENDMENT TO THE INTERCONNECTION AGREEMENT - Page 1 Boise-169041.1 0029164-00016 ELI and Qwest respectfully submit this Amendment provides no basis for either of these findings, and, therefore jointly request that the Commission approve this Amendment expeditiously. This Amendment is consistent with the public interest as identified in the pro- competitive policies of the State of Idaho, the Commission, the United States Congress, and the Federal Communications Commission. Expeditious approval of this Amendment will enable ELI to interconnect with Qwest facilities and to provide customers with increased choices among local telecommunications services. ELI and Qwest further request that the Commission approve this Amendment without a hearing. Because this Amendment was reached through voluntary negotiations, it does not raise issues requiring a hearing and does not concern other parties not a party to the negotiations. Expeditious approval would further the public interest. Respectfully submitted this 22nd day of March, 2004. Qwest Corporation AI vi 41 t------- Mary S. H son Stoel Rives LLP, Attorneys for Qwest and Jenny Smith Electric Lightwave, Inc. APPLICATION FOR APPROVAL OF AMENDMENT TO THE INTERCONNECTION AGREEMENT - Page 2 Boise-169041.1 0029164-00016 CERTIFICATE OF SERVICE I hereby certify that on this 22nd day of March, 2004, I served the foregoing APPLICATION FOR APPROVAL OF AMENDMENT TO THE INTERCONNECTION AGREEMENT upon all parties of record in this matter as follows: Jean Jewell, Secretary Idaho Public Utilities Commission 472 West Washington Street Boise, Idaho 83720-0074 11 ewell~puc.state.id. us ----X- Hand Delivery U. S. Mail Overnight Delivery Facsimile Email Jenny Smith Electric Lightwave, Inc. 9260 East Stockton Boulevard Elk Grove, CA 95624 Telephone: (916) 686-3533 Hand Delivery ----X- U. S. Mail Overnight Delivery Facsimile Email ~~~ Brandi L. Gearhart, PLS Legal Secretary to Mary S. Hobson Stoel Rives LLP APPLICATION FOR APPROVAL OF AMENDMENT TO THE INTERCONNECTION AGREEMENT - Page 3 Boise-169041.1 0029164-00016 DC Power Reduction Amendment to the Interconnection Agreement between Qwest Corporation and Electric Lightwave, Inc. for the State of Idaho This is an Amendment ("Amendment") to the Interconnection Agreement for DC Power Reduction Procedure between Qwest Corporation ("Qwesf'), a Colorado corporation, and Electric Lightwave, Inc. ("CLEC" ). CLEC and Qwest shall be known jointly as the ("Parties RECITALS WHEREAS, the Parties entered into an Interconnection Agreement, for service in the State of Idaho, that was approved by the Idaho Public Utilities Commission ("Commission ) on October 11 2000, as referenced in Case No. USW-00-21, and WHEREAS, the Parties wish to amend the Agreement further under the terms and conditions contained herein. AGREEMENT NOW THEREFORE, in consideration of the mutual terms, covenants and conditions contained in this Amendment and other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, the Parties agree as follows: Amendment Terms The Agreement is hereby amended by adding terms, conditions and rates for DC Power Reduction Procedure as set forth in Attachment 1 and Exhibit A to this Amendment, attached hereto and incorporated herein by this reference. Rates in Exhibit A that are "Under Development" shall be updated upon establishment of a rate. Rates in Exhibit A shall otherwise be updated to reflect legally binding decisions of the Commission and shall be applied on a prospective basis from the effective date of the legally binding Commission decision, unless otherwise ordered by the Commission. Effective Date This Amendment shall be deemed effective upon approval by the Commission; however, the Parties may agree to implement the provisions of this Amendment upon execution. To accommodate this need, CLEC must generate, if necessary, an updated Customer Questionnaire. In addition to the Questionnaire, all system updates will need to be completed by Qwest. CLEC will be notified when all system changes have been made. Actual order processing may begin once these requirements have been met. February 20, 2004/lhd/ELI/Amend-DC Power Reduction/ID Amendment to: CDS-000612-0162 Template version: DC PowerReduction 6-20- Further Amendments Except as modified herein, the provisions of the Agreement shall remain in full force and effect. The provisions of this Amendment, including the provisions of this sentence, may not be amended, modified or supplemented, and waivers or consents to departures from the provisions of this Amendment may not be given without the written consent thereto by both Parties authorized representative. No waiver by any Party of any default, misrepresentation, or breach of warranty or covenant hereunder, whether intentional or not, will be deemed to extend to any prior or subsequent default, misrepresentation, or breach of warranty or covenant hereunder or affect in any way any rights arising by virtue of any prior or subsequent such occurrence. Entire Aareement The Agreement as amended (including the documents referred to herein) constitutes the full and entire understanding and agreement between the Parties with regard to the subjects of the Agreement as amended and supersedes any prior understandings, agreements, or representations by or between the Parties, written or oral, to the extent they relate in any way to the subjects of the Agreement as amended. Qwest c~rP5!t~on / Signature (()AD ('f\( (jy~Vl Name Printed/Typed ...f.e est --L Co 0 Title LT. Christensen Name Printed/Typed Director - Interconnection Aareements Title ~/Y. / ~)7DateDate February 20, 2004/lhd/ELI/Amend-DC Power Reduction/lD Amendment to: CDS-000612-0162 Template version: DC PowerReduction 6-20- Attachment 1 ATTACHMENT 1 DC POWER REDUCTION PROCEDURE Description 1 Qwest's Power Reduction Procedure offers CLEC the option to reserve a fuse or breaker position on the power board or Battery Distribution Fuse Bay (BDFB) when reducing a multiple feed to zero. CLEC's payment of the Monthly Power Maintenance charge will provide an option to hold the existing power cabling and fuse position for the CLEC's future power augment requests as described in section 2.6 below. 0 Terms and Conditions If a CLEC wishes to reduce its amount of power and will not require it for future use, Qwest will process the request as a standard augment order and not as a DC Power Reduction request. Applications for DC Power Reduction may be submitted only for collocation sites that have been previously accepted by the CLEC. Power reductions to sites under construction or for sites not previously accepted by the CLEC, will follow standard change or augment procedures and rates. Before submitting a power reduction application, CLEC'financial obligations with respect to the collocation site must be current, with the exception of formally disputed charges. CLEC'financial obligations include payment of one hundred percent (100%) of all non- recurring quoted charges for the collocation site and all applicable monthly recurring charges that are more than 30 days past due. 2.4 Collocation applications for new, change and augment requests must be submitted to the Collocation Project Management Center (CPMC) on the form provided by Qwest at www.qwest.co.lwholsale/pcat/collocation.html.apform . The CPMC will notify the CLEC of any deficiencies in the application within ten (10) days of receipt. A nonrefundable Quote Preparation Fee (QPF) in the amount reflected in CLEC's Interconnection Agreement must be submitted with the application. A walk through will be performed prior to quote preparation to determine the amount of work required to perform the power reduction. When eliminating a secondary feed, CLEC may purchase the option to have the power cable and fuse position held for its future use. CLEC will be required to pay a monthly Power Maintenance Charge until such time as CLEC notifies Qwest that it wishes either to reenergize the feed or to discontinue the option. In instances where a shortage of fuse position is imminent, Qwest reserves the right to notify CLEC of the need to exercise its option or relinquish the fuse position to Qwest. Upon receipt of such notification, CLEC will have the option of energizing the secondary feed to at least 20 amps or returning the fuse position to Qwest within thirty (30) days of receipt of the notification. CLEC assumes all responsibility for outages and/or impacts to CLEC-provided service and equipment due to the reduction in DC Power. February 20, 2004/lhd/ELI/Amend-DC Power Reduction/lD Amendment to: CDS-000612-0162 Template version:DC PowerReduction 6-20- Attachment 1 Restoration of the desired power is contingent upon desired power and fuse position availability. Rate Structure Collocation charges will be based upon the information provided to Qwest by CLEC on the Collocation Application Form. Below is an example of additional charges that are unique to a Power Reduction Request and will be provided to CLEC via a quote: Based on this evaluation of work provided in the quote, the rates provided in Exhibit A to this Amendment will apply. One QPF per application/per collocation site will be charged. When multiple feeds at the same collocation space are reduced or eliminated, CLEC will pay one QPF. Other nonrecurring and recurring charges may apply as reflected in CLEC's Interconnection Agreement. Qwest will provide CLEC a quote for additional nonrecurring charges associated with the Power Reduction Procedure based upon the rates provided in Exhibit A. All quoted nonrecurring charges must be paid within thirty (30) Days from the quote. Such payment constitutes CLEC's quote acceptance and authorizes Qwest to perform the work to effect the requested power reduction. 1.4 Billing to CLEC for initial power value at the collocation site will be modified to reflect the reduced amount upon receipt of payment of the quoted charges and will be made effective back to the date of acceptance of the Power Reduction Application by the CPMC. Recurring billing for the Power Maintenance Charge will terminate on the day CLEC energizes the feed or returns the fuse position to Qwest. Nonrecurring Charges QPF: Includes the cost of performing a feasibility study and producing the quote for fulfilling the Power Reduction request. It covers the project, order and support management associated with the administrative functions of processing the request. Power Reduction Charge: Includes costs associated with reducing the fuse/breaker size. Rates are categorized in this manner based upon the work involved and power distribution point (e.g., BDFB or power board) and are set forth in Exhibit A of CLEC's Interconnection Agreement. Where additional work is needed, such as rewiring the power lead at the power source (or some cases may require relocation of the feed), rates will be calculated on an Individual Case Basis (ICB) basis. These rates will be provided to CLEC on the quote prior to work beginning. Power Restoration Charge (assessed if power is restored): ICB Charge associated with restoring the power cable to the power source and is contingent upon whether the desired power and fuse position is available. Qwest will evaluate work required to perform the Power Restoration request and provide CLEC a quote utilizing standard power element charges (for example, DC power usage, labor, and cabling charges) included in Exhibit A of CLEC's Interconnection Agreement. February 20, 2004/lhd/ELI/Amend-DC Power Reduction/ID Amendment to: CDS-000612-0162 Template version:DC PowerReduction 6-20- Attachment 1 Recurring Charge Power Maintenance Charge: Monthly recurring charge associated with option to hold the power infrastructure from a secondary feed in place for potential CLEC requests. Ordering CLEC should submit the "Collocation Application for New, Augment or Change" and indicate specific power feeds to be reduced (e.g., eliminate or reduce multiple feeds from 60 to zero amps or reduce main feed from 60 to 20 amps). Under the "type of request" category CLEC should indicate that this is an Augment. February 20, 2004/lhd/ELI/Amend-DC Power Reduction/ID Amendment to: CDS-000612-0162 Template version:DC PowerReduction 6-20- Exhibit A EXHIBIT A Power Feed Initial Voltage Work Performed Applicable Charges Tvpe Value Reduce Primary Initial amount less Changing fuse QPF-$441. or secondary than 60 amps value at BDFB-Power reduction charge feed value Note: Must maintain No cabling work $346. 20 amp minimum required.Total Charge: $787. primary feed. Initial feed at power Changing breaker QPF-$441. board and with at Power plant Power reduction charge reduction cable $587. stays at power Total Charge: $1028. board. Reduction of power Requires power Walk through will detail work requires a change in cabling changes and elements needed to location from power and detailed perform reduction. Quote will board to BDFB.engineering work be provided on an ICB utilizing performed.standard power element charges (DC power usage cabling etc.) as defined in CLEC's Interconnection AQreement. Secondary May be reduced to Power restored to $68.92 is added to above Feed zero and held in Qwest inventory.nonrecurring power reduction place for future based on initial value of augment requests.secondary feed. QPF-$441. Fuse position and Monthly recurring charges of cabling held for $37.00 to hold fuse position. future use. Cate 0 Power Restoration Descri tion Qwest will evaluate work required to perform Power Restoration of the power cable to the power source contingent on whether the desired power and fuse position is available. Rates/Char es ICB Charge with standard power element charges (e. DC power usage, labor, and cabling charges) as defined in Exhibit A of CLEC' Interconnection A reement. February 20, 2004/lhd/ELI/Amend-DC Power Reduction/ID Amendment to: CDS-000612-0162 Template version:DC PowerReduction 6-20-