HomeMy WebLinkAbout19961212Memorandum.doc2/12/96
To: Commissioner Nelson
Commissioner Smith
Commissioner Hansen
Weldon Stutzman
From: Lynn Anderson and Bill Eastlake
Subject: LCP Rates and Revenue in GTE-T-95-3
Attached are two worksheets using current rates as suggested by Commissioners for Moscow and other exchanges and adding to LCP the Harrison--Kellogg/Pinehurst route.
The first worksheet was prepared by Bill to estimate the effect of using current rates in the Moscow exchange for the Swisher alternative, which keeps the flat rate area exactly as is. All other routes stay in Comm. Plus; there is no Premium. The estimated buy-ups are staffs. This worksheet shows most classes of customers (excluding only semipublic and P.A.L.) and the conclusion is that this alternative will probably not harm the Company financially.
The second worksheet was prepared by Lynn to estimate the effect of extending the Swisher alternative to the several other exchanges where GTEs proposal resulted in the problem of forcing customers to choose between higher rates or losing existing flat rate calling areas. This worksheet shows only residence rates and revenue with an implication that using GTEs bus./res. rate ratios will result in total revenue changes that are approximately proportional to current bus./res. revenue proportions, i.e. 45%/55%. In other words, the total revenue loss is approximately double that of residence only. Again, the staff conclusion is that the Commissions Swisher alternative applied to these six exchanges and adding the Harrison--Kellogg/Pinehurst route will not financially harm the Company.
Our no harm conclusion is based on the premise that estimated revenue changes that are under 1% of base revenue are less than the range of the confidence interval of the estimate. In other words, these are all guesstimates and we assume the Commission will true-up any significant revenue excess or shortfall. Its worth noting that a uniform $.10 change in rates is worth approximately $12,000 per month and we think our estimates are easily within this range. We think it likely that GTEs projected marketing success for Centranet will affect revenues more than the deviations of estimates from future actualities in this LCP case.
Having said that we think the Commissions rate design will work financially, we do need to add that we think this will perpetuate unnecessary differences between exchanges vis-a-vis calling areas and rates. For example, Mullans Community rate of $12.10 includes flat-rate calling to 2,688 lines, while St. Maries lower Community rate of $11.80 includes flat-rate calling to 4,373 lines. Another example, Spirit Lakes $15.25 rate includes flat-rate calling to 16,063 lines, while Moscows lower $14.60 rate includes over 10,000 more lines in its flat-rate area. We believe the Commissions rate design, like the Staffs, solves the problems caused by GTEs proposal. But, while the Staffs rate design admittedly results in a few anomalies, the magnitude of these are smaller than with the Commissions rate design. (See two attached graphs.) The Commissions alternative will perpetuate dual rate designs, which will befuddle GTE, Staff and Commission efforts in the future. While we admit that consistency of rate design among exchanges should not be the overriding criteria in setting rates, such consistency, absent extenuating circumstances, results in an equitable distribution of rates among exchanges and should be sought when it has no adverse effects.