Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20230523Direct Communications Rockland CAF ICC Data.pdf
RECEIVED Tuesday, May 23, 2023 9:32:04 AM IDAHO PUBLIC UTILITIES COMMISSION Study Area: DIRECT COMMUNICATIONS ROCKLAND, INC. (ID: 472232) Holding Company: DIRECT COMMUNICATIONS ROCKLAND, INC. (ID: 200002232) Access Recovery Charges Recalculate ARC Rates & CAF Support revenues © 2023 NECA Terms of Use |Privacy Policy Suzanne Reed Home Paper Certi cation Tracking Study Area Selection Main Page Study Area Data Input Menu CAF & ARC Output Historic Reports Certi cation Instructions & Documents Contact Us Test Period 2023-2024 Post-True-Up (Filing) View Exchange/ZoneName ResidentialLinesexcludingLifelines ResidentialARC ResidentialARCRevenue SLB Lines SLB ARC SLB ARCRevenue MLB Lines MLB ARC MLB ARCRevenue Total ARCRevenue Study AreaSummary 287 $0.00 26 $3.00 $936.00 61 $3.00 $2,196.00 $3,132.00 Arbon 55 $0.00 $0.00 Paris 182 $0.00 $0.00 Rockland 50 $0.00 $0.00 Test Period 2023-24 Pre-True-up View Test Period 2023-24 Post-True-Up (Filing) View Study Area: DIRECT COMMUNICATIONS ROCKLAND, INC. (ID: 472232)Holding Company: DIRECT COMMUNICATIONS ROCKLAND, INC. (ID: 200002232) Settlement Type: Cost CONNECT AMERICA FUND[Data to be provided to USAC/FCC in June 2023 for CAF ICC Purposes] Test Period 7/1/23-6/30/24 Post True-up (Filing) View Rate-of-Return (ROR) Carrier Revenue Requirement 1 2011 Interstate Switched Access Revenue Requirement $1,851,232 2 FY 2011 Intrastate Terminating Switched Access Revenues $14,857 3 FY 2011 Net Reciprocal Compensation Revenues $0 4 2011 ROR Carrier Base Period Revenue (Line 1 + Line 2 + Line 3)$1,866,089 5 ROR Carrier Baseline Adjustment Factor (0.95 ^ 12)0.540360 6 ROR Carrier Revenue Requirement (Line 4 x Line 5)$1,008,360 7 Pool Administration Expenses $27,591 8 Total ROR Carrier Revenue Requirement (Line 6 + Line 7)$1,035,951 Revenues from Reformed Intercarrier Compensation (ICC) Rates 9 Interstate Switched Access Revenues $25,926 10 Interstate Allocated Switched Access Revenues#$140,247 11 Transitional Intrastate Access Service Revenues $11,562 12 Net Transitional Reciprocal Compensation Revenues $0 13 Total ICC Revenue (Line 10 + Line 11 + Line 12)$151,809 Eligible Recovery 14 TRS Increment $0 15 Regulatory Fees Increment $0 16 NANPA Increment $0 17 Interstate Local Switching Support for Price Cap Affiliates or Estimated Duplicate LSS Costs in CAF II $0 18 Adjustment for Double Recovery or Corrections $0 19 Test Period 21/22 Trueup - Net Impact on Total Eligible Recovery $20,619 20 Eligible Recovery (Line 8 - Line 13) + (Line 14 + Line 15 + Line 16 + Line 18 + Line 19) - (Line 17)$904,761 Revenues from Access Recovery Charges (ARC) 21 Residential ARC Revenues $0 22 Single Line Business ARC Revenues $936 23 Multi-Line Business ARC Revenues $2,196 24 Total ARC Revenues (Line 21 + Line 22 + Line 23)$3,132 Connect America Fund (CAF) ICC Support** 25 Connect America Fund (CAF) ICC Support (Line 20 - Line 24)$901,629 Revised CAF ICC Support with Imputed ARC Revenues for Broadband-Only Loops 26 Imputed ARC revenue for broadband-only loops $108 27 Adjusted Test Period 2023-2024 CAFICC Support (Line 25 - Line 26)$901,521 NOTES:#Per FCC Designation Order, calculated as (Sum of Line 9 for all TS pool participants) * (Line 1/ Sum of Line 1 for all TS pool participants)**NECA estimate provided for informational purposes only - actual to be calculated by USAC. Study Area: DIRECT COMMUNICATIONS ROCKLAND, INC. (ID: 472232) Holding Company: DIRECT COMMUNICATIONS ROCKLAND, INC. (ID: 200002232) Intrastate Revenues (FCC TRP exhibit) Download TRP Data in Excel Intrastate Revenues View TRP report in Excel Test Year 2023-2024 Expected Maximum Intrastate Revenue: $0.00 Col D -- Rate Element Description Col E -- Unit of Demand Col F -- 7/1/2023 Interstate Rate Col G -- Test Year 2022- 2023 Current Intrastate Rate Col H -- 7/1/2023 Proposed Intrastate Rate Col I -- FY 2011 Intrastate Units: Terminating for Non-Dedicated or Originating and Terminating for Dedicated Elements Col J -- H*I Intrastate Price-out with 7/1/2023 proposed intrastate rate and FY2011 Demand Col K -- FY 2022 Intrastate Units: Terminating for Non-Dedicated and total for Dedicated Elements Col L -- Test Year 2023- 2024 Forecasted Intrastate Units Col M -- [(L/K)^(12/21)-1]*100 Intrastate Units Growth Rate % Col N -- H*L TY 2023-24 Forecasted Intrastate Revenue Terminating End O ce Access Service Terminating End O ce, Premium, per access minute MOU $0.00000000 $0.00000000 $0.00000000 339,369.00 $0.00 108,188.00 97,369.00 -5.84%$0.00 Terminating End O ce Access Service Terminating End O ce, Non- Premium, per access minute MOU $0.00000000 $0.00000000 $0.00000000 0.00 $0.00 0.00 0.00 0.00%$0.00 Entrance Facility, Per Termination Voice Grade Two Wire Termination $88.78 $88.41 $88.78 0.00 $0.00 0.00 0.00 0.00%$0.00 Entrance Facility, Per Termination Voice Grade Four Wire Termination $142.09 $141.49 $142.09 0.00 $0.00 0.00 0.00 0.00%$0.00 Entrance Facility, Per Termination High Capacity DS1 Termination $432.89 $431.07 $432.89 0.00 $0.00 0.00 0.00 0.00%$0.00 Entrance Facility, Per Termination High Capacity DS3 Termination $3,952.70 $3,936.07 $3,952.70 0.00 $0.00 0.00 0.00 0.00%$0.00 Entrance Facility, Per Termination Synchronous Optical Channel OC3 Termination $4,030.58 $4,013.62 $4,030.58 0.00 $0.00 0.00 0.00 0.00%$0.00 Entrance Facility, Per Termination Synchronous Optical Channel OC12 Termination $4,303.38 $4,285.27 $4,303.38 0.00 $0.00 0.00 0.00 0.00%$0.00 Entrance Facility, Per Termination ESALT 2 Mbps Circuit $766.77 $763.54 $766.77 0.00 $0.00 0.00 0.00 0.00%$0.00 Entrance Facility, Per Termination ESALT 10 Mbps Circuit $826.43 $822.95 $826.43 0.00 $0.00 0.00 0.00 0.00%$0.00 Entrance Facility, Per Termination ESALT 50 Mbps Circuit $1,070.67 $1,066.17 $1,070.67 0.00 $0.00 0.00 0.00 0.00%$0.00 Direct Trunked Transport Facility/ Mile Voice Grade - Two Wire & Four WireMile $6.34 $6.31 $6.34 0.00 $0.00 0.00 0.00 0.00%$0.00 Direct Trunked Transport Facility/ Mile High Capacity DS1 Mile $29.67 $29.55 $29.67 0.00 $0.00 0.00 0.00 0.00%$0.00 Direct Trunked Transport Facility/ Mile High Capacity DS3 Mile $258.36 $257.27 $258.36 0.00 $0.00 0.00 0.00 0.00%$0.00 Direct Trunked Transport Facility/ Mile Synchronous Optical Channel OC3 Mile $276.56 $275.40 $276.56 0.00 $0.00 0.00 0.00 0.00%$0.00 Direct Trunked Transport Facility/ Mile Synchronous Optical Channel OC12 Mile $347.13 $345.67 $347.13 0.00 $0.00 0.00 0.00 0.00%$0.00 Direct Trunked Transport Facility/ Mile ESALT 2 Mbps DTF-E1 Circuit Miles $87.36 $86.99 $87.36 0.00 $0.00 0.00 0.00 0.00%$0.00 Direct Trunked Transport Facility/ Mile ESALT 2 Mbps DTF-E2 Circuit Miles $58.26 $58.01 $58.26 0.00 $0.00 0.00 0.00 0.00%$0.00 Direct Trunked Transport Facility/ Mile ESALT 2 Mbps DTF-E3 Circuit Miles $80.93 $80.59 $80.93 0.00 $0.00 0.00 0.00 0.00%$0.00 Direct Trunked Transport Facility/ Mile ESALT 2 Mbps DTF-E4 Circuit Miles $135.50 $134.93 $135.50 0.00 $0.00 0.00 0.00 0.00%$0.00 Direct Trunked Transport Facility/ Mile ESALT 10 Mbps DTF-E1 Circuit Miles $221.50 $220.57 $221.50 0.00 $0.00 0.00 0.00 0.00%$0.00 Direct Trunked Transport Facility/ Mile ESALT 10 Mbps DTF-E2 Circuit Miles $132.92 $132.36 $132.92 0.00 $0.00 0.00 0.00 0.00%$0.00 Direct Trunked Transport Facility/ Mile ESALT 10 Mbps DTF-E3 Circuit Miles $203.71 $202.85 $203.71 0.00 $0.00 0.00 0.00 0.00%$0.00 Direct Trunked Transport Facility/ Mile ESALT 10 Mbps DTF-E4 Circuit Miles $417.82 $416.06 $417.82 0.00 $0.00 0.00 0.00 0.00%$0.00 Direct Trunked Transport Facility/ Mile ESALT 50 Mbps DTF-E1 Circuit Miles $620.24 $617.63 $620.24 0.00 $0.00 0.00 0.00 0.00%$0.00 Direct Trunked Transport Facility/ Mile ESALT 50 Mbps DTF-E2 Circuit Miles $413.52 $411.78 $413.52 0.00 $0.00 0.00 0.00 0.00%$0.00 Direct Trunked Transport Facility/ Mile ESALT 50 Mbps DTF-E3 Circuit Miles $665.30 $662.50 $665.30 0.00 $0.00 0.00 0.00 0.00%$0.00 Direct Trunked Transport Facility/ Mile ESALT 50 Mbps DTF-E4 Circuit Miles $1,185.66 $1,180.67 $1,185.66 0.00 $0.00 0.00 0.00 0.00%$0.00 Direct Trunked Transport Facility/Termination Voice Grade - Two Wire & Four Wire Termination $63.56 $63.29 $63.56 0.00 $0.00 0.00 0.00 0.00%$0.00 Direct Trunked Transport Facility/Termination High Capacity DS1 Termination $153.88 $153.23 $153.88 0.00 $0.00 0.00 0.00 0.00%$0.00 Direct Trunked Transport Facility/Termination High Capacity DS3 Termination $988.15 $983.99 $988.15 0.00 $0.00 0.00 0.00 0.00%$0.00 Direct Trunked Transport Facility/Termination Synchronous Optical Channel OC3 Termination $1,028.89 $1,024.56 $1,028.89 0.00 $0.00 0.00 0.00 0.00%$0.00 Direct Trunked Transport Facility/Termination Synchronous Optical Channel OC12 Termination $2,240.20 $2,230.77 $2,240.20 0.00 $0.00 0.00 0.00 0.00%$0.00 Direct Trunked Transport Facility/Termination ESALT 2 Mbps Circuit terms $203.85 $202.99 $203.85 0.00 $0.00 0.00 0.00 0.00%$0.00 Direct Trunked Transport Facility/Termination ESALT 10 Mbps Circuit terms $249.20 $248.15 $249.20 0.00 $0.00 0.00 0.00 0.00%$0.00 Direct Trunked Transport Facility/Termination ESALT 50 Mbps Circuit terms $304.57 $303.29 $304.57 0.00 $0.00 0.00 0.00 0.00%$0.00 Multiplexing, Per Arrangement DS3 to DS1 Termination $901.57 $897.78 $901.57 0.00 $0.00 0.00 0.00 0.00%$0.00 Multiplexing, Per Arrangement DS1 to Voice Termination $348.07 $346.61 $348.07 0.00 $0.00 0.00 0.00 0.00%$0.00 Customer Node Per Node OC3 155.52 Mbps Port $935.90 $931.96 $935.90 0.00 $0.00 0.00 0.00 0.00%$0.00 Customer Node Per Node OC12 622.08 Mbps Port $2,703.78 $2,692.40 $2,703.78 0.00 $0.00 0.00 0.00 0.00%$0.00 Customer Premises Port, Per Port OC3 155.52 Mbps Port $307.09 $305.80 $307.09 0.00 $0.00 0.00 0.00 0.00%$0.00 Customer Premises Port, Per Port STS-1 51.84 Mbps Port $368.73 $367.18 $368.73 0.00 $0.00 0.00 0.00 0.00%$0.00 Customer Premises Port, Per Port DS3 44.736 Mbps Port $368.73 $367.18 $368.73 0.00 $0.00 0.00 0.00 0.00%$0.00 Customer Premises Port, Per Port DS1 1.544 Mbps Port $94.51 $94.11 $94.51 0.00 $0.00 0.00 0.00 0.00%$0.00 Add/Drop Multiplexing Central O ce Port, Per Port DS1 1.544 Mbps Port $75.64 $75.32 $75.64 0.00 $0.00 0.00 0.00 0.00%$0.00 Add/Drop Multiplexing Central O ce Port, Per Port OC3 155.52 Mbps Port $307.09 $305.80 $307.09 0.00 $0.00 0.00 0.00 0.00%$0.00 Add/Drop Multiplexing Central O ce Port, Per Port DS3 44.736 Mbps Port $189.07 $188.27 $189.07 0.00 $0.00 0.00 0.00 0.00%$0.00 Network Blocking, Per Blocked Call Network Blocking, Per Blocked Call, Applies to FGD only Call $0.01667000 $0.01660000 $0.01667000 0.00 $0.00 0.00 0.00 0.00%$0.00 ESALT Real Time CoS/QoS, Per ESALT DTF-E1 Facility ESALT 2 Mbps Facility $16.69 $16.62 $16.69 0.00 $0.00 0.00 0.00 0.00%$0.00 ESALT Real Time CoS/QoS, Per ESALT DTF-E1 Facility ESALT 10 Mbps Facility $83.39 $83.04 $83.39 0.00 $0.00 0.00 0.00 0.00%$0.00 ESALT Real Time CoS/QoS, Per ESALT DTF-E1 Facility ESALT 50 Mbps Facility $259.46 $258.37 $259.46 0.00 $0.00 0.00 0.00 0.00%$0.00 ESALT Entrance Facility Protection, Per ESALT Entrance Facility ESALT 2 Mbps Circuit $288.93 $287.71 $288.93 0.00 $0.00 0.00 0.00 0.00%$0.00 ESALT Entrance Facility Protection, Per ESALT Entrance Facility ESALT 10 Mbps Circuit $288.93 $287.71 $288.93 0.00 $0.00 0.00 0.00 0.00%$0.00 ESALT Entrance Facility Protection, Per ESALT Entrance Facility ESALT 50 Mbps Circuit $288.93 $287.71 $288.93 0.00 $0.00 0.00 0.00 0.00%$0.00 Common Channel Signaling Network Connection Signaling Mileage Facility, Per Mile Mile $8.52 $8.48 $8.52 0.00 $0.00 0.00 0.00 0.00%$0.00 Common Channel Signaling Network Connection Signaling Mileage Termination, Per Termination Termination $85.58 $85.22 $85.58 0.00 $0.00 0.00 0.00 0.00%$0.00 Common Channel Signaling Network Connection Signaling Entrance Facility, Per Facility Facility $163.87 $163.18 $163.87 0.00 $0.00 0.00 0.00 0.00%$0.00 Common Channel Signaling Network Connection STP Port, Per Port Port $844.52 $840.97 $844.52 0.00 $0.00 0.00 0.00 0.00%$0.00 Terminating Tandem Switched Transport Terminating Tandem Switched Transport Facility Minutes / Mile $0.00043700 $0.00043500 $0.00043700 87,986,631.00 $38,450.16 0.00 0.00 0.00%$0.00 Terminating Tandem Switched Transport Terminating Tandem Switched Termination Minutes $0.00227100 $0.00226100 $0.00227100 813,768.00 $1,848.07 0.00 0.00 0.00%$0.00 Terminating Tandem Switched Transport Terminating Tandem Switching Minutes $0.00572900 $0.00570500 $0.00572900 0.00 $0.00 0.00 0.00 0.00%$0.00 Suzanne Reed Home Paper Certi cation Tracking Study Area Selection Main Page Study Area Data Input Menu CAF & ARC Output Historic Reports Certi cation Instructions & Documents Contact Us Nonrecurring Charges Voice Grade Two Wire Facility $489.07 $487.01 $489.07 0.00 $0.00 0.00 0.00 0.00%$0.00 Nonrecurring Charges Voice Grade Four Wire Facility $489.07 $487.01 $489.07 0.00 $0.00 0.00 0.00 0.00%$0.00 Nonrecurring Charges High Capacity DS1 Facility $358.67 $357.16 $358.67 0.00 $0.00 0.00 0.00 0.00%$0.00 Nonrecurring Charges High Capacity DS3 Facility $483.64 $481.61 $483.64 0.00 $0.00 0.00 0.00 0.00%$0.00 Nonrecurring Charges Synchronous Optical Channel OC3 Facility $391.26 $389.61 $391.26 0.00 $0.00 0.00 0.00 0.00%$0.00 Nonrecurring Charges Synchronous Optical Channel OC12 Facility $391.26 $389.61 $391.26 0.00 $0.00 0.00 0.00 0.00%$0.00 Nonrecurring Charges Interim NXX Translation, Per Order Order $239.11 $238.10 $239.11 0.00 $0.00 0.00 0.00 0.00%$0.00 Nonrecurring Charges FGC and FGD Conversion of Multifrequency Address Signaling to SS7 Signaling or SS7 Signaling to Multifrequency Address Signaling, per 24 trunks converted or fraction thereof on a per order basis Order $480.38 $478.36 $480.38 0.00 $0.00 0.00 0.00 0.00%$0.00 Nonrecurring Charges Trunk Activation, per 24 trunks activated or fraction thereof on a per order basis Order $498.85 $496.75 $498.85 0.00 $0.00 0.00 0.00 0.00%$0.00 Nonrecurring Charges Flexible Automatic Number Identi cation (Flex ANI), per End O ce, per CIC End O ce $0.00000000 $0.00000000 $0.00000000 0.00 $0.00 0.00 0.00 0.00%$0.00 Nonrecurring Charges ESALT 2 Mbps Facility $579.64 $577.20 $579.64 0.00 $0.00 0.00 0.00 0.00%$0.00 Nonrecurring Charges ESALT 10 Mbps Facility $579.64 $577.20 $579.64 0.00 $0.00 0.00 0.00 0.00%$0.00 Nonrecurring Charges ESALT 50 Mbps Facility $579.64 $577.20 $579.64 0.00 $0.00 0.00 0.00 0.00%$0.00 Nonrecurring Charges ESALT Direct Trunked Termination, per ESALT Direct Trunked Termination installed Order $381.88 $380.27 $381.88 0.00 $0.00 0.00 0.00 0.00%$0.00 Nonrecurring Charges ESALT Entrance Facility Protection, per ESALT Entrance Facility Facility $585.89 $583.43 $585.89 0.00 $0.00 0.00 0.00 0.00%$0.00 $40,298.23 $0.00 © 2023 NECA Terms of Use |Privacy Policy