Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20190531Oregon-Idaho Utilities CAF ICC.pdf
OREGON-IDAHO UTILITIES 1023 N. Horton Street P.O. Box 1880 Nampa, ldaho 83653 208461-7802 208-461-7896 FAX RECEIVED i0l9l{Ay 3 t AH 8: 32 ,rri?ffioctJrffil8r,o* INC. Via US Mail May 31,2019 Idaho Public Utilities Commission PO Box 83720 Boise,lD 83720-0074 tl.t(- l- - n- o, RE: 2019 CAF ICC Data for Oregon-Idaho Utilities,Inc. Dear Commission, Part 54.304(d)(1) of the FCC rules require rate-of-return carriers seeking CAF ICC support to file data with the relevant state commissions by the date of NECA's annual access tariff filing. As such, enclosed please find 2019 CAF ICC data for Oregon-Idatro Utilities, Inc. which will be filed on Monday, June 17, 2019 with the FCC. Sincerely, Oregon-Idaho Utilities, Inc. Perez Controller / Corporate Secretary st28t2019 Col u Rate Elemgnt Doscription Terminating End Office Access Seruice Terminating End Office, Premium, per access minute Terminating End Office Access Seruice Terminating End Office, Non-Premium, per access minute Entrance Facility, Per Termination Voice Grade Two Wire Entrance Facility, Per Termination Voice Grade Four Wire Entrance Facility, Per Terminataon High Capacity DS1 Entrance Facility, Per Termination High Capacity DS3 Entrance Facility, Per Termination Synchronous Optical Channel OC3 Entrance Facility, Per Termination Synchronous optical channel oc12 Entrance Facility, Per Termination ESALT Z Mbps Entrance Facility, Per Termination ESALT 10 Mbps Entrance Facility, Per Termination ESALT 50 Mbps Direct Trunked Transport Facility/ Mile Voice Grade - Two Wire & Four Wire Direct Trunked Transport Facility/ Mile High Capacity DS1 Direct Trunked Transport Facility/ Mile High Capacity DS3 Direct Trunked Transport Facility/ Mile Synchronous Optical Channel oc3 Direct Trunked Transport Facility/ Mile Synchronous Optical Channel OC12 Direct Trunked Transport Facility/ N4ile ESALT 2 Mbps DTF.E1 Col E Unit of Delnand MOU MOU Termination Termination Termination Termination Termination Termination Circuit Circuit Circuit Male Mile Mile Mile Mile Circuit Miles NICA l-lome NECA Data Collections Contact U$ CAF ICC - Instructions & Document$ Logged in User: Justin Perez Home Select Company Main Page Study Area Data Input Menu ) Study Area: OREGON-IDAHO UTILITIES, INC. (ID: 532390) Holding Company: oREGoN-IDAHo UTILITIES, INC. (ID: 200000286) Intrastate Revenues (FCC TRP exhibit) option 1: View TRP Output in Excel Option 2: Download TRP Data in Excel Intrastate Revenues Test Year 2019-2020 Expected Maximum Intrastate Revenue: $O.OO Col F 7t1t2019 lnterstate Rate $0.00070000 $0.00070000 $82.70 $r32.34 $403.18 $3,681.34 $3,7s3.86 $4,007.91 $714.1 1 $769.67 $997.16 $s.88 $27,63 $240.63 $257.58 $323.31 $81.36 Col G Iest Year 20r8-2019 Current lntrastat€ Rate $0.002 I 3300 $0.002 1 3300 $83,07 $132.93 $404.99 $3.697,83 $3,77O.68 $4,025,87 $777,3t $773,72 $ 1,00 r.63 $5'91 $27,7s $24t.7L $2s8.73 $324,76 s81.72 2019 CAF ICC Data Collection Col H 7tlt2019 Proposed lntrastate Rate $0.00070000 $0.00070000 $82.70 $t32.34 $403,18 $3,681.34 $3,753,86 $4,007.91 $714.1 1 $769.67 $997.16 $s.88 127,63 $240.63 $257.58 $323.31 $81,36 https ://www. neca i nfo. org/lCC_CAF/sou rce/lntrastateTRPOutput.aspx 114 2019 ICC CAF Data Collection Col I FY 2011 lntrastate Units: Terminating for Non. Dedicated or Originating and Term inati ng ior Dedicated Elements 6s8,8O8.OO o.oo 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Col J H'l lntrastate Pricerut with 7t1t2019 proposed rntrastate rate and FY2011 Demand $46L.t7 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Col K FY 20't8 lntrastate Units: Teminating tor Nofi- Dedicated and lotal for Dedicated Elements o.oo o.oo 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CAF & ARC Output ) Historic Reports > E-Certification > Col L Test Year 2019-2020 Forocasted lntrastale Units o.oo o.oo 0.00 0.00 0.00 0.00 0,00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0,00 NfCA IR - paper Certification Tracking Logout ro Col M [(L/X]^(122r )-11'1 00 hltrastate Units Growth Rate % 0.000/o 0.00o/o 0.00% 0.00% 0.00o/o 0.000/o 0.00Yo 0.0006 0.000/o 0.00o/o 0.00o/o 0.00o/o 0.000/o 0.00Vo 0.00o/o 0.00Yo 0.00o/o Col N H'L rY 2019-20 Forecasted lntrastato Revenue $0.00 $0.00 $0,00 $0.00 $0.00 $0,00 $0.00 $0.00 $0.00 $0.00 $0.00 $0,00 $0.00 $0.00 $0.00 $0.00 $0.00 ffm-> st28t2019 2019 ICC CAF Data Collection Direct Trunked Tra nsport Facility/ Nlile ESALT 2 Mbps DTF-E2 Direct Trunked Transport Facillty/ l"lile ESALT 2 Mbps DTF-E3 Direct Trunked Transpoft Facility/ N4ile ESALT 2 Mbps DTF-E4 Direct Trunked Transport Facility/ Nlile ESALT 10 Mbps DTF.E1 Direct Trunked Transport Facility/ Nlile ESALT 10 Mbps DTF.E2 Direct Trunked Transport Facility/ Ivlile ESALT 10 Mbps DTF.E3 Direct Trunked Transport Facility/ Ivlile ESALT 10 Mbps DTF.E4 Direct Trunked Transport Facility/ Nlile ESALT 50 Mbps DTF.E1 Direct Trunked Transport Facility/ Iltile ESALT 50 Mbps DTF.E2 Direct Trunked Transport Faciliry/ Mile ESALT 50 Mbps DTF.E3 Direct Trunked Transport Facility/ Mile ESALT 50 Mbps DTF.E4 Direct Trunked Transport Facilityfiermination Voice Grade - Two Wire & Four Wire Direct Trunked Transport Facilityfiermination H i9h Capacity DS1 Direct Trunked Transport Faciliry/fermination H i gh Capacity DS3 Direct Trunked Transport Faciliryffermination Synchronous Optical Channel OC3 Direct Trunked Tra nsport Facilityffermination Synchronous Optical Channel OC12 Direct Trunked Transport Faciliry/rermination ESALT 2 Mbps Direct Trunked Transport Facilityffermination ESALT 10 Mbps Direct Trunked Transport Facilityffermination ESALT 50 Mbps Multiplexing, Per Arrangement DS3 to DS1 Multiplexing, Per Arrangement DS1 to Voice Customer Node Per Node OC3 155.52 Mbps Customer Node Per Node OC12 622.08 Plbps Customer Premises Port, Per Port OC3 155.52 lVbps Customer Premises Port, Per Port STS-1 51,84 Mbps Customer Premises Port, Per Port DS3 44.736 Mbps Customer Premises Port, Per Port DS1 1.544 Mbps AddlDtop Multiplexing Central Office Port, Per Port DS1 1.544 Mbps Add/Drop Multiplexing Central Office Port, Per Port I Circuit Miles $54.25 $s4.49 $s4.2s 0.00 $0.00 0.00 0.00 0.00o/o $0.00 Circuit Miles $80.78 $81.14 $80.78 0.00 $0.00 0.00 0.00 0.00o/o $0.00 Circuit Miles Circuit Miles Circuit Miles Circuit Miles Circuit Miles Circuit Miles Circuit Miles Circuit Miles Circuit Miles Termination lermrnatron Termination Termination : Termination $ 1 3s.26 $ 1 3s.87 $135.26 0.00 $0.00 0.00 0.00 0.00o/o $0.00 $206.30 $207.22 $206.30 0.00 $0.00 0.00 0.00 0.00o/o $0.00 $ 123.80 $ 1 24.3s $ 1 23.80 0.00 $0.00 0.00 0.00 0,00o/o $0.00 $203.33 $204.24 $203.33 0.00 $0.00 0.00 0.00 0.00o/o $0.00 $4 17.0s $418.92 $4L7.Os 0.00 $0.00 0.00 0.00 0.00o/o $0.00 5577.6s $s80.24 $s77.65 0.00 $0.00 0.00 0.00 0.00o/o $0.00 $38s.1 2 $386.8s $385.12 0.00 $0.00 0.00 0.00 0.00o/o $0.00 $664.07 $667.O4 $664.07 0.00 $0.00 0.00 0.00 0.00o/o $0.00 $ 1,183.48 $1,188.78 $ 1,183.48 0.00 $0.00 0.00 0.00 0.00o/o $0.00 $s9.20 $59.47 $s9.20 0.00 $0.00 0.00 0.00 0.00o/o $0.00 $143.32 $143.96 $L43.32 0.00 $0.00 0.00 0.00 0.00o/o $0.00 $920.32 $924.44 $920.32 0.00 $0.00 0.00 0.00 0.00o/o $0.00 $9s8.24 $962.s3 99s8.24 0.00 $0.00 0.00 0.00 0.00o/o $0.00 Circuit terms circuit terms Circuit terms Termination Termination Port Port Port Port Port Port Port Port $2.086.38 $189.85 $232.10 $283.67 $839.68 9324.2O $871.66 $2,5 18.15 $286.01 $343.40 $343.40 $88.03 $70.42 $286.01 $2,095.73 $190.70 $233.14 $244.94 $843.44 $32s.6s $87s.57 $2,529.43 $287.?9 $344.94 $344.94 $88.42 $70.74 $287.29 $2,086.38 $ 189.8s $232.10 $283.67 $839.58 $324.20 $871.56 $2,5 18.1s $286.01 $343.40 $343.40 $88.03 $70,42 $286.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0,00 0.00 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00 0,00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0,00 0.00 0.00 0.00 0.00o/o 0.00o/o 0.00o/o 0.00o/o 0,007o 0,009o 0,009o 0,00o/o 0.00o/o 0.00o/o 0.00o/o 0.00o/o 0.00o/o 0.00o/o $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 hft ps:i/www.necainfo.org/lCC_CAF/source/lntrastateTRPOutput.aspx 214 5t28t2019 OC3 155.52 Mbps Add/Drop Multiplexing Central Office Port, Per Port DS3 44.736 lt4bps Network Blocking, Per Blocked Call Network Blocking, Per Blocked Call, Applies to FGD only ESALT Real Time CoS/QoS, Per ESALT DTF-E1 Facility ESALT 2 Mbps ESALT ReaI Time CoS/QoS, Per ESALT DTF-EI Facility ESALT 10 Mbps ESALT Real Time CoS/QoS, Per ESALT DTF-EI Facility ESALT 50 Mbps ESALT Entrance Facility Protection, Per ESALT Entrance Facility ESALT 2 Mbps ESALT Entrance Facility Protection, Per ESALT Entrance Facility ESALT 10 Mbps ESALT Entrance Facility Protection, Per ESALT Entrance Facillty ESALT 50 Mbps Common Channel Signaling Network Connection Signaling Mileage Facility, Per Mile Common Channel Signaling Network Connection Signaling Mileage Termination, Per Termination Common Channel Signaling Network Connection Signaling Entrance Facility, Per Facility : Common Channel Signaling Network Connection STP Port, Per Port Terminating Tandem Switched Transport Terminating Tandem Switched Transport Facility Terminating Tandem Switched Transport Terminating Tandem Switched Termination Terminating Tandem Switched Transport Terminating Tandem Switching Nonrecurring Charges Voice Grade Two Wire Nonrecurring Charges Voice Grade Four Wire Nonrecurring Charges High Capacity DS1 Nonrecurring Charges Hiqh Capacity DS3 Nonrecurring Charges Synchronous Optical Channel OC3 Nonrecurring Charges Synchronous Optical Channel OC12 Nonrecurring Charges Interim NXX Translation, Per Order Nonrecurring Charges FGC and FGD Conversion of Multifrequency Address Signaling to SS7 Signaling or SS7 Signaling to Multifrequency Address Signaling, per 24 trunks converted or fraction thereof on a per order basis $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00l $7.94 $7.98 2019 ICC CAF Data Collection $0.00 $0.0 1660000 $0.00 $ 1 s.s3 $77.69 $24L.76 $288.40 $288.40 $0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0,00 0.00 0.00 0876$$776.87 60$ .69$289, $289.69 .69$289 $ 1 76.08 $0,0 1660000 Port Call Facility Facility Facility Circuit Circuit Circuit 00 00 00 $o $0 $0 $0.0 1670000 $78.04 $242.84 $1s.53 .00 .00 .00 .00 .00 .00 .00 .00 .00 0 0 0 0 0 0 0 $0.00 00$0 $77.69 $241.76 $288.40 $288.40 $288.40 $7.94 .69$79 I 1 s2.64 .40$288 Mile $0.00 i 0$79.69 $80 $1s2.64 $1s3.32 $786.s4 $790.06 $786.s4 05Termination Facility Port $0.00 0 00 00 0. 0 10$1 39.Minutes / Mile $0.00043700 $0.00043900 $0.00043700 Minutes $0.00226700 $o.oo2277oo $0.00226700 2zL,o23.oo $s01.06 Minutes $0.00s71800 $0.00s74400 $0.00571800 Facility $490.36 $490.36 $359.61 $484.91 Order Order 3 18,300.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0,00 0.00l o.oo l o.oo I I0.001 o.oo i $488.17 $488.17 $358.01 $482.7s $390.s4 $390.s4 $238.67 $488.1 7Facility Facility Facility 0.00 $488.17 $3 58.01 9482.7s $390. s4 $390.54 $238.67 Facil Facil itv ity 0.00 0.00 0.00 0.00 0.00 $392.29 $392.29 $239,74 $481.64 0.00 0.0079,4979.49$4 https ://www.necainfo.org/lCC_CAF/source/lntrastateTRPOutput.aspx $4 3t4 0.00 0.00 0.00 0.00 0.00 0.00 0,00 0.00 0.00o/o 0.00o/o 0.00o/o 0,00o/o 0,00o/o 0.00o/o 0,00o/o 0.00o/o 0.00o/o 0.00o/o 0.00o/o 0,00o/o 0,00o/o 0.00o/o 0,000/o 0.00o/o 0.00o/o 0.00o/o 0.00o/o 0.00o/o 0.00o/o 0.00o/o 0,000/o $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00 $0 $0 .00 .00 .00 0,00 0,00 0.00 0.00 0.00 $0 $0.00 00 00 00 $0. $0. $0.0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $0.00 $0,00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00 0.00 0.00 5t28t2019 2019 ICC CAF Data Collection Nonrecurring Charges Trunk Activation, per 24 trunks activated or fraction thereof on a per order basis Nonrecurring Charges Flexible Automatic Number Identifi cation (Flex ANI), per End Office, per CIC Nonrecurring Charges ESALT 2 Mbps Nonrecurring Charges ESALT 10 Mbps Nonrecurring Charges ESALT 50 Mbps Nonrecurring Charges ESALT Direct Trunked Termination, per ESALT Direct Trunked Termination installed Nonrecurring Charges ESALT Entrance Facility Protection, per ESALT Entrance Facility Order $497.93 $s00.15 $497.93 0.00 $0.00 0.00 0.00 0.00o/o $0.00 End office $0.00oooooo $0.00000000 $0.00000000 0.00 0.00 0.00 0.00 0.00 $0.00 $0.00 $0.00 $0.00 $0,00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00o/o 0.00o/o 0.00o/o 0.009o 0.00o/o $0.00 $0.00 $0.00 $0.00 $0.00 Facility Facility Facility $578.s7 $s78. s7 $578. s7 $s81.16 $58 1.16 $s81.16 $s78.s7 $578.57 $s78.s7 Order $38 1.18 $382.89 $381,18 Facility $584.82 $s87.44 $s84.82 0.00 $0.00 s1,101.33 0.00o/o o201s NECA Terms ol U$ | Pivacy Policy https://wwwnecainfo.org/lCC_CAF/source/lntrastateTRPOutput.aspx 4t4 o.oo I aral $o.oo I $0.00 |I 5t2812019 2019 ICC CAF Data Collection 2019 CAF ICC Pata Collection NfeA li$me NCCA Data Collections Contsct U$ CAf ICC - Instructions & Documents NrCA IR - paper Certification Tracking Logout Logged in User: Justin Perez .,**i Home Select Company Main Page Study Area Data Input Menu ) CAF & ARC Output ) Historic Reports ) E-Certification ) Study Are.: OREGOII-IDAHO UTILITIES, INC. (ID: 532390) Holding Company: OREGOI{-IDAHO UTILITIES, INC. (ID: 200000286) Acccss RGcoYGry ChargGs Recalculate ARC Rates & CAF Supporl revenues Test Period 2019-20 Pre-True-up Vi€w Test Period 2019-20 Post-True-Up (Filing) View Test Period 2O19-2O2O Post True-Up (Filing) View ExchangelZone R*$ident;sl Lirres exeluding Li{elifies 51 83 20 t43 69 50 Residential ARC Residential ARC Revenue SLB Lines SLA ARC SLB ARC Revenue MLB Lines MLA ARC MLB ARC Revenu€ Total ARC RevenueName Adrian Jordan Valley/R1 Jordan Valley/R1A Jordan Valley/R1B Ridgeview South Mountaln Study Area Summary $2.40 $3.00 $3.00 $2.40 $0.89 $2.10 $1,468.80 $2,988.00 $720.00 $4,1 1 8.40 $736.92 $1,260.00 7LL,292.L2416 ,rl $3.ool 1756.001 1o4l $3.ool $,744.oo1 $rs,7ez.rzl @ 2019 NECA hft ps://www.necainfo.org/l CC_CAF/source/ARCChanges.aspx Tm5 of Uso I Privaq Poliq 1t1 st28t2019 2019 ICC CAF Data Collection 2019 CAF ICC Data Collection NECA Home NECA Data Collections Contact Us CAf lCC - In$tructions & Documents NECA IR - Paper Certification Tracking Logged in User: Justin Perez Home Setect Company Jtlain Page Study Area Data Input ilenu ) CAF & ARC Output ) Hlstoric Reports ) E-Certification ) Study Area3 OREGON-IDAHO UTILITIES, INC. (ID: 532390) Holding Company: OREGON-IDAIIO UTILITIES, INC. (ID: 200000286) Study Area USAC Reports I View printer-frlendly repoft |2O1g USAC D.t t port G.n P.rlod 2orr-2020) CONNECT AMERICA FUND IData to be provided to USAC/FCC in June 2019 for CAF ICC Purposes] Settlement Type: Cost i$ Test Period 7l'1119-0130120 Post True-up (Filing) View Rate-of-Return (ROR) Carrier Revenue Requirement 1 2011 Interstate Switched Access Revenue Requirement $742,416 2 FY 2011 Intrastate Term Switched Access Revenues 3 FY 2011 Net Reciprocal Compensation Revenues $28s,482 $0 4 zOLl ROR Carrier Base Period Revenue (Line 1 + Line 2 + Line 3)$ 1,027,898 5 ROR Carrier Baseline Adjustment Factor (0.95 ^ 8)0.663420 6 ROR Carrier Revenue Requirement (Line 4 x Line 5)$681,928 7 Pool Administration Expenses $20,166 8 Total ROR Carrier Revenue Requirement (Line 6 + Line 7)17o2,o94 Revenues from Reformed Intercarrier Compensatlon (ICC) Rates 9 Interstate Switched Access Revenues $73,s18 10 Interstate Allocated Switched Access Revenues#$ 133,493 1 1 Transitional Intrastate Access Service Revenues $783 72 Net Transitional Reciprocal Compensation Revenues $0 13 Total ICC Revenue (Line l0 + Line 11 + Line 12)*134,276 Eligible Recovery 14 TRS Increment $2, s88 15 Regulatory Fees Increment $0 10 NANPA Increment $o 17 Interstate Local switching Support for Price Cap Affiliates or Estimated Duplicate LsS Costs in CAF U $0 18 Adjustment for Double Recovery or Corrections $0 19 Test Period L7/LBfrueup - Net Impact on Total Eligible Recovery $4,839 20 Eligible Recovery (Line8 - Line 13) + (Line 14 + Line 15 + Line 16 + Line 18 + Line 19) -(Line 17)1575,245 Revenues from Acccss Recovery Charg€s (ARC) 2l Residential ARC Revenues $7t,292 22 Single Line Business ARC Revenues $7s6 23 Multi-Line Business ARC Revenues $3,744 24 Total ARC Revenues (Line 21 + Line 22 + Line 23)1L5,792 Connect America Fund (CAF) ICC Support** 25 Connect America Fund (CAF) ICC Support (Line 20 - Line 24)$559,453 R.evised CAF ICC Support with Imputed ARC R.evenues to. Brcadband-Only Loops 26 ARC Revenue Adjustment following "Second Order on Reconsideration & Clarification" FCC 18-13 $0 27 Adru.ted Test Perlod 2o19-2O2O CAFTCC Support (Line 25 - Llne 26)$ss9,4s3 NOTES: *Per FCC Designation Order, calculated as (Sum of Une 9 for all TS pool pafticipanB) * (Line 1/ Sum of Line 1 for all TS pool padiopants) "NECA 6tlmate provided for lntormatlonal purposes only - adual to be cakulated by USAC, @2019 NECATms of Use I Pdvacy Poliry https://www.necainfo.org/l CC_CAF/sou rce/USACData.aspx '11 iliu>