BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
IN THE MATTER OF THE APPLICATION )
OF NEUSTAR,INC.,ON BEHALF OF THE )CASE NO.GNR-T-15-06
IDAHO TELECOMMUNICATIONS )
INDUSTRY,FOR APPROVAL OF )NOTICE OF APPLICATION
NUMBERING PLAN AREA RELIEF FOR )
THE 208 AREA CODE )NOTICE OF
)MODIFIED PROCEDURE
)
______________________________
)ORDER NO.33355
On July 21,2015,Neustar,Inc.filed an Application seeking approval to implement a
“Relief Plan”for the 208 area code,which has been projected to run out of available numbers in
mid-2018.Neustar made this Application in its capacity as the administrator of the North
American Numbering Plan (“NANP”),and on behalf of the Idaho telecommunications industry
(‘Tndustry”).’Neustar’s proposed Relief Plan includes the addition of a new area code for the
entire State of Idaho,which is currently served only by the 208 area code.Neustar further
recommends a 16-month implementation period.The overlay relief plan will require all
customers to dial ten digits for all telephone calls (both local and long-distance).
NOTICE OF APPLICATION
YOU ARE HEREBY NOTIFIED that in April 2015,Neustar reported that the 208
number plan area (“NPA”)is projected to exhaust during the second quarter of 2018.Due to the
projected exhaust of available numbers,Neustar notified the Industry on April 14,2015,that area
code relief needed to be addressed.On June 9,2015,Neustar conducted a conference call with
Industry representatives to discuss relief alternatives.Specifically,two relief options were
discussed:(1)overlaying a new area code for all services (“Overlay”);and (2)splitting the state
into two or more area codes (“Split”).
YOU ARE FURTHER NOTIFIED that the Overlay alternative would superimpose a
new [area code number]over the same geographic area covered by the existing 208 NPA.All
existing customers would retain their 208 area code and would not have to change their
Industry is composed of current and prospective telecommunications carriers operating in,or considering
operations within,the 208 area code of Idaho.
NOTICE OF APPLICATION
NOTICE OF MODIFIED PROCEDURE
ORDER NO.33355 1
telephone numbers.Application at 4.Notably,“however,ten-digit local dialing would be
required by all customers within and between NPAs in the affected rate areas.’Id.at 3.Neustar
claims that the Overlay alternative has a projected life of 66 years.Id.at 4.
YOU ARE FURTHER NOTIFIED that in the Split alternative,Idaho would be split
into two or more geographic areas and new area codes would be assigned to the areas formed by
the split,and one area would retain the 208 NPA.All split plans require ten-digit dialing
between different NPAs.However,within the same NPA,seven-digit dialing would be
permitted.Id.Neustar stated in its Application that “the proposed boundary line would run
along rate center boundaries starting at the Oregon border between Riggins and New Meadows
rate centers and [would continue]east and then turn southward ending at the Nevada border
between the Three Creek and Oakley rate centers.”Id.at 3-4.According to Neustar,the area
north and east of the boundary line has a projected life of 68 years,and the southwestern portion
has a projected life of 65 years.Id.Neustar has not proposed which geographic area would keep
the 208 area code.
YOU ARE FURTHER NOTIFIED that during the June conference call,Industry
representatives discussed the attributes of both alternatives.Participants on the conference call
included incumbent local exchange carriers,competitive local exchange carriers,cellular
carriers,broadband carriers,Commission Staff,and Neustar Relief Planning experts.See
Exhibit A at 9.At the conclusion of the call,a consensus was reached to recommend that the
Commission adopt the all-services overlay with a 16-month implementation schedule,as
follows:
EVENT TIMEFRAME DATE
Total Implementation Period 16 months -
Start Network Preparation and Customer Education 6 months TBD
Start of Permissive 7-digit and 10-Digit Dialing Period
(Calls within 208 NPA can be dialed using 7 or 10 digits)9 months TBD
and continued Customer Education
Mandatory dialing at the end of the Permissive Dialing -TBD
Period during 4Q2017
First Code Activation after end of Permissive Dialing I months TBD
Period (‘Effective date for codesfrom new NPA)
YOU ARE FURTHER NOTIFIED that Neustar has indicated that the Commission
has some flexibility in choosing implementation dates on the proposed schedule.See Exhibit A
NOTICE OF APPLICATION
NOTICE OF MODIFIED PROCEDURE
ORDER NO.33355 2
at 7.In setting dates,Neustar has encouraged the Commission to give serious consideration to
what time of year is best to introduce dialing changes,as well as the length of time to allow for
permissive dialing.Neustar recommends that the Commission avoid major holidays and tourism
seasons.Finally,Neustar recommends that mandatory dialing begin six months prior to the
forecasted exhaust for the 208 NPA,which would be fourth quarter 2017.
YOU ARE FURTHER NOTIFIED that Neustar has requested that this Application be
processed under Modified Procedure.
NOTICE OF MODIFIED PROCEDURE
YOU ARE FURTHER NOTIFIED that the Commission has determined that the
public interest may not require a formal hearing in this matter and will proceed under Modified
Procedure pursuant to Rules 201 through 204 of the Idaho Public Utilities Commission’s Rules
of Procedure,IDAPA 31.01.01.201 through .204.The Commission notes that Modified
Procedure and written comments have proven to be an effective means for obtaining public input
and participation
YOU ARE FURTHER NOTIFIED that any person desiring to state a position on this
Application may file a written comment in support or opposition with the Commission within 60
days from the date of this Notice.The comment must contain a statement of reasons supporting
the comment.Persons desiring a hearing must specifically request a hearing in their written
comments.Written comments concerning this Application shall be mailed to the Commission
and Neustar at the addresses reflected below:
Commission Secretary Kimberly Miller,Counsel
Idaho Public Utilities Commission Neustar Inc.
P0 Box 83720 1775 Pennsylvania Ave.NW,4th Floor
Boise,ID 83720-0074 Washington,DC 20006
E-mail:kimherlvini Icr(neustarhiz
Street Address for Express Mail:
472 W Washington Street
Boise,ID 83702-59 18
These comments should contain the case caption and case number shown on the first page of this
document.Persons desiring to submit comments via e-mail may do so by accessing the
Commission’s home page located at wwpucJdalioov.Click the “Case Comment or Question
NOTICE OF APPLICATION
NOTICE OF MODIFIED PROCEDURE
ORDER NO.33355 3
Form”under the “Consumers”tab,and complete the comment form using the case number as it
appears on the front of this document.These comments must also be sent to Neustar at the e
mail address listed above.
YOU ARE FURTHER NOTIFIED that the Application and supporting documents
have been filed with the Commission and are available for public inspection during regular
business hours at the Commission offices.The Application is also available on the
Commission’s web site at www,puc.idaho.gov.Click on the “File Room”tab at the top of the
page,scroll down to “Telecom Cases,”and then click on the case number as shown on the front
of this document.
YOU ARE FURTHER NOTIFIED that if no written comments or protests are
received within the time limit set,the Commission will consider this matter on its merits and
enter its Order without a formal hearing.If written comments are received within the time limit
set,the Commission will consider them and,in its discretion,may set the same for formal
hearing.
ORDER
IT IS HEREBY ORDERED that the Application of Neustar,Inc.shall be processed
by Modified Procedure,IDAPA 31.01.01.201-204.Persons interested in submitting written
comments in this matter must do so no later than 60 days from the service date of this Order.
NOTICE OF APPLICATION
NOTICE OF MODIFIED PROCEDURE
ORDER NO.33355 4
DONE by Order of the Idaho Public Utilities Commission at Boise,Idaho this
day of August 2015.
PAUL K LLAN ,PRESIDENT
&&tg/jki
MARSHA H.SMITH,COMMISSIONER
ATTEST:
O:GNR-T-15-06_bk
NOTICE OF APPLICATION
NOTICE OF MODIFIED PROCEDURE
ORDERNO.33355
Q)
KRIfNE RAPER,CO MISSIONER