HomeMy WebLinkAbout20120223final_order_no_32468.pdfOffice of the Secretary
Service Date
February 23,2012
BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
IN THE MATTER OF THE APPLICATION )
OF CABLE ONE,INC.FOR AN )CASE NO.GNR-T-11-05
INVESTMENT TAX CREDIT FOR )
INSTALLING QUALIFYING BROADBAND )ORDER NO.32468
EQUIPMENT )
On September 19,2011,the Commission received an Application from Cable One,
Inc.(“Cable One”or “Company”)requesting an Order,pursuant to Commission Order No.
28784 and Idaho Code §63-30291(4),confirming the Company’s broadband investments in
Idaho during tax years 2008,2009,and 2010.
THE APPLICATION
In the Application,Cable One states that it delivers high-speed data services through
a “Hybrid Coax Network”(HCN)designed to offer data services using bi-directional fiber optic
receivers,transmitters and related equipment.The HCN provides transmission rates of 1,500
Kbps to over 4 Mbps.The Company estimates that 99.9%of its customers have access to
broadband services and the Company’s system reaches approximately 91%of the population in
the areas served by Cable One.The Company confirmed that the switching equipment and
routers for Ti and Internet connections “in front”of the head ends are not included in the
qualifying equipment list.The Application includes materials and labor necessary to bring the
cable to the outside of the subscriber’s house.Cable One asserts that with the upgraded
equipment and services,it increased the connectivity speeds for Idaho subscribers.
When determining broadband expenses,the Company explains that it is standard
industry practice to use 60%to identify the cost to extend the drop to a house;whereas current
engineering suggests the outside cost to be closer to 80%since most homes are pre-wired.In its
Application,Cable One elected to take the more conservative approach by using 60%for its drop
material and drop labor.In addition,expenses for the cable systems crossing the border to
Oregon and Washington were reduced by 5%and 35%,respectively,to reflect the drop spending
for Idaho Systems.
After Staff review of the Application and follow up discussions with Cable One,the
Company submitted a revised itemization of its broadband investments for the three year period
ORDER NO.32468 1
of 2008-2010.Each year’s broadband investment is discussed below.See Revised Head End
and Plant Expenditures for Broadband Tax Credit.
2008 Broadband Equipment Expenses
By the end of calendar year 2008,Cable One estimates 383,993 potential subscribers
are served by the Company.Approximately 2,900 miles of aerial coaxial RF distribution plant,
3,180 miles of underground coaxial RF distribution plant,and 1,095 miles of fiber optic cable are
in use by the cable television systems serving Boise,Idaho Falls,Lewiston,Twin Falls,
Pocatello,and surrounding areas.The Company invested approximately $18,648,800 in 2008.
2009 Broadband Equipment Expenses
By the end of calendar year 2009,Cable One estimates 384,734 potential subscribers
are served by the Company.Approximately 2,960 miles of aerial coaxial RF distribution plant,
3,390 miles of underground coaxial RF distribution plant,and 1,153 miles of fiber optic cable are
in use by the cable television systems.The Company invested approximately $15,380,400 in
2009.
2010 Broadband Equipment Expenses
By the end of calendar year 2010,Cable One estimates 387,204 potential subscribers
are served by the Company.Approximately 2,970 miles of aerial coaxial RF distribution plant,
3,410 miles of underground coaxial RF distribution plant,and 1,225 miles of fiber optic cable are
in use by the cable television systems.The Company invested approximately $7,032,460 in
2010.
STAFF REVIEW
Staff reviewed the list of proposed broadband equipment submitted by Cable One and
found that the equipment identified meets the statutory criteria outlined in idaho Code §63-
30291(3)(b).Staff determined that Cable One’s installed equipment is “necessary to the
provision of broadband service and an integral part of a broadband network.”Idaho Code §63-
30291(3)(b)(i).
Staff noted that some of the itemized investments contained in the Application were
for expenses associated with the rerouting or replacement of existing broadband network
facilities as a result of road or utility construction.These expenses did not necessarily expand
the availability of broadband services to additional subscribers.The Company asserts that these
expenses were accepted in past applications.Staff noted that in the Commission’s most recent
ORDER NO.32468 2
Order assessing the Company’s broadband investments in Idaho,the Commission stated that the
Idaho Tax Commission is best qualified to determine the eligibility of such investments.See
Order No.30506 at 3.
Consequently,Staff can state that the itemized equipment meets the eligibility
requirements for broadband services pursuant to Idaho Code §63-30291,hut Staff was not
prepared to offer a judgment as to the qualification of the expenses associated with relocation or
replacement of portions of Cable One’s network.It is for the Idaho Tax Commission to
determine whether investments identified as ‘replacement.”‘reroute,”relocation.”or
“realignment”on the itemized list of expenses are eligible for a tax credit as a “qualified
investment”under Idaho Code §63-2039B(3),rather than pursuant to Idaho Code §63-20291.
Further,Staff believes Cable One’s adoption of standard industry practice of an estimated 60%
allocation is conservative and accepts this estimate for expense related with “drop spending.”
Staff recommended that the Commission issue an Order confirming the equipment is
qualified broadband equipment and forward the approving Order along with a copy of the
original Application to the Idaho Tax Commission.
COMMISSION FINDINGS
In order to be eligible to obtain the tax credit,the taxpayer must first obtain an Order
from the Commission “confirming that the installed equipment is qualified broadband
equipment.”Idaho Code §63-30291(4).‘Such qualifying equipment shall be necessary to the
provision of broadband service and an integral part of a broadband network.”Idaho Code §63-
30291(3)(b)(i).Qualified broadband equipment is defined as those network facilities capable of
transmitting signals at a rate of at least 200.000 bps to a subscriber and at least 125,000 bps from
a subscriber.Idaho Code §63-3029l(3)(b).If the equipment is installed by a cable or open
video system operator,“such qualifying equipment must extend from the subscriber’s side of the
headend to the outside of the structure in which the subscriber is located.”Idaho Code §63-
3 0291(3)(b)(iii).
Based upon our review of the Application and the recommendations of Staff,we find
that the Application for a qualifying broadband equipment Order should be granted.Cable One
has adequately demonstrated that during the tax years of 2008,2009,and 2010 it has installed
qualifying broadband equipment subject to the tax credit.
ORDER NO.32468
The Commission also finds that the installed equipment is an integral part of the
Company’s broadband network and that it is necessary to facilitate the delivery of broadband
Internet service to Idaho customers.It is therefore appropriate for the Commission to issue this
Order confirming that the equipment identified in Cable One’s Application is qualifying
broadband equipment.The Commission makes no findings regarding the costs of the installed
broadband equipment.”Order No.30506 at 3.In addition,the Commission makes no finding
whether Cable One,Inc.may obtain a tax credit for broadband equipment that replaced existing
broadband equipment.”Id.
ORDER
IT IS HEREBY ORDERED that the Application of Cable One,Inc.seeking an Order
certifying that it has installed qualifying broadband equipment in Idaho during tax years 2008,
2009,and 2010 is granted.
IT IS FURTHER ORDEREI)that a copy of this Order and a copy of Cable One’s
Application be served upon the Idaho State Tax Commission.
THIS IS A FINAL ORDER.Any person interested in this Order (or in issues finally
decided by this Order)may petition for reconsideration within twenty-one (21)days of the
service date of this Order with regard to any matter decided in this Order.Within seven (7)days
after any person has petitioned for reconsideration,any other person may cross-petition for
reconsideration.Idaho Code §61-626,63-30291(4).
ORDER NO.32468 4
•....••DONE by Order of the Idaho Public Utilities Commission at Boise,Idaho this
day of February 2012.
,4’,
I /
——,__//_
PAUL KJELLAJ1fyR:paEsIDENT
MACK A.REDFORD,C MISSIONER
Out of the Office On this Date
MARSHA H.SMITH,COMMISSIONER
ATTEST:
///J4(l
Jean D Jewell
Cmmission Scretary
O:GNR-T-1 1-O5np
ORDER NO.32468 5