Loading...
HomeMy WebLinkAbout20120814Application.pdfCmTHIA A.MELILL0 PLLC 8385 W EMERALD STREET •BoisE,IDAHO 83704 (208)577-5747 cam@camlawidaho.com 11:37 August 14,2012 VIA HAND DELIVERY Jean Jewell Idaho Public Utilities Commission 472 W.Washington .7j3 —[_I -t)/P.O.Box 83720 Boise,ID 83720-0074 Re:Custer Telephone Broadband Services LLC’s Application for Broadband Tax Credit Certification Dear Ms.Jewell: Enclosed for filing,please find the original and four copies of Custer TelephoneBroadbandServicesLLC’s Application in the above referenced case.Please conform one of thecopiesandreturnittome. If you have any questions,please feel free to contact me. Sincerely, Cynthia A.Melillo CAM! Enclosures CAM to IPUC end 2011 BR tax credit application (CTBS) Cynthia A.Melillo [ISB No.5819] CYNTHIA A.MELILLO PLLC 8385 W.Emerald Street Boise,ID 83704 Telephone:(208)577-5747 Fax:(208)361-3441 carn(carnlawidaho.corn i::;::P12:26 Attorneys for Custer Telephone Broadband Services LLC BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION fl’THE MATTER OF THE APPLICATION OF CUSTER TELEPHONE BROADBAND SERVICES LLC FOR BROADBAND TAX CREDIT CERTIFICATION Case No.C T —7 )( CUSTER TELEPHONE BROADBAND SERVICES LLC’S APPLICATION Custer Telephone Broadband Services LLC (“CTBS”or “Applicant”),by and through its attorneys,Cynthia A.Melillo PLLC,files this Application for an Idaho Public Utilities Commission (“Commission”)order certifying that certain telecommunications equipment is eligible for the broadband infrastructure tax credit authorized by Section 63-3029,Idaho Code. In support of its Application,CTBS states as follows: 1.CTBS is a provider of basic local exchange service,broadband telecommunications service and other telecommunications services in southern Idaho. 2.During the calendar year 2011,CTBS made certain investments that constitute “qualified broadband equipment”within the meaning of Section 63-3029(I)(3)(b),Idaho Code. Exhibit A,attached hereto,describes CTBS’s qualified broadband equipment and contains the information and representations required by this Commission’s Order No.28784 in Case No. GNR-T-01-10. CUSTER TELEPHONE BROADBAND SERVICES LLC’S APPLICATION - 3.Communications regarding this Application should be addressed to the following: Cynthia A.Melillo CYNTHIA A.MELILLO PLLC 8385 W.Emerald Street Boise,ID 83704 (208)577-5747 carn@carnlawidaho.com Teresa Westergard Custer Telephone Cooperative,Inc. 1111 South Main Street P.O.Box 324 Challis,ID 83226 adrniii@custertel.net 4.Applicant does not believe that the public interest requires a hearing on this matter and,therefore,requests that the Commission approve the Application by Minute Order or under Modified Procedure.In the event the Commission determines that further proceedings are necessary,Applicant stands ready for immediate hearings. WHEREFORE,CTBS requests that the Commission issue its order determining that the installed equipment identified in Exhibit A constitutes qualified broadband equipment eligible for the investment tax credit authorized by Section 63-30291,Idaho Code. RESPECTFULLY SUBMITTED this 14th day of August 2012. Cynthia A.Melillo CYNTHIA A.MELILLO PLLC Attorneys for Custer Telephone Broadband Services LLC CUSTER TELEPHONE BROADBAND SERVICES LLC’S APPLICATION -2 CERTIFICATE OF SERVICE I HEREBY CERTIFY that on this 14th day of August 2012,I caused to be served a true and correct copy of the foregoing by the method indicated below,and addressed to the following: Jean Jewell,Commission Secretary U.S.Mail Idaho Public Utilities Commission Hand Delivered 472 West Washington Street Overnight Mail P.O.Box 83720 Facsimile Boise,ID 83720-0074 CyTtMa A.Melillo CUSTER TELEPHONE BROADBAND SERVICES LLC’S APPLICATION -3 Idaho Broadband Equipment Tax Credit Application Company Information 1.Name of company: Custer Telephone Broadband Services LLC. 2.Address: Box 324, 1101 East Main Ave., Challis Idaho 83226 Physical Location: 400 Shoup Street, Salmon, ID 83467 3.Type of company: Cable Modern HSI, Fixed Wireless HSI, CATV Provider 4.Contact person: Teresa Westergard, Box 324, Challis Id 83226 admin@custertel.net 208-879-2281 Equipment Description 5.Broadband services offered: Cable Modem HSI, Fixed Wireless HSI 6.Network description: Fiber Optic Fed CATV System that provides Cable Modem Service. Fiber optic transport electronics. Fiber optic backbone and distribution cable. 7.Transmission rate: 256,000 bits per sec - 1,000,0000 bits per sec from a subscriber 256,000 bits per sec - 6,000,000 bits per sec to a subscriber 8.Number and percentage of 800 customers with broadband out of Idaho customers served: 2,000 possible 9.Equipment list: See attached Broadband Equipment List I hereby certify that I have read the applicable statutes for broadband investment income tax credit and believe that the equipment listed herein qualifies for the tax credit under Idaho Code 63-30291. Teresa Westergard Custer Telephone Broadband Services LLC. Cu s t e r Te l e p h o n e Br o a d b a n d Se r v i c e s LL C Br o a d b a n d Eq u i p m e n t Li s t Ma n u f a c t u r e r / P r o v i d e r Mo d e l or ID No . Co s t Da t e s In s t a l l e d Co u n t y Lo c a t i o n s Ci s c o UB R K 10 K Ro u t e r $ 1 83 , 8 7 2 . 8 0 De c e m b e r 20 1 1 Le r n h i : fo r th e Sa l m o n Ci s c o 35 6 0 Sw i t c h $ 16 , 0 7 5 . 0 6 Ex c h a n g e WO # 20 1 0 - 8 Co r n i n g Fi b e r Op t i c Ca b l e $ 11 , 7 9 6 . 0 2 Fe b r u a r y 20 1 1 Le m h i : fo r th e Sa l m o n Ex t e n s i o n to Sy r i n g a Lo d g e Ex c h a n g e WO # 20 1 0 - 1 1 Au r o r a Fi b e r To Th e No d e $ 18 1 , 4 7 9 . 7 9 De c e m b e r 20 1 1 Le m h i : fo r th e Sa l m o n Eq u i p m e n t Ex c h a n g e WO # 20 1 0 - 1 4 Co r n i n g Fi b e r Op t i c Ca b l e $ 36 , 3 6 2 . 3 4 Ju n e 20 1 1 Le m h i : fo r th e Sa l m o n St e e l e Me m o r i a l Ho s p i t a l Ex c h a n g e WO # 20 1 0 - 2 1 Da n p e x Fi b e r Op t i c Tr a n s p o r t S 1, 1 5 5 . 8 9 Fe b r u a r y 20 1 1 Le m h i : fo r th e Sa l m o n Ex c h a n g e WO # 20 10 - 2 6 Ca n o p y Ca n o p y 5. 7 GH Z 5 11 , 2 4 3 . 7 6 Fe b r u a r y 20 1 1 Le r n h i : fo r th e Sa l m o n Ac c e s s Po i n t s / S y r i n g a Ex c h a n g e WO # 2 0 1 1 - 2 Lo d g e Ca n o p y Ca n o p y 5. 7 MH Z $ 6, 3 8 7 . 3 0 De c e m b e r 20 1 1 Le m h i : fo r th e Sa l m o n Wi r e l e s s Su b s c r i b e r Ex c h a n g e WO # 20 11 - 5 Mo d u l e s Fu j i t s u Fi b e r Op t i c Tr a n s p o r t $ 1 19 . 2 5 Fe b r u a r y 20 1 1 Le m h i : fo r th e Sa l m o n Ca r d Fo r 43 0 0 Ex c h a n g e WO # 20 1 1 - 8 Co m i n g Fi b e r Op t i c Ca b l e $ 13 , 0 8 2 . 5 6 De c e m b e r 20 1 1 Le m h i : fo r th e Sa l m o n Ca l i x 76 0 GX ON T $ 6, 4 3 4 . 6 7 Ex c h a n g e WO # 20 1 1 - 9 Ca n o p y Ca n o p y 5. 7 MH Z $ 15 , 1 9 6 . 8 8 De c e m b e r 20 1 1 Le m h i : fo r th e Sa l m o n Wi r e l e s s SM & Ex c h a n g e WO # 20 1 1 - 1 3 AP Fo r Du m p Hi l l Gr a n d To t a l $ 48 3 , 2 0 6 . 3 2 Vork order cost summary Nork order description Nork order number rotal overhead rotal Cost New UBR10K for Salmcn 12010-8 I I 73,884 81 I 199947861 yes oh I I es I Quantity)Unit matenal costIndividualassets)items Part Number i IFootage UBR10012 W2 PRE-2,2 DTCC and 2 MC5x2OH curds 1 port GE half slot line card UBR10012 Series DC Power Entry Module Full length base carrier for half slot line card UBR RF Switch 1000 Base LX)LH SFP DOM) PowerWrox Select Fuse Panel Seismic Enclosure 84 X 28 four post rack Standalone 24 Port 10f100)1000 3560 Switch 1G Network Module 4 x SFP 1000 Base LX)LH SFP (DOM) U10012-2d5x20H-H ESR-HH-1 GE UBP1O-PWR-DC BSR-HH-Carrier UBR-RFSW SFP-GE-L PWX-041 RCA4GIYSPWP WS-C3560-24T-S C3KX-NM-1 G SFP-GE-L 1 00 2 00 2 00 1 00 1 00 400 1 00 1 00 2,00 200 5 00 Total matenal Labor and Total unit cost Total cost Actcostoeerheadallocated 69,394.00 6939400 4067141 11006541 11006541 1 14068 10,40000 20.80000 12 19076 1649538 32990.76 114068 130000 2.60000 1.52384 2,061 92 4.12384 1 14068 52000 52000 30477 82477 82477 1.1406 8 16,60000 15.60000 9.14307 24.74307 24,743.07 1.14068 57200 228800 1,34098 90725 3,62898 1.1406.8 1,001 05 1,001 05 566.71 1.58776 1,587.76 1.1406.8 3,72500 3.72500 2.18320 5,90820 5,90820 1.1406.8 3,377.50 260.00 572.00 6,75500 520 00 2,86000 3.95907 304 77 1,67623 5,357.03 412 38 907 25 10,714,07 824 77 4,536 23 1.1406.S 1,1406.8 1 1406.,J Labor and Overhead Summary Labor hmpLoyee Payroll Cost4NameDateHours 113 313112010 2.00 123.47 113 4/6-19/2010 7.00 501 20 113 5/3-4/10 400 23412 105 8/18-20110 1200 553,65 115 8/19/2010 600 28345 105 9/8-22/10 11 50 55728 115 9/13&22110 1950 1,12439 115 10/8/2010 1000 47687 /36 10/6/2010 800 37877 /05 1/10/2010 14.00 72392 15 11/29/20/0 1400 74970 /31 1/30/200 3200 t,151.33 136 11/3/2010 1000 38132 131 12/7-8/0 700 28228 131 3/17-3I1 2200 745.15 131 4/t-20/1 4600 1,769.71 See attached sheet for detail 5/31/2C 1 22500 9,2C6.59 See attached sneet fordeta/7/19-28/11 1800 769.08 131 8/2-3/11 700 26581 Total labor 47500 20,28809 Special Invoices Vencor CosNameDateC/reck Mid-State Cor.sultants 5/4/2010 25994 410.00 Syr.nga Netwoms 7/14/2310 11747 S 3,03960 S (2,860 00/ 179.60 -. —S 179.60 Syringa Networks 7/29)2010 11765 .—------——i S 8.12490 S (7.275 00) 849.90 --———S 849 90 Syringa Networks 8/26/200 11815 ‘“12559092 5)111,202 00) 14,38892 “ “‘S 14,38892 KGP Logistics 9/14/2010 11833 13456 OTCI OH Material 9/30/2010 t64 98 Syririca Netwo’ks 9/22/2010 11852 18,19900 KGP Logistic.10/3/2010 11870 811 83 KGP Logistics 10/13/2010 11882 30327 KGP Logistics 10/27/2010 11911 ‘1 01362 S (1,001.05) 12.57 -r’—---—S 1257 KGP Logistics 11/8/2010 11922 158.56 Power Producl Services 11/8/2010 11929 1,271 00 KGP Logistics 11/8/2010 11933 36664 KGP Logistics 11/8/2010 11933 “.3,99581 $(3,725,00) 27081 -.-S 27081 CTCI OH Material 11/30/2010 1068 KGP Logistics 11/19/2010 11959 7202 KGP Logistcs 11/19/2010 11959 4765 Benclennpordiem 11/29/2010 11954 5000 CTC)OH Material 12/29/2010 12497 Stagecoach Inn 12/15/2010 25846 83.18 AN)6/8/2011 12273 t3,98000 CTCI OH Material 5/24/2011 18.14 Total Special Invoices 52,00828 Sales tax ____________ Use Tao 8.07*1091 94.54 71*18 20.60 82.9.51.76 21 1,588.44 Veh.Sep. Plow Sop.- POAD FreIght Misc. Total labor and overhead 73,884.81 Work order cost summary Work order description Work order number Fiber Extension to Syringa Lodge 12010-11 yes Individual assets/items:Quantity/F ootage Unit material cost Total material Labor and Total unit cost Total cost ActcostjoverheadallocatedII BFO 12 1,540.00 0.30 466 31 11 .329.71 766 11,79602 1.2423.1 — 5,833.37 1.1406.7 Total overhead Total cost r 16,932.48 I 17.62939 yes ok CAT’.’Flooded 500 500.00 0.46 230.60 5,602.77 11 67 0.76 696.91 16,932.48 19.33 17,629.39 Labor and Overhead Summary Employee Name Payroll -- Hours Cost 105.00 682.50 200.00 321.00 952.50 37.04 14.40 5148.25 (466.31) (230.60) 4,451.34 +—4,451.34 6.39310 40.00 38.00 Labor Cost#Date 134 5/27/2010 4.50 234.74 134 7/19-26/10 6.00 233.54 104 8/24/2010 2.00 84.39 113 9/28/2010 1.00 84.78 104 10/4-18/10 43.00 1858.74 118 10/13/2010 5.00 251.53 127 10/13-14/10 8.00 334.25 136 10/18/2010 4.00 189.38 139 10/4&18/10 8.00 229.20 201 10/18/2010 2.50 119.32 204 10/18/2010 3.00 77.73 Total labor 87.00 3,697.60 Special Invoices Vendor Name Date Check MidState Consultants 5/14/2010 26053 MidState Consultants 6/3/2010 26105 Lemhi Co.Road and Bridge 6/15/2010 11694 MidState Consultants 6/15/2010 26167 MidState Consultants 6/24/2010 11704 MidState Consultants 7/9/2010 11730 MidState Consultants 7/29/2010 11767 CTCI OH Material 10/31/2010 Rays Heating 11/8/2010 1 1 930 MidState Consultants 11/5/2010 11936 MidState Consultants 1/5/2011 12026 Total Special Invoices 13,234.88 Sales tax Use Tax Veh.Exp. Plow Exp. POAD Freight Misc. Total labor and overhead 16,932.48 Work order cost summary Work order description Work order number Total overhead Total cost I yes 5k I yes salmon HeodEnd Acrora 3 RU Advanced Mid Piano Chasss Ccmmunicalicns Msdu’e 1 0HZ bundwidlh tranmitler AC ycwer supply wilh display AC pcwer supply wilhccl display salmon Ceetrol Office Aarora 3 RU Advanced Mid Plane Chassis CH3000N Ccmmuniculiuns Mcdcln CX3002 1 0HZ bsndwidth Iranmiller AT3303O-N-1-AS OpliTrace Elemevl Msnsgemenl suttware SW-EM030-AU OpliTrace Crull Monogemenl Ssftware EW-CMS 10-AU Fsrwurd Pals Ansing Receiver AR30020-1-AS Pack Plole fnr lear dual cegmenl reneiuers BP-3lOdC-AS Pock Plole Icr Is prsvide mid plane msunled c OP-AS Dual relurn channel digilal receiver DR3021-AE DC pswer supply with display PS31d8D DC pswer supply withcul display PS3148N salmon Central Office ATX equipment MN5EA ACTIVE CHASSIS MNSEA DC POWER SUPPLY ASS ROHS MNDC 10,2206,OoAs PD,P Cane 20db is TPs QMN100022OP/P MAXNET RP DETECTOR1SWITCH,F,ROHS MNRSP MAXNET 20 DO DC P 5 Op 6 COMPLIANT MN2ODCPP MAXNET ODE DC PS Op 6 COMPLIANT MNSDCPP MAXNET 15 WAY SPL,EQUALIZER,P.S Op MN1STSPP-E MAXNET DIPLEX PILTER 42104 MHZ MN9655P MAXNET TRIPLE 2-WAY MODULE MN2-3PP MN56 SRU CHASSIS MNSO MAXNET DUAL 2-WAY COMBINER MN2-2TCPP MAXNST DUAL 4-WAY COMBINER MN4-2TCPP IvIAXNET DUAL 4-WAY SPLITTER Mtu4-2TSPP MAXNET S-WAY COMBINEP.EQUALIZED MN8TCPP-E 2 00 2.00 6 00 1.00 1,00 1.00 2.00 1.00 6.00 2.00 2.00 1 00 1 00 1 00 1 CS 1.02 1 00 1 00 1 00 6 00 6.00 1 00 2 SO 2,00 1,00 1,00 1 00 1 00 1.00 1,00 1 00 3 00 3 CO 3 CO 2 CO 280 560 00 470 552 00 1146 667600 4.200,00 420000 14000 14000 630 00 630 00 726 00 1 456 00 9600 9800 756.00 4,53600 936 00 1,67600 626 00 1,652 00 476 47600 1146 1,14600 705 700 00 630 CO 630 00 756 CO 756 00 2,492.00 2,492.00 84 CO 84.00 938 CD 938 00 2,492.00 14,95200 8400 50400 31769 31769 53508 1,07016 51738 1,03476 001 69 501 69 7369 7369 7369 7369 24415 244 15 286.69 285 69 12923 12923 19400 19400 9877 25631 16062 48186 16062 46186 122 15 24430 1,26267 911.34 1,82267 1,14068 2,145 54 1,54927 309854 114068 15.50381 3,72997 22,37981 11406.8 9,47054 13,67004 1367004 1,1406.8 31567 45567 45567 11406.8 1 42051 2.05051 2,05051 1,14068 328295 236947 4,73855 1,1406.8 22097 31897 31897 114068 10.227 64 2,460,61 14,76364 114068 422995 3,05268 6,10595 1,1406.8 3 72496 268844 5,37688 114068 1.07327 1,54927 1,54827 1,14068 2.58387 3,72597 372697 114068 57834 2 20 34 227634 1 14266 42051 205051 20505’1 14068 1704.61 2.46061 2,46061 1,14368 55’665 8,110 89 8,11089 11406.8 18940 27340 27340 114368 2,114.98 3,052.98 3,05296 11406.8 33,713.34 8,11089 4866534 1.1406.8 1 13640 27340 1.64040 114068 71632 1,034.01 1,034.01 11406,8 2,41297 1,741 56 3.483 13 11406,8 233315 1,68395 3,36791 1.14268 1,131 20 1.63289 1,53289 114258 16615 23984 239.84 1.1435.8 156 15 23964 23964 1 1406.8 55050 79465 79465 1 14068 54417 92986 92986 1 14068 29138 42061 42061 1 1406.8 43743 631 43 631 43 1 14068 56811 32147 55442 114066 1,08648 52278 156834 114068 ‘46545 52278 156634 114066 55054 397.57 795 Id 114268 F.Oer in 15€None 12010-14 I 125,721 71 I 181,479791 [Individual assets/items’Part Number 0uomj UniI maredal cost Totalntenal oset’aated1 Total and cost Total cast Ant CH3000N 100 285 280 DC 63134 91134 91’34 1,1406,8 CX3CO2 100 476 47600 ‘0/327 1 54927 1,54927 114066 AT3303O-N-1-AS 1 00 1146 1,14600 256397 372897 3,72997 1 14068 P630050 1 00 700 70000 1 57834 2,278.34 2,27834 I 14068 PS3505N 1 SC 588 58600 1,32581 1,913.81 1,91381 1.14068 Seare Aurora Communications Madam CX3002 1 0HZ bundwidt9 Ivunmilter A733O3O-N-1-A5 AC pswer supy y wrth dissisy P533050 Ps’wa’c Pain Sea cg Receiver AR33020-1-AS OuaI return cnunrel n’siioI receive’DR3321-AS NC403C senes 4s4 segmeniable opt’col east NC42215055-u0000000 Plug in 2 125 00/s transceiver Mndu1e TR400OcI DC pswer supply witn disslay P031480 Nodes in Pield Aurora NC4200 senes 4 s4 segmenaEIe optical nsdt NC42215055-L0000000 Plug in 2 126 Os/s Iransceiver Msduie TR4000-PI Salmon Central Office Fiber Media Ccnverter TX/AX matcned pair CFM-3450-8O3/5 20 tnr link Irom HITS in HE Is RPD230C in central olsce Piker Mediu Csnustter TXIRX mulched pair CPM-3450-60315 20 tsr link trsm cenirol stflce LAN Is HE tsr Aurora cnntrsl netwsrk 1 20 74250 74250 1,574 17 2.41687 241667 1 2231 100 74250 74250 1.57417 2,415 67 2,416 67 1 2231 26 10545 55,758.08 129,121.11 91.41881 191,419.19 Labo,sod Overhead Sunonaso Dale Pay Cost 125 92422/4 1204 04’54 113 01-3312 2150 I 05595 441 92493412 1600 72545 ‘13 724273 I 00 6997 /53 97-3917 1134 ‘7495 ‘13 ‘0212010 4234 395744 20’506,2313 400 ‘7665 ‘75 11/10274 200 ‘4012 1/3 ‘‘2754 4370 154439 I’S 11/2970/0 400 8398 113 t2’I-D”O 350 40275 I’S ‘22-103 3354 I 46399 127 ‘22-104 3196 I 25509 113 34-29’’500 36462 Seee/le00009/e499000”-3’’12456 519699 9o’eu/Isc’,oo 6’0]54700’1 77123’’9996 439054 Sees/IeoneCc/e0437.c’l 53070‘‘9500 2947°7 531 72923’’206 9,59 201 72-27/I 3490 I 57699 See snachad ble3k7702n 977911 9300 309095 113 1775,2711 199 5655 201 10/16-27,/I 5200 55494 201 11/1979/I 390 14051 204 /l/197011 200 6655 Oslal labor 33800 3442995 Date Check 6,dSIaIe Ccosullaos 6/1 9/2013 26167 29700 Pc,D’orn 6/2212010 11699 19000 6,dSlate Consultants 674/2710 51704 32900 6149/ale ConsultsOs 78/2010 11777 29700 Son 6o,sboski 7/9/2050 11733 9150 6,49/ate Consultants 779/2010 11767 3921 70 6,dOtole Corsulta,,to 9/0/2010 11795 /29600 6,40/ate Consultants 9/3/2010 26426 9290 6149/ate Consul/ants 9722010 11660 23590 6,dotete Consultants l0/9/2010 26559 16490 6,49/ale Consul/a//Is I0/l0/2010 26609 28700 M,dototo Consullonts Il/5/2D/2 //939 79650 135 lI/t7/20/0 /1954 M,4S/ote Consulonls t1/IS/2017 11961 367003 M,dhtsts Consunslls I 1/30/2010 11970 57400 379500 Sale/ISa 1215/77/I t 52276 6 4753500 ICS 12520/0 11986 6439404 6 5269024 044’X_ I 475524 6 405724 6,451410 Coosuoass ‘217270 12000 45423 1167 ‘216,7011996 74464 7,456/c Consulaos /225200 11/016 93319 014914/a Ccosullan/s 1777’l 0329 34923 ,0’,30t4/oCcneuld’2s ‘79201 12350 173-96 6,dStats Consultants 2/10701,12099 8450 FCc’Cc/it CaseShoc-0°ue/eparoo 22923’-’27097 799 6 1620 MnsStateCo/sunspIs 223,2111’2113 21120 699/steCo,,eu/e5’,s 07,2011 12/34 49956 56-2311 1217’097 145 o/cooCuT 339 ‘94/cole.5525’l’l/S’u 44799 We6Fs/4oCuT%T9taoIo,oles 6/522/‘2/62 133479 Wells Fs,oo,’CLT 070 Noto,o,usIO/lOtI/2t82 -—2923 6 559/96 6 /542909/ 5260 6 15160 6’dSlaIeConsultants 4/6/201/t 2179 59227 61491410Consuhaots 3/3177//12153 67490 179 4/2220/I 12197 39946 7073-Corn Seo,ceo,Inc 4/107011 12196 265000 6/dSIule Consultanta 4/227011 12204 9099 F/bet Cot/c Cable 5000730//c Fa,3o 4/277011 /2206 79694 6 /74200/ 9444 $5444 MldSl4te Co7441ts516 4/27/2011 12210 12679 Do/Os,Slates 5/11/2011 12240 260,70 ICS 5/19/loll 12245 6306t Oos,on T6CO Inc 9/19/2711 /2240 300030 Seals Cornlton/os,Inc 6/0/20/1 /2279 77600 bodet Slates 6/8/20t//7278 22529 Wells Fs’o595 ,oonnslocd 9/227//12274 37236 Tech-Corn ServIces Inc 5/23/201//2290 1227000 lC9 6/29/201/12295 39773 M,dSIaIoCOt’cultjnts 6/29/2011 2300 9450 59640764101,414 n/3I7o/t 1971 756909 Meleouls 9/9/2011 50044 6,40/4/0 Consuflants 9/15701’12410 31 70880 6,97/a/c Cones//ante 9/207011 12437 25636 6,491a/c Consul/an/s 10/20701 I 12471 I 07525 6,35/Ic Oonssnr/s 10702511 12479 29255/ no 114231112498 I 7755, dsocPooce,1122’2011 11527 99007 M 40/s/s Co/,6u57’ls 1272311 25177 I 6-05/a/a Cones/sOs 12292311 12577 ‘7’56 MOSaIc 70445215 12292211 1.777 21703 M99/ateConsulsnls 102012 ‘1592 56925 076579 Va/cola /2317211 13774’ 6 09135 Coossoanls ‘231 24’’’26/5 113 /4 6,00toIoCo,’s,Oan/s ‘7,22 ‘2507 /3470 noIaI Sesclal lnoelcss -—6708202 Use Tas 371372 73/7 1’’4u0’243 44’57027’62 09.7 77.’,)90.37 55.47 n73I504’a9 09.1392.23 83 Plo,.Eso P000 M,ac Work order cost summary Work order description Work order number Staking project to Steel Memorial Hospital with fiber 2010-21 I Total overhead Total cost F yes Individual assets/items.Quantity/Footage Unit material cost Total material Labor and Total unit cost Total cost i cost i overhead allocated - ___________________lAct 288 Aerial Fiber Optic Cable BFO12 Buried Fiber Optic Cable 2420.00 804,00 3,38 8,18896 0.32 258.14 2706216 853 08 1457 35.25112 1,2421.1 1.38 1,111 22 1.2423.1 3.70 8447.10 27,915.24 15.95 36,362.34 I 2791524 I 36,362 34 I yes ok Labor and Overhead Summary Labor Employee Payroll Cost#Name Date Hours 118 2/7/2011 5.00 243.33 104 3/23/2011 3.00 113.31 113 3/22/2011 1.00 58.46 118 3/24-25/11 8.00 369.78 127 3/24-25/11 6.00 247.43 201 3/23/2011 3.00 172.38 118 4/1-6/11 19.00 852.31 127 4/1/2011 5.00 345.31 118 5/25/2011 5.00 232.93 127 5/25-31/11 21.00 940.92 127 6/1-8/11 34.00 1450.61 Total labor 110.00 5,02677 Special Invoices Vendor Name Mid-State Consultants Mid-State Consultants Mid-State Ccnsultants Mid-State Consultants City of Salmon Mid-State Consultants Mid-State Consultants Mid-State Consultants Mid-State Consultants Idaho Power KGP Logistics KGP Logistics CTCI OH Material KGP Logistics CTCI OH Material Tech-Corn Services,Inc Border States KGP Logistics KGP Logistics Date 8/6/2010 9/3/2010 9/22/2010 11/5/2010 11/3/2010 11/19/2010 12/15/2010 12/29/2010 1/5/2011 1/24/2011 1/28/2011 2/23/2011 3/31/2011 4/15/2011 4/29/2011 4/15/2011 5/11/2011 5/26/2011 6/3/2011 Cost 1,632.52 348.00 525.00 157.50 25.00 18.59 38.00 52.50 10.11 240.00 136.35 ‘“8,188.96 fiber Total Special Invoices 21,545.01 Sales tax ___________ Use Tax 8.18+491.34+207.9+114.06+130.45+21.17+34.1,343.46 Veh.Exp. __________ Plow Exp.- POAD ________ Freight ___________ Misc. ___________ Check 11797 26428 11860 11936 11931 11961 12000 12016 12026 12052 12065 12111 514 06 12187 7,540.20 258.14 fiber 12196 3,781.60 12240 352.90 12252 572.36 12259 5,600.32 Total labor and overhead 27915.24 Work order cost summary Work order description Fiber Opt c Transport mesa converters for lns;te tower canopy backhaul Work order number 1201026 I Total overhead I I I jes I Ok I Total cost 1.15569 yeS Individual assets/items Part No Quantity/F Unit material cost Total material Labor and Total unit cost Total cost Actoolagacostoverheadallocated Media Converter WDM SM Sirryle Fiber 10/100 SC .--- Matched Pair Danpeo 34500 1310/1550 CFM-3450-BD3/5 20 100 742.50 7420 41339 1.15589 1,15589 1 2231 74250 74250 41339 115559 1155.89 Labor and Overhead Summary Labor Employee Payroll Cost#Name Date Hours 131 1/6&7/11 600 262.14 Total labor 6.00 262.14 Special Invoices Vendor CostNameDateCheck Fiber Optic Cable Shop 10/27/2010 VISA/26636 —$758.76 S(742.50) 16.26 4 $16.26 Border States Total Special Invoices Plow Exp. POAD Freight Misc. 1/5/2011 12027 84.40 10066 Sales tax Use Tax 45.53+5.06 Veh.Exp. 50.59 413.39Totallaborandoverhead Work order cost summary Work order description Work order number Total overhead Canopy Access Points for Syringu Lodge 12011-2 I 4,18426 I Total cost 11,243761 yes Individual assets/items:I QuanfityiF IPartNo.Total material Labor and I Total unit coal Total cost Act.Unit material cost Coat overhead allocated Media Converter WDM SM Single Fiber 10/100 SC Matched Pair Danpes 34505 1310/1550 Canopy 5.7 GHZ Advantage Access Point DDB Outdoor encloser APO 5750AP 300 1 00 1,53900 4,61700 1,70000 1,70000 2.736 56 2.45119 7.35356 1.1406 4 1,007.61 2,70761 2.70761 1.14064 3,981.50 7059.50 4,184.26 6,341.39 11,243.76 yes ok CFM-3450-BD315 20 1.00 742.50 74250 44009 1,18259 1,182.59 1 2231 Labor and Overhead Summary Misc. Cost •—$758.70 $(742.50) 16.20 ..--$16.20 44.46 211 12 33.04 25.28 —$4,632.00 $(4,617.00) 15.00 i $15.00 ____—*1,986.36 $(1 700.00) 286 36 i 286.36 Labor Employee Payroll Cost#Name Date Hours 127 1/27-28/11 6.00 266.63 131 1/27/2011 2.00 74.89 139 1/27/2011 5.00 171.24 127 2/1-2/2011 10.00 555.79 131 2/3-9/2011 14.50 589.42 139 2/1-2/2011 10.00 353.85 201 2/3-9/2011 9.00 410.75 204 2/9/2011 3.00 91.72 Total labor 59.50 2,514 29 Special Invoices Vendor Name Date Check Fiber Optic Cable Shop 1/28/2011 12064 Havemann Ace Hardware 2/4/2011 12074 CDW 2/4/2011 12075 Allied Builders Supply 2/3/2011 27004 CDW 2/15/2011 12094 3dB Networks 2/15/2011 12095 3dB Networks 2/15/2011 12095 CTCI OH Material 2/28/2011 581.70 Total Soecial Invoices 1,213 16 Sales tax Use Tax 45.52+12.67÷1.52÷277.92+119.18 Veh.Exp. Plow Exp. POAD Freight 456.81 Total labor and overhead 4.184,26 Work order cost summary Work order description Work order number Canopy SM Radio work order 12011-5 I no Quantity/Total material Labor andIndividualassets/items:Unit matenal cost Total unit Cost Total costFootagecostoverheadallocated MOlD CANOPY 5.7 MHZ 12.00 230.67 284004 801 30 30344 3641 34 MOTO CANOPY 5.7 MHZ 7.00 237.04 1,65928 468 16 30392 2,12744 MOTO CANOPY 5,7 MHZ 9.00 237.04 2,13336 601 91 303.92 2,735.27 MOTO CANOPY 5.7 MHZ 5.00 237.04 1,18520 33440 303.92 1,519.60 MOTO CANOPY 57 MHZ 4.00 231.80 92720 261 60 29720 1,18880 MOTO CANOPY 5.7 MHZ 3.00 231.80 69540 196.20 29720 891.60 MOTO CANOPY 5.7 MHZ 8.00 231.80 1,85440 523.21 29720 2,377.61 MOb CANOPY 5.7 MHZ 6.00 231.80 1,39080 392.41 297.20 1.78321 MOTO CANOPY 5.7 MHZ 3.00 231.80 69540 196.20 29720 891 60 MOTO CANOPY 5.7 MHZ 7.00 231.80 1.62260 457.81 297.20 2,080.41 MOb CANOPY 5.7 MHZ 1.00 231.80 231.80 65.40 297.20 29720 MOTO CANOPY 5.7 MHZ 3.00 231.80 69540 19620 297.20 891 60 Tstat Taken Out of inventory to Workorder 68.00 2.802,19 15,930.88 4,494.80 3,592.81 20,425.68 MOTO CANOPY 5.7 MHZ Jan 1 00 (250 87)(250 87)-(250.87)(250 87) MOTO CANOPY 5.7 MHZ Feb 2.00 (251 26)(502 52)-(251 26/(502 52) MOTO CANOPY 5.7 MHZ March 3.00 (251 26)(753 78)-(251.26)(753.78) MOTO CANOPY 5.7 MHZ June 200 (245 71/(491 42)(245 71)(491.42) MOTO CANOPY 57 MHZ Aug 4.00 (245 71)1982.84)-1245 71)(982.84) MOW CANOPY 5 7 MHZ Sept 6.00 /24571)11.474 26)-/245.71)/1,474 26) MOTO CANOPY 57 MHZ Nov 2.00 245.71)(491 42)/245 71)(491 42) MOTO CANOPY 57 MHZ Dec 37.00 (245.71)(9,091 27j (245.71)/9,091 27) Total Taken Out of Work order Back to Inventory 57.00 4.49480 1,834.07 6,387.30 Ii Canopy’s 41900 54,609.00 1.1406.4 lw/OH)51,778.30 1.7991.93 Total overhead Tota)cost I 4,49480 I I 6,387 30 I yes I Ok I Total Net to Go Into Plant 11.00 2,551.32 15,68001 Labor and Overhead Summary Labor Employee Payroll Cost#Name Date Hours 204 204 11/22/2011 3.50 119.94 Totallabor 350 119.94 Special Invoices Vendor CostNameDateCheck CTCI OH Material 1/31/2011 812.48 CTCI OH Material 2/28/2011 90.41 CTCI OH Material 3/31/2011 1,156.23 CTCI OH Material 4/30/2011 539.60 CTCI OH Material 5/31/2011 496.63 CTCI OH Material 6/30/2011 19550 CTCI OH Material 7/31/201 1 857.99 CTCI OH Material 8/31/2011 276.76 CTCI OH Material 9/30/2011 (110.99) CTCI OH Material 10/31/2011 811.87 CTCI OH Material 11/30/2011 69.40 CTCI OH Material 12/31/2011 (1,776.89) Total Special Invoices 3,418.99 Sales tax 184.6+71 1+85.32+71.10+55.64+13.91+111.28 955.87 Use Tax __________ Veh.Exp. Plow Exp. POAD ________ Freight ___________ Misc. ___________ Total labor and overhead 4494.80 Work order cost summary Work order description Work order number Total overhead Total cost IT-i Card for Fujitsu 4300 2011-8 I 6751 I 119251 yes Ok I I yes I 112.50 112.50 6.75 119.25 119.25 Quantity/Fl Total material I Labor andIndividualassets/items:Unit material cost Total unit cost Total costootagecostoverheadallocated Enhanced OS1 Path Performance 100 112.50 112.50 6.75 11925 119.25 4’? Labor and Overhead Summary Labor Employee Payroll Cost#Name Date Hours Total labor -- Special Invoices Vendor CostNameDateCheck Total Special Invoices - Sales tax Use Tax 6.75 Veh.Exp. Plow Exp. POAD Freight Misc. Total labor and overhead 6.75 Work order cost summary Work order description Work order number Fiber to the Salmon Business and Inovation Center 12011-9 I Total overhead Total cost yes 1,258.92 3,814.96 15,702.27 6,44060 19,517.23 I 15702271 I 19517231 yes ok I Quantity/F I Total material I Labor andIndividualassets/items:Unit material cost I I Total unit cost Total cost Actootagecostoverhea9allocated 760GX ONT 1 00 1,25776 1.25776 5.17691 6.43467 6.43467 1.2232 CABLE C048 3,660.00 0.579600 2,121 34 8.731 37 297 10.85271 1.2421.1 CABLE BF048 752.00 0 579601 43586 1.793 99 297 2 22985 1.2423 1 Labor and Overhead Summary Employee Name Payroll Hours Labor Cost#Date 113 5/23/2011 2.00 117.86 113 10/19/2011 2.00 117.16 201 10/17-19/11 9.50 382.72 118 11/4-7/11 10.00 481.24 127 11/4-8/11 13.00 643.89 132 11/16/2011 5.00 190.63 201 11/3-7/11 2.50 117.20 204 11/3/2011 0.50 17.14 127 12/1/2011 5.00 222.02 Total labor 49.50 2,289 86 Special Invoices Vendor CostNameDateCheck MID-STATE CONSULTANTS 6/29/2011 12300 2,91 7.10 MID-STATE CONSULTANTS 7/6/2011 12313 290.63 MID-STATE CONSULTANTS 8/5/2011 27700 1971 Idaho Power 8/25/201 1 12390 995 00 KGP Logistics 11/8/2011 12508 783.82 Havemanns Ace Hardware 11/3/2011 12506 6.34 Tech-Com Services.Inc 11/4/2011 12498 6481.50 CTCI OH Materials 11/15/2011 645.66 CTBS OF Materials 12/31/2011 346.41 Idaho Power 12/31/2011 310.00 MID-STATE CONSULTANTS 12/31/2011 12592 216.56 MID-STATE CONSULTANTS 12/31/2011 12618 123.75 Total Special Invoices 13,13648 Sales tax 75 47 75.47 UseTax 19.44+27.59+15343 20046 Veh.Exp. Plow Exp. POAD Freight Misc. Total labor and overhead 15,702.27 Work order cost summary Work order description Work order number Canopy 5.4 AP for dump hill tower 12011-13 I yes I 369 25 11406 4 7.754 26 1.1406,4 3,536.69 1.1406.4 3.53669 3,53669 1.1406.4 6,206.20 12,073.29 3,123.59 7,811.87 15,196.88 Total overhead Total cost I 3,12359 I 15,196 yes ok I Quantity/F I Total material I Labor andIIndividualassets/items:Unit material coal I I I Total unit cost Total cost ActIoolagecostoverheadallocated MOTO CANOPY 5 4 0HZ SM 1 00 293 35 293 35 75 90 36925 MOTO CANOPY 5.4 GHZ SM 21 00 293 35 6,16044 1 59382 369.25 Dump Hill ---- MOTO CANOPY 54 0HZ Access Point 1.00 2,809.75 2,80975 72694 3,53669 Spare - MOTO CANOPY 5.4 0HZ Access Point 1.00 2,809.75 2.80975 726.94 Labor and Overhead Summary Total Special Invoices 58504 Sales tax ___________ Use Tax 370 98+1760+369.63 _________ Veh.Exp. ___________ Plow Exp. __________ POAD ________ Freight ___________ Misc. ___________ Labor Employee Payroll Cost#Name Date Hours 113 10/20/2011 1.00 87.86 118 10/20/2011 6.00 299.54 131 10/20/2011 6.00 239.17 139 10/20/2011 6.00 209.76 201 10/20-21/11 7.50 302,13 131 11/2/2011 6.00 220.81 201 11/2/2011 3.50 164.04 204 11/2/2011 7.50 257.03 Total labor 43.50 1,780.34 Special Invoices Vend or Name 3dBNetworks 3d B Networks Date 8/5/2011 8/25/2011 Check 12357 12393 Cost 21.48 ‘-—‘---—-—--> $6,183.06 $(5,619.50) 563.56 <-$563.56 —758.21 Total labor and overhead 3,123.59