Loading...
HomeMy WebLinkAbout20230714Comments_1.pdf1 The following comment was submited via PUCWeb: Name: Suzanne Knorr Submission Time: Jul 14 2023 7:12AM Email: drywellboise@gmail.com Telephone: 208-703-2453 Address: Highlander Road Boise, ID 83709 Name of U�lity Company: Veolia Case ID: VEO-W-23-01 Comment: "Many households have dry wells and were wai�ng for water, some for over a year. I support construc�ng mainlines because residents have already or may run out of water in their wells in the future. The rate of development will con�nue and may accelerate if the decisions of our current commissioners at the city and county levels are any indica�on. One important considera�on is that when the PUC approves the proposal, it will be a PERMANENT change in procedure. In the future, if there is a need to install water mainlines, it would simply be a mater of Veolia nego�a�ng with the local municipality. This would bring Veolia water to affected well owners faster than the current process. However, our water supply is under the control of a very large foreign-owned corporate conglomerate whose corporate goals may or may not be in the best interests of Treasure Valley residents. Meanwhile, development is in overdrive, and the push is for increased density, which places more demand on the aquifer. IDWR already established the water table in South and Southwest Boise is receding by a foot per year. The groundwater flow model was only recently released and scenarios based on the water flow model have barely begun. Purveyors can simply raise rates on subscribers as the water table recedes and costs of obtaining water increases. Water is a necessary element for survival, and as such should always remain affordable. At least in this case, residents do not directly bear the cost of construc�on and will have reduced costs to hook up in the future under the ARPA agreement. For these reasons, I support PUC approval." --------------------------------------------------------------------------------