Loading...
HomeMy WebLinkAbout20051104Complaint.pdf- - --. \ ,., "' ;LL:L \'t:. BrIKC~S(f!)lNr (f!J1t~i\rATTORNEYS AT LAW r)\-" c.: ":1- Li od"; Molly 0 Leary j' iL ;(ib? ~: ~~~\j ~SI0H Tel: 208-938-7900 Fax: 208-938-7904 molly0'ri chard so n ando I ea 'y,com O, Box 7218 Boise, ID 83707 - 515 N, 27th Sr. Boise, ID 83702 November 4 , 2005 Ms. Jean Jewell Commission Secretary Idaho Public Utilities Commission POBox 83720 Boise ID 83720-0074 RE: Case No. U UJ1;: -uJ -05 -oS- Dear Ms. Jewell: Enclosed please find an original and seven (7) copies of the COMPLAINT OF JAYO CONSTRUCTION, INC., COMPLAINANT, vs. UNITED WATER IDAHO, INC. RESPONDENT. I have also enclosed an extra copy to be service-dated and retumed to us for our files. Thank you. Sincerely, WJ\Gt~ Nina Curtis Administrative Assistant encl. ; -... . Molly O'Leary (ISB # 4996) Richardson & O'Leary PLLC 515 North 27tl1 Street O. Box 7218 Boise, Idaho 83707 Telephone: (208) 938-7900 Fax: (208) 938-7904 " - 1. C', i' , ' ,' ! (': ,.;,-- ) Cji;;ci;~;Simi Attorneys for J ayo Construction, Inc. BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION JA YO CONSTRUCTION, INe. Respondent. CASE NO. UwI:-Lv---OS- -oS' COMPLAINT Complainant vs. UNITED WATER IDAHO, INC. COMES NOW, JA YO Construction, Inc., a duly organized Idaho corporation (hereafter Jayo Construction" or "Complainant") by and through undersigned counsel, and files this FORMAL COMPLAINT against United Water Idaho, Inc. (hereafter , " United Water" or Respondent") for violation of its Special Facilities Tariff. This Complaint is submitted pursuant to Rule 54 of the Rules of Procedure of the Idaho Public Utilities Commission ("Commission IDAPA 31.01.01.054 COMPLAINT United Water Idaho, Inc. is a regulated public utility subject to the Idaho Public Utilities Commission s jurisdiction pursuant to Title 61 ofthe Idaho Code. JA YO CONSTRUCTION COMPLAINT AGAINST UNITED WATER IDAHO - 1 Jayo Construction, Inc. is a duly organized Idaho corporation in the business of developing residential subdivisions. Doug Jayo is president of Jayo Construction. Jayo Construction is developing an 88-10t subdivision in the north Boise Foothills commonly know as Sommerset Ridge Subdivision No.4 ("Sommerset Ridge 4" ). See Complainant's Exhibit 1 , attached. In December of2004, United Water agreed to provide service to Sommerset Ridge 4, pursuant to its "tariffs, rules and regulations as filed with the Idaho Public Utilities Commission.See Complainant's Exhibit 2, attached. In January of2005 , United Water sent Mr. Jayo a "Special Facilities Analysis" for Somerset Ridge 4, identifying the need for additional water storage capacity to serve the new subdivision as well as meet United Water s "Existing Peak Storage Needs" and existing fire protection needs. See Complainant's Exhibit 3 , attached. In January of2005, United Water directed Jayo Construction to obtain an attached. easement" for a new reservoir ("New Claremont Reservoir ). See Complainant's Exhibit 4 The location of said easement was determined by United Water, based on its desire to tie the New Claremont Reservoir into United Water s Existing Claremont Reservoir. See Complainant's Exhibit 5, Affidavit of Doug Jayo, attached. Unlike United Water s Existing Claremont Reservoir, which sits below the line of sight of adjoining building lots, the location of the proposed New Claremont Reservoir is in full view of said adjoining lots. Id.; see also Complainant's Exhibit 6, attached. 10.On or about August 1 2005, Jayo Construction purchased an easement ftom Claremont Realty Company for siting ofthe New Claremont Reservoir. The purchase price was $226 239.00 ("Easement Purchase Price ). See Exhibit 7, attached. 11.Although characterized as an easement, construction of an above-ground water storage reservoir on the site identified by United Water will consume virtually the entire market JA YO CONSTRUCTION COMPLAINT AGAINST UNITED WATER IDAHO - 2 value ofthe easement property as a Boise Foothills building site due to the size and location of the proposed New Claremont Reservoir. See Complainant's Exhibit 8, attached. 12.Although characterized as an easement, construction of a water storage reservoir on the site identified by United Water will negatively impact the market value of adjoining building sites due to the proposed water reservoir s prominence in relation to surrounding building lots. 13.Due to the lack of options regarding siting of the proposed New Claremont Reservoir, its size, and its view obstruction in relation to other valuable Boise Foothill building lots, the Easement Purchase Price paid by Jayo Construction was fair, just and reasonable. See Complainant's Exhibit S. 14.United Water s "Special Facilities Tariff' requires United Water to "construct and/or install special facilities as may be required ftom time to time to maintain the rendering of adequate water service to existing customers.See Paragraph 76, sheet No. 24, United Water Idaho, Inc.s Rules and Regulations Governing Water Main Extensions, Complainant's Exhibit , attached. 15.According to United Water s calculations, it needs 60 100 gallons of storage capacity to meet its Existing Peak Storage Needs in the existing Somerset Ridge and Claremont subdivisions. See Complainant's Exhibit 3. 16. capacity to meet fire protection requirements for its existing customers. Id. According to United Water s calculations, it needs 116 000 gallons of storage 17. Existing Claremont Reservoir, it needs 86 700 gallons of new storage capacity. Id. According to United Water s calculations, given the 90 000-gallon capacity ofthe 18.According to United Water, its new storage needs represent 44% of the water storage capacity ofthe proposed New Claremont Reservoir. Id. 19.Based on its Special Facilities Tariff, United Water offered to share in 44% of the cost of siting and constructing said new reservoir. !d. 20.United Water s 44% share of the Easement Purchase Price is $99 545.16. JA YO CONSTRUCTION COMPLAINT AGAINST UNITED WATER IDAHO - 3 21.Paragraph 75 of United Water s Special Facilities Tariff requires United Water to submit an "advance and refund agreement" governing the terms of an Applicant's advances in aid of Special Facilities construction to the Commission for approval. See Complainant' Exhibit 22.United Water acknowledged its duty to submit said agreement to the Commission for its approval in a letter to Jayo Construction dated January 20 2005. See Complainant's Exhibit 4. 23.Based on the chronological list of action items in United Water s January 20tlJ. letter to Jayo Complainant, it is clear that United Water understood that a Special Facilities Agreement should be submitted to the Commission for its approval early on in the process. !do 24.United Water acknowledged that time was of the essence in "managing the project schedule" for the New Claremont Reservoir Id. 25.Despite United Water s acknowledgement that time was ofthe essence in managing the project schedule, and in violation of its Special Facilities Tariff, United Water did not even provide Jayo Construction with a draft Special Facilities Agreement until August 11 2005 - seven months after it acknowledged its obligation to do so, and 10 days after Jayo Construction concluded the purchase of the easement United Water directed it to obtain. See Complainant's Exhibit 10 attached. PRAYER FOR RELIEF 26.Based on the foregoing facts, Complainant hereby prays the Commission to determine that the Easement Purchase Price for the New Claremont Reservoir is a fair market price for said easement and that United Water s agreement to pay for 44% of said Easement Purchase Price is fair, just and reasonable. 27.Based on the foregoing facts, Complainant hereby prays the Commission to order United Water to comply with its Special Facilities Tariff: (a) by immediately executing the Special Facilities Agreement attached hereto as Exhibit 11 and submitting said agreement to the Commission for its immediate review; OR JA YO CONSTRUCTION COMPLAINT AGAINST UNITED WATER IDAHO - 4 (b) by independently building a new storage reservoir facility to serve its existing peaking storage needs and fire protection storage needs identified in Complainant'Exhibit 3. 27.Complainant further prays for an award of its attorney fees and costs against Respondent United Water. RESPECTFULLY SUBMITTED this day of November, 2005. ction, Inc., Complainant JA YO CONSTRUCTION COMPLAINT AGAINST UNITED WATER IDAHO - 5 PL A T S H O W I N G SO M E R S E T R I D G E SU B D I V I S I O N N O . RE S U B D I V ' S I O N O F L O T 1, BL O C K 2 O F OR I D A R I D G E N O . 2 S U B D I V I S I O N AN D PO R T I O N S O F T H E 5 1 / 2 O F SE C T I O N 3 5 . T . 4N . , R . 2E . , 8 . M. , AN D TH E ~~ ~ CtJ + N1 / 2 O F SE C T I O N 2 , T . 3N . , R . 2E . , 8 . BO I S E , A D A C O U N T Y ID A H O 20 0 5 En g 1 D . Be r i n g N o r t h W e s t L L C BO I S E , I D A H O IO N c. . ( ' ) t ; I ; j iS : (' ) ~ ~ o~ ~ ZZ " " 00 ~ (') SH E E T 0 F SE E \J \ . \ ~ '! I ~~ ~ (- - -CJ: I- - .. . J NO T E S : 1) P . \.L L O T l i N E S C ~ M O k ~ TO A p v a u c . RI G 1 - \ T - O f - l ' i : t . . Y U N E H.t . . V E A T f ~ (1 0 ) FO O T Y l l D E ~A N E N T p- u e u c U T l U l l E S , PR D P E R r Y O R I \ J N , r . , G ~ , P ! J A C D . l r n ' i t- \ ' G H W A Y O I S T R 1 C T 5 ' - O P E f A $ ' O I , , A N D B O I S E a T \ ' S T R E E T U G H ? E/' S C ~ E N T . 2~ E A O i S1 1 ) E o r , t ~ ~ ' C f ! LO T L N E ' i i K A V E A FI ~ ( 5 ) r o O T '/ r D ; . PU B L I C UD U D E S , m J PR O P E R W Q f t / , I N A G : : E " S H I ! : N T , U t ~ L E S S D l M E N . s : O t ~ E D DM - " ' R \ \ ! S E , 3) I D A K O SE C D Q \ I 3 1 - J8 0 5 CO t i C E R r H ~ ~ C ; r R R ' C . /'D O t ~ W A T E R I S 1 i , / , P P U c . / , B L E AS T H E R E I S N O 'R R i G A T I C ~ ~ T O ~ ~ E P R O P E R T Y . 4) ! H E O C Y E L O ? t . l E N T IX - rn J S P R C P E R T Y $'- 1 , , 1 , 1 - 5 ~ I t ! CD t ~ F f f i " ' A N C E ~lT H fH E IJ E T A U . E D . H ' L l . S i E P E R M I , (C r H ~ 9 - 0 ~ 1 2 / ! , 1 0 D ) A S F; E Q U I I i ' C . D B Y B C ~ ~ E C I T Y . 5) C Q ' l S 1 R i J C T l m i I N T H ' S S I J ~ X " ' S ! O I I S ' H A J _ ( c r J j , j P L Y W l l H CI- ' . A P l E ' R " ' O F n - : E . 20 0 0 I N l E R N A l l O l ~ A L RE $ l D ~ N n . . . L O O D E " N G A f ' P r N D ' X C l - i A P T f f i 3 3 , ) " , TH E 19 9 7 U t I l F D : W EU J l . D l ~ G C O O E A I m J J . . E BO i 5 " - C I T Y K t L S i O C 1, " 1 \ ) , O O T H L L ,, ~ C€ V i : : L O P t . ! E N T =\ N A ~ c r , &) L D T S . , 3 5 ~ 5 0 . eU X K 4 : LO 1 J 3 , B L ( ) ( x 5 : L O T " E : L D C K 1 0 At l D L . OT 1 BL O C I ( ' 1 A R E o( S I ~ A T r o A S CO M ~ ; ) I ( A R O A L O " ! $ T O B E O " "~ E D A N D "" A J N T A I ~ I E D B Y T H E S O M E R S E T H E t : ; H T S H " O M E O W N E R ' S A S S O O A n o " O R fO U N D A T l O i ' \ 1 A S S O C : O f l E O I N T H E C O t ~ D i n C N S , CO V E N " ' N ~ A N D R E S T R ' C l l O t l S OF $ D I A E R S E T R I D G E 9 J B D I ' I 1 S I C N N O . " A~ D " A . Y t W T RE f A D V E D W : T H O . l ~ TH E E X P R E S S C o . ~ 5 " - N T O F eO l ~ CI T Y , U J T " B U X l K ' 0 A L S O H A S A J O ! _ "'N \ ( O ac x $ ' O C I T Y S A N I T " ' - R Y E ~ S E t . ! E t n , :: ; Ii: ; i- ' :: ; \1 ) \1 ) i- ' I. : Q:= : : ex :CA: :: ; ) 7) L O T ~ 5 , 8 ' _ 00 ( 5 ' S T O B E OO N V i : : Y I D T O - r n . E a n y O F 6" O ' S E F O R A . N E I G H 8 . ~!1 I W D D PA R X 5 I l E ' A N D O P m S P p . c E . 8) t A I N I ~ . UM B U I U m ~ G S E T e A C K L l t ~ E S S ~ A L J . B E I N A OX t ! 1 P A N C C . " " l H TH E B a S E CI T Y Z O t l ~ t ~ G ~J ' l P N C E A T Tf 1 : E . l l t l E 0, I S S U " , ~C E O F I r E B l ! U H N G PE R I - I I T o ~ AS S F l : : O F l c : . 1 o . U Y AP ~ \ O BY C U P 9 5 ' - O O D s . . 3 . A N D C : U P 9 9 - QO O & 5 / \ . 1 C D , A L J . La ! . P A R C a AN D " , , " ' C T S I Z E S S H . AL J . M E E T O " . O f S ' O N A l S T A I m A R D S A S ES T A 8 U S H E D I f ( TH E B o : . S E a T v ' l O ' . m ( G D R I J ! , j A l H z . 0 " A . S S " ' f C i F l C N . . . L ~ AP P R O V E D B Y O ' J P 9 9 - a ( ) O ~ J A t m . C U P 9 9 - 00 D S S / M C D . ( 8 . O. 9 - 2 \ ) - 7 . 9) A r N R I : . - s u s ! J " I 1 S I O N OF T H I S P L A T S H , AL L C C t W L Y ~ l H Tt i E A P P L I C A B L E Z Q U l K G RE G U L A ! l O t G I N E f F E C T A T l H E l l " E O F Rf S U e D l " " ' ~ D ~ . HI ) S D ~ E ~ T HE l Q i T S K O M E O W N E R ' S . . . . s S O O A n O ' - l D R A I N A G E E A . ~E " 1 . 1 . f ~I N T I N A N C ; : Of M N ~ ' ~ A ' P o \ " ' C i f ' "" P F ( ) ' f I , Y I T J f ('K / ' \ ~ ~ ! ' j r . . A , , - , r , ~ 11 - : ~ P " r " " " , " " ' R J I ' T ' r.. - r" r (-- - : (-- - : -- ( 0 : ' 1 f ) o / ! j - q 3 f - ,9 0 ' / Hf 1 I \ ~ Cn j o tJ . t , J - ~1 1 o ~ 5O C O 'C : f.- ' 5: ' 5: ' f.- ' 'T 1 (7 ' , .,- United Water 1('0.. United Water Idaho Inc:,8248 W. Victory Road O, Box 190420 Boise, 10 83719.0420telephone 208 362 7300 facsimile 208 362 3858 December 8, 2004 Engineering North West LLC Mr. Gene Smith 423 N. Ancestor Place, Suite 180Boise, ID 83704 Subject: Sommerset Ridge Subdivi5ion No. Dear Mr. Smith: The pUrpose of this letter is to advise you that the above mentioned subject, Sommerset Ridge Subdivision No.4 is serviceable \\ith United Water Idaho under its present wiffs , rules, andregulations as ftled with the Idaho Public Utilities Commission. Fire protection design for single family residential subdivisions is 1500 GPM with a 20 pound residual for a ~wo hourduration. I trust that this letter will aid you ill the speedy process of this project. V cry truly yours, ~ \!), John Lee Construction Coord mator RECEIveD DEC - 9 2004 www,unltedw8ter,com EXHIBIT 2 COMPLAINT JAYO C STRUCTION, INC. ,.c:: (~: 5~o"t' ~,e.;. l&?LL O~;; SOMERSET SUBDIVISION SPECIAL FACILITIES ANALYSIS EXISTING CONDITIONS EXISTING RESERVOIR: CLAREMONT RESERVOIR - 90 000 GALLONSEXISTING PUMPING FACILITIES: CRESTLINE BOOSTER STATION SUNVIEW BOOSTER STATION EXISTING UWID CUSTOMERS - 162 NEW CONDITIONS ADDITIONAL CUSTOMERS WITH SOMERSET - 88 ADDITIONAL STORAGE CAPACITY REQUIRED NO ADDITIONAL PUMPING FACILITIES REQUIRED STORAGE CAPACITY REQUIREMENTS EXISTING UWID CLAREMONT CUSTOMERS AVERAGE JULY-AUGUST USAGE = 1 564 GALLONS PER DA Y/CUSTEXISTING SOMERSET CUSTOMERS AVERAGE JULY-AUGUST USAGE = 2 228 GALLONS PER DAY/CUST MAXIMUM DAY FACTOR = 62/55.4 = 1.1 EXISTING CLAREMONT CUSTOMERS MAX DAY = 1 564 X 1,1 = 1 720 GALLONS PER CUSTOMER PER DAY TOTAL MAXIMUM DAY = 1 720 X 132 = 227 000 GALLONS PEAKING STORAGE = 227 000 X 0.20 = 45,400 GALLONS EXISTING ORIDNSOMERSET CUSTOMERS MAX DAY = 2 ~28 Xi, 1 = 2 451 GALLONS PER CUSTOMER PER DAYTOTAL MAXIMUM DAY = 2,451 X 30 = 73,500 GALLONS PEAKING STORAGE = 73 500 X 0.20 = 14,700 GALLONS EXISTING PEAKING STORAGE NEEDS =45,400 + 14,700 = 60,100 GALLONS NEW SOMERSET CUSTOMERS MAX DAY = 2 228 X 1.1 = 2,451 GALLONS PER CUSTOMER PER DAY TOTAL MAXIMUM DAY = 2,451 X 88 = 215 700 GALLONS PEAKING STORAGE = 215 700 X 0.20 = 43 100 GALLONS NEW PEAKING STORAGE NEEDS = 43 100 GALLONS TOTAL PEAKING STORAGE NEEDS = 60 100 + 43 100 = 103,200 GALLONS FIRE PROTECTION IS BASED UPON 1 500 GALLONS FOR TWO HOURS = 180 000 GALLONS TOTAL STORAGE REQUIREMENT = 103 200 + 180,000 = 283 200 GALLONS NEW STORAGE ADDITION = 283 200. EXISTING 90 000= 193,200 GALLONS ASSUMING EACH PARTY PARTICIPATES IN THE FIRE PROTECTION VOLUME PROPORTIONATE TO THE NUMBER OF LOTS: UWID: 162 EXISTING LOTS (162+ 88) = 64.8% =;:. 0.648 X 180 000 = 116 600 GALLONS SOMERSET: 88 NEW LOTS (162 + 88) = 35.2% =;:. 0.352 X 180 000 = 63,400 GALLONS TOTAL VOLUME REQUIREMENTS PER PARTY: UWID: PEAKING - 60,100 GALLONS + FIRE PROTECTION -116 600 = 176 700 GALLONSSOMERSET: PEAKING -100 + FIRE PROTECTION - 63,400 GALLONS = 106 500 GALLONS UWID HAS EXISTING 90 000 GALLONS - REDUCING NEW VOLUME REQUIREMENT TO 86 700 GALLONS700/193 200 = 0,449, OR 44,9% OF NEW VOLUME ADDITION AS A RESULT: UWID SHARE = SOMERSET SHARE = 44, 55. .....-/- "':,=#1 ~.-/i /;g,/.~.... :;;vJ EXHIBIT 3 CO MPLAINT JA YO CONSTRUCTION, INC. ~P(/(; '1 /wo 'J. United Water f,I~. (ID United Water Idaho Inc. 8248 W, Victory Road O, Box 190420 Boise, ID 83719-0420 telephone 208 362 7331 facsimile 208 362 3858 January 2005 Mr. Doug Jayo, President J ayo Construction, mc, 1323 South Five Mile Road Boise, ID 83709 SUBJECT: Construction of new Claremont Reservoir Dear Mr. J ayo: We appreciated the opportunity to meet with on Friday, January 14 2005 to discuss the above project. It appears that the project schedule is a very high priority. With that in mind, I havelisted below a few of the key tasks that need to be addressed and the responsible party: Project cost estimate - UWID Adapt Special Facilities Contract to this project - UWID Submit executed agreement to IPUC for review and approval - UWID Secure easement for new tank - JCI Hire structural engineer - JCI Provide key design specifications for tank - UWID Submit plans & specs to DEQ - JCI Submit project to P&Z for approval- JCI Submit final construction plans to Building Dept - JCI Secure construction bids from contractors - JCI Oversee construction - Structural Engineer/UWID Fill tank, disinfect and place in-service - UWlD Clearly there are many sub-tasks involved in each of these, but I think this covers most of the major items that need to be completed in order to successfully construct this new facility. The approved structural engineers are Stapely and JUB Engineers. The approved concrete contractors are McAlvain, Concrete Placing and JC Constructors. On Friday we discussed your concerns regarding the project schedule and your willingness to proceed with construction while the IPUC performs their review of the proposed agreementnoting the risk that the IPUC does not approve the agreement as proposed. We trust thiscircumstance will not occur, but it is important to acknowledge the risk up front. EXHIBIT 4 COMPLAINT JAYO CONSTRUCTION, INC. f=IVC1:.:, . t:~ , JAN 2 4 2005www,unitedwater.com In order to mitigate that risk, it will be very important to closely manage this project. I will contact Gene Smith with Engineering Northwest, to develop a plan for managing the project schedule. Sincerely, Daniel Brown Senior Project Engineer C: Gene Smith, Engineering Northwest Scott Rhead, United Water Idaho '-.". Molly O'Leary (ISB # 4996) Richardson & O'Leary PLLC 515 North 27th Street O. Box 7218 Boise, Idaho 83707 Telephone: (208) 938-7900 Fax: (208) 938-7904 Attorneys for J ayo Construction, Inc. BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION JA YO CONSTRUCTION, INC. CASE NO. AFFIDAVIT OF DOUGLAS JA Complainant vs. UNITED WATER IDAHO, INC. Respondent. COMES NOW, Douglas Jayo, who being first duly sworn on oath, deposes and says: corporation. I am the President of J ayo Construction, Inc., a duly organized Idaho I have personal knowledge of the facts stated herein.3. Jayo Construction is developing an 88-10t subdivision in the Boise Foothills commonly known as Sommerset Ridge Subdivision No.4. ("Sommerset Ridge No.4. Jayo Construction was advised by United Water ofIdaho, Inc. ("United Water ) that a new water storage facility would be required in order for United Water to provide service to Sommerset Ridge No.5. Because United Water does not currently have sufficient capacity to meet its existing peak storage needs, United Water agreed to contribute 44% of the cost of the siting and construction of said new water storage reservoir.6. Jayo Construction was instructed by United Water to purchase an easement for the siting of said new water storage reservoir. AFFIDAVIT OF DOUGLAS JA YO - 1 EXHIBIT 5 COMPLAINT JAYO CONSTRUCTION, INC. ('""\ 7. At no time prior to J ayo Construction s purchase of said easement did United Water set a maximum price to be paid for said easement, or in any other way limit its 44% participation in the cost of said easement. United Water determined the location ofthe new water storage reservoir.9. The location chosen by United Water is a prime Foothills building site owned by Claremont Realty. 10. Due to the size and location ofthe new water storage reservoir, virtually the entire market value of the building site selected by United Water will be consumed by the placement of the new water storage reservoir on the lot. 11. United Water s existing water storage reservoir sits below the crest of the hill where United Water wants the new water storage reservoir to be constructed. Thus unlike the location chosen by United Water for the new water storage reservoir, the existing storage tank does not obstruct the viewscape of adjoining lots. See Exhibit 2 attached. 12. Due to the market value of the building site chosen by United Water for placement of the new water storage reservoir, Claremont Realty was reluctant to sell an easement to Jayo Construction for the new water storage reservoir. 13. Claremont Realty hired Gene Smith, P., of Engineering Northwest, LLC to evaluate other possible locations for the new water storage reservoir; however, no other suitable location could be identified due to the hilly terrain of the surrounding foothills and the need to tie the new reservoir to United Water s existing reservoir. 14. For this reason, the fair market value of the easement on the building site chosen by United Water is $226, 239.00. See Exhibit 1 attached. FIANT SA ~JR NAUGHT oug s Jayo / Dated: //- !r- f!1 ...11.."",.. --' .....' .., "R Y -'# .. .. i" '" J'o ~ Li" '" ......':' .. "'" ff.~ ~R Y "" . .:~ .: ~ o , ~ : ' , 0 : :. \ ::r:: :. .\)~ - : - M . "" ~......,.. ..,....... " .. " 87''1 TE 0 '" "II""" NOTARIAL ACKNOWLEDGMENT State of Idaho ) ss. County of Ada Subscribed and sworn to before me, the undersigned Notary Public, on this 3- day of November, 2005, by the above-named DOUGLAS JA YO, personally known to me to be the person named as the affiant in the above affidavit. AFFIDAVIT OF DOUGLAS JA YO - 2 IN WITNESS WHEREOF, I have hereunto set my hand and seal the day and year in this certificate above written. ill;;,..u J Notary Public in and for d Residing in Boise, Ada County, Idaho AFFIDAVIT OF DOUGLAS JA YO - 3 My commission expires f?/ RJ EXHIBIT 1 AFFIDAVIT COMPLAINT JAYO CONSTRUCTION, INC. EXISTING CLAREMONT STORAGE TANK The existing Claremont Storage Tank sits just below the ridgeline. The New Claremont Storage Tank would be located to the right on the ridgeline. EXHIBIT 2, pg 1 AFFIDAVIT COMPLAINT JAYO CONSTRUCTION, INC. CLAREMONT WATER STORAGE TANK ADA COUNTY , IDAHO 5/18/05 WATER LINE AND OVER FLOW/DRAIN LINE PIPING PLAN EXHIBIT2 pg2 AFFIDAVIT COMPUUNT JAYO CONSTRUCTION, INC. EXISTING CLAREMONT STORAGE TANK The existing Claremont Storage Tank sits just below the ridgeline. The New Claremont Storage Tank would be located to the righton the ridgeline. EXHIBIT 6 COMPLAINT JAYO CONSTRUCTION, INC. TITLEONE COMMERCIAL 1101 W. RIVER ST, SUITE 201 BOISE , ID 83702 (208)424-8511 STATEMENT OF SETTLEMENT FOR PURCHASERS PROPERTY ADDRESS: CLAREMONT DR., BOISE, ID 83702 PURCHASER/BORROWER(S): JAYO CONSTRUCTION , INC, SELLER(S): CLAREMONT REALTY COMPANY SETTLEMENT DATE: August 1 , 2005 DISBURSED: August 1 , 2005 PRORATION DATE:August 1 2005 Contract Sales Price 225 000_Settlement or Closing Fee TITLEONE COMMERCIAL 250.Title Insurance Premium COMMONWEALTH LAND TITLE INSUR 980,Recording Fees TlTLEONE COMMERCIAL DEBIT CREDIT Subtotals Balance Due FROM Purchaser/Borrower TOTALS 226 239, 226 239, 226 239, 226 239, The above figures do not include sales or use taxes on personal property APPROVED and ACCEPTED / '----- TITL ONE CORPORATION "": EXHIBIT 7 COMPLAINT JAYO CONSTRUCTION, INC. (AO544368.PFDI AO544368/15) -----------= - -.5?~_-:---~::-- - 3260~ . CLAREMONT WATER STORAGE TANK ADA COUNTY, IDAHO WATER LINE AND OVER FLOW/DRAIN LINEPIPING PLAN EXHIBIT 8 COMPLAINT JAYO CONSTRUCTI()~, INC. 5/1 Sheet No. 23 Replacing all Previous Sheets IDAHO PUBLIC UTILITIES COMMISSIONApproved Effective August 11, 2005 August 2, 2005 Jean D. Jewell Secretary UNITED WATER IDAHO INC. RULES AND REGULATIONS GOVERNING WATER MAIN EXTENSIONS (continued) specifications, and estimates, the Applicant shall reimburse the Company an amount equal to Company s expenses. 73. The deposit referred to in paragraph 71 above, shall normally be a cash deposit. In this instance, the Company shall provide the material and labor for installation of the project. However, the Applicant may provide the material and/or contract labor for the installation of the necessary facilities. In this instance, the Applicant shall deposit with the Company an amount equal to the estimated cost of applicable overheads for the entire project and the estimated direct labor costs incurred by the Company for such items as engineering design, estimating, and inspection. Also, the Applicant shall furnish the Company a certified invoice of sufficient detail to show the separate costs of material and labor for water mains and appurtenances by size, service laterals by size, meter boxes, meter settings and fire hydrants. The Company shall specify the material to be supplied by the Applicant with respect to size and type. In general, the material shall conform to the Company s standard material specifications and applicable AWWA specifications. The Company shall, at Applicant's expense, make all connections to the Company s existing system if in the Company s opinion the contractor does not have the experience or equipment to make such connection. Applicant's contractor shall comply with Section and Section 2 of Company Requirements for Labor in Lieu of Cash Contractors. general, areas covered are requirements for inspection, monitoring of construction acceptance and handling of materials , documertation of costs , correction of faulty installation, insurance, bonding, license requirements, experience, and equipment availability. The Company may deny the right of Applicant to provide a contractor who has not complied with its requirements in the past. SPECIAL FACILITIES 74. Special facilities shall include source of supply, storage and booster pumping facilities which may be required to render adequate water service to an area for which such service has been requested. 75. Should an Applicant propose a Residential, Commercial , Industrial , or Municipal Development requiring a special facility or special facilities, the Applicant shall advance the cost of such facility or facilities. Normally, the advance shall be a cash advance. In this instance, the Company shall provide the material and labor for the installation of the facilities. However, the Applicant may, with the Company s approval, provide the material and/or contract labor for the installation of the special facility or facilities. In the instance where an Applicant provides the material and/or contract labor, the Applicant shall deposit with UNITED Issued Per IPUC Order No. Effective - August 2, 2005 Issued by UNITED WATER IDAHO INC. Gregory P ,. Wyatt, Vice President 8248 West Victory Road, Boise, Idaho EXHIBIT 9 COMPLAINT JA YO CONSTRUCTION, INC. DRAFT 8-11- SPECIAL FACILITIES AGREEMENT A. No. C05EO01 AGREEMENT between UNITED WATER IDAHO INC., hereinafter caned the Company" and JAYO CONSTRUCTION, INC., hereinafter called "Jayo. WHEREAS, a water storage reservoir and associated equipment and facilities, hereinafter called the "System Extension " is required to serve Jayo s Sommerset Ridge Subdivision Jayo has requested the Company extend its system as follows and in accordance with the map or plan attached hereto marked as Exhibit A and made a part hereof: Construction of a 193 200 gallon storage reservoir, the necessary supply line overflow and drain line, power line, telemetry equipment and booster pumping improvements at a total estimated cost of $442 377, necessary to provide peaking supply and fire protection to the following 250 lots: 162 Existing lots within the Claremont Reservoir pressure zone 88 New lots within Sommerset Ridge Phases 4 & 5 And WHEREAS, the Company owns the existing 92 000 gallon Claremont Reservoir whose capacity is insufficient to provide the necessary peaking supply and fire protection to the above referenced 250 lots and is located contiguous to the site for the proposed system extension. And WHEREAS , the Company is willing to make such extension upon the terms and conditions hereinafter set forth. NOW, THEREFORE, in consideration of the promises and of the mutual covenants and agreements herein contained, THE PARTIES HERETO AGREE AS FOLLOWS: 1. Application for System Extension.Jayo hereby applies to the Company for the said extension of its system, and the Company agrees to construct the said SystemExtension upon the terms and conditions hereinafter set forth and in accordance with its Rules and Regulations. EXHIBIT 10 COMPLAINT JAYO CONSTRUCTION, INC. SPECIAL FACILITIES AGREEMENT eE.A. No. C05EO01 AGREEMENT between UNITED WATER IDAHO, INc., hereinafter called the Company" and JAYO CONSTRUCTION, INc., hereinafter called "Jayo WHEREAS, a water storage reservoir and associated equipment and facilities, hereinafter called the "System Extension , is required to serve the 88 residential lots in Jayo s Sommerset Ridge No.4 Subdivision, and Jayo has requested the Company to extend its system in accordance with the map or plan attached hereto marked as Exhibit A and made a part hereof; and WHEREAS, the Company requires 176,700 gallons of additional water storage capacity to meeting peaking and fire protection water storage needs for its existing 162 customers within the existing Oaremont Reservoir pressure zone; and WHEREAS, Jayo has agreed to construct a 193,200 gallon storage reservoir New Claremont Reservoir"), the necessary supply line, overflow and drainline, power line, telemetry equipment and booster pumping improvementsnecessary to provide peaking supply and fire protection to the 250 above- identified residential lots at an estimated cost of $673,441.90 (see Exhibit B attached hereto and incorporated herein by this reference); and WHEREAS, the Company existing 92,000 gallon Claremont Reservoir Existing Oaremont Reservoir"), whose capacity is insufficient to provide the necessary peaking supply and fire protection to the above-referenced 250 lots, is located contiguous to the site chosen by the Company for the proposed system extension; and WHEREAS, the Company is willing to make such extension upon the terms and conditions hereinafter set forth. NOW, THEREFORE, in consideration of the promises and of the mutual covenants and agreements herein contained, THE PARTIES HERETO AGREE AS FOLLOWS: - - EXHIBIT 11 COMPLAINT JAYO CONSTRUCTION, INC. 1. Application for System Extension. ayo hereby applies to the Company for the said extension of its system, and the Company agrees to construct the said System Extension upon the terms and conditions hereinafter set forth and in accordance with its Rules and Regulations, 2. Company Betterment Toward the System Extension.The Company agrees to pay 44.0% of the cost of the System Extension as Company betterment for the 162 existing customers served by the Existing Claremont Reservoir. 3. layo Advances and Contributions Toward the System Extension. Jayo shall advance to the Company upon the execution hereof the sum of Two Hundred Seventy-Seven Thousand and Five Hundred and Eighty-Two dollars and Thirty cents ($277,582.30), in cash or the combination of cash and labor and materials in-lieu-of-cash, which amount the Company estimates to be Jayo s 56% share of the cost of installing the said System Extension as described above including overhead costs to the Company and supervision, engineering, accounting, legal expenses and the cost of obtaining any necessary governmental permits. Any clifference between the actual cost of the System Extension attributable to Jayo and the amount advanced shall be shown as a revision of the amount of advance and shall be payable within thirty(30) days of submission. The actual cost thus finally determined shall be referred to as the II advanced cost of the System Extension If it is necessary to adjust the amount of Jayo advance, in accordance with the terms of this paragraph, a supplemental memorandum will be prepared setting forth the II advanced cost of the System Extension" and shall be attached hereto and made a part hereof. 4. Refunds.The Company will make a one-time refund to Jayo per new residential customer within Sommerset Ridge Phases 4 and 5 served by the System Extension, the amount of which shall be determined in accordance with the table set forth in Exhibit C, attached hereto and incorporated herein by reference. The refund amount will be based upon the annual revenue receivedby the Company from the residential customer for water utility service as determined by using the most recent twelve months of billing data, after the residential customer which is the subject of the calculation, has received permanent water utility service from the Company for a period of twelve (12)consecutive months. The total refund amount shall not exceed the final II advanced cost of the System Extension . The only connections eligible for refund shall include all residential lots within Jayo s proposed Sommerset Phases 4 and 5. The average annual consumption per residential customer within the existing Sommerset area is projected to be approximately 400 cd which results in a refund of $1 800 as per Exhibit C. The Company agrees to refund to Jayo 80%of this amount ($1 440) as new residential customers are connected. Thesepayments will occur on a quarterly basis. Final adjustment to the refund amount will occur at the conclusion of the 12 consecutive months, as referenced above with the Company paying Jayo the balance of the refund amount above $1 440 orJay paying the Company the difference if the final refund amount is less than 440. 5. Accounting.The amount of said" advanced cost of the SystemExtension" less the total amount refunded over the term of this agreement, shallbe retained b y the company and booked as a contribution in aid of construction. 6. Timing and/or Delays.The Company will use its best efforts tocommence and carry to completion as soon as possible the installation of the said System Extension, but will not be responsible for delays which may beoccasioned by weather, acts of God or the public enemy, strikes, delaysprecipitated by Jayo, or other matters not within its control. 7. Permits and Approvals.It is further understood and agreed by and between the parties hereto that the Company s agreement to construct the saidSystem Extension is subject to the Company obtaining all necessary consentsorders, permits and approvals of public officers or public bodies havingjurisdiction over or lawful interest in any of the subject matters herein. In theevent that the Company, after prompt application and diligent effort, is unable to obtain any necessary consent, order, permit or approval as aforesaid, or in theevent that the Company is enjoined or prevented by lawful action of any such public officer or official body from constructing the said System Extension, theCompanys sole obligation will be to repay Jayo the difference between theamount advanced and estimated expenses incurred by the Company inconjunction with the System Extension which is the subject of this Agreement. 8. Easement(s) for Location of System Extension.Jayo agrees to grant tothe Company a permanent easement for access and utility purposes, for thebenefit of the Company, for the purpose of constructing, accessing andmaintaining such access roadway(s), water storage tank(s), water line(s), drainline(s), pump(s), pump house(s), drainage pipe(s), landscaping, power facilities . .- '~~~ and/ or communication facilities, subject to the terms and conditions set forth in the Exhibit D. 9. Ownership of System Extension.It is further mutually understoodand agreed that the System Extension within the limits of the street, avenuesroads, ways or easement areas, whether or not attached to or serving customers but constructed as part of the System Extension shall be and remain the propertyof the Company, its successors and assigns. The Company shall have the right to extend any main installed by it pursuant to the terms of the Agreement in or to other lands, streets, or avenues. 10. Agreement Subject to Idaho Public Utilities Commission Approval. It is agreed and mutually understood that the terms of the agreement,particularly paragraphs two (2), four (4) and five (5), are subject to approval bythe Idaho Public Utilities Commission. Further, should the Idaho Public Utilities Commission not approve the Company betterment, or the refund provision in paragraph two (2) and paragraph four (4), the Company shall retain the advanced cost for the System Extension. 11. Term of Agreement.The term of this agreement shall be fore fifteen (15) years from the date hereof. IN WITNESS WHEREOF the parties hereto have caused these presents to be signed by their duly authorized officers this _ day of 2005. UNITED WATER IDAHO, INC: Attest: Gregory P. Wyatt Its: Vice-President JA YO CONSTRUCTION, INC: Attest: Douglas Jayo Its: President . .-~,.,=--, CLAREM ON T WATER TAN WATER TANK EASEMENT ~WA1ER TIINK---..... M&t~cr - ,- --r- ... ;'1 \ ... msnNO WAtER (" TANK \/ /\. \'"'" /' , J- --sa..-'""Of\"18-9\ . ,, .!!trt" ~...~/'...#;,...... s.35 NS9'9'36"W 265D.9!!' 5.35 S.2 S.2. 5.1 1" 100' ~~AA...tI)O(\""~T,*-""",-"'" 7~ ,"'.,... All NOT - EXHIBIT A S:();EC~ FACILITIES AGREEMENT - -- -~,,=,------------ CLAREMONT WATER UTILITY EASEMENT TANK N-T-S m~ .., ~" ~fr---SSz~~~- rNj7l~:!:"- ~~= =-g9t ::L.... ~l)..e:::::sn~o:t-;W"i\'1ft~--1:JMW'"i"Wz,z:r ~27G" l-:V~ ~J1r '44.,:t;8.i1t 13.712.2&...tt. , NG5~YWU- , ~ omY"--.J ~~r S8QtY E)CISTI..O WA1ER TAW( "I;~~"'A1IIL~""'TAHluJrorr~.... 7~ IIrot;;!J NJ 1m r.TA """' .~ -- --- -- CLAREMONT WATER WA TER EAS~MENT TANK _. ~~.\ "" "/- "~~~" "\ \\ \\ " \ ",-...:._ ~~~-r 77t.3V' \'f "'.h '- --~--- -.'tlf(J~!Io..JlU~w 27:13X'-'?'1" NI5S'O1 CiG.:J2' ~~,,~~~ NO5'S5's.n-.J ~'04'~55.80' L 6a.1&'~-rr 18 :a: 150' "~~1IILr~""'~~ '(l;Vt"", ""."'" ~ ....--- ._-- --... -..- --- . - .n.. , - .- . -'T" "'" CLAREMONT WATER TANK LANDSCAPE EASEMEN 1" - 1cxf s.35 JteD"J8";,e-V; 2851L.8" $.35 $5.2 8.2 5. "~1OL~ ,~",* ""'13 "'lIlT ".. -- ---.""-----".-- CLAREMONT WATER TANK TEMPORARY CONSTRUCTION EASEMENT N84-ofO!E:54.00' \~~\ " ~"Oo\'~7"t0\ .".,.- ,10.01~i\ ,/ ~5\riliiROPOSED \8.~ \1.1 \.. - swvroTi' ./ 132.92" .pj/.p~~.... 5.3S N!l1I19'36"W 2650.98" 5.35 S.2 $.2 5. 1- II1II 100" . , -'~on.Jlj~M...~'WA""WOl.,."""--~ '~f1'~ ""O1-.ZI N411$T -- ' T."f, .-..-. ,-.-..-..---' CLAREMONT WATER TANK TANK SCREENING EXHIBIT EXHIBIT LEGEND 0" SCREENING. VEGETAlION- , . - SCALE: ,- 30' ~0 \ , \ \ \ , PROPOSED LANDSCAPEEASEUENT , \ \ \ ~EXlSl'lNG WATER\G\ TANk EASEMENTf \ ~, , \ Q -~..Y- ..~~...tllt..m4II\""~~'" 7/1b1!11D5 .....'" Mj .... - . ----..0' ..,..","'"--.". "-----.--. JAYO CONSTRUCTION INC. PLAZA POINTE, 1323 S-.FIVE MtLE RD. BOISE, IDAHO 83709 (208) 322-3663 CLAREMONT WATER TANK COSTS Thursday, November 3. 2005 $226,239, 308 000. 26,498. 543, 056, Easement from Claremont Realty Co. C. Constructors (construction of tank) Price subject to change due to increased cement prices B- Engineers (water tank design) Engineering Northwest (easements and legal description for water tank) Ada County (grading and building permits) 40,369. 700, 500. 11,400. 000, 000. 136. ?????????? 673,441 . Jayo Construction Management Fee United Water Overhead United Water Labor (estimate) Telemetry (estimate) Power (estimate) Booster Pump Improvement (estimate) Application fees to Ada County Change orders/contingencies EXHIBIT B : :.:eSPECIAL FACILITIES AGREEMENT EASEMENT TO BE ASSIGNED TO UNITED WATER EXHIBIT D COMPLAINT JAYO CONSTRUCTION, INC. ADA COUNTY RECORDER J. DAVID NAVARRO AMOUNT 48.00 lti BOISE IDAHO 08/02105 04:27 PM DEPUTY Bonnie Oberbillig 1111111111111111111111111111111111111~~O ~~e ED-REQUEST OF 105107129 , .. . Uu - EASEMENT A9REEMENT Claremont Realty Company. an Idaho corporatioD, of Post Office Box 27. City of Boise. County of Ada, State of Idaho ("Grantor \ owner of that land on which the below described easement runs. in consideration of good and valuable consideration receipt of which is aclrnowlcdged, hereby grants, bargains, sells and conveys to JAYO CONSTRUCTION, INc. an Idaho corporation, whose address is 1323 South Five Mile Road, Boise, ill 83709 Grantee ), the following easements: A perpetual easement for the construction, maintenance and operation of a water tank (the "New Water Tank") located wholly or partially on the property particularly described and generally depicted in Exhibit "A" attached hereto and incorporated herein, which property is immediately adjacent to an existing easement in which an existing water tank (the Existing Water Tank") is cmrcntly located. perpetual easement for the construction, maintenance and operation of- llnderground power, telephone and communications facilities associated with the New Water Tank on the property particularly descn'bed and generally depicted in Exhibit " attached hereto and incorporated herein. perpetual easement for the construction, maintenance and operation of underground water lines carrying water to and from the New Water Tank and the Existing Water Tank on the property particularly described and generally depicted in Exhibit "C" att2.cbed hereto and incorporated herein. A perpetual easement for the construction and maintenance and replacement of landscaping on the property particularly described and generally depicted in Exhibit "D3' attached hereto and incorporated herein. A temporary construction easement for the construction of the New Water Tank and associated facilities on the property particularly described and generally depicted in Exbibit "E" attached hereto and incorporated herein, which easement shall tenninate six (6) months after the date of this Easement Agreement. The foregoing easements arc granted on the express conditions enumerated below, which Grantee hereby agrees to fulfill:1. Grantee shall secure all permits necessary to enable Grantee to construct any desired improvements and shall comply'with all such permits and penmt conditions and any applicable laws, roles and orders concerning the use of the easement areas and the construction maintenance and operation of aJIY improvements on the easement areas, Grantee shall Ie- vegetate all areas disturbed by Grantee s activities and maintain the same until such vegetation js pennanently re-established. 2. Simu.ltaneous with the construction of the New Water Tank, Grantec shall install landscaping as generally depicted on l1-:xhibit "F" and pursuant to detaikd plans and speciflcations approved in ,~'ritiJ1g and in advance by Grantor. Grantee shall thereafter forever EASEMENT AGREEMENT Bojsc-186096,j 0045136.00006 ()()() em ~,n "~TT.~nT~"~.~ ~TP~ ~~~~ --~ ,.~- ~...- --. -- ----~ ~- -- . ' maintain and replace such landscaping as is necessary to kcep the same in good condition and to maintain a visual screen of the Existing Water Tank at all times. This obligation may forever be enforced by the Grantor named herein even if the Grantor named herein conveys its entire interest in the land encumbered by this Easement Agreement.3. Grantee shall indemnify, defend, and hold Grantor and its agents and employees hannless ftom any damage, loss, cost, expense (including, without limitation, reasonable legal fees, court costs, and expenses), liens or claims caused by, attributable to, or resulting from the entry onto the easement areas or Grantor s adjoining property or use of the easements herein granted by Grantee, its agents, emp10yees contractors. or consultants.4. So long as the Grantor named herein owns fee title to the land subject to this Easement Agreement, and as long as the Grantee is not a Public Water Utility, the foregoing additional conditions apply and Grantor hereby agrees to fulfill these conditions: Prior to entering onto the easement areas, Grantee shall execute Grantor standard-form Insurance and Indemnity Agreement, a copy of which has been provided to Grantee, and a full aI:Id unconditional release of all rights to:file construction or other liens against Grantor s property. Prior to allowing any contractors or subcontractors or other third parties to enter upon the easement areas, Grantee shall cause such contractors or subcontractors and third parties to execute Grantor s standard-foID1 Insurance and Indemnity Agreement and a full and unconditional release of all rights to file construction or other liens against Grantor ;; property. This Easement Agreement shall be binding upon and benefit the successors and assigns of Grantor and Grantee and, unless otherwise indicated, a reference to Grantor or Grantor includes their successors and assigns. The foregoing notwithstanding, Grantee shall not assign this easement to anyone other than United Water Idaho, Inc. OT another public utility company providing water service to residences in the area where the easement is located (a "Public Water Utility" ). Any purported assignment of this Easement Agreement to an assignee who is not a Public Water Utility shall be voidable and shall eDtitle Grantor to terminate this Easement Agreement at Grantor s election. The easements granted herein are subject to subject to easements, encumbrances and other matters of record or appearing on the land and are non- exclusive provided easements granted after the date this Easement Agreement is recorded shall be subject to Grante~s rights hereunder. In the event any litigation is undertaken to enforce the provisions of this Easement Agrccment, the prevailing party shall be entitled to an award of costs and reasonable attorney s fees incurred in prosecuting or defending such action, whether before trial, at trial on appeal, or in bankruptcy proceedings. (Signature Page Follows) EASEMENT AGREEMENT 80;",.186096_1 0045136-00006 TITLEONE COMMERCIAL 1101 W. RIVER ST. SUITE 201 BOISE, ID 83702 (208)424-8511 STATEMENT OF SETTLEMENT FOR PURCHASERS PROPERTY ADDRESS: CLAREMONT DR., BOISE. fD 53702 PURCHASER/BORROWER(S): JAYO CONSTRUCTION, INC. SELLER(S): CLAREMONT REALTY COMPANY SETILEMENT DATE: August 1 , 2005 DISBURSED: August 1 , 2005 PRORATION DATE August 1 , 2005 DEBIT CREDIT Contract Sales price 225 000. Settlement or Closing Fee TITLEONE COMMERCIAL :250, Title Insurance Premium COMMONWEALTH LAND TITLE INSUR.980, Recording Fees TITLEONE COMMERCIAL Subtotals Balance Due FROM PurchaserlSorrower TOTALS 226.239, 226 239. 226 239, 226,239_ The above figures do not include sales or use taxes on personal property APPROVED and ACCEPTED ....... (AO54436B.PFOIAO544358115) . , IN WITNESS WHEREOF, Grantor and Grantee have executed this Easement Agreement the --L day of fJu'11J$-t 2005. GRANTOR: CLAREMONT REALTY COMWANY , ~ Idaho corporation ~~~ By: M1chael L. SimplotIts: President STATE OF IDAHO GRANTEE: JAYO CONSTRUCTION, INC.; an Idaho corporation By: Its: Douglas Jayo President )5S.COUNTY OF ADA On this day of 2005, before me .6J.a;a:z; Notary Public, personally ap Michael L. Simplot, known or i entified to me, to be the president of Claremont Realty (;D8PWl1.. the corporation that executed the above instrument or the person who executed the in~ent ~~ of said corporation and ac1rnowledged to me that such corporation executed the~~. .....:' ""'" . D ........ .~.. : Q:J: ~o A~~. .. - or ~-4 :: * -.- .. 0 .. * :. ~ P~BL'l.C ": f.P. " .. .. ":0 .;-. It . .. 11 C) .. -1 .......,.",;.~ ~ .. t. l: '" l'- ..f" ..... .." 'g"...H~'!' STATE OF IDAHO ) " )5S. COUNTY OF ADA Nola')' Public f Residing at Commission Expires: .;;j (:/ flff On this day of , 2005, before me Notary Public, personally appeared Douglas J"ayo, lmown or identified to me, to be the president of Jayo Construction, Inc., the corporation that executed the above instrument or the person who executed the instrument on behalf of said corporation and acknowledged to me that such corporation executed the same. EASEMENT AGREEMENT Boisc-l ::'6096.1 0045136-00006 Notary Public for Idaho Residing at Commission Expires: . - iN WI'INESS WHEREOFt Grantor and Grantee have executed this Easement Agreementthe day of "~~~J.2005. GRANTOR: CLAREMONT REALTY COMPANY, an Idaho corporation By: Its: Michl1el L. Simp1ot President STATE OF IDAHO )ss. COUNTY OF ADA GRANTEE: JAYO CONSTRUCTION, INC., an Idaho corpora n On this day of 2005, before me , a Notary Public, personally appeared MIchael L. SimpJot, known or identified to me, to be the president of Claremmlt Realty Company, the corporation that ~ecutoo the above im:trument or the person who executed the instrument on behalf of said cOIpOl'ation and acknowledged to me that such corporation executf:d the same. STATE OF IDAHO ) 0 )55. COUNrY OF ADA Notary Public for Idaho Residing at Commission Expires: OnthisJ~_dayof A"',Lt~ 2005, before me, ~~b"'~iijrlc:! Notary Public, personally appeared Douglas Jayo, known or identified to me, to be the president of Jayo Construction, Inc., the corporation that executed the above jnstrument or the person who executed the insttUmen~ ol\~tll!lfQ'~1.id corporation and acknowledged to me that such corporation executed the same. :-. ..~ ~,\ DARl../.A:#"~ 0 .. "". 'v '" ..:- () ...~' ~ ~":J,f .:: . ~ o'fA~r .. . v ..1,.: ...... --- 7'0 ~ 0:. . .., 1S -:. . )011-' l"'\:: -:. ...p ~ ~-:" " -1'.4 ..... ....;. "l'- .;. ~1"D 1::l'\v ...Q ... " EASEMENT AGREEMEN~""'I'II"" Boj~c-\86096,1 0045136.00006 . - n - - Notary Public for Idaho Residing at _.0 COTT DARLING Commission Expires: -----ESr:ROWOFFICER RESIDING: EAGLE, iO COMMISSION EXPIRES: "-26- 0'- EXHIBIT Elif:.ineering N orlb !Vest, ILC 423 N. Ancestor Ptacc. Suite 180 Boi5e, Idaho 83104 (208) 316-5000 . Fax (208) 376-'556 Project No. 03-027-Date: July 22~ 2005 SOMERSET RIDGE WATER TANK EASEMENT DESCRIPTION An easement lying in t1:w SW 1/4 of Section 36, T. 4 N.. R. 2 B.. B.M., Ada Countyt . Idaho, more particularly described as roUows: Commencing at the 114 section comer common to Section 35 ofT. 4 N:., R. 2 E.~ B.M. and Section 2 ofT. 3 N., R. 2 B" BoM.; Thence South 890 19'36" 265fl.98 feet on tho section me. common to said. S.edions 35 and 2 to the &cction Comer common 10 Sections 3S and 36 oruid T.4 N.. R. 2 E.. and SectioDs 1 and 2 Druid T.3 N.,R.2B.; Thence North SsoSS'49" Eas~ 549.84 feet to the REAL POINf OF' BEGlNNINGj Thence South OSOSS'S3" Eas~ 98.26 feet; Thence South 84004'07" West, 68.91 feet to the southeast comer ~f an existing water tank easement; Thence North OSDSS'S3" We~ 98.26 feet on 1he easterly easement line of said a.isting water tank easement; 'lbence leaving said existing easement line, North 840 04'07" East, 68.91 feet to the real point of be ginning. PREPARED BY: Engineering NorthWest, LLC .James R. Washburn, PLS So",cmct Ridge Wa.\cr Tanir wcmcnl Dcsc.doo Page I of 1 TTA "'" .~,~ ,'.----.--..---.---- CLAREMONT WATER TANK WATER TANK EASEMENT EXSINC; WATER TANK --....--.. M8\-r:aCP~EASENENT . ,- -r- - -.... ..-U.,.. \ V \~TANK \ /' /,. ~ _/ '- - sa4-~Or""61).91 . ,, o!!J ~;' "S'.;.gi:/ 1/;' r'7' ",, JI' .... s.35 N89'1t'3&-W 2650.911' 5.35 S.2 5.2. 501 1" - 100' ,,~ro...WO(\""---TA*..D"'-"" T~ 'u.,......- .---.-.-.--.-- EXHIBIT Engineering North West, ILC 423 N. Ancestor Place. SuIte 180 Boiset Jd3ho 83704 (208) ~76-SOOO . FM (208) 376-5556 Project No. 03-027-Date: July 22, 2005 SOMERSET RIDGE WATER TANK UTILITY EASEMENT (IDAHO POWER & QWES1) DESCRIPTION An easement lying in the SW 1/4 of S~tion 36 and the SB 1/4 of Section 3St T. 4 N.t R. 2 E., B.M., Ada County, Idaho, 1001'0 particuWJy described as follows: Counnenclng at the 1/4 section tQtIlet common to S=tion 35 ofT. 4 N"t R.. 2 B." B.M. and Section 2.or.T~.3 N~.-R. 2,'f BoM.; Thence South Sgo19'361t East, 2650.98 feet on the" section tine common to said Sccticms 35 and 2, to "the section comer common to Sections 3S and 36 ofuid TAN., R. 2 B., and Sectiqns 1 and 2 of said T.3 N., R. 2 E; Thence North 55055'4911 East. 549.84 (eet; Thence South 84004'070 West, 58.18 feet to the REAL :POINT OF BEGINNING; Thence continuing South 84004'07" Wast, 52.03 feet; Thence North OSo5S'53n Wcs~ 53.80 feet; Thence North 34028'20" West, 106.25 feet; . , Thence North 55O01'2"r West, 56.32 feet; Thence North 87O4S.40n West, 275.32 feet; Thence South 84056'19" West, 282.86 feet; Thence North 82040'44" W~t, 96.99 feet; Thence South 84037'04" West, 144.14 feet; Thence South 800 11'43" West1 155.89 feet to a point on the easterly right-of-way line of North Claremont Drive; Thence North 05002'03" 15.52 feet on the easterly right..of-way line of North Claremont Drive; SQl11en;cl T8Ilk UtUlty Em/(:. Dcoc,dQC 1'8ge 1 of2 --. ~TA "'" .~. -~ d___ ---.- -- .-. .-- Thence leaving :;aid rightwof-way. North 80"11'43" Bast, 152.49 feet; Thence North 84037'04'1 Eas~ 146.39 feet; Thence South 82040'44" ~ 97.03 feet; Thence North 84056'19" East, 272.41 feet; Thence North 7SClI6'24" Bast. 21.39 feet; Thence South 87045'40" ~ 271.39 feet; Thence South SsoO~127" East, 65.82 feet; Thence-South 34~28'10" East 181.99 -feet tQ the real point-efbernmg. Somcrst:t Tank Utility &ze. Desc.dQC PREPARED BY: EDglneeriDg NorthWest, LLC James R. Washburn, PLS Page 2 - --- -- ----- CLAREMONT WATER UTILITY EASEMENT TANK N-T-S flJ:.4~ HBf~1.~ S~'1r t ~ Nti~"fi.w-,j~- ~~-- .m-~.fI!.U21~(":'~')l).. ~ - ~i: ;:::: =~w-ii ~1~~;': 1-I"W~.w- - - ~ -- 1t&T~27~-1-~V~J1r 1#.,~ ~ 13.7$2..2$ .q.ft. . N65:~f" ~~- ' UG- ~,'" ir'3W--.a ~~~r 58QW E)lS1ItiO wA1fJt TA~ ./;~~YrA1'QL~lDIrMlulroTY~.... 7~ 11,2I;;D IIJ 1m --- Enf:i,neering North West, 423 N. Ance~to1' Place. SuIte 180 Boise, Idaho 83704 EXHIBIT (208) 376-5000 . FIIX (208) 376-55'6 ~ject No. 03.027.Date: 1uly 22 2005 SOMERSET RIDGE WATER TANK WATER EASEMENT DESCRIPTION An easement lying in the SW 1/4 of Section 36 and the SE 1/4 of Section 35, T. 4 N., R. 2 B., B.M, Ada County, Idaho. more partiColarly described as follows: CQmmcncing at the 1/4 seetion comer common to Section 3S ofT. 4 N~ R. 2 B., B.M. and Section 2 ofT. 3 N., R. 2 Eo, B.M. Thence South 8~19'36lt ~ 2650.98 feet on the section line common to said Sections and. 2, to 1heJlDon comer cmomon.tP S~.9ns.3S m1d ~6.of!ml4 T..,lt,1.B'JI ~~ Sectional- 2 of said T.3 N~ R. 2 H; 1'hencG North ssaSSf49" Bast,. 549.84 feet; Thence South 84004'07" West, 58.18 feet to the REAL POINT OF BEGINNING; Thence South 84004'07" W~ 52.03 feet; Thence Nortl,. 05055'53" We~ 53.80 feet; Thence North 34~8'20" West, 106.25 feet; Thence North 55001 '27" West, 5632 feet; Thence North 87D45"40" West, 275.32 feet; Thenee North 35031'33" West, 424.78 feet; 1hence North 51 DJO'58~t Eas~ 20.03 feet; Thence South 35031'3311 Bast, 416.00 feet; Thence Sooth 87045'40" East, 271.39 feet; Thence South 55001127" East, 65.82 feet; Thence South 340:28'20" East, 1 .99 feet to the real point of be ginning. 80111=1 TQ!\k W"tJ::r Euse, ~.doo PREPARED BY: Engineering NorthWm, LLC James R Washbutli,PLS hgt 1 of 1 AT.. '~"T ..,.TT~~'n_.. --- ------ CLAREMONT WATER WA TER EASEMENT TANK ~,~,', , .fr ' ,~~~ '\Cft. , ,, ,\ ,' , \ '-..;.- ~!1M_'ZJ~- '--- N'u~'4bT,n75.V-l"::' ~~ N5S'O1-UW/ 5G. ~ ,~~~~ H05"56'5n-.J \~~r55.80" ~-r;grw EXlS11NG WATER TANK 1- - 150' ..~~1tILT---"'1EHJJH(.JrIUT1'~ 1~- 1,,"":1:1'" "'" ------- ---- EXHIBIT 1) ~neerin1; North West UC 423 N. ADm1Dr Place, &nW 180 Boise, Idaho 83704 (208) 37~SOOO . Fax (lOS) 37fi.SSS6 Projeet No. 03-027-01 Date: Ju1y21,2005 SOMERSET RIDGE WATER TANK LANDSCAPE EASEMENT DES~ON An eaI~~t lying in the SW 1/4 of ~on 36, T. 4 N., R. 2 &. B.M.. Ada County, IdiIbo. JDOte particu1ady dalCIibcd as roUOWJ: CoJtn1'eaciDg at tho 1/4 Bedim comcrcommon to ScctioD 35 qfT. 4 N., R.. 2 B.. B.M. and Scdion2 ofT. 3 N", R. 2 B., BoM.; , , .... , .,. hTbe1lc8South-8go.19'3~-26So-.9ticI:t'OII-the'secdoa'1iDe'enqmJftll to-aid-8eetioDs- - 35 IIIUl 2 to the ICCtion (....,.-onto ScctionI3S ami 36 ofsaid T.4 N., R. 2 B.. Sections 1 add 2 of said. T.3 N.,.R. 2 B..; 'lbc:Dce NOIth 4"'59'50- East, 441.80 feet to the IIO1thwa4 CCIInCI' of an cxIstiDs W8ia: taDk cascmc:m, said point beiDa the REAL POINT OF BEGINNING; South 05"55'53" Bast. 120.61 feet 011 tho wcstedy 1in., ofsaid existing water tank casomeut 1othCI BOUthwcrt comer or said Thence 1eams said cxistiDg easemmt line, Sourh 84O04'G7" West, 5.00 feet; 'I'hcaccNOIfhO5OSS'S3I1 W~ 102.61 feet; Thence NOIth 84004'07" Bast. 5.00 W to tho real poiJJt ofbegbmins. PREPARED BY: EDglaeerIDg Norih~est. LLC Junes R. WuJaburo, PLS Somcmt 1'8nIc S' Land~ euc. IX:8c-doc , ~~I()fI CoT""""'~'n "''~_hh"-- --- h- "-- . - . u .. - .. . CLAREMONT WATER TANK LANDSCAPE EASEMENT 1" - 100 ",~IfIL.~ ,~",,* "'talii", \aT aT" em '~,n .'...__...._n_. ..... . .._u" ..- EXHIBIT p;ngineering tV orlh West, UC 423 N. Ancestor Place, Suite 180 Boise. Ida1J.o 83704 ... (208) 376-5000 . Fa;( (208) 376-5~56 Pruject No. 03.027-Date: July 22, 2005 SOMERSET RIDGE WATER TANK TEMPORARY CONSTRUCfION EASEMENT DESCRIPTION An easement lyjng in tho SW 1/4 of Section 36, T. 4 N., R. 2 B? B.M., Ada County, Idaho, more particularly desco1Jed as follows: Commencing at the 114 section comer common 10 Section 35 ofT. 4 N., R. 2 E.. B.M. and Section 2 ofT. 3. N~ R. 2 B., B.M.; ., ... .. .,-,"-, .~~~ outhJ~~.1!r36~~~26S2 ~~~.~~. ~~lm~~~~-t'1Rid.~tiomI 3S and 2 to 'the sectiOn comer common to Sections 35 and 36 of said T.4 N., R. 2 E., and ScetioO$ 1 and 2 of said T.3 N., R. 2 B; Thence North SSo55'4~ East. 549.84 feet to the REAL POINT OF BEGINNING; Thence North 84DO4'O7" East,.1 0.01 feet; 1'benco South OSoSS'S3" East, 106.00 feet; Thence South 84004'07" 'West. 132.92 feet; Thmcc North. 05055'53" West, 190.36 feet; Thence North 84 Q04'O7" East, 54.00 feet; Thence South 45010'34" ~ 108.92 feet to the real pohrt of beginning. PREP ABED BY:Englnee rthWest, LLC James R. WashbuIlI) PLS Somcroo::tTlIt1k Temp (;on.1I Ease DMc,doc Page I of! . - CLAREMONT WATER TANK TEMPORARY CONSTRUCTION EASEMENT H84"04.:27't r._.. ,~~ B4-~'Ort 10.01.aU! ~\\ \i~ nOPO5a) \~i r.t " , '- - Sa4'-oroT\v /' 132.92' ~~".". 5.35 N!l919'JS W 21i50.ge. 5.35 S~5.2 5.2 5. 1" .. 100' "~=.JII~1IIL~Y'lDIWOl.,."""'--~ ?/1'~ """"11 N41t1$1' CLAREMONT WATER TANK TANK SCREENING EXHIBIT EXHIBIT LEGEND 0"' SCREENlNG"'\lEGETAliONo " '" ." SCAlE: ,- 1m 30' --I \lif \ \ \ \ PROPOSED LANDSCAPE EASEMENT , \ \ , ~EXlSTlNG WATER TANI( EASEMENT " , ~I \ \ 'cl- ..~~...m...~~~.... 7~ "..,rJ1 ~ ...,. .,.",GO, .- -- h_____-