SUR-REPLY TO COMMISSION STAFF’S REPLY COMMENTS RE: ORDER NO. 34770 Page 1 of 7
15412429_2.docx[15376.1]
Preston N. Carter, ISB No. 8462
Blake W. Ringer, ISB No. 11223
Givens Pursley LLP
601 W. Bannock St.
Boise, ID 83702
Telephone: (208) 388-1200
Facsimile: (208) 388-1300
prestoncarter@givenspursley.com
blakeringer@givenspursley.com
Attorneys for the Company
BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
IN THE MATTER OF THE COMMISSION’S
INVESTIGATION INTO CDS STONERIDGE,
LLC’S HOOK-UP FEE FOR NEW
CUSTOMERS TO CONNECT TO ITS WATER
SYSTEM
Case No. SWS-W-20-02
SUR-REPLY TO COMMISSION STAFF’S
REPLY COMMENTS RE: ORDER NO.
34770
CDS Stoneridge Utilities, LLC, owned by J.D. Resort, Inc. (collectively the “Company”)
through its attorneys of record Givens Pursley LLP submits this Sur-Reply to Commission Staff’s
Reply Comments Regarding the Idaho Public Utilities Commission’s (the “Commission’s”) Order
No. 34770, dated September 9, 2020.
INTRODUCTION
First, the Company acknowledges that this Sur-Reply has been filed late. The
Commission’s Order No. 34828 instructed Staff to file a written Reply to the Company’s
September 30 Response by November 20, and the Company to file a Sur-Reply by November 27.
Staff’s Reply was filed on November 20 but the undersigned counsel was not served with the
Reply until midday on November 23, leaving the Company with less than a week, over the
Thanksgiving holiday, to draft and file a Sur-Reply. In any event, and despite its late arrival, the
Company respectfully requests that the Commission consider this Sur-Reply before reaching a
decision in the case.
RECEIVED
2020December 4, PM 3:15
IDAHO PUBLIC
UTILITIES COMMISSION
SUR-REPLY TO COMMISSION STAFF’S REPLY COMMENTS RE: ORDER NO. 34770 Page 2 of 7
15412429_2.docx[15376.1]
As it did in its Response, the Company acknowledges the need to overhaul its operations
to come into compliance with Commission rules and regulations. The Company has made concrete
steps in that direction in recent months and intends to fully “right the ship,” so to speak. However,
the Company inherited a very difficult situation. For one, the applicable Tariff has not been
updated for over 13 years. The Tariff’s Hook-Up Fee of only $1,200 compared to the Company’s
actual costs in making service connections demonstrates just how much of a disconnect exists
between the Tariff and the situation on the ground. Even Staff agreed in its Reply that the Tariff
needs changes. Reply at 5. Much of the Company’s confusion over what it could and could not
charge to customers stemmed from the impossibility for the Company to operate sustainably under
the current Tariff.
Along with the outdated Tariff, the Company inherited minimal records and maps from its
predecessor. The maps of the main water line that the Company does have are frequently
inaccurate, leading to expensive exploratory work just to find the main.
In spite of these challenges, the Company has made concrete steps toward full compliance.
For example, the Company just hired a new full-time operator who has years of experience in the
utility industry and understands Commission regulations well. The Company is also now making
more complete records of its interactions with customers and the services it provides.
The following contains the Company’s comments to Staff’s Reply. Primarily, the
Company seeks to comment on Staff’s application of § 9.4 of the Tariff, as well as Staff’s
interpretation of § 9.3.
I. Much of the services provided by the Company has resulted from “out-of-the-
ordinary circumstances,” justifying the additional amounts charged to some
customers.
Section 9.4 of the Company’s Tariff was set forth in the Company’s Response. Response
at 3-4. In short, it permits the Company to charge a customer more than the approved $1,200 Hook-
SUR-REPLY TO COMMISSION STAFF’S REPLY COMMENTS RE: ORDER NO. 34770 Page 3 of 7
15412429_2.docx[15376.1]
Up Fee when there exist “out-of-the-ordinary” (or, extraordinary) circumstances in the installation
of a service connection that result in “extra costs” to the Company. In its Reply, Staff takes the
position that an “ordinary” service connection involves the following work:
1) locating the main, 2) installing a hot tap/corp stop on the main, 3)
installing a water meter and curb stop near the edge of the
customer’s property, 4) running a service line between the main and
the water meter, and 5) all excavation and horizontal boring
necessary to perform this work.
Reply at 4. Staff acknowledged the Company could reasonably incur “extraordinary costs,”
pursuant to § 9.4 of the Tariff, if the work was more complex than the steps outlined above. Id.
Staff concluded, however, that “the Company provided no evidence suggesting extraordinary
circumstances existed that might justify it incurring extraordinary costs for any connection.” Id.
Yet, the Company has provided documentation indicating that extraordinary circumstances
led to extraordinary costs on several occasions. The extraordinary circumstances most commonly
encountered were (1) excessive and unexpected difficulties in locating the water main, and (2)
horizontal boring under roadways.
Regarding the first, the records and maps of the main that the Company received from its
predecessor are so incomplete and inaccurate that exploration frequently takes up to five hours,
sometimes even days. Certainly, such extensive efforts to find the main, resulting from the
inadequacy of maps and records that the Company inherited from its predecessor, would constitute
“out-of-the-ordinary” circumstances.
Regarding the second, given the state of the Company’s maps and records of the location
of the main, the Company regularly discovers the main on the wrong side of a road and must bore
underneath the road to reach a customer’s property and complete the connection. This work is
further complicated by the need to avoid other utility lines as well as direct traffic.
SUR-REPLY TO COMMISSION STAFF’S REPLY COMMENTS RE: ORDER NO. 34770 Page 4 of 7
15412429_2.docx[15376.1]
The Company respectfully submits that, under § 9.4 of the Tariff, it is entitled to pass the
additional costs resulting from these extraordinary circumstances onto the customer. Filed along
with this Sur-Reply is a table (Exhibit A) identifying the customers for whom such extraordinary
circumstances arose, the additional costs incurred by those circumstances, as well as the supporting
documentation.1 The Company submits that it should not be obligated to refund these additional
costs to the respective customers.
II. The Company’s Tariff requires that it reject service connection applications that
are not accompanied by a building location permit or a building permit.
Section 9.3 of the Company’s Tariff states that applications for service connections “must
be accompanied by an approved building location or building permit issued by Bonner County.”
Staff’s Reply expresses its belief that “owning a platted lot within the certificated area of the
Company could satisfy Section 9.3.” Reply at 6.
The Company is skeptical that Section 9.3 could be interpreted so loosely. A plain reading
of the section suggests that “building location” and “building” are both modifying the same noun:
permit. Section 9.3 would therefore have the same meaning if it was written alternatively, like so:
“must be accompanied by an approved building location permit, or building permit, issued by
Bonner County.” This reading of Section 9.3 is logical because Bonner County issues “building
location permits” to residents who submit an application and pay a fee.2 Thus, Section 9.3 is simply
referring to the same thing twice when it lists the county’s official term, “building location permit,”
as well as the layman’s term, “building permit”. Importantly, Section 9.3 mandates that an
1 An unredacted version of Exhibit A is provided to the Commission under separate cover to protect customers’
addresses and billing information. Furthermore, aside from one customer in Exhibit A, all of the documentation the
Company uses to support its assertion of extraordinary circumstances is contained within the file of documents the
Company has already submitted to the Commission. These documents were listed on the Commission’s website on
October 26, 2020 and are titled “In Support of Company’s Response.”
2 See https://www.bonnercountyid.gov/building-location-permit for the county’s Building Location Permit
Application and other instructional material.
SUR-REPLY TO COMMISSION STAFF’S REPLY COMMENTS RE: ORDER NO. 34770 Page 5 of 7
15412429_2.docx[15376.1]
application for a service connection be accompanied by a building location permit issued by
Bonner County. It is unlikely, then, that a platted lot could satisfy the provisions of Section 9.3.
III. The Company has provided the Commission with all records and documents that
are responsive to Order No. 34770.
The Commission, in Order No. 34770, required the Company to, among other things:
produce and provide the Commission true and correct copies of all
records about new customer connections to the water system since
November of 2018 through the present, including an itemization and
description of the labor performed, equipment and materials
installed, and all charges the customer paid to connect to the
Company’s water system.
Order No. 34770, at 5. Staff noted that the documentation provided by the Company in response
to Order No. 34770 was inadequate. Reply at 2, 7-8. The Company acknowledges that the records
and documentation it has provided in response to the Commission’s order does not include all of
the details and itemized information requested by the Commission. However, the Company has
provided the Commission with all records and documents in its possession that are responsive to
the Commission’s order. Any inadequacy in the Company’s response to this element of the order
is merely a product of poor recordkeeping on the Company’s part.
CONCLUSION
The Company fully acknowledges the difficulties it has experienced in attempting to
operate sustainably and in compliance with the Commission’s rules. The Company remains
committed to achieving both compliance and sustainability, and it hopes to demonstrate this intent
by taking the steps identified in its Response.
//
//
//
SUR-REPLY TO COMMISSION STAFF’S REPLY COMMENTS RE: ORDER NO. 34770 Page 6 of 7
15412429_2.docx[15376.1]
Dated: December 4, 2020.
Respectfully submitted,
Preston N. Carter
Blake W. Ringer
Givens Pursley LLP
Attorneys for the Company
SUR-REPLY TO COMMISSION STAFF’S REPLY COMMENTS RE: ORDER NO. 34770 Page 7 of 7
15412429_2.docx[15376.1]
CERTIFICATE OF SERVICE
I certify that on December 4, 2020, a true and correct copy of the foregoing was served
upon all parties of record in this proceeding via electronic mail as indicated below:
COMMISSION STAFF
Jan Noriyuki
Idaho Public Utilities Commission
11331 W. Chinden Blvd., Bldg. 8, Ste. 201-A
Boise, ID 83714
EMAIL: jan.noriyuki@puc.idaho.gov
John R. Hammond, Deputy Attorney General
Idaho Public Utilities Commission
11331 W. Chinden Blvd., Bldg. 8, Ste. 201-A
Boise, ID 83714
EMAIL: john.hammond@puc.idaho.gov
____________________________________
Preston N. Carter
EXHIBIT A
CASE NO. SWS-W-20-02
CDS STONERIDGE UTILITIES, LLC
Redacted – List of Extraordinary
Circumstances and Supporting
Documentation
EXHIBIT A
Customer Location of Connection Overage Charged Extraordinary Work Extraordinary Cost Documentary Support
2,800.00$ Bored across road 2,000.00$ Swank Exc. Invoice #0823 (Supporting Documents pp. 17)*
2,800.00$ 5 hours of exploration 750.00$ Swank Exc. Invoice #0709 (Supporting Documents pp. 21)
**2,800.00$ Bored across road and extended main 8,540.00$ NW Utility Estimate (Supporting Documents pp. 40, 43-44)
-$ 8 hours of exploration 880.00$ Swank Exc. Invoice #0822 (Supporting Documents pp. 74)
2,800.00$ 5 hours of exploration and bored across road 2,825.00$ Swank Exc. Invoice #0707 (Supporting Documents pp. 82)
2,800.00$ 3.5 hours of exploration 437.50$ Swank Exc. Invoice #0706 (Supporting Documents pp. 89)
2,800.00$ Bored across road 1,500.00$ Swank Exc. Invoice #0704 (Supporting Documents pp. 104)
2,800.00$ Bored across road 2,000.00$ Swank Exc. Estimate #2 (submitted with this Exhibit)
***3,400.00$ 2 days of exploration 2,000.00$ Stoneridge Invoice (4/17/2019) (Supporting Documents pp. 32)
* "Supporting Documents" refers to the documents previously filed with the Commission. These documents were listed on the Commission's website on October 26, 2020 and are titled "In Support of Company Response".
** This customer's service connection was exceptionally difficult. It required an extension of the main as well as boring across a road. The $8,540 amount in extraordinary cost was calculated by first taking the
Stoneridge Invoice (Supporting Documents pp. 43) and calculating the amount due to "extraordinary circumstances". Because the typical Stoneridge Invoice involves, for example, only 10 hours of work for the
Operator and Operator's Assistant, the excess hours on this invoice (36 hours for each) were assessed as extraordinary costs. This calculation was done for each item on the invoice. The total was then added to
the $1,800 charged by Northwest Utility (Supporting Documents pp. 40), resulting in a sum of $8,540.
*** This customer's service connection was also exceptionally difficult. Exploration went on for two days and the service line installed was well over 50 feet. The extraordinary cost of $2,000 was calculated by
referring to the Stoneridge invoice (Supporting Documents pp. 32) and performing the same calculation as described above.
r\tE,F?rt3(cË,
StoneRidge Utility Co.
PO Box 298 Blanchard, ID 83804
(208) 437-3148
APPtTC.&TTTN F'Offi. IMATER.I SEXVER. C TNNEC T'TCIN
SE\1rgR_--
WAT'ER. ,Y
-
NAME ß- t' tq
MAILINGADDRESs
CITY, STATE,ztp'
TELEPHoNE No.:
LOT: UBDIVISION:
sTREETADDRESS:
RECEIVED
WATER/SEWER FEES:
-,,-'fisie\SEWER HOOK-UP
il¡\i\
$t,zooWATER HOOK.UP
CONTRIBUTION IN AID OF CONSTRUCTION
OF EXPANSION OF SYSTEM
FCIR COMPANY USË ONLY:
TOTAI. CHARGES $
TOTAL PAYMENT s
RESPONSE w\d R{æî'
Ur¿ü\\- tnt/o
Swank Excavating
1380N EwellCt
Post Falls ID 83854
Estimate
Name / Address
Stoner idge lìesort
Date Estimate #
412712020 2
þl tk"ts
lQ ¡a "5Ô
rfiln
Project
Description Qtv Rate ïotal
Ujr
dù
parts/rnaterials
,tap rental
trafïic control
oquipnertt rnobiIization
excavation/l abor
boririg across roacl
h
É'
P
2,462.27
300.00,
450.00
400;00
3,708.00
2,000.00,
2,462.27
300.00
450.00
400.00
3,708.00
2,000.00
Total fig,320.27
\n\ernCI |
0Perùk/Ø
I r5 t#s 0 eSrt¿ ;
bs"s'ióõ rsre :- b