HomeMy WebLinkAbout20220408Notice of Name Change.pdfOvGoLrA
James C. Cagle
Vice President Rates & Regulatory Affairs
Veolia North America
461 From Road, Suite 400
Paramus, NJ 07410
Via E-Filino and E-mail
April8,2022
Ms. Jan Noriyuki, Commission Secretary
ldaho Public Utilities Commission
11311W. Chinden Blvd., Bldg. 8, Ste. 201-A
Boise, ldaho 83714
Re:
Dear Ms. Noriyuki,jwz-r-^:- 27-ol \/ Eo- lr- L2.- ol
The Veolia Environment S.A. (Veolia) and SUEZ S.A. (SUEZ) merger closed on Tuesday,
January 18,2022. The Competition and Markets Authority (CMA) provided antitrust clearance
for the transaction in the United Kingdom on March 10, 2022 clearing the way for Veolia and
SUEZ to commence the integration of the Veolia North America (VNA) and the SUEZ North
America (SNA) businesses, which include SUEZ Water ldaho lnc. (SUEZ Water ldaho). As part
of the integration, there will be a rebranding of the SNA businesses to the 'Veolia' brand.
The purpose of this letter is to advise the Idaho Public Utilities Commission ('PUC') that
the name change set out below became effective on March 28,2022:
COMPANY NAME
SUEZ Water ldaho lnc.
NEW COMPANY NAME
Veolia Water ldaho, lnc.
Corresponding changes will be made to bills, signage, vehicles and uniforms during the
remainder of this year. Please note that notice of the name change will be provided to \MlD's
customers through a variety of means. A customer letter is being sent in accordance with bill
cycles after March 21,2022, and will continue for an entire billing cycle. Additionally, MtrlD will
further notiff customers of the name change in May through a second notification via direct mail,
bill insert, and website and social media postings. The name change will have no impact on
V\rVlD customers, who will continue to receive water service under the same rates, terms and
conditions as are cunently in effect.
Finally, so that the PUC's records accurately reflect the name change of \AA/lD, enclosed are
copies of various materials filed with, and received from, the ldaho Secretary of State effectuating
the name change as well as a copy of the cunent customer letter being sent to customers.
Additionally, V\A/lD is providing a red-lined complete copy of its commission approved tariffs which
indicate the name change and the effective date.
o
GC:
Pleaso feel free to contact me if you have any questione rcgarding the name ehange or any of
the attached materials.
Best regards,
/s/ James C. Caqlle
James C. Cagle
Mm Prcsident Rates & Regulatory Affairs
JCC:dmv
Prcston N. Carter, Givens Pursley, LLP
Marshall Thompson, Veolia Water ldaho
Verlla North Amerlca
461 From Rsad, Sulte 4(X)
Paramus, NJ 07410
tel. +1 201 01S2901 fax +1 20'l 7W-5'n8
wuu.wollsnofthamerie.oonr
-Hztrl
Hf{U
HH
ATTACHMEI\T 1
STATE OF IDAHO
Lawercnce Denneyl Secretary of Stafe
Business Oftice
450 North 4th Street
PO Box 83720
Boise, lD 83720
Veolia Water ldaho, lnc.
sTE 400
461 FROM RD
PARAMUS, NJ 07652.3526
March 28,2022
Filing Acknowledgment
Please review the filing information bqlow and notiff our office immediatelv of any discrepancies.
File # :
Filing Name:
Filing Type:
Status:
63138
Veolia Water ldaho, lnc.
General Business Corporation (D)
Active-Good Standing
Amendment Type: Articles of Amendment
Filed Date: Ogn$nozz1:58 PM
lmage # : 80685-2953
This will acknowledge the filing of the attached Amendment with an effective date as indicated above.
When corresponding with this office or submitting documents for filing, please refer to the file number
given above.
Denney
HaI,gs*gr:BJ"iB["s,BFi"ion
Field Name Changed From Changed To
Filing Name
Common Shares
SUEZWATER IDAHO INC.
0
Veolia Water ldaho, lnc.
10000
Phone:208-334-2301 * Email: business@sos.idaho.gov * Website: sosbiz.idaho.gov
lD: 99CE7D2462FO-,|12C{1 6tr9FAFEE897D20
ililtililtilffi]
ARTICLES OF AMENDMENT
(General Business)
Title 30, Chapters 21 and 29, ldaho Code
Base Filing fee: $30.00 + $20.00 br manual processing (fglm..16gelbgepgD.
1. The name of the corporatlon ls:
SUEZ Water ldaho lnc.
lf thc corporallon hr been admlnistratlvcly distolved and the oorporata oamc ie no longer
avallable lor uee, lhc amen&nen(s| bclow mwl lnclude e changc of corponb nane .
2, The taxt of each article being amended
The Articles of lnoorporation of the Corponalion are hereby amended by striking out Artide FIRST thereof and by
substituting in lieu of said Article the following new Article as adopted:
'FIRST. The name of the corporation shall be Veolia Water ldaho, lnc,."
3. The date of adoption of the amondment(s)was: March 28,2022
4. Manner of adoption (choose one):
Q fne amendment consists exclusively of mafters which do not require shareholder action pursuant tro
sectlon 3G29-1002, 30-29-1005, and 3G29-1006, tdaho Code, and was, therefore, adopted by the
board of direc{ors.
Q ttone of the corporation's shares have been issued and was, therefore, adopted by the
I incorporator E Uoaro of directors.
@ epproval by the shareholders is requlred and the shareholders duty approved the amendment(s)
as required by elther Title 30, Chapbrs 20,21 , and N, ldaho Code or by the Articles of lncorporation.
Secretary ofState use onty
Dated:March 28-2022
Prlnted Name:
Signature:
flovbrd 0li,l0lg
e6^4fu4
N
Hz
Ft]
=
filt{U
HH
ATTACHMENT 2
SUEZ
CIS-DIVISION-NAME
CIS-DIVISION_ADDRESS 1
CIS-DIVISION-CITY, CIS-DIVISION STATE_CIS DIVISION-POSTAL
CIS-DIVISION-PHONE
FAX CIS-DIVISION-FAX
CIS DIVISION EMAIL
DATE
CUSTOMER-NAME
MAlLING-ADDRESSl
MAILING-ADDRESS2
MAILING CITY MAILING STATE MAILING ZIP
Dear CUSTOMER GREETING NAME:
SUEZ is excited to announce that it has completed its merger with Veolia. As always, we remain committed to
bringing you best-in-class water services, providing life's most essential resource for your daily needs, and having
an active presence in your local community.
What does this mean for you?
Our phone numbers and addresses, your account number, the way you pay your bill, and your rates will remain
unchanged. You can expect the same level of commitment to service and to water quality you have always had,
with the same local team dedicated to providing you with essential water services.
ln the coming months, our website, social media channels, service trucks and uniforms will only have the Veolia
name. We will provide you with notification before any change occurs.
Who is Veolia?
With nearly 179,000 employees worldwide, the company designs and
provides water, waste and energy management solutions which contribute to
the sustainable development of communities and industries. Veolia operates
8,500 water and wastewater facilities around the world and currently serves
over 550 communities in North America.
OvGoLrA
Stronger together
SUEZ and Veolia are stronger together, bringing an unwavering commitment to operational safety and compliance
with a wealth of experience and resources. We believe that together we can better serve your needs, while
accelerating innovation to bring you more choice, greater possibilities, and improved water quality and service.
For more information, please see our FAQ on the reverse of this page. Still have questions? Visit
mysuezrvater.com/merger or see us on social media.
Best regards,
cls_DrvrsroN_vP
SUEZ North America
TITLE
@suez
SUEZ Merqerwith Veolia: FAQ
What is the benefit of the mergor for customers?
By bringing together the two world leaders in water management and environmental services, this merger will
allow Veolia to leverage the combined human, technical and technological capital to better serve local
customers and help guarantee a sustainable future across North America. The combined experience and
expertise of Veolia and SUEZ will strengthen our ability to provide solutions to operational and environmental
challenges for our customers across North America. lt will allow us to invest more, to innovate and to invent
more, all with the goal of guaranteeing a more sustainable future for the communities in which we operate.
What will the company name be?
ln North America, SUEZ will become Veolia.
Will my water service change? Wil! someone new provide my water service?
While Veolia is always interested in attracting new talent, generally the same dedicated, local staff will continue
to work hard to deliver highquality water to you daily.
Willmy rates change?
No. Your rate for water service will remain the same.There are no changes to rates as a result of the merger.
Willthere be changes in the way I pay my bill or contact you?
You will continue to pay your bill in exactly the same way for now, whether online (at mysuezwater.com), by mail,
in person (if available in your area), or by phone. Beginning in March 2022, our email addresses will change, so
you will receive emails from Veolia.com (although we will still get emails sent to the old Suez.com addresses).
After the transition to Veolia (expected in the second quarter of 20221=
What stays the same:o Your account number.o The address to send your bill/pay in person.o The phone number to pay your bill.o AutoPay/Direct Debit or Recurring Card payments; your enrollment will not change
What will change:o Our website url for online payments.o The name you write on the "pay to the order of line on your check will change.
"We will notify you of the new name/urlto use and the date when this change will begin.
Will financial assistance programs remain after the companles are comblned?
Veolia will actively provide financial assistance programs for customers in need.
Will Veolia play an active role in community activities?
Veolia will be active in the communities it serves and will continue to make investments through partnerships. ln
many communities that will mean an increase in investments.
Stil! have questions?
Visit mysuezwater.com/merger or see us on social media
(f)
Hz
F1
f+it{U
H
E'(
ATTACHMENT 3
Sheet No. 1
Replacing all Previous Sheets
| ruwArERtDAHeJgJNc.
S{JEZVEOLTA WATER |DA,HoDAHO rNC
RATE SCHEDULES
RULES AND REGULATIONS
GOVERNING THE RENDERING OF WATER SERVICE
AND WATER MAIN EXTENSIONS
lssued Per IPUC Order No.€503OEffective-@
lssued by SU@!A WATER lDAHe+qlNC.
Marshall Thompson, Vice President
8248 West Victory Road, Boise, Idaho
Sheet No.2
Replacing all Previous Sheets
SIJE:ZVEOLIA WATER IDAHO]O. INC.
Title Page
Table of Contents
Schedules of Rates
Schedule Number 1
Schedule Number 1A
Schedule Number 1B
Schedule Number 1C
Schedule Number 2
Schedule Number 3
TABLE OF CONTENTS
General Metered Service
DEQ Fee
Flat Rate Service
Brian Subdivision Surcharge
Public Hydrants and Street Sprinkling
Private Fire Sprinkler and Service
Sheet Number
1
2
Schedule Number 4 Private Fire Hydrant Service
Schedule Number 5 Miscellaneous Fees and Charges
Schedule Number 6 Municipal Franchise Fees
Application for Service
Service Connection
Meters
Meter Setting
Meter Testing
Bills
Discontinuance of Service
Customeds Deposits
Budget Bill Plan
Builder's Temporary Service
Fire Protection
Miscellaneous
Definitions - Water Service
Definitions -Water Main Extension
Water Main Extensions - General
Water Main Extensions - Connection Fees
Water Main Extensions - Individual Residences
Water Main Extensions - Residential Subdivision or Multiple Family Housing
Development
Water Main Extensions - Commercial, lndustrial, or Municipal Development
Special Facilities
Non-contiguous Expansion
Water Main Extension Agreement, lndividuals, Advances, Refunds
Water Main Extension Agreement, Residential, Multiple Family Housing,
Commercial, lndustrial, or Municipal Development
Residential or Multiple Family Housing Non-contiguous Water System Agreement
20
21,22,23,
24,25,26
27
28
28
30
30
31
32
32
33
33
34
35
35
35,36
37
37
38
38
39
3,4, 5, 6, 7, II
10, 11, 12
13
14
15, 16, 17,18,19,
40
41,42
46,47
51,52,
56,57
61,62,
66
42
43,44,45,
48,49, 50,
53, 54, 55,
58, 59, 60,
63, 04, 65,
lssued by @!IA WATER IDAHO+qINC.
lssued Per IPUC Order No.€5247 MarshallThompson, Vice President
Effective - 8248 West Victory Road, Boise, !D
Sheet No.3
Replacing all Previous Sheets
SI.IEJZVEOLIA WATER IDAHEUO. INC
SCHEDULE NO. 1
GENERAL METERED SERVICE
Availabilitv: To all General Metered customers not served under a separate schedule
Customer Charges Bi-Monthly
Per Meter CharoeEffective Effective05t01t2021 05t01t2022
Meter Size
518"-314
1"
1-114" and 1-112"
2' or multiple meters of equivalent capacity
3" or multiple meters of equivalent capacity
4" or multiple meters of equivalent capacity
6" or multiple meters of equivalent capacity
8" or multiple meters of equivalent capacity
10" or multiple meters of equivalent capacity
Volume Charoe:
For allwater used less than 3CCF (100 cubic Feet) (CCF)
(1 CCF=748 gallons):
For all water used greater than 3CCF
Winter RatesEffective Effective05t0112021 05t01t2022
$1.5208 $1.5959
$1.5208 $1.5959
$21.88
$27.97
947.84
$74.23
$144.82
$270.18
$451.04
$589.58
$840.19
$22.96
$29.35
$50.21
$77.92
$151.97
$283.52
$473.35
$619.25
$882.48
Volume Charqe:Summer RatesEffective Effective05t01t2021 05t01t2022
For allwater used less than 3CCF (100 cubic Feet) (CCF)
(1 CCF=748 gallons):$1.5208 $1.5959
For all water used greater than 3CCF $1.9254 $2.0204
Conditions of Gontract:
The customer shall pay the total of the customer charge plus the volume charge. The volume
charge is based on all metered water for the billing period. Consumption is expressed in hundred
cubic foot units or thousand gallon units as determined by the meter installed by the Company. The
customer charge will be prorated whenever the customer has not been a customer for the entire
billing period.
Summer Period:
The summer rate will apply to water consumed between May 1 and September 30. Meter readings
straddling these dates will be prorated.
lssued Per IPUC Order No.€503OEffective-W
lssued by SIJEZVEOIIA WATER IDAHO+qINC.
Marshall Thompson, Vice President
8248 West Victory Road, Boise, lD
Sheet No.4
Replacing all Previous Sheets
SIJEiZVEOLIA WATER IDAHOIO. INC.
SCHEDULE NO. I (Continued)
GENERAL METERED SERVICE EAGLE WATER SERVICE AREA
Availabilitv: To all existing General Metered customers residing in the area formerly serviced by
Eagle Water Company as of January 1,2022.
Monthly
Customer Charges: Per Meter CharqeEffeciii5- Effective
Meter Size
5t8-314
1"
1-114" and 1-112"
2' or multiple meters of equivalent capacity
3" or multiple meters of equivalent capacity
4" or multiple meters of equivalent capacity
6" or multiple meters of equivalent capacity
8" or multiple meters of equivalent capacity
10" or multiple meters of equivalent capacity
Volume Charoe:
For all water used less than 1.SCCF (100 cubic Feet) (CCF)
(1CCF=748 gallons):
For all water used greater than 1.SCCF
01t01t2022 05t01t2022$s.47 $5.74
$6.99
$11.96
$18.56
$36.21
$67.55
$112.76
$147.40
$210.05
Winter RatesEffective Effective01t01t2022 05t01t2022
$7.34
$12.ss
$19.48
$37.99
$70.88
$118.34
$154.81
$220.62
$0.7604
$0.7604
$0.7980
$0.7980
Volume Charoe: Summer RatesEffective Effective01/012022 05t0112022
For allwater used less than 1.SCCF (100 cubic Feet) (CCF)
(1 CCF=748 gallons): $0.7604 $0.7980
For all water used greater than 1.5CCF $0.9627 $1.0102
Conditions of Contract: The customer shall pay the total of the customer charge plus the volume
charge. The volume charge is based on all metered water for the billing period. Consumption is
expressed in hundred cubic foot units or thousand gallon units as determined by the meter
installed by the Company. The customer charge will be prorated whenever the customer has not
been a customer for the entire billing period. Only existing customers at the time of acquisition of
Eagle Water Company are covered by this schedule. The rates in this schedule expire on
December 31 of the effective year. The Company, by tariff advice, will file subsequent revisions
to this schedule to implement the terms of Order Number 35247 dated December 9,2021.
Future rates are subject to change based on base rate increases as approved by the IPUC.
All new customers to the area formerly serviced by Eagle Water Company after January 1,2022,
whether by new construction, sale or purchase shall pay the new customer current
SUEZVEOLIA General Metered Service - Eagle Water Service Area monthly rates as contained
on Schedule No. 1 of this tariff.
Summer Period: The summer rate will apply to water consumed between May 1 and September
30. Meter readings straddling these dates will be prorated.
lssued by SIJEZVEOLIA WATER I DAHO+Q-INC.
lssued Per IPUC Order No. 352,17 MarshallThompson, Vice President
Effective av 1.2022 8248 West Victory Road, Boise, !D
Sheet No.5
Replacing all Previous Sheets
ST'EZVEOLIA WATER IDAHOIO. INC.
SCHEDULE NO. I (Continued)
GENERAL METERED SERVICE EAGLE WATER SERVICE AREA
Aygjphillft: To allexisting general metered customers residing in the area formerly serviced by
Eagle Water Company as of January 1,2022.
Monthly
Customer Charges: Per Meter CharoeEffective Effective
Meter Size 0110112023 0110112024518"-314 $6.70 $7.651', $8.56 $9.78
1-114" and 1-112" $14.&l $16.74
2' or multiple meters of equivalent capacity $22.73 $25.97
3" or multiple meters of equivalent capacity W.32 $50.66
4" or multiple meters of equivalent capacity $82.69 $%.51
6" or multiple meters of equivalent capacity $138.06 $'157.78
8" or multiple meters of equivalent capacity $180.61 $206.42
10" or multiple meters of equivalent capacity $257.39 $294.16
Volume Charoe:Winter RatesEffective Effective01t01t2023 01t01t2024
For all water used less than 1.SCCF (100 cubic Feet) (CCF)
(1CCF=748 gallons):
For all water used greater than 1.SCCF
$0.9309
$0.9309
$1.0639
$1.0639
Volume Charqe: Summer RatesEffective Effective01t01t2023 01t01t2024
For all water used less than 1.SCCF ('100 cubic Feet) (CCF)
(1 CCF=748 gallons): $0.9309 $1.0639
For all water used greater than 1 .SCCF $1 .1786 $1 .3469
Conditions of Contract: The customer shall pay the total of the customer charge plus the volume
charge. The volume charge is based on all metered water for the billing period. Consumption is
expressed in hundred cubic foot units or thousand gallon units as determined by the meter
installed by the Company. The customer charge will be prorated whenever the customer has not
been a customer for the entire billing period. Only existing customers at the time of acquisition of
Eagle Water Company are covered by this schedule. The rates in this schedule expire on
December 31 of the effective year. The Company, by tariff advice, will file subsequent revisions
to this schedule to implement the terms of Order Number 35247 dated December 9,2021.
Future rates are subject to change based on base rate increases as approved by the IPUC.
All new customers to the area formerly serviced by Eagle Water Company after January 1,2022,
whether by new construction, sale or purchase shall pay the new customer current
StEZYEOLIA General Metered Service - Eagle Water Service Area monthly rates as contained
on Schedule No. 1 of this tariff.
Summer Period: The summer rate will apply to water consumed between May 1 and September
30. Meter readings straddling these dates will be prorated.
lssued by SUEZVEOLIA WATER IDAHO+qINC.
lssued Per IPUC Order No. 3E;247 MarshallThompson, Vice President
Effective - 8248 West Victory Road, Boise, lD
Sheet No.6
Replacing all Previous Sheets
STJEZVEOLIA WATER IDAHO+O. INC.
SCHEDULE NO. I (Continued)
GENERAL METERED SERVICE EAGLE WATER SERVICE AREA
AvailabiliW: To all existing general metered customers residing in the area formerly serviced by
Eagle Water Company as of January 1,2022.
Monthly
Customer Charges: Per Meter CharoeEffective Effective01t01t2025 01t01t2026
Meter Size5t8"-3t4 $8.61 $9.571" $11.01 $12.23
1-114" and'l-112" $18.83 $20.92
2" or multiple meters of equivalent capacity $29.22 $32.47
3" or multiple meters of equivalent capacity $56.99 $63.32
4" or multiple meters of equivalent capacity $106.32 $118.13
6" or multiple meters of equivalent capacity $177.51 $197.23
8" or multiple meters of equivalent capacity $232.22 $258.02
10" or multiple meters of equivalent capacity $330.93 $367.70
Volume Charoe:Winter RatesEffective Effective01101t2025 01t01t2026
For all water used less than 1.SCCF (100 cubic Feet) (CCF)
(1 CCF=748 gallons):
For all water used greater than 1.SCCF
Volume Charoe:Summer RatesEffective Effective
01t0'12025 01t01t2026
For all water used less than 1.SCCF (100 cubic Feet) (CCF)
(1 CCF=748 gallons):
For all water used greater than 1.SCCF
$t
$1 1 969
$1.1969
$1.5153
$1.3299
$1.3299
969
$1.3299
$1.6837
Conditions of Contract: The customer shall pay the total of the customer charge plus the volume
charge. The volume charge is based on all metered water for the billing period. Consumption is
expressed in hundred cubic foot units or thousand gallon units as determined by the meter
installed by the Company. The customer charge will be prorated whenever the customer has not
been a customer for the entire billing period. Only existing customers at the time of acquisition of
Eagle Water Company are covered by this schedule. The rates in this schedule expire on
December 31 of the effective year. The Company, by tariff advice, will file subsequent revisions
to this schedule to implement the terms of Order Number 35247 dated December 9,2021.
Future rates are subject to change based on base rate increases as approved by the IPUC.
All new customers to the area formerly serviced by Eagle Water after January 1,2022, whether
by new construction, sale or purchase shall pay the current S{JEZVEOLIA General Metered -
Eagle Water Service Area monthly rates as contained on Schedule No. 1 - General Metered
Service of this tariff.
Summer Period: The summer rate will apply to water consumed between May 1 and September
30. Meter readings straddling these dates will be prorated.
lssued by SIJ@LIA WATER IDAHO+qINC.
lssued Per IPUC Order No.3EPq7 MarshallThompson, Vice President
Effective av1 .2022 8248 West Victory Road, Boise, lD
Sheet No. 7
Replacing all Previous Sheets
SIJEZVEOLIA WATER IDAHEUO lNC
SCHEDULE NO. I (Continuedl
GENERAL METERED SERVICE EAGLE WATER SERVICE AREA
Availabilitv: To allexisting general metered customers residing in the area serviced by as Eagle
Water Company as of January 1,2022.
Monthly
Customer Charges: Per Meter CharoeEffective Effective01t01t2027 01t01t2028
Meter Size5t8"-314 $10.52 $11.481', $13.45 $14.68
1-114" and 1-112" $23.01 $25.11
2' or multiple meters of equivalent capacity $35.71 $38.96
3" or multiple meters of equivalent capacity $69.65 $75.99
4" or multiple meters of equivalent capacity $129.95 $141.76
6" or multiple meters of equivalent capacity $216.95 $236.68
8" or multiple meters of equivalent capacity $283.82 $309.63
10" or multiple meters of equivalent capacity V04.47 W1.24
Volume Charqe:Winter RatesEffective Effective01t0112027 01t0112028
For allwater used less than 1.SCCF (100 cubic Feet) (CCF)
(1CCF=748 gallons):
For all water used greater than 1.SCCF
$1.4629
$1.4629
$1.s959
$1.5959
Volume Charqe:Summer RatesEffective Effective
01t01t2027 0'v01t2028
For all water used less than 1.SCCF (100 cubic Feet) (CCFl CCF=748 gallons): $1.4629 $1.5959
For all water used greater than 1.5CCF $1.8520 $2.0204
Conditions of Contract: The customer shall pay the tota! of the customer charge plus the volume
charge. The volume charge is based on all metered water for the billing period. Consumption is
expressed in hundred cubic foot units or thousand gallon units as determined by the meter
installed by the Company. The customer charge will be prorated whenever the customer has not
been a customer for the entire billing period. Only existing customers at the time of acquisition of
Eagle Water Company are covered by this schedule. The rates in this schedule expire on
December 31 of the effective year. The Company, by tariff advice, will file subsequent revisions
to this schedule to implement the terms of Order Number 35247 dated December 9,2021.
Future rates are subject to change based on base rate increases as approved by the IPUC.
All new customers to the area formerly serviced by Eagle Water Company after January 1,2022,
whether by new construction, sale or purchase shall pay the new customer current
S{JEU/EOLIA General Metered Service - Eagle Water Service Area monthly rates as contained
on Schedule No. 1 of this tariff.
Summer Period: The summer rate will apply to water consumed between May 1 and September
30. Meter readings straddling these dates will be prorated.
lssued by SIJEZVEOLIA WATER IDAHO+qINC.
lssued Per IPUC Order No.3524+ MarshallThompson, Vice President
Effective - 8248 West Victory Road, Boise, lD
Sheet No. 8
Replacing all Previous Sheets
Qr rEr!/tr.|l la waTFR lDAl{o_lt.t lNe
SCHEDULE NO. 1 (Continued)
GENERAL METERED SERVICE EAGLE WATER SERVICE AREA
Availabilitv: To all new general metered customers residing in the area formerly serviced by Eagle
Water Company after January 1,2022.
Monthly
Customer Charges: Per Meter CharqeEffective Effective05t01t2021 05t01t2022
Meter Size5t8"-3t4 $10.94 $11.481', $13.99 $14.68
1-114" and 'l-'112" $23.92 $25.11
2' or multiple meters of equivalent capacity $37.12 $38.96
3" or multiple meters of equivalent capacity $72.41 $75.99
4" or multiple meters of equivalent capacity $135.09 $141.76
6" or multiple meters of equivalent capacity $225.52 $236.68
8" or multiple meters of equivalent capacity $294.79 $309.63
10" or multiple meters of equivalent capacity $420.10 $441.24
Volume Charoe:Winter RatesEffective Effectiveo5t01t202't 05t01t2022
For all water used less than 1.SCCF (100 cubic Feet) (CCF)
(1 CCF=748 gallons):
For all water used greater than 1.SCCF
$1.s208
$1.5208
$1.5959
$1.5959
Volume Charoe: Summer RatesEffective Effective05tun021 05t01t2022
For all water used less than 1.5CCF (100 cubic Feet) (CCF)
(1 CCF=748 gallons): $1.5208 $1.5959
For all water used greater than 1.5CCF $1.9254 $2.0204
Conditions of Contract:
The customer shall pay the total of the customer charge plus the volume charge. The volume
charge is based on all metered water for the billing period. Consumption is expressed in hundred
cubic foot units or thousand gallon units as determined by the meter installed by the Company. The
customer charge will be prorated whenever the customer has not been a customer for the entire
billing period.
Only new customers after January 1,2022, whether by new construction, sale or purchase following
the acquisition of Eagle Water Company are covered by this schedule. The Company by tariff
advice will file subsequent revisions to this schedule to implement the terms of Order No. 35247
dated December 9,2021.
All existing customers at time of acquisition in the area formerly serviced by Eagle Water Company
as of January 1, 2022, shall pay the current SIJEZVEOLIA General Metered - Eagle Water Service
Area existing customer monthly rates as contained on Schedule 1 of this tariff.
Summer Period: The summer rate will apply to water consumed between May 1 and September 30.
Meter readings straddling these dates will be prorated.
lssued by S{JEZVEOLIA WATER !DAHO+qINC.
lssued Per IPUC Order No. 3,52a+ MarshallThompson, Vice President
Effective av 1,2022 8248 West Victory Road, Boise, lD
Sheet No.9
Replacing all Previous Sheets
S{JEA/EOLIA WATER IDAHE+O. INC.
SCHEDULE NO. 1A
DEQ FEE
Purpose:
The ldaho Department of Environmental Quality (!DEO) assesses a fee to fund its drinking
water program.
Applicabilitv: All Customers
Rate: State Drinking Water Program $.50 bi-monthly per customer
or $.25 monthly per customer
Since this fee is not recovered in tariffed water rates, the cost will be passed along to
customers as a fixed charge appearing as a separate item on each bill.
lssued by SUEZVEOLIA WATER IDAHO{qINC.
lssued Per IPUC Order No. €i€847 MarshallThompson, Vice President
Effective - 8248 West Victory Road, Boise, lD
Sheet No. 10
Replacing all Previous Sheets
STJEZVEOLIA WATER IDAHO{O. INC.
SCHEDULE NO. I B
FLAT RATE SERVICE
Availabilitv:
To non-metered residential customers pursuant to Residential or Multi-Family Housing
Non-Contiguous Water Systems Agreement Paragraph 11(a) addressing Flat Rate
systems, not served under a separate schedule.
Customer Charqes:
Based on SUEZIEOIIA Water ldaho residential consumption for the year ending June
1998 of 208.75 ccf, the average residential bill, assuming aYt" meter and 65% I 35o/o
summer/winter split, is $503.20 effective 0510112021and $528.50 effective O51O112022.
Bi-Monthly Charge Effective
0510112021
$83.87
Effective
05t01t2022
$88.08
Conditions of Contract:
a) The monthly charge wil! be prorated whenever the customer has not been a
customer for the entire billing period. The Company or the customer may convert to
metered service pursuant to Subparagraphs (b) or (c) of Paragraph 11 as follows:
b) lf Company should determine that a flat rate customer is using water in excess of
the average residential customer, the Company will provide a meter setting and
meter. Customer wil! then pay Company's metered tariff rates as approved by the
IPUC, which rates may be amended from time to time.
c) lf a customer prefers to pay Company's approved metered tariff rates, the
customer shall pay the installation and material costs associated with the installation
of a meter setting.
lssued Per IPUC Order No.3503O
Effective
lssued by SUEZyEOLIA WATER IDAHO+9,INC.
Marshall Thompson, Vice President
8248 West Victory Road, Boise, lD
Sheet No.11
Replacing all Previous Sheets
SIJEJZVEOLIA WATER IDAHEIO. INC.
SCHEDULE 1B (Continued)
FLAT RATE SERVIGE: EAGLE WATER SERVICE AREA
Availabilitv: To all existing flat rate service customers residing in the area formerly serviced by
Eagle Water Company as of January 1,2022.
Customer Charoes:
Based on SUEZIEOIIA Water ldaho residential consumption for the year ending June 1998 of
208.75 ccf, the average residential bill, assuming a Ya" meter and 65% I 35o/o summer/winter
split, is $503.20 effective OSlO1l2021and $528.50 effective O5lO1l2O22.
Monthlv
Non-Metered
Effective
01t01t2022
$20.97
Effective
01t01t2025
Non-Metered $33.03
Effective
05101t2022
$22.02
Effective
01t01t2026
$36.70
Effective
01101t2023
$25.69
Effective
01t01t2027
$40.37
Effective
01t01t2024
$29.36
Effective
01t01t2028
$44.04
Conditions of Contract:
a) The monthly charge will be prorated whenever the customer has not been a customer for
the entire billing period. The Company or the customer may convert to metered service
pursuant to Subparagraphs (b) or (c) of Paragraph 11 as follows:
b) lf Company should determine that a flat rate customer is using water in excess of the
average residential customer, the Company will provide a meter setting and meter. Customer
willthen pay Company's metered tariff rates as approved by the IPUC, which rates may be
amended from time to time.
c) lf a customer prefers to pay Company's approved metered tariff rates, the customer shall
pay the installation and material costs associated with the installation of a meter setting.
d) Only existing customers at the time of acquisition of Eagle Water Company are covered
by this schedule. Future rates are subject to change based on base rate increase as
approved by the !PUC. The rates in this schedule expire on December 31 of the effective
year. The Company by tariff advice willfile subsequent revisions to this schedule to
implement the terms of Order Number 35247 dated December 9,2021. All new customers to
the area formerly serviced by Eagle Water Company after January 1,2022, whether by new
construction, sale or purchase shall pay the new customer current SUEZVEOLIA Flat Rate
Service -Eagle Water Area monthly rates as contained on Schedule No. 1B of this tariff.
lssued by SIJEZVEOIIA WATER IDAHO+qINC.
lssued Per IPUC Order No.€5247 MarshallThompson, Vice President
Effective - 8248 West Victory Road, Boise, lD
Sheet No.12
Replacing all Previous Sheets
SIJEiZVEOLIA WATER IDAHErc. INC.
SCHEDULE 1 B (Continuedl
FLAT RATE SERVICE: EAGLE WATER SERVIGE AREA
Availabilitv: To all new flat rate service customers residing in the area formerly serviced by Eagle
Water Company after January 1,2022.
Customer Charoes: Based on S,|.J@/EO!!A Water ldaho residential consumption for the year
ending June 1998 o1208.75 ccf, the average residential bill, assuming aYo" meter and 65% /
35% summer/winter split, is $503.20 effective 0510112021and $528.50 effective 0510112022.
Monthlv
Effective
05t01t2021
$41.94
Effective
05101t2022w.uNon-Metered
Conditions of Contract:
a) The monthly charge will be prorated whenever the customer has not been a customer for
the entire billing period. The Company or the customer may convert to metered service
pursuant to Subparagraphs (b) or (c) of Paragraph 11 as follows:
b) !f Company should determine that a flat rate customer is using water in excess of the
average residential customer, the Company will provide a meter setting and meter. Customer
will then pay Company's metered tariff rates as approved by the IPUC, which rates may be
amended from time to time.
c) lf a customer prefers to pay Company's approved metered tariff rates, the customer shall
pay the installation and material costs associated with the installation of a meter setting.
d) Only new customers after January 1,2022, whether by new construction, sale or
purchase following the acquisition of Eagle Water Company are covered by this schedule.
The Company by tariff advice will file subsequent revisions to this schedule to implement the
terms of Order No. 35247 dated December 9,2021. All existing customers residing in the
area formerly serviced by Eagle Water as of January 1,2022 shall pay the existing customer
current S{J#VEOLIA Flat Rate Service - Eagle Water Service Area monthly rates as
contained on Schedule No. 1B of this tariff.
lssued by SIJEZVEOLIA WATER IDAHO+9,INC.
lssued Per IPUC Order No.€5247 MarshallThompson, Vice President
Effective - 8248 West Victory Road, Boise, ID
Sheet No.13
Replacing all Previous Sheets
SUE:ZVEOLIA WATER IDAHOTO. INC.
SCHEDULE NO. lC
BRIAN SUBDIVISION SURCHARGE
To all metered customers, who were previously customers of Brian Subdivision Water
Users Association lnc., located in the Brian Subdivision, Ada County, baho.
Surcharqe Amount
A bi-monthly surcharge in the amount of $141 .35 will be billed every other month
unless the customer is enrolled in Budget Billing. Budget Billing customers will be
billed $70.67 monthly.The surcharge is in addition to charges for water service as
specified in Schedule No. 1, Genera! Metered Service and other applicable charges.
Conditions of Contract:
The surcharge set forth above shal! take effect in the first billing period following the
customeds connection to the Company's distribution system, computation of fina!
project costs, and approval by the ldaho Public Utilities Commission. The surcharge
shall continue for a period of ten (10) years until November 12,2028.
The surcharge shall attach to the customer service address and payment thereof shall
be the responsibility of subsequent customers taking service at that address.
The Company shall not propose to change the surcharge amount, terms or conditions
in subsequent general rate proceedings.
ln lieu of the surcharge, a customer may elect to pay a single lump sum payment
equal to the NPV of the surcharge amount owed at the time of election. The lump sum
amount must be paid within thirty (30) days of the customer's election and shall be
irrevocable.
lssued by SUEaIEOIIA WATER IDAHO+qJNC.
lssued Per IPUC Order No.€5?t7 MarshallThompson, Vice President
Effective - 8248 West Victory Road, Boise, lD
Sheet No. 14
Replacing al! Previous Sheets
S{JE:ZVEOLIA WATER IDAHETO. INC.
SCHEDULE NO. 2
PUBLIC HYDRANTS AND STREET SPRINKLING
Availabilitv:
To the Ada Coun$ Highway District
Rates:
Street Sprinklino Service
Monthlv
Effective
05t0112021
$292.01
Effective
05t01t2022
$306.70Flat Charge
Miscellaneous:
Bills will be rendered monthly, bi-monthly, or at other interuals upon mutual
agreement of the Company and the customer.
Hydrants and service pipes from the fitting on the Company main to the hydrants
are to be installed and maintained by and at the expense of the Ada County
Highway District.
lssued Per IPUC Order No.€503eEffective-W
lssued by WLIA WATER !DAHO+qINC.
Marshall Thompson, Vice President
8248 West Victory Road, Boise, lD
Sheet No. 15
Replacing all Previous Sheets
$tIE|ZVEOLIA WATER IDAHO-IO. INC.
SCHEDULE NO.3
PRIVATE FIRE SPRINKLER AND SERVICE
Availabilitu:
To all customers who have sprinkler systems and/or inside hose connections supplied by a
dedicated service line for fire fighting purposes, not served under a separate schedule.
Rate:
For service through a separate line for fire fighting purposes.
For 3" service or smaller
For 4" service
For 6" service
For 8" service
For 10" service
Fot 12" service
Bi-Monthlv Charoe
Effective Effective05t01t2021 05t01t2022$38.54 $40.48
$58.42 $61.36
$145.10 $152.39
$238.44 $250.43
$371.83 $390.54
$556.96 $584.98
Miscellaneous:
Provided that if the installation of a private fire service shall require an extension of the
existing mains of the company, the cost of such extension shall be borne by the customer.
All private fire services shall be equipped with sealed gate valves or thermal automatic
openings.
Meters may be placed on fire services by the utility at any time; however, metered rates will not
apply unless improper use of water is disclosed, and if such be the case, usage will be billed to the
consumer under the current S{JEZVEOLIA General Metered Service Schedule No. 1 of this tariff.
lssued Per IPUC Order No.€503eEffective-W
lssued by S{JEZVEOLIA WATER IDAHO+qINC.
Marshall Thompson, Vice President
8248 West Victory Road, Boise, lD
Sheet No. 16
Replacing all Previous Sheets
SUEZVEOLIA WATER IDAHOTO. INC.
SCHEDULE NO. 3 (Continued)
PRIVATE FIRE SPRINKLER AND SERVICE
EAGLE WATER SERVICE AREA
Availabilitv: To all existing private fire sprinkler and service customers residing in the area formerly
serviced by Eagle Water Company as of January 1,2022.
Rate: For service through a separate line for fire fighting purposes.
Monthlv Charqe
Effective Effective01t01t2022 05t01t2022
For 3" service or smaller $9.64 $10.12
For 4" service $14.61 $15.34
For 6" service $36.28 $38.10
For S" service $59.60 $62.61
For 10" service $92.95 $97.64
For 12" service $139.24 $146.25
Miscellaneous:
a) Provided that if the installation of a private fire service shall require an extension of the
existing mains of the company, the cost of such extension shall be borne by the customer.
b) All private fire services shall be equipped with sealed gate valves or thermal automatic
openings.
c) Meters may be placed on fire services by the utility at any time; however, metered rates will
not apply unless improper use of water is disclosed, and if such be the case, usage will be
billed to the consumer under the current S{JEZVEOLIA General Metered Service on Schedule
No.1.
d) Only existing customers at the time of acquisition of Eagle Water Company are covered by
this schedule. Future rates are subject to change based on base rate increase as approved by
the IPUC. The rates in this schedule expire on December 31 of the effective year. The
Company by tariff advice will file subsequent revisions to this schedule to implement the terms
of Order Number 35247 dated December 9,2021. Al! new customers to the area formerly
serviced by Eagle Water after January 1,2022, whether by new construction, sale or purchase
shall pay the new customer current S{JEZVEOLIA Private Fire and Sprinkler Service - Eagle
Water Service Area monthly rates as contained on Schedule No. 3 of this tariff.
lssued by S{JEZVEOLIA WATER IDAHO+qINC.
Issued Per IPUC Order No.€,5447 MarshallThompson, Vice President
Effective - 8248 West Victory Road, Boise, lD
Sheet No. 17
Replacing all Previous Sheets
SUEZVEOLIA WATER IDAHOTO. INC.
SCHEDULE NO. 3 (CONTINUED)
PRIVATE FIRE SPRINKLER AND SERVICE
EAGLE WATER SERVICE AREA
&aj,!g!!!i!y: To all existing private fire sprinkler and service customers residing in the area
formerly serviced by Eagle Water Company as of January 1,2022.
Rate:For service through a separate line for fire fighting purposes.
Monthlv
For 3" service or smaller
For 4" service
For 6" service
For 8" service
For 10" service
For 12" service
Miscellaneous:
Effective
01t0112023
$11.81
$17.90
$'44.45
$73.04
$113.91
$170.62
Effective
01t01t2024
$13.49
$20.45
$50.80
$83.48
$130.18
$194.99
a) Provided that if the installation of a private fire service shall require an extension of the
existing mains of the company, the cost of such extension shall be borne by the customer.
b) All private fire services shall be equipped with sealed gate valves or thermal automatic
openings.
c) Meters may be placed on fire services by the utility at any time; however, metered rates will
not apply unless improper use of water is disclosed, and if such be the case, usage will be
billed to the consumer under the current SIJEZVEOLIA General Metered Service on Schedule
No.1.
d) Only existing customers at the time of acquisition of Eagle Water Company are covered by
this schedule. Future rates are subject to change based on base rate increase as approved by
the IPUC. The rates in this schedule expire on December 31 of the effective year. The
Company by tariff advice will file subsequent revisions to this schedule to implement the terms
of Order Number 35247 dated December 9,2021. All new customers to the area formerly
serviced by Eagle Water after January 1,2022, whether by new construction, sale or purchase
shall pay the new customer current SI.JEZVEOLIA Private Fire Sprinkler Service - Eagle Water
Service Area monthly rates as contained on Schedule No. 3 of this tariff.
lssued by S{JEZVEOIIA WATER IDAHO+Q,INC.
lssued Per IPUC Order No.€524+ MarshallThompson, Vice President
Effective - 8248 West Victory Road, Boise, lD
Sheet No. 18
Replacing all Previous Sheets
S{JEZVEOLIA WATER IDAHEIo. INC.
SCHEDULE NO. 3 (CONTINUED)
PRIVATE FIRE SPRINKLER AND SERVICE
EAGLE WATER SERVICE AREA
Availabititv: To all existing private fire sprinkler and service customers residing in the area
formerly serviced by Eagle Water Company as of January 1,2022.
Rate: For service through a separate line for fire fighting purposes.
Monthlv
For 3" service or smaller
For 4" service
For 6" service
For S" service
For 10" service
For 12" service
Miscellaneous:
Effective
01t01t2025
$15.18
$23.01
$57.15
$93.91
$146.45
$219.37
Effective
01t01t2026
$16.87
$25.57
$63.50
$104.35
$162.73
$243.74
a) Provided that if the installation of a private fire service shall require an extension of the
existing mains of the company, the cost of such extension shall be borne by the customer.
b) All private fire services shall be equipped with sealed gate valves or thermal automatic
openings
c) Meters may be placed on fire services by the utility at any time; however, metered rates will
not apply unless improper use of water is disclosed, and if such be the case, usage will be
billed to the consumer under the current SUEa/EOLIA General Metered Service Schedule No.
1.
d) Only existing customers at the time of acquisition of Eagle Water Company are covered by
this schedule. Future rates are subject to change based on base rate increase as approved by
the IPUG. The rates in this schedule expire on December 31 of the effective year. The
Company by tariff advice willfile subsequent revisions to this schedule to implement the terms
of Order Number 35247 dated December 9,2021. All new customers to the area formerly
serviced by Eagle Water after January 1,2022, whether by new construction, sale or purchase
shall pay the new customer current S{JEZVEOLIA Private Fire Sprinkler Service - Eagle Water
Service Area monthly rates as contained on Schedule No. 3 of this tariff.
lssued by SUEIZVEOLIA WATER IDAHO+qINC.
lssued Per IPUC Order No.€5247 MarshallThompson, Vice President
Effective - 8248 West Victory Road, Boise, lD
Sheet No. 19
Replacing all Previous Sheets
S{JEZVEOLIA WATER IDAHE{O. INC.
SCHEDULE NO. 3 (CONTINUED}
PRIVATE FIRE SPRINKLER AND SERVICE
EAGLE WATER SERVICE AREA
Ayqilglllig: To allexisting private fire sprinkler and service customers residing in the area
formerly serviced by Eagle Water Company as of January 1,2022.
Rate: For service through a separate line for fire fighting purposes.
Monthlv
For 3" service or smaller
Fot 4" service
For 6" service
For 8" service
For 10" service
For 12" service
Miscellaneous:
Effective
01t01t2027
$18.55
$28.12
$69.85
$114.78
$179.00
$268.12
Effective
01t01t2028
$20.24
$30.68
$76.20
$125.22
$195.27
$292.49
a) Provided that if the installation of a private fire service shall require an extension of the
existing mains of the company, the cost of such extension shall be borne by the customer.
b) All private fire services shall be equipped with sealed gate valves or thermal automatic
openings.
c) Meters may be placed on fire services by the utility at any time; however, metered rates will
not apply unless improper use of water is disclosed, and if such be the case, usage will be
billed to the consumer under the current SUEZVEOLIA General Metered Service Schedule No.
1.
d) Only existing customers at the time of acquisition of Eagle Water Company are covered by
this schedule. Future rates are subject to change based on base rate increase as approved by
the IPUC. The rates in this schedule expire on December 31 of the effective year. The
Company by tariff advice will file subsequent revisions to this schedule to implement the terms
of Order Number 35247 dated December 9,2021. All new customers to the area formerly
serviced by Eagle Water after January 1,2022, whether by new construction, sale or purchase
shall pay the new customer current SUEZVEOLIA Private Fire Sprinkler Service - Eagle Water
Service Area monthly rates as contained on Schedule No. 3 of this tariff.
lssued by S{JEZVEQIA WATER ! DAHo+qlNC.
lssued Per IPUC Order No.€524+ MarshallThompson, Vice President
Effective - 8248 West Victory Road, Boise, lD
Sheet No.20
Replacing all Previous Sheets
SIJEZVEOLIA WATER IDAHOTO. INC.
EAGLE WATER SERVICE AREA
Availabilitv: To all new private fire sprinkler and service customers residing in the area formerly
serviced by Eagle Water Company after January 1,2022.
Rate: For service through a separate line for fire fighting purposes.
For 3" service or smaller
Monthlv Charoe
Effective Effectiveo5lo1t202't 05t01t2022
$19.27 $20.24
$29.21 $30.68
$72.55 $76.20
$119.20 $125.22
$185.90 $195.27
$278.48 $292.49
For 4" service
For 6" service
For 8" service
For l0" service
Fof 12" service
Miscellaneous:
a) Provided that if the installation of a private fire service shall require an extension of the
existing mains of the company, the cost of such extension shall be borne by the customer.
b) All private fire services shal! be equipped with sealed gate valves or thermal automatic
openings.
c) Meters may be placed on fire services by the utility at any time; however, metered rates will not
apply unless improper use of water is disclosed, and if such be the case, usage will be billed to
the consumer under the current S{JEA/EOLIA General Metered Service Schedule No. 1.
d) Only new customers after January 1,2022, whether by new construction, sale or purchase
following the acquisition of Eagle Water Company are covered by this schedule. Future rates
are subject to change based on base rate increase as approved by the IPUC. The Company by
tariff advice will file subsequent revisions to this schedule to implement the terms of Order
Number 35247 dated December 9,2021.
lssued by SIJEZ!'EOLIA WATER IDAHO+qINC.
lssued Per IPUC Order No.€521+ MarshallThompson, Vice President
Effective - 8248 West Victory Road, Boise, lD
Sheet No.21
Replacing all Previous Sheets
SIJE:ZVEOLIA WATER IDAH€}-TO. INC.
SGHEDULE NO.4
PRIVATE FIRE HYDRANTS
Availabilitv:
To all customers having private fire hydrant installations, not served under a separate schedule.
Rate:
For fire hydrants installed and maintained by the customer at custome/s expense:
Bi-Monthlv Charoe
Effective
05t01t2021
$23.38
Effective
05t01t2022
$24.56Each fire hydrant
Miscellaneous:
Service pipe from the fitting on the company water main to the fire hydrant is to be
installed and maintained by the customer.
lssued Per IPUC Order No.€503e
Effective
lssued by SIJEZVEoIA WATER IDAHO+qINC.
Marshall Thompson, Vice President
8248 West Victory Road, Boise, lD
Sheet No.22
Replacing all Previous Sheets
SUEA/EOLIA WATER IDAHOIO. INC.
SCHEDULE NO. 4 (Continued)
PRIVATE FIRE HYDRANTS
EAGLE WATER SERVICE AREA
Availabilitv:
To all existing customers having private fire hydrant installations for former customers of Eagle
Water Company as of January 1,2022.
Rate:
For fire hydrants installed and maintained by the customer at custome/s expense:
Monthlv
Each fire hydrant
Effective
01t01t2022
$5.85
Effective
01t01t2025
$9.21
Effective
05t01t2022
$6.14
Effective
01t01t2026
$10.23
Effective
01t01t2023
$7.16
Effective
01t01t2027
$1 1.26
Effective
01t01t2024
$8.19
Effective
01t01t2028
$12.28Each fire hydrant
Miscellaneous:
Service pipe from the fitting on the company water main to the fire hydrant is to be
installed and maantained by the customer.
Only existing customers at the time of acquisition of Eagle Water Company are covered by this
schedule. Future rates are subject to change based on base rate increase as approved by the
IPUC. The rates in this schedule expire on December 31 of the effective year. The Company by
tariff advice will file subsequent revisions to this schedule to implement the terms of Order
Number 35247 dated December 9,2021. All new customers to the area formerly serviced by
Eagle Water after January 1,2022, whether by new construction, sale or purchase shall pay the
new customer current S+JEVEOLIA Private Fire Hydrants - Eagle Water Service Area monthly
rates as contained on Schedule No. 4 of this tariff.
lssued by S{J.EZVEOIIA WATER IDAHO+Q,INC.
lssued Per IPUC Order No.+€847 MarshallThompson, Vice President
Effective - 8248 West Victory Road, Boise, lD
Sheet No.23
Replacing all Previous Sheets
SIJEVEOLIA WATER IDAHEIO. INC.
SCHEDULE NO. 4 (Gontinued)
PRIVATE FIRE HYDRANTS
EAGLE WATER SERVICE AREA
Availabilitv:
To all new customers having private fire hydrant installations in service area formerly
serviced by Eagle Water Company after January 1,2022.
Rate:
For fire hydrants installed and maintained by the customer at customer's expense:
Monthlv
Effective
01t01t2022
$1 1.69
Effective
05101t2022
12.28
Miscellaneous:
Service pipe from the fitting on the company water main to the fire hydrant is to be
installed and maintained by the customer.
Only new customers after January 1,2022, whether by new construction, sale or purchase
following the acquisition of Eagle Water Company are covered by this schedule. The Company
by tariff advice will file subsequent revisions to this schedule to implement the terms of Order No.
35247 dated December 9,2021. All existing customers residing in the area formerly serviced by
Eagle Water as of January 1,2022 shall pay the existing customer current S{JEZVEOLIA Private
Fire Hydrants - Eagle Water Service Area monthly rates as contained on Schedule No. 4 of this
tariff.
lssued by S{JEZVEOLIA WATER IDAHO+qINC.
lssued Per IPUC Order No.+6247 MarshallThompson, Vice President
Effective - 8248 West Victory Road, Boise, lD
Sheet No.24
Replacing all Previous Sheets
SUEZVEOLIA WATER IDAHOIO. !NC.
SCHEDULE NO. 5
MISCELLANEOUS FEES AND CHARGES
1. Return Check Charoe
Apolication:
This charge is applicable to al! customers where the custome/s check or bank
draft is returned by the bank for insufficient funds, closed account, or some other
appropriate reason.
Rate:
Returned check charge
Each Occurrence
$20.00
2. Reconnection Charoe for Nonpavment Terminations or Cross Connection Control
Aoplication:
This charge is applicable to all customers where water has been physically turned
off for nonpayment of a delinquent bill or the Company has determined that a
dangerous condition exists due to failure to provide or maintain appropriate cross
connection control. Reconnections requested outside of regularly staffed hours
willtake place the following day, beginning at 8:00 a.m., Reconnections will not
take place Monday through Friday, between the hours of 6:31 p.m. and 7:59 a.m.,
or weekends/observed holidays between 4:31 p.m. and 7:59 a.m.
Rates
Each
Occurrence
Reconnection Charge
(during normal business hours)
Monday - Friday, not observed holidays
8:00 a.m. to 4:30 p.m.
Reconnection Gharge
(other than normal business hours)
Monday - Friday, not observed holidays
4:31 p.m. to 6:30 p.m.
$20.00 $10.00
$30.00 $15.00
Weekends or observed holidays
8:00 a.m. to 4:30 p.m.
Remotely
Disconnected/
Reconnected
lssued Per IPUC Order No.€503eEffective-W
lssued by SIJEZYEQIIA WATER I DAHO+qINC.
Marshall Thompson, Vice President
8248 West Victory Road, Boise, ldaho
Sheet No.25
Replacing all Previous Sheets
SIJE:ZVEOLIA WATER IDAHCLIr) INC
3.
SCHEDULE NO. 5
MISCELLANEOUS FEES AND CHARGES (continued)
Observed holidavs:
New Year's Day, Martin Luther King Jr. Day, Memorial Day, lndependence Day,
Labor Day, Veterans Day, Thanksgiving Day, day after Thanksgiving, Christmas
Eve, Christmas Day (or the day observed for any holiday).
Service Connection Charoe for Other Than Normal Business Hours
Application:
New service connections wil! take place at no charge during normal business
hours 8:00 a.m. to 4:30 p.m., Monday through Friday (not observed holidays).
New service connections requested outside of regularly staffed hours willtake
place the following day, beginning at 8:00 a.m. New service connections will not
take place on observed holidays, Monday through Friday, between the hours of
6:31 p.m. and 7:59 a.m., or weekends between 4:31 p.m. and 7:59 a.m.
This charge is applicable to all customers who request service outside of normal
business hours or weekends.
Rate:
Each Occurrence
$25.00
4:31 p.m. to 6:30 p.m.
8:00 a.m. to 4:30 p.m.
Service Charge
Afterhours (Monday - Friday)
Weekends
lssued Per IPUC Order No.€5e3OEffective-W
lssued by S{JEZVEOLIA WATER IDAHO+qINC.
Marshall Thompson, Vice President
8248 West Victory Road, Boise, ldaho
4
Sheet No.26
Replacing all Previous Sheets
SUEA/EOLIA WATER IDAHEIo. INC.
5.
SCHEDULE NO.5
MISCELLANEOUS FEES AND CHARGES (cont'dl
Temporarv Disconnection at Customer Request Charoe:
Application:
This charge is applicable when the Company is requested by customer to shut off
the water at the meter for repairs to custome/s plumbing.
Rates: Each Occunence
Water Disconnection at Customer Request $15.00
(during normal business hours)
Monday - Friday, not observed holidays
8:00 a.m. to 4:30 p.m.
Water Disconnection at Customer Request $25.00
(other than normal business hours)
Meter Test at Customer Request Charoe
Application:
This charge is applicable when the customer requests the Company to test the
accuracy of a meter in the case of a disputed bill.
Rate:
Error in registration of 1-112o/o or less
6. Meter Rental Charqe for Construction
Application:
Rate:
Temporary Meter Charge
This charge is applicable when contractors, builders, or others request temporary
service from a fire hydrant.
Each Occurrence
$10.00
Each Occurrence
$25.00
lssued Per IPUC Order No.€503eEffective-W
lssued by S{JEZVEOLIA WATER IDAHO+qINC.
Marsha!! Thompson, Vice President
8248 West Victory Road, Boise, ldaho
Sheet No.27
Replacing all Previous Sheets
SIJEiZVEOLIA WATER IDAHOJO. INC.
Purpose:
Applicabilitv:
Rate:
The purpose of this schedule is to set forth the charges such as license, franchise,
business occupation, operating, excise, use of street taxes or other charges that
are imposed on the Company by municipal corporations and billed separately by
the Company to its customers within the corporate limits of a municipality.
SCHEDULE NO. 6
MUNICIPAL FRANCHISE FEES
Ordinance No.
This schedule is applicable to the gross operating revenues received by the
Company from the sale of water and water services within the corporate limits of
the city.
The rates and charges for the sale of water and water services provided under the
Company's schedules will be proportionately increased by the following charge
within the municipality on and after the effective date of the applicable municipal
ordinance. Since this fee is not recovered in tariffed rates, the cost will be passed
to customers. The charge will be shown as a separate item on the customer's
billing.
Municipalitv
City of Boise
City of Eagle
5623
414
Effective Date
December 17,
2003
May 15,2003
Charoe
3.0o/o
1.0o/o
lssued Per IPUC Order No.€503eEffective-W
lssued by SUEZVEOTIA WATER IDAHO+qJNC.
Marshall Thompson, Vice President
8248 West Victory Road, Boise, ldaho
Sheet No.28
Replacing all Previous Sheets
STJEZVEOLIA WATER IDAHOIO. INC.
RULES AND REGULATIONS GOVERNING THE RENDERING OF SERVICE
APPLICATION FOR SERVICE
1. Water service will be provided at all existing service locations after the
prospective customer (or a properly authorized agent) makes application for service and
the Company approves the application. The service request may be taken by telephone,
in writing, or by personalvisit to the Company office. Each service request will be
prepared on a separate order form specifically designed for this purpose.
2. On all new service applications requiring the installation of a service line
and/or meter box, or connections necessary after a customer has altered their plumbing,
service will be provided after the plumbing has been inspected and approved by the
appropriate plumbing authority and the prospective customer has made an application
for service that the Company approves.
3. The application for new service or the connection request on existing
services will state clearly the class, scope and type of use for each service.
4. Office hours are 8:00 a.m. to 4:30 p.m., Monday through Friday. Any
request for service after regular office hours, weekends or holidays will result in a service
charge as shown on Schedule 5, Miscellaneous Fees and Charges.
5. The application for service and/or connection request and these rules and
regulations constitute a contract between the customer and the Company. Each
customer agrees to be bound by this contract after the service application is made,
approved and service rendered. Copies of the Company's presently approved rules and
regulations are on file at the Company's office and are available for public inspection.
SERVICE CONNECTION
6. Each customer shall be supplied through a separate service Iine
7. The Company will make all connections to its existing mains which front the
property to be served and willfurnish, install, and maintain all service lines from the main
to and including the meter box or vault, meters and service setting. The meter box or
vault shall be placed inside the curb line or Company right-of-way. A!!service lines shall
be property of the Company and shall be accessible to and under its control. ln instances
where the existing mains do not front the property to be served, the Applicant shall enter
into the appropriate main extension agreement as provided under Company's Rules and
Regulations Governing Main Extensions.
8. All service lines from the meter box or to the custome/s building or place of
consumption shall be approved by the Company as to
lssued Per IPUC Order No.3503O
lssued by S{JEZVEQIIA WATER lDAHOrqlNC.
Marshall Thompson, Vice President
8248 West Victory Road, Boise, ldahoEffectivev12022
Sheet No.29
Replacing all Previous Sheets
SIJEZVEOLIA WATER IDAHOIO. !NC.
RULES AND REGULATIONS GOVERNING THE RENDERING OF SERVICE (cont'd)
size, kind of pipe, and installation and shall be installed and kept in good repair by the
customer at the customer's expense. All such service lines within Boise City limits shall
be placed in conformance with Boise City Code 4-01-12. All such service lines outside
Boise City limits shall be placed in conformance with Uniform Plumbing Code Chapter 6
Section 609.1.
9. No service lines shall be laid in the same trench with the wastewater pipe.
10. When a meter is located within the custome/s building, a positive shutoff
valve easily accessible to the occupants shall be placed in the service line within the
building supplied with water. Such valve shall be located so that it wil! be possible to
drain the meter and all pipes in the building. When the Company is requested by
customer to shut off the water at the meter for repairs to custome/s plumbing, a charge
will be made in accordance with Schedule 5, Miscellaneous Fees and Charges.
11. The customer shall promptly repair all leaks inside the premises, in
sprinkling systems and in the custome/s service Iine. Failure to repair leakage promptly
may result in termination of service as allowed under the IPUC's Rules and Regulations
Governing Customer Relations.
12. The Company shall, at its own expense, replace or enlarge service
connections whenever it is necessary to change the location of any service connection
due to relocation or abandonment of the Company's mains. The Company will also
furnish allwork and materials that are necessary to connect to the new service.
13. The use of water service by a customer shall be in accordance with the
class, scope and type of use, and for the purpose stated in the application. A customer
shall not use or allow use of water service through the service facilities for others or for
purposes other than those covered by the application. To make service available for
other purposes or character of use, a new application and contract is required.
CROSS CONNECTION - BACKFLOW PREVENTION DEVICES
14. ln accordance with its Cross Connection Control Program, as required by
the ldaho State Department of Environmental Quality, the Company shall maintain an
inspection program to locate cross connections and determine suitable protection. An
appropriate backflow prevention assembly shall be installed on any custome/s service
connection where an actual or potential health hazard is determined by the Company to
exist. lnstalled assemblies shall appear on the ldaho State Department of Environmenta!
Quality's list of approved backflow prevention assemblies and be inspected by the
Company.
lssued Per IPUC Order No.€503OEffective-@
lssued by SlJEz\l/EoLIA WATER IDAHO+Q-jNC.
Marshall Thompson, Vice President
8248 West Victory Road, Boise, ldaho
Sheet No. 30
Replacing all Previous Sheets
SIJEZVEOLIA WATER IDAHE|o. INC.
RULES AND REGULATIONS GOVERNING THE RENDERING OF SERVICE (cont'd)
15. !n the event of a backflow prevention device is required, it shal! be installed
and maintained at the customer's expense. A dangerous condition posing a threat to
public health may result from a custome/s failure to properly install or maintain the
required device. The required device shall be tested annually by a licensed tester at the
customer's expense. lf the Company determines that the device has not been tested
annually, it may issue a notice to terminate service absent proof of testing. lf the
customer fails to provide proof that the device has been tested or otherwise fails to
comply with the Company's notice, the Company may discontinue service. !f the
Company determines that a dangerous condition exists and immediate action is
necessary to eliminate an immediate health hazard, it may discontinue service without
notice to the customer in accordance with the IPUC's Utility Customer Relations Rules
(IDAPA 31.21.01.303).
16. ln accordance with ldaho State Plumbing Code Section 602.0, regarding
Unlavyfu! Connections (see IDAPA 07.02.06.011), no potable water supply piping on a
premise served by the Company shall be made in such a manner that it will be possible
for non-potable water to enter any part of the Company's water system. The Company
shall determine the type of device or permanent physical separation required for
protection in accordance with its Cross Connection Control Program. lnstallation of any
device or separation shall be inspected by the Company.
METERS17. A!! water service, except flat rate service under Schedule 1B and water for
firefighting purposes will be rendered only through meters.
18. Each customer shall have a separate meter to register the amount of water
consumed.
19. All meters will be furnished by, and remain the property of, the Company.
The Company reserves the right to establish the size and location of meter required by
each customer.
20. Meters will be maintained by the Company for ordinary wear and tear. The
costs of repair or replacement resulting from damages to the meter, meter box or setting,
caused or allowed by the customer, will be charged to the customer. The customer will
not permit anyone other than the Company to remove, inspect or tamper with the
Company's meter or other Company propefi located on the customer's premises.
21. The customer shall notify the Company of any damage to the meter or of
any malfunction in the registration, as soon as the customer is aware of the problem.
METER SETTING22. All meters shall be set at convenient locations, accessible to the Company,
and subject to its control. The meter will normally be placed in a meter box or vault on
the property served. Each meter box or vault shall be provided with a suitable cover.
lssued Per IPUC Order No.€503e
lssued by %QtlA WATER IDAHO+qINC.
Marshall Thompson, Vice President
8248 West Victory Road, Boise, ldahoEffectiveav 1.2022
Sheet No.31
Replacing all Previous Sheets
S{JEZVEOLIA WATER IDAHEIO. INC.
RULES AND REGULATIONS GOVERNING THE RENDERING OF SERVICE (cont'd)
23. Where it is not convenient or if both the customer and the Company agree
not to place the meter in a box or vault, as provided in Rule 22,lhe meter wil! be placed
inside the building in a suitable location.
24. This section intentionally left blank
25. The Company shallfurnish and install meter boxes or vaults for all meters
up to and including 2-inch. The customer shall be responsible to pay the Company's
costs to furnish and instal! meter boxes or vaults for all meters larger than 2-inch. The
meter boxes or vaults and covers for outside meter settings shall conform to a proper
uniform standard established by the Company. The covers shall be of uniform design for
convenience and efficiency in the Company's operation.
26. To prevent heat damage to the meter where steam or hot water under
pressure is used, other than for normal residential use, an approved backflow prevention
device with appropriate hot water kit and a thermalexpansion tank must be placed, at
the expense of the customer, on the discharge side of meter and before any outlets are
taken off the service line.
METER TESTING
27. The quantity of water recorded by the meter shall be conclusive for both
the customer and the Company, except when the meter has been found to be registering
inaccurately or has ceased to register. ln either of such cases, the meter will be promptly
repaired or replaced by the Company and the quantity of water consumed shall be
estimated by the average registration of the meter on previous corresponding periods.
28. ln case of a disputed bill involving the accuracy of a meter, the meter shall
be tested upon the request of the customer. lf the meter is found to have an error in
registration of one and one-half percent (1-112 o/o) or less, the Company will charge a fee
in accordance with Schedule 5, Miscellaneous Fees and Charges, as compensation of
such test. lf the error in registration is found to be greater than one and one-half percent
(1-112 %), the cost of the test shall be borne by the Company. When a meter is to be
tested, the customer will be notified of time and place and may be present. lf the test
shows the meter to be over or under registering by more than one and one-half percent
(1-112o/o), the meter will be replaced and an adjustment for the over-registration will be
made according to the Rules and Regulations Governing Customer Relations of Gas,
Electric, and Water Public Utilities and the jurisdiction of the ldaho Public Utilities
Commission.
lssued Per IPUC Order No.€503eEffective-W
lssued by SUEZVEOIIA WATER IDAHO-+qINC.
Marshall Thompson, Vice President
8248 West Victory Road, Boise, ldaho
Sheet No.32
Replacing all Previous Sheets
SUE:ZVEOLIA WATER IDAHO+O. INC.
RULES AND REGULATIONS GOVERNING THE RENDERING OF SERVICE (cont'd)
BILLS
29. Each customer is subject to a customer charge, the amount of which is set
forth in the Schedule of Rates.
30. Bills for water service will be rendered and are due and payable as
specified in Rules 200 through 299 of the IPUC's Customer Relations Rules and
Regulations.
31. The presentation or non-presentation of a bill shall not be held to be a
waiver of any of the rules and regulations.
DISCONTINUANCE OF SERVICE
32. When a customer wishes to terminate water service, the Company must be
notified. This request for disconnection may be made in writing, by telephone or a
personal visit to the Company office. The customer will be responsible for payment of all
service rendered prior to the termination of water service.
33. lf the premises will be temporarily unoccupied and the customer wishes to
cease charges during the vacancy period, the customer must notify the Company. The
Company willterminate the service and cease the billing untilthe property is again
occupied and the customer notifies the Company to restore the service and resume
billing. No refund or allowance will be made for unoccupied property if the customer fails
to request a disconnect. Only one temporary disconnect will be granted per season.
34. lf the customer's property is vacant and the Company is not notified to
terminate service, the customer will be responsible for any damage to the property
arising from freezing, water damage, injury to the meter or any other failure.
35. The Company may deny or terminate water service under the provisions of
Rules 300 through 400 of the IPUC's Rules and Regulations Governing Customer
Relations of Gas, Electric and Water Public Utilities.
The customer has the right to file an informal or formal complaint with the IPUC
concerning the denial or termination of service. lf the customer files a complaint, the
service will not be terminated providing the customer pays all undisputed charges.
Service that has been disconnected for nonpayment will not be restored until the amount
due plus the applicable reconnect fee has been paid. Reconnection of service
lssued Per IPUC Order No.€503eEffective-W
lssued by @/Eo!A WATER IDAHO+qINC.
Marshall Thompson, Vice President
8248 West Victory Road, Boise, ldaho
Sheet No.33
Replacing all Previous Sheets
SI.'EZVEOLIA WATER IDAHOIO. INC.
RULES AND REGULATIONS GOVERNING THE RENDERING OF SERVICE (cont'd)
by anyone other than the Company is strictly prohibited and may result in an additional
service charge(s).
36. ln case of a break, an emergency or other similar situations, the Company
shall have the right to temporarily discontinue the water supply in order to make
necessary repairs, connections, etc. The Company shall use all reasonable and practical
measures to notify the customer in advance of discontinuance of service. The Company
shall not be liable for any damage or inconvenience suffered by the customer, or for any
claim for interruption in service, lessening of supply, inadequate pressure, poor quality of
water, or any other cause. The Company may restrict or regulate the quantity of water
used by customers in case of scarcity or whenever the public welfare may require it.
37. The Company may at any time restrict the use of water for air conditioning
and refrigeration by requiring the installation of cooling towers and recirculation pumps.
38. The right to discontinue service for any of the above reasons may be
exercised whenever and as often as such reasons may occur, and neither delay nor
omission on the part of the Company to enforce this rule at any one or more times shall
be deemed a waiver of its right to enforce the same at any time, so long as the reason
continues.
CUSTOMERS' DEPOSITS
39. The Company reserves the right to require a deposit according to Rules 100
through 199, Deposit and Guarantee Practices for Residentialand Small Commercial
Customers, of the IPUC Customer Relations Rules and Regulations. Reasonable
deposits may be collected for customers not covered under the IPUC's Customer
Relations Rules and Regulations.
40. The Company wil! refund said
service, or (2) establishes and maintains g
Relations Rules and Regulations.
deposit when the customer (1) discontinues
ood credit as defined by the IPUC's Customer
BUDGET BILL PLAN
41. Residential Budget Bill Plan: A Budget Bill Plan is available to Residential
Customers, as defined in paragraph 51 of these Rules, desiring to levelize payments for
water service. A Residential customer may enroll in the Budget Bill Plan at any time during
the year. To be eligible for the Budget Bill Plan, the customer must have a minimum of 12
consecutive months of service at the current location and have no past due balance owing at
the time of enrollment. Residential Budget Bill Plan participants will receive monthly billing
statements, though their meters will continue to be read on a bi-monthly basis.
lssued Per IPUC Order No.€50ile
lssued by S{JEZVEQLIA WATER IDAHO+qINC.
Marshall Thompson, Vice President
8248 West Victory Road, Boise, ldahoEffectivev 1,2022
Sheet No. 34
Replacing all Previous Sheets
SUEA/EOLIA WATER IDAHOIO. INC.
RULES AND REGULATIONS GOVERNING THE RENDERING OF SERVICE (cont'd)
The levelized monthly payment will approximate the 12-month average of the most current 6
bi'monthly bills. Budget Bill Plan a mounts will be recalculated annually at the 12-month
anniversary of the date the customer began paying the most current Budget Bill amount. The
new monthly payment will be the recalculated Budget Bill amount. A custome/s Budget Bill
amount may decrease, increase, or remain the same from year to year.
Customers with a negative (underpaid) balance in their Budget Bill Plan account at the time
of recalculation will have new monthly Budget Bill Plan charges equal to the recalculated
Budget Bill amount plus one-twelfth of the negative balance. At the custome/s option, a
negative balance may be paid in full and disregarded for purposes of calculating the next
period's Budget Bill amount. lf the negative balance exceeds 25o/o of the estimated annua!
bill for the ensuing annual period, the Company may request that the negative balance be
paid in full. Customers with a positive balance exceeding $25 in their Budget Bill Plan
account at the time of recalculation may be refunded at the customer's request. lf no request
for refund is made, the monthly Budget Bill Plan charge will be equalto the recalculated
Budget Bill Plan amount reduced by one-twelfth of the positive balance. Upon termination of
the Budget Bill Plan agreement, after all charges for services are paid, positive balances will
be refunded at the customer's option.
Estimates of future costs based on historical charges furnished by the Company with such
Budget Bill Plan should not be construed by the customer as a guarantee that the total actual
charges will not exceed the estimates. !n the event of a significant change in rates for water
service or substantial deviation from the custome/s historical water consumption, the
Company may at any time submit a revised estimate to the customer and require that the
customer pay the revised monthly Budget Bill installment amount as a condition of
continuation in the Budget Bill Plan.
The Budget Bill amount will be billed monthly. Once established, the Budget Bill Plan will
remain in effect from year to year until the customer notifies the Company not less than 30
days prior to the desired date of cancellation or unless the customer fails to pay the Budget
Billamount.
TEMPORARY SERVICE FOR CONSTRUCTION PURPOSES
42. Contractors, builders, or others who wish temporary service from a
designated fire hydrant will:
A. Obtain a permit for use of the fire hydrant from the appropriate fire department.B. Present the approved permit and pay a fee to the Company in accordance with
Schedule 5, Miscellaneous Fees and Charges, for the use of a temporary meter.C. Comply with Company's Cross Connection Control Program.D. Agree that water used will be billed at Company's approved rate schedule for
genera! metered service.E. Return the meter to the Company in the time frame outlined in the permit and agree
that the customer is responsible for any damage to the meter or fire hydrant
resulting from misuse or negligence on their part.
lssued Per IPUC Order No.€5030Effective-W
lssued by S{JEzVEgtlA WATER lDAHOrqlNC.
Marshall Thompson, Vice President
8248 West Victory Road, Boise, ldaho
Sheet No.35
Replacing all Previous Sheets
SUEA/EOLIA WATER IDAHO+O. INC.
RULES AND REGULATIONS GOVERNING THE RENDERING OF SERVICE (cont'd)
FIRE PROTECTION
43. Water from fire hydrants or other fire fighting facilities shall be used only for
firefighting purposes and for water sold pursuant to Rule No. 42.
44. All private fire service connections from the main to the property !ine,
including all valves, shall be furnished and installed by the Company. AIlfire service line
connections will be separate from potable service lines, except that residentialfire
protection systems conforming to NFPA 13D standards for flow through usage will be
permitted on the meter size range one-inch or smaller (<=1).
45. The Company reserves the right to require at any time, a meter and
appropriate backflow prevention device to be furnished and installed on the customer's
fire service connection. The customer shall be responsible to pay the associated costs of
materials, installation and overheads. The meter and required backflow prevention
device shall be inspected and approved by the Company.
MISCELLANEOUS
46. The authorized employees and agents of the Company shal! have the right
of access, between the hours of 8:00 a.m. and 4:30 p.m., Monday through Friday, and
with approva! of the customer, to the premises supplied with water for the purpose of
reading meters, examining pipes and fixtures, observing manner of using water, and for
any other purpose which is proper and necessary in the conduct of the Company's
business. Such employees and agents shallcarry proper credentials evidencing their
employment by the Company.
47. Except in case of an emergency, no one other than Company personne!
shal! open or close any of the Company's curb stops or valves in any public or private
Iine.
48. The Company reserves the right to alter or amend these Rules and
Regulations in the manner provided by law.
DEFINITIONS
49. The word "Company" as used herein shall mean Su€zveolia Water
ldaheldahg. lnc. acting through its properly authorized officers, agents or employees,
each acting within the scope of the particular duties entrusted to them.
50. "Custome/'shall be the party contracting for a supply of water through a
single meter and service through each meter shal! be considered, for billing purposes, as
service to a separate customer.
lssued Per IPUC Order No.€503O
lssued by SUEZVEOLIA WATER IDAH+IqJNC.
Marshall Thompson, Vice President
8248 West Victory Road, Boise, ldahoEffectiveav 1.2022
Sheet No.36
Replacing all Previous Sheets
SUEA/EOLIA WATER IDAHSIO. INC.
RULES AND REGULATIONS GOVERNING THE RENDERING OF SERVICE (cont'd)
51. Residential customer shall designate a building under one roof, which is
owned, leased or rented by one party and occupied as a residence.
52. Commercial, lndustrial and Municipal customers shall be designated by the
following:
l. Commercial customershalldesignate:
A. A building containing two or more apartments or family units, which
are rented or leased to tenants.
B. A building occupied by a retai! or service business which does not
manufacture any item or items on the premises.
C. Any building containing any combination of 'A' and 'B' above.
D. A hotel, motel, tourist court, trailer court or mobile home park which
rents or leases rooms or spaces to tenants.
ll. lndustrial customer shall designate any buiHing or combination of buildings
in the same compound whose primary use is for the manufacture,
fabrication, and/or assembly of any product.
lll. Municioal customer shall designate a publicly owned building such as a
school, city hall, courthouse, fire house, hospital, or other public institution.
53. The purpose of the foregoing rules and regulations and definitions is to
preserye, to the maximum extent possible, the obligation of the Company to furnish
service. The rules and regulations and definitions contained herein shall be construed
and applied in accordance with the spirit and intent of Title 61 of the ldaho Code
lssued Per IPUC Order No.€503eEffective-W
lssued by SIJEA/EoIA WATER IDAHO+9,INC.
Marshall Thompson, Vice President
8248 West Victory Road, Boise, ldaho
Sheet No. 37
Replacing all Previous Sheets
STJEiA/EOLIA WATER IDAHO-IO. !NC.
RULES AND REGULATIONS GOVERN]NG WATER MAIN EXTENSIONS
DEF!NITIONS
54. lndividual(s) shall mean a person or group of persons requesting a water
main extension to make water service available to an existing detached, single family
residence(s) occupied by or to be occupied by the requesting Pafi(ies).
55. Developer shall mean a person, firm or corporation who (1) sells two or
more lots, parcels or tracts of land to others for the purpose of constructing thereon any
type of building or (2) constructs any type of building, on land which is for sale, Iease or
rent by or to another party(ies).
56. Subdivision shall mean the lega! dividing of a tract of land into two or more
tracts, lots or parcels.
57. Multiple family housing development shall mean any building or buildings
consisting of two or more living units.
58. Applicable overheads shall be overhead cost to the Company such as
supervision, engineering, accounting, legal expenses and the cost of any necessary
governmental permits.
GENERAL
59. Any individual or developer may request water service to be made available
to any lot(s) or subdivision under these rules and regulations.
60. The minimum size of water main to be installed under these rules and
regulations shall nonnally be 8-inch inside diameter. The Company shalldetermine the
size of allwater mains to be extended.
61. The norma! routing for water main extensions shall be in dedicated streets.
The Company may, but will not be required to, make extensions under this rule in
easements or rights-of-way where final grades have not been established or where
street grades have not been brought to those established by public authority. lf
extensions are made when grades have not been established and there is a reasonable
probability that existing grade will be changed, the Company shall require the
Applicant(s) to deposit the estimated cost for altering the facilities installed.
This deposit shall be made at the time of execution of the agreement. Such alterations
may be, but are not limited to, relocating, raising or lowering of facilities. Adjustment of
any difference between the amount so deposited and the actual cost of relocating,
lssued Per IPUC Order No.€503e
Effective
lssued by SUEZ!'EOIIA WATER IDAHO-+qINC.
Marshall Thompson, Vice President
8248 West Victory Road, Boise, ldaho
Sheet No. 38
Replacing all Previous Sheets
S{JE{IVEOLIA WATER IDAHO-IO. INC.
RULES AND REGULATIONS GOVERNING WATER MAIN EXTENSIONS (continued)
raising or lowering facilities shal! be made within thirty (30) days after the Company has
ascertained such actua! cost. The net deposit representing actual cost is not subject to
refund. The deposit related to the proposed relocation, raising or lowering shall be
refunded when such displacements are determined by proper authority not to be
required.
62. Company shall design and be the sole judge as to the adequacy of any
water main extension and appurtenances.
EXTENSTONS FOR TNDIVTDUAL RESTDENCE(S)
63. Free-Footage Allowance. The utility shall extend its water distribution mains
to serve new individual residential customers at its own expense when the cost of
constructing a main extension from the nearest existing utility facility capable of providing
adequate flow is not in excess of five hundred dollars ($500.00) per service connection.
64. ln instances where the cost of main extensions is in excess of five hundred
dollars ($500.00), the individual(s) shall enter into an agreement with the Company of the
type attached hereto and marked Exhibit A, INDIVIDUAL RESIDENCE MAIN
EXTENSION AGREEMENT. The cost of the water main extension shall be based on the
use of an eight-inch inside diameter main. The estimated cost of the main extension less
free-footage allowance shall be deposited with the Company.
65. ln instances where more than one individual has requested a water main
extension, any contribution shall normally be divided in proportion to front footage of the
lots. ln unusual circumstances, other methods of dividing the deposit may be used,
provided they are acceptable to all individuals and the Company.
66. A water main extension must extend to the extreme property lines of the
building lot to be served.
67. The deposit referred to in paragraph 64 above, shall normally be a cash
deposit. ln this instance, the Company shall provide the materia! and labor for the
installation of the project.
However, the Applicant may provide the materia! and/or contract labor for the installation
of the necessary facilities. ln this instance, the Applicant shall deposit with the Company
an amount equal to the estimated cost of applicable overheads for the entire project and
the estimated direct labor costs incurred by the Company for such items as engineering
design, estimating, and inspection. Also, the Applicant shall
lssued Per IPUC Order No.€503eEffective-@
lssued by SUEZVEOLIA WATER IDAHO-19-INC.
Marshall Thompson, Vice President
8248 West Victory Road, Boise, Idaho
Sheet No.39
Replacing all Previous Sheets
STIHZVEOLIA WATER IDAHETO. INC.
RULES AND REGULATIONS GOVERNING WATER MAIN EXTENSIONS (continued)
furnish the Company a certified invoice of sufficient detail to show the separate costs of
water mains and appurtenances by size, service laterals by size, meter boxes, meter
settings and fire hydrants. The Company shall specify the materia! to be supplied by the
Applicant with respect to size and type. ln genera! the material shall conform to the
Company's standard material specifications and applicable A\ A/VA specifications. The
Company shall, at Applicant's expense, make all connections to the Company's existing
system if, in the opinion of the Company, the contractor does not have sufficient
experience or equipment to make the required connection. Applicant's contractor shall
comply with Section 1 and Section 2 of Company's Requirements for Labor in Lieu of
Cash Contracfors. ln general, areas covered are requirements for inspection, monitoring
of construction, acceptance and handling of materials, documentation of costs,
correction of faulty installation, insurance, bonding, license requirements, experience,
and equipment availability. Company may deny the right of Applicant to provide a
contractor who has not complied with its requirements in the past.
EXTENSIONS FOR OTHER THAN INDIVIDUAL RESIDENCES
68. The Applicant(s) for a water main extension shallfurnish drawing(s) of
suitable scale showing street(s), lot and/or building layouts, storm and sanitary sewer
facilities, location and flow capacity of fire hydrants as may be required by appropriate
fire department or district, and when requested by the Company contours or other
indication of the relative elevation of the various parts of the area to be developed.
69. A water main extension must extend to the extreme propefi lines of the
development.
70. Each separate water main extension to and/or within a development shal! be
subject to a separate agreement.
71. Applicant(s) shall enter into an agreement of the type attached hereto and
marked as Exhibit "D" and deposit with the Company the estimated cost of the required
main extension, including service laterals and meter settings to be installed at the time of
the main extension. ln instances, such as Industrial and/or Commercia! Subdivisions,
where size and location of domestic service laterals cannot be determined at the time the
water main is installed, the cost of such service laterals shall be borne by the Applicant
requesting service. The cost shall be based on the average cost, as determined by the
Company, for the requested size of service.
72. The Company shall prepare plans, specifications, and cost estimates for
proposed main extensions at its own expense. ln the event a main extension agreement
is not entered into within 120 days after the Company furnishes plans, specifications,
lssued Per IPUC Order No.€503OEffective-W
lssued by SUEZVEOIIA WATER IDAHOTQ-.INC.
Marshall Thompson, Vlce President
8248 West Victory Road, Boise, ldaho
Sheet No.40
Replacing all Previous Sheets
STJEZVEOLIA WATER IDAHO-IO. INC.
RULES AND REGULATIONS GOVERNING WATER MAIN EXTENSIONS (continued)
and estimates, the Applicant shall reimburse the Company an amount equalto Company's
expenses.
73. The deposit referred to in paragraphTl above, shall normally be a cash
deposit. ln this instance, the Company shall provide the material and labor for installation of
the project.
However, the Applicant may provide the material and/or contract labor for the installation of
the necessary facilities. ln this instance, the Applicant shall deposit with the Company an
amount equal to the estimated cost of applicable overheads for the entire project and the
estimated direct labor costs incurred by the Company for such items as engineering design,
estimating, and inspection. Also, the Applicant shallfurnish the Company a certified invoice
of sufficient detail to show the separate costs of materia! and labor for water mains and
appurtenances by size, service laterals by size, meter boxes, meter settings and fire
hydrants. The Company shall specify the material to be supplied by the Applicant with
respect to size and type. ln general, the material shall conform to the Company's standard
material specifications and applicable A\AMA specifications. The Company shall, at
Applicant's expense, make all connections to the Company's existing system if in the
Company's opinion the contractor does not have the experience or equipment to make such
connection. Applicant's contractor shall comply with Section 1 and Section 2 of Company's
Requirements for Labor in Lieu of Cash Contractors. ln general, areas covered are
requirements for inspection, monitoring of construction, acceptance and handling of
materials, documentation of costs, correction of faulty installation, insurance, bonding,
license requirements, experience, and equipment availability. The Company may deny the
right of Applicant to provide a contractor who has not complied with its requirements in the
past.
SPECIAL FACILITIES
74. Specia! facilities shall include source of supply, storage and booster-pumping
facilities which may be required to render adequate water service to an area for which such
service has been requested. Specialfacilities do not include transmission or distribution line
facilities.
75. Should an Applicant propose a Residential, Commercial, lndustrial, or Municipal
Development requiring a specialfacility or specialfacilities, the Applicant shall advance the
cost of such facility or facilities. Normally, the advance shall be a cash advance. ln this
instance, the Company shall provide the material and labor for the installation of the
facilities.
lssued Per IPUC Order No.€503eEffective-@
lssued by S{JEZVEOIIA WATER IDAHO+qINC.
Marshall Thompson, Vice President
8248 West Victory Road, Boise, ldaho
Sheet No.41
Replacing all Previous Sheets
SIIEZVF()I !A WATFP INAHO-If} IN(:
RULES AND REGULATIONS GOVERNING WATER MAIN EXTENSIONS (continued)
However, the Applicant may, with the Company's approval, provide the materialand/or
contract labor for the installation of the specia! facility or facilities. ln the instance where an
Applicant provides the material and/or contract labor, the Applicant shal! deposit with the
Company an amount equal to the estimated cost of applicable overheads for the entire
project plus the estimated direct labor costs for such items as engineering design,
estimating, and inspection.
An amount equa! to the estimated cost of the necessary facilities shall be deposited with the
Company prior to construction. The Company shall adjust the deposit based upon the
determination of the actual cost of facilities installed. Any difference between the estimated
and actual cost of the facilities installed shall be shown as a revision of the amount
deposited and shall be payable within thirty (30) days of submission.
The cost of the special facilities advanced, or a portion thereof, shall be refunded based
upon customer connections and in accordance with the following equation' f, = (R-E-D-
IrYI- (S+M), where:
X = Refund per Customer
R = Annual Revenues per Customer (actua! revenue received from each customer
served from the specialfacility)
E = Annual Operating and Maintenance Expense per Customer (including Ad
Valorem Tax)
D = Annual Depreciation Expense per Customer (Depreciation rate(s) for type(s) of
facility installed x investment in that type of facility installed)
Y = Authorized Rate of Return
T = Income Taxes on Net lncome per Customer
S = Imbedded investment in Source and Storage plant, less accumulated
depreciation and customer advances and contributions against the plant.
(Value of plant allocable to support consumption per customer level that
produces the annual revenue per customer)
M = Meter Cost lnstalled
Should the Company agree that the cost of any portion of the special facilities (source,
storage, or pumping) not be advanced by the Applicant, the per customer refund shall be
reduced by the per customer cost of that facility not advanced. The advance and refund
agreement for each development shall be evaluated on a case-by-case basis and filed with
the ldaho Public Utilities Commission for review and approval.
76. The Company shall be responsible to construct and/or install specialfacilities as
may be required from time to time to maintain the rendering of adequate water service to
existing customers.
lssued Per IPUC Order No.€503eEffective-W
lssued by SUEZVEOIIA WATER IDAHO+qINC.
Marshall Thompson, Vice President
8248 West Victory Road, Boise, ldaho
Sheet No.42
Replacing all Previous Sheets
STJEZVEOLIA WATER IDAHOIO. INC.
RULES AND REGULATIONS GOVERNING NON-CONTIGUOUS EXPANSION
77. The Company shall be the sole judge as to the design of and the time of
construction and/or installation of any special facility(ies).
78. The definitlons and general rules governing water main extensions, Rules 54
through 62, shall be applicable to developer or subdivider requested non-contiguous
expansion of the Company's existing service area.
79. The Applicant(s) for a non-contiguous expansion shallfurnish drawing(s) of
suitable scale showing street(s), lot and/or building layouts, storm and sanitary sewer
facilities, location and flow capacity of fire hydrants as may be required by appropriate fire
department or district, and when requested by the Company, contours or other indication of
the relative elevation of the various parts of the area to be developed.
80. A non-contiguous expansion must extend to the extreme property lines of the
development.
81. Each separate water main extension to and/or within a development shall be
subject to a separate agreement.
82. ln instances where a non-contiguous water system is currently providing
customers with a potable water supply, the system owner and Company must notify the
customer of the intent to sell the water facilities and inform them of the impact the proposed
sale would have on their future water service. This notification must include any change in
water rates, anticipated changes in water quality or quantity, added benefits or potential
concerns, and inform them that upon public notification by Commission they will have the
opportunity to provide comments or concerns regarding the sale.
83. Applicant(s) shall enter into an agreement of the type attached hereto and
Marked as Exhibit 'F" and deposit with the Company the estimated cost of the required
infrastructure, if applicable, including wells, well lots, well houses, distribution lines,
reservoirs, pumps, booster pumping stations, valves, pipes, service laterals and meter
settings to be installed. The cost shall be based on the average cost, as determined by the
Company, for the requested size of service.
84. The rules relating to specialfacilities under the rules governing water main
extensions (Rules 74 through 77) shall be applicable to non-contiguous expansions.
lssued Per IPUC Order No.€503O
Effective
Issued by SUEZVEOLIA WATER I DAHO+9,]NC.
Marshall Thompson, Vice President
8248 West Victory Road, Boise, ldaho
Sheet No.43
Replacing al! Previous Sheets
SIJEZVEOLIA WATER IDAHSIO. INC.
Exhibit A
INDIVIDUAL RES!DENCE
MAIN EXTENSION AGREEMENT
C.E.A. No.
AGREEMENT between SIJEZ\/EOIIA WATER IDAHOIDAHO- INC., hereinafter
called "Company", and , hereinafter called the "Applicant"
NOW, THEREFORE, in consideration of the premises and of the mutual
covenants and agreements herein contained, THE PARTIES HERETO AGREE AS
FOLLOWS:
1. The Applicant(s) hereby applies to the Company for the said extension for its
system, and the Company agrees to construct the said extension upon the terms and
conditions hereinafter set forth in accordance with its Rules and Regulations. Said
extension is described as follows and shown on the attached sketch which is hereto
made a part of this Agreement:
2. Applicant shall contribute to the Company upon the execution hereof the sum of
Dollars ($ ) which amount the Company estimates to be the cost
of installing the said "on-site" extension as described above including overhead cost to
the Company such as supervision, engineering, accounting, lega! expenses and the cost
of obtaining any necessary governmental permits. Any difference between the actual
cost and the amount contributed, shall be shown as a revision of the amount of
contribution, and shall be payable within thirty (30) days of submission. The actual cost
thus finally determined shall be referred to as the "contributed cost of on-site facilities". lf
it is necessary to adjust the amount of Applicant's contribution, in accordance with the
terms of this paragraph, a supplemental memorandum will be prepared setting forth the
"contributed cost of on-site facilities" and shall be attached hereto and made a part
hereof.
3. Applicant shall contribute to the Company upon the execution hereof the
sum of Dollars ($ ) which amount the Company estimates to be
the cost of installing the said off-site main extension including overhead cost to the
Company such as supervision, engineering, accounting, legal expenses and the cost of
obtaining any necessary governmenta! permits. Any difference between the actual cost
and the amount contributed shall be shown as a revision of the amount contributed and
shall be payable within thirty (30) days of submission. The actual cost thus finally
determined shall be referred to as the "contributed cost of off-site mains". lf it is
necessary to adjust the amount of Applicant's advance, in accordance with the terms of
this paragraph, a supplemental memorandum will be prepared setting forth the
"contributed cost of off-site mains" and shall be attached hereto and made a part hereof
lssued Per IPUC Order No.€503OEffective-W
lssued by S{JEZYEQLIA WATER IDAHo+qlNC.
Marshall Thompson, Vice President
8248 West Victory Road, Boise, ldaho
Sheet No.44
Replacing all Previous Sheets
SUEA/EOLIA WATER IDAHOIO. INC.
I NDIVI DUAL RESI DENCE MAI N EXTENSION AGREEMENT (continued)
4. Each additional bona fide customer whose service lateral is directly
connected to the extension during the ten (10) year term of this contract shall deposit,
with the Company an amount equal to: One-half of the actual per foot cost of the
extension times the front footage of the property to be served by the service lateral. The
per foot cost shall be determined by dividing the actual cost of the extension by the total
serviceable footage along the extension. This deposit shall be made prior to the
installation of the service lateral necessary to provide the service requested. The monies
so deposited shall be refunded to the originalApplicant(s) without interest within 30 days
of receipt by the Company.
5. The total of monies returned to the Applicant(s) shall not exceed the amount
contributed to the Company as described in Paragraph 2.
6. A bona fide customer shall mean any person, firm, Corporation, company,
association, governmental unit or owner of property as guarantor furnished water service
of a permanent nature by the Company; and the term "Extension" shall mean the mains
and appurtenances shown on attached plan.
7. The Company will use its best efforts to commence and carry to completion,
as soon as possible, the installation of said extension, having in mind, however, delays
which may be occasioned by weather, acts of God or the public enemy, strikes or other
matters not within its control.
8. !t is further mutually understood and agreed that the mains and
appurtenances within the limits of the streets, avenues, roads, ways, or easement areas,
whether or not attached to or serving customers but constructed as part of the extension,
shall be and remain the propefi of the Company, its successors and assigns.
The Company shall have the right to extend any main installed by it pursuant to
the terms of this Agreement in or to other land, streets, or avenues, but the Applicant(s)
shall not by reason thereof be entitled to any refunds other than those above provided
for. On labor-in-lieu of cash projects, project becomes Company property only after
acceptance.
9. The Applicant(s) will, on the request of the Company, grant to it an
exclusive and irrevocable easement, at no cost to Company, for the installation,
maintenance, operation, repair and replacement of said main extension and
appurtenances within the limits of any existing or proposed street, avenue, road, way or
easement area, together with the right of ingress and egress thereto, in a form
satisfactory to the Company, duly executed and acknowledged in proper form for record
lssued Per IPUC Order No.€503eEffective-W
lssued by SUEa/EOLIA WATER IDAHO+qJNC.
Marshal! Thompson, Vice President
8248 West Victory Road, Boise, ldaho
Sheet No.45
Replacing all Previous Sheets
SUEZVEOLIA WATER IDAHEIO. INC.
INDIVIDUAL RESIDENCE MAIN EXTENSION AGREEMENT (continued)
10. lt is further understood and agreed by and between the parties hereto that
the Company's agreement to construct the said extension is subject to the Company
obtaining all necessary consents, orders, permits and approvals of public officers or
public bodies having jurisdiction over, or lawful interest, in any of the subject matters
herein. ln the event that the Company, after prompt application and diligent effort is
unable to obtain any necessary consent, order, permit, or approval as aforesaid, or in the
event that the Company is enjoined or prevented by lawful action of any such public
officer of official body from constructing the said extension, the Company's soleobligationwillbetorepaytoApplicantthesaidsumof-
DOLLARS ($ ). This amount shall be the difference between the amount advanced
and estimated expenses incurred by the Company in conjunction with the main
extension and appurtenances which are the subject of this Agreement.
11. It is agreed by the Applicant(s) that he will not build at any time hereafter
on, in, or over the said easement any structure, the construction or presence of which
will endanger, render ineffective, or make difficult the access to the water pipes or
appurtenances of the Company. Additionally, Applicant(s) agrees not to lay other pipes
or conduits within two (2') feet measured horizontally, from the said water pipes except
pipes crossing same at right angles in which latter case a minimum vertical distance of
six (6") inches shal! be maintained between the pipes. No excavation or blasting shall be
carried on which in any way endangers the said water pipes. Provided, however, that
should the Applicant(s) wish to do so he may, at his own expense, provide a new
location acceptable to the Company for the water pipes and the Company wil! then move
said water pipes and appurtenances to the new location. The whole cost of such moving
and altering and any expenses incident thereto, shall be borne by the Applicant(s).
12. lt is further understood and agreed that in case of any damage by
Applicant(s) or caused by neglect of Applicant(s) to the water pipes or their
appurtenances, or other injuries to the propefi of the Company in connection therewith,
which are caused by the acts or neglect of the Applicant(s) the amount of such damage
shall be paid to the Company by the said Applicant(s).
13. The term of this Agreement shall be ten (10) years from the date of
execution.
lssued Per IPUC Order No.€503OEffective-@
lssued by SUEZVEOLIA WATER IDAHO+qINC.
Marshall Thompson, Vice President
8248 West Victory Road, Boise, ldaho
Sheet No.46
Replacing al! Previous Sheets
SIJE:A/EOLIA WATER IDAHEIo. INC.
INDIVIDUAL RESIDENCE MAIN EXTENSION AGREEMENT (continued)
IN WITNESS WHEREOF, the parties hereto have caused their respective seals to
be hereunto affixed and these presents to be signed this day of
COMPANY
S{JEZVEOIIA WATER rDA}roleAtlq r NC.
Print Name
APPLTCANT(S)
DEVELOPER NAME
Print Name:
By
By
lssued Per IPUC Order No.€503OEffective-W
lssued by SUEZVEOLIA WATER IDAHO+qINC.
Marshall Thompson, Vice President
8248 West Victory Road, Boise, ldaho
Sheet No.47
Replacing all Previous Sheets
SIJEiZVEOLIA WATER IDAHOJO. INC.
INDIVIDUAL RES!DENCE MAIN EXTENSION AGREEMENT
SU PPLEMENTAL MEMORANDUM
C.E.A. No
This supplemental memorandum shall be attached to and made a part of the
water main extension agreement between
and SIJEZVEOLIA WATER
{DA.HOIAAHO. !NC. dated the _ day of
It is understood and agreed by and between the parties hereto that the actual cost of the
main extension referred to above is Dollars ($ ). lt is further
understood and agreed by and between the parties here to that (1) the Applicant(s)
contribution to the Company is being adjusted to Dollars ($ );
(2) that the actual onsite cost is
actualoffsite costs is
Dollars ($ ); and 3) that
Dollars ($ )
suEa/EoLrA WATER rDA,HolDALlq r NC.
ATTEST:
Print Name
APPLTCANT(S)
DEVELOPER NAME
ATTEST:
Print Name
By
Its
lssued Per IPUC Order No.€503e
Effective
lssued by S{JEZYEQIIA WATER IDAHO+qINC.
Marshall Thompson, Vice President
8248 West Victory Road, Boise, ldaho
Sheet No.48
Replacing all Previous Sheets
S{JEZVEOLIA WATER lDAHErc. INC.
Exhibit D
RESIDENTIAL, MULTIPLE FAMILY HOUS!NG, COMMERC!AL,
INDUSTRIAL, OR MUNICIPAL DEVELOPMENT
WATER MAIN EXTENSION AGREEMENT
CEA No.
I nOREEMENT between S{JEZVEOIIA WATER IDA^HO!pAH9, lNC. hereinafter called
the "Company" and hereinafter called
the Applicant.
WHEREAS, the Applicant has applied to the Company for an extension to its mains as
follows:
and
WHEREAS, the Company has agreed to such extension upon the terms and conditions
hereinafter set forth.
NOW, THEREFORE, in consideration of the premises and of the mutual covenants and
agreements herein contained, THE PARTIES HERETO AGREE AS FOLLOWS:
A. GENERALLY
1. For the purposes of this agreement, a bona fide customer shall mean any person(s),
firm, Company, corporation, association, governmental unit or owner of propefi as
guarantor furnished water service of a permanent nature by the Company; and the
term "Extension" shall mean the water mains and appurtenances and service laterals
as shown on the attached plan excluding fire hydrants.
2. The term of this Agreement shal! be for ten (10) years from the date hereof
3. The Applicant agrees to provide all easements and rights of way, which the
Company considers necessary either from the Applicant or from third persons, as the
case may be, to assure the legal feasibility of the Extension, without cost to the
Company.
4. The applicant's right to receive monies from off-site connections is personalto the
Applicant and unassignable either as collateral security or otherwise.
5. This Extension shall be made in accordance with the rules and regulations, and
specifications of the Company and subject to the approval of the Company, which
approvals will not be unreasonably withheld.
lssued Per IPUC Order No.€503O
Effective
lssued by S{JEZVEOLIA WATER I DAHO+qINC.
Marshall Thompson, Vice President
8248 West Victory Road, Boise, ldaho
Sheet No.49
Replacing all Previous Sheets
SIJHIVEOLIA WATER IDAHE.Io. INC.
RESIDENTIAL, MULTIPLE FAMILY HOUSING, COMMERCIAL, INDUSTRIAL, OR
MUNICIPAL DEVELOPMENT WATER MAIN EXTENSION AGREEMENT (continued)
B. WHERE THE APPLICANT HAS ASKED THE COMPANY TO PERFORM THE
EXTENSION
1. Applicant hereby applies to the Company for the said Extension of its system and
the Company agrees to construct the said Extension upon the terms and conditions
hereinafter set forth and in accordance with its Rules and Regulations.
2. Applicant sha!! contribute to the Company upon the execution hereof the sum ofilaning tne saio?,3[1]?ti9.,,J#'TiX3T3S#:::3[,:1H';:'i',['i?:,'f"::T;,if'
the Company such as supervision, engineering, accounting, legal expenses and the cost
of obtaining any necessary governmental permits. Any difference between the actual and
the amount contributed shall be shown as a revision of the amount of contribution and
shall be payable within thirty (30) days of submission. The actual cost thus finally
determined shall be referred to as the "contributed cost of on-site facilities". lf it is
necessary to adjust the amount of Applicant's contribution, in accordance with the terms
of this Paragraph, a supplemental memorandum wil! be prepared setting forth the
"contributed cost of on-site facilities" and shall be attached hereto and made a part
hereof.
3. Applicant shall contribute to the Company upon the execution hereof the sum of
Dollars ($ ) which amount the Company estimates to be the
cost of installing the said off-site main Extension including overhead cost to the
Company such as supervision, engineering, accounting, legal expenses and the cost of
obtaining any necessary governmental permits. Any difference between the actualand
the amount contributed shal! be shown as a revision of the amount contributed and shall
be payable within thirty (30) days of submission. The actual cost thus finally determined
shal! be referred to as the "contributed cost of off-site mains". lf it is necessary to adjust
the amount of Applicant's advance, in accordance with the terms of this Paragraph, a
supplemental memorandum will be prepared setting forth the "contributed cost of off-site
mains" and shal! be aftached hereto and made a part hereof.
4. The Company will use its best efforts to commence and carry to completion as
soon as possible the installation of said Extension, having in mind however, delays which
may be occasioned by weather, acts of God or the public enemy, strikes or other matters
not within its control.
5. The amount of "contributed costs for on-site" facilities shal! be retained by the
Company and booked as a contribution in aid of construction.
6. The amount of "contributed costs for off-site mains" shall be retained by the
Company and booked as a contribution in aid of construction. However, an applicant for
lssued by SUEZVEOLIA WATER IDAHO+qINC.
Marshall Thompson, Vice President
8248 West Victory Road, Boise, ldaho
lssued Per IPUC Order No.€503eEffective-W
Sheet No. 50
Replacing al! Previous Sheets
SI|EZ\/EOLIA WATER IDAHEIO. INC.
RES!DENTIAL, MULTIPLE FAMILY HOUSING, COMMERCIAL, INDUSTRIAL, OR
MUNICIPAL DEVELOPMENT WATER MAIN EXTENSION AGREEMENT (continued)
service for which the service lateral (including laterals to a fire hydrant(s)) will be directly
connected to said off-site main Extension within ten (10) years of the date of this
Agreement sha!! deposit with the Company one-half the cost per front foot of the main
Extension times the Applicant(s) totalfront footage. The cost per front foot shall be the
actua! cost of the off-site main Extension divided by the total serviceable footage. This
deposit will be forwarded to the Applicant without interest within thirty (30) days of receipt
by the Company.
7. The total monies forwarded to the Applicant shall not exceed the amount of
"contributed cost of off-site mains" as described in Paragraph 3. All future customers
whose service Iateral connects directly to the said "off-rillg main(s)" after ten (10) years
from the date of this agreement shall not be subject to the deposit described in
Paragraph 6 nor shall the Applicant be entitled or receive any reimbursement after ten
(10) years from the date of this Agreement.
8. lt is further understood and agreed by and between the parties hereto that the
Company's agreement to construct the said Extension is subject to the Company
obtaining al! necessary consents, orders, permits and approvals of public officers or
public bodies having jurisdiction over or lawful interest in any of the subject matters
herein. ln the event that the Company, after prompt application and diligent effort, is
unable to obtain any necessary consent, order, permit or approval as aforesaid, or in the
event that the Company is enjoined or prevented by lavuful action of any such public
officer or official body from constructing the said Extension, the Company's sole
obligation will be to repay to Applicant the said sum of DOLLARS ($ )
This amount shall be the difference between the amount advanced and estimated
expenses incurred by the Company in conjunction with the main Extension and
appurtenances which are the subject of this Agreement.
9. lt is further mutually understood and agreed that the mains and appurtenances
within the limits of the street, avenues, roads, ways or easement areas, whether or not
attached to or serving customers but constructed as part of the Extension shall be and
remain the property of the Company, its successors and assigns. The Company shall
have the right to extend any main installed by it pursuant to the terms of this Agreement
in or to other lands, streets, or avenues without incurring any liability to Applicant
whatsoever.
10. Applicant agrees that before the commencement of work by the Company, he will
clearly indicate upon the ground by means of stakes or in some other equally positive
manner the exact lines and grades to which the street, highway, or land in which the said
water pipes are to be laid is to be finally built and that he will grade the said street,
lssued by SUEZVEOLIA WATER IDAHO+qINC.
Marshall Thompson, Vice President
8248 West Victory Road, Boise, ldaho
lssued Per IPUC Order No.€503eEffective-W
Sheet No.51
Replacing all Previous Sheets
S+JEZVEOLIA WATER IDAHO{O. INC.
RESIDENTIAL, MULTIPLE FAMILY HOUSING, COMMERCIAL, INDUSTRIAL, OR
MUNICIPAL DEVELOPMENT WATER MAIN EXTENSION AGREEMENT (continued)
highway, or land so that it will be at al! points within less than one (1) foot of the above
finished grades before the Company commences the work of installing the said water
pipes. The Applicant also agrees to stake the exact location and grade of all meter
settings. The Company, however, shall not be required to lay its pipes according to lines
or grades of which it does not approve. And it is agreed that in case of any time, prior to
the dedication and acceptance as a public street or highway by the municipality of any
street or highway under which water mains are laid in conformity with this agreement it
shall become necessary to change or move the said pipes or their appurtenances by
reason of any change or alteration in the lines or grades of the street, highway, or land in
which they are laid, then the expense of such change or moving of said pipes and their
appurtenances, and any other expense incidental thereto, shall be borne by Applicant.
11. lt is agreed by Applicant that he will not build at any time hereafter on, in or over the
said easement any structure, the construction or presence of which will endanger or
render ineffective or difficult of access the water pipes or appurtenances of the
Company, or lay other pipes or conduits within two (2') feet, measured horizontally, from
the said water pipe except pipes crossing same at right angles in which latter case a
minimum vertical distance of eighteen (10") inches shall be maintained between the
pipes. No excavation or blasting shall be carried on which in any way endangers the said
water pipes. Provided, however, that should the Applicant wish to do so he may at his
own expense provide a new location acceptable to the Company for the said water pipes
and the Company will then move said water pipes and appurtenances to the new
location. The cost of moving and altering and any expenses incident thereto, shall be
borne by the Applicant. lt is further understood and agreed that in case of any damage
by Applicant or caused by neglect of Applicant to the water pipes or their appurtenanoes,
or other injuries to the propefi of the Company in connection therewith, these facilities
will be repaired and brought to proper grade by the Company or Company's contractor at
Applicant's expense.
C. WHERE THE APPLICANT HIRES A THIRD PARTY CONTRACTOR TO PERFORM
THE EXTENSION
1. Applicant hereby applies to the Company for the said Extension of its system, and
the Company agrees to allow said Extension upon the terms and conditions hereinafter
set forth and in accordance with its Rules and Regulations.
2. The Applicant hereby agrees that it will hire only those contractors that have been
approved by the Company and that it will require all such contractors to comply with the
Labor and Materials In-Lieu-of-Cash Contractors Rules for Performance and Conduct,
annexed hereto and made a part hereof as exhibit A. The Applicant further agrees that it
lssued Per IPUC Order No.€503eEffective-W
lssued by S{JEZVEO!|A WATER IDAHO-+qINC.
Marshall Thompson, Vice President
8248 West Victory Road, Boise, ldaho
Sheet No.52
Replacing all Previous Sheets
SIJEZVEOLIA WATER IDAHOIO. INC.
RESIDENTIAL, MULTIPLE FAMILY HOUSING, COMMERCIAL, !NDUSTRIAL, OR
MUNICIPAL DEVELOPMENT WATER MAIN EXTENSION AGREEMENT (continued)
will require its contractor to comply, via its contract with contractor, with all terms and
conditions set forth herein.
3. The Company estimates that ($ ) will be the cost of
installing the said 'reiQ" Extension as described above including overhead cost to the
Company such as supervision, engineering, accounting, and legalexpenses. Any
difference between the actual and the amount contributed shall be shown as a revision
of the amount of contribution and shall be payable within thirty (30) days of submission.
The actual cost thus finally determined shall be referred to as the "contributed cost of on-
site facilities". lf it is necessary to adjust the amount of Applicant's contribution, in
accordance with the terms of this Paragraph, a supplemental memorandum will be
prepared setting forth the "contributed cost of on-site facilities" and shall be attached
hereto and made a part hereof.
4. The Company estimates that ($ ) wil! be the cost of
installing the said "qff5ilg" Extension as described above including overhead cost to the
Company such as supervision, engineering, accounting, and legalexpenses. Any
difference between the actual and the amount contributed shall be shown as a revision
of the amount of contribution and shall be payable within thirty (30) days of submission.
The actual cost thus finally determined shall be referred to as the "contributed cost of off-
site facilities". lf it is necessary to adjust the amount of Applicant's contribution, in
accordance with the terms of this Paragraph, a supplemental memorandum will be
prepared setting forth the "contributed cost of off-site facilities" and shall be attached
hereto and made a part hereof.
5. The Applicant agrees to advance to the Company, simultaneously with the
execution of this Agreement, the sum of
Dollars ) which
represents the cost of the Company's overhead fees, and such items as inspection and
testing. Such amount shall be subject to reconciliation after all such costs are known and
the difference shall be either refunded to or collected from the Applicant.
6. The installation shall be subject to the Company's inspection, testing and acceptance,
however, absence of such inspection or testing by the Company shall not relieve the
Applicant of any of its obligations. The Company shall require the Applicant and the
Applicant's contractor (via its contract with the Applicant) to wanant the work in accordance
with Paragraph 15 below. The Company shallfurther require the Applicant and the
Applicant's contractor (via its contract with the Applicant) to maintain insurance as follows:
lssued Per !PUC Order No.€503e
lssued by SIJEZVEOIIA WATER IDAHO-+qINC.
Marshall Thompson, Vice President
8248 West Victory Road, Boise, ldahoEffectivev1,2022
Sheet No. 53
Replacing all Previous Sheets
STJEZVEOLIA WATER IDAHO-IO. INC.
RESIDENTIAL, MULTIPLE FAMlLY HOUSING, COMMERCIAL, INDUSTRIAL, OR
MUNICIPAL DEVELOPMENT WATER MAIN EXTENSION AGREEMENT (continued)
a) Worke/s Compensation with Statutory limits and any applicable Federal (e.9.,
Longshoremen's), and Employe/s Liability of $100,000.
b) Genera I Liability, Comprehensive Form (includ in g Premises-Operations ;
lndependent Contractors' Protective; Products and Completed Operations; Broad
Form Property Damage; Blanket Contractual Liability, Personal lnjury with
Employment Exclusion deleted) with the following limits and endorcements:
(i) Bodily lnjury & Property Damage: Single-Limit $1,000,000
(ii) Products and Completed Operations to be maintained for two (2) year(s)
after fina! payment.
(iii) Property Damage Liability lnsurance shall provide X, C and U coverage.
(iv) Railroad Protective Liability Coverage as applicable with $5,000,000
aggregate limit.
c) Comprehensive Automobile Liability: Bodily lnjury & Property Damage: Single-
Limit $1,000,000
d) Umbrella Excess Liability: $5,000,000 over primary insurance
The Company shall be named as an additional insured on all policies except Workers'
Compensation. AII Certificates of lnsurance shall include a thirty (30) day notice provision
for cancellation or materia! change in coverage, except ten (10) days notice for non-
payment of premium.
7. The amount of said "contributed cost for on-site "facilities shall be booked as a
contribution in aid of construction.
8. The amount of said "contributed cost for off-site mains" shall be booked as a
contribution in aid of construction. However, an applicant for service for which the service
lateral (including laterals to a fire hydrant(s)) will be directly connected to said off-site
main Extension within ten (10) years of the date of this Agreement shall deposit with the
Company one-half the cost per front foot of the main Extension times the Applicant(s)
total front footage. The cost per front foot shall be the actual cost of the gff-slte main
Extension divided by the total serviceable footage. This deposit will be forwarded to the
Applicant without interest within thirty (30) days of receipt by the Company.
lssued Per IPUC Order No.€503eEffective-W
lssued by S{JEZVEOLIA WATER IDAHO+qINC.
Marshall Thompson, Vice President
8248 West Victory Road, Boise, ldaho
Sheet No. 54
Replacing all Previous Sheets
SIJEZVEOLIA WATER IDAHO-IO. INC.
RESIDENTIAL, MULTIPLE FAMILY HOUSING, COMMERCIAL, INDUSTRIAL, OR
MUNICIPAL DEVELOPMENT WATER MAIN EXTENSION AGREEMENT (continued)
9. The total monies forwarded to the Applicant shall not exceed the amount of
"contributed cost of off-site mains" as described in Paragraph 8, above. All future
customers whose service latera! connects directly to the said "gff-site main(s)" after ten
(10) years from the date of this Agreement shall not be subject to the deposit described
in Paragraph 8 nor shal! the Applicant be entitled or receive any reimbursement after ten
(10) years from the date of this Agreement.
10. lt is further understood and agreed by and between the parties hereto that the
Company's agreement to allow construction of the said Extension is subject to the
Applicant and/or its contractor obtaining all necessary consents, orders, permits and
approvals of public officers or public bodies having jurisdiction over or lawful interest in
any of the subject matters herein, with the exception of special permits, such as state
highway and railroad permits, which the Company is required to obtain. ln the event that
the Company, after prompt application and diligent effort, is unable to obtain any such
special permit, or in the event that the Company is enjoined or prevented by lawful action
of any such public officer or official body from constructing the said Extension, the
Company's sole obligation will be to repay to Applicant the said sum ($)
This amount shall be the difference between the amount advanced and estimated
expenses incurred by the Company in conjunction with the main Extension and
appurtenances which are the subject of this Agreement.
'l'1. lt is further mutually understood and agreed that the mains and appurtenances
within the limits of the street, avenues, roads, ways or easement areas, whether or not
attached to or serving customers but constructed as part of the Extension sha!! be and
remain the property of the Company, its successors and assigns. The Company shall
have the right to extend any main installed by it pursuant to the terms of this Agreement
in or to other lands, streets, or avenues without incurring any liability to Applicant
whatsoever.
12. The Applicant shall require the Contractor to use its best efforts to commence and
carry to completion as soon as possible the installation of said Extension, having in mind
however, delays which may be occasioned by weather, acts of God or the public enemy,
strikes or other matters not within its control.
13. Applicant agrees that before the commencement of work by the contractor, he or
his contractor will clearly indicate upon the ground by means of stakes or in some other
equally positive manner the exact lines and grades to which the street, highway, or land
in which the said water pipes are to be laid is to be finally built and that he or his
contractor will grade the said street, highway, or land so that it will be at all points within
less than one (1') foot of the above finished grades before the contractor commences the
work of installing the said water pipes. The Applicant also agrees to require his
contractor to stake the exact location and grade of all meter settings. The contractor,
lssued Per IPUC Order No.€503O
Effective
lssued by S{JEZVEOLIA WATER lDAHOlqlNC.
Marshal! Thompson, Vice President
8248 West Victory Road, Boise, ldaho
Sheet No.55
Replacing all Previous Sheets
S{JEZVEOLIA WATER IDAHOIO. INC.
RESIDENTIAL, MULT!PLE FAMlLY HOUSING, COMMERCIAL, INDUSTRIAL, OR
MUNICIPAL DEVELOPMENT WATER MAIN EXTENSION AGREEMENT (continued)
however, shall not lay its pipes according to Iines or grades which have not been
approved. And it is agreed that in case of any time, prior to the dedication and
acceptance as a public street or highway by the municipality of any street or highway
under which water mains are laid in conformity with this Agreement it shall become
necessary to change or move the said pipes or their appurtenances by reason of any
change or alteration in the lines or grades of the street, highway, or land in which they
are laid, then the expense of such change or moving of said pipes and their
appurtenances, and any other expense incidental thereto, shall be borne by Applicant.
14. lt is agreed by Applicant that he will not build or have his contractor build, at any
time hereafter on, in or over the said easement any structure, the construction or
presence of which will endanger or render ineffective or difficult of access the water
pipes or appurtenances of the Company, or lay or have Iaid other pipes or conduits
within two (2') feet, measured horizontally, from the said water pipe except pipes
crossing same at right angles in which latter case a minimum vertical distance of
eighteen (18") inches shal! be maintained between the pipes. No excavation or blasting
shall be carried on which in any way endangers the said water pipes. Provided, however,
that should the Applicant wish to do so he may at his own expense provide a new
location acceptable to the Company for the said water pipes and the Company will then
move said water pipes and appurtenances to the new location. The cost of moving and
altering and any expenses incident thereto, shall be borne by the Applicant. lt is further
understood and agreed that in case of any damage by Applicant or his contractor or
caused by the negligence of Applicant or his contractor to the water pipes or their
appurtenances, or other injuries to the propefi of the Company in connection therewith,
these facilities will be repaired and brought to proper grade by the Company or
Company's contractor at Applicant's expense.
15. The Applicant shall have its contractor warrant that the work performed in installing
the main and appurtenances is free of any defect of equipment, material or workmanship.
Such shall continue for a period of two (2) years from completion and approval of the
Extension or within such longer period of time as may be prescribed by law. Pursuant to the
warranty, the Applicant's contractor, under Company supervision, shall remedy at his own
expense any such failure to conform or any such defect upon receipt of written notice from
the Company within a reasonable time after the discovery of any failure, defect or damage.
ln addition, during the aforesaid warranty period, the contractor shall remedy at his own
expense, under Company supervision, any damage to realor persona! propefi, when that
damage is the result of any such defect of equipment, material or workmanship installed by
the contractor. The warranty with respect to work repaired or replaced hereunderwill run for
a period of one year from the date of such repair or replacement or shall run for the
remainder of the originaltwo-year period, whichever is greater. During the warranty periods
as defined herein, the contractor shall reimburse the Company for the
lssued by SUE+VEOLIA WATER I DAHO-+qINC.
Marshal! Thompson, Vice President
8248 West Victory Road, Boise, ldaho
lssued Per IPUC Order No.€503e
Effective
Sheet No.56
Replacing all Previous Sheets
SUEZVEOLIA WATER IDAHCIJO. !NC.
RESIDENTIAL, MULTIPLE FAMILY HOUSING, COMMERCIAL, INDUSTRIAL, OR
MUNICIPAL DEVELOPMENT WATER MAIN EXTENSION AGREEMENT (continued)
costs of any emergency repairs undertaken by the Company to maintain the system in
good working order. Without limiting any other provision herein contained, these warranty
provisions shall be incorporated in Applicant's contract with contractor. lf contractor fails to
reimburse the Company as set forth in this Paragraph, within fofi-five (45) days of the
Company's request for such reimbursement, then the Applicant hereby agrees that it will do
so.
16. lf the Applicant's contractor, for any reason, should failto commen@ installation
within sixty (60) days of this Agreement, the Company shall have the right to terminate this
Agreement.
lN WITNESS WHEREOF, the parties hereto have caused their respective corporate
seals to be hereunto affixed and these presents to be signed by their duly authorized
officers this day of
COMPANY
S{JEZVEOLTA WATER |DA,HoDAL!9_ I NC.
ATTEST
Print Name
APPLICANT
ATTEST
Its
Its
lssued Per IPUC Order No.€503e
Effective
lssued by S{JEZVEOLIA WATER IDAHO+Q-INC.
Marshall Thompson, Vice President
8248 West Victory Road, Boise, ldaho
Sheet No. 57
Replacing all Previous Sheets
SUE:ZVEOLIA WATER IDAHO-IO. INC.
RESIDENTIAL, COMMERC!AL, INDUSTRIAL, OR MUNICIPAL DEVELOPMENT
WATER MAIN EXTENSION AGREEMENT
SUPPLEMENTAL MEMORANDUM
CEA No
This supplemental memorandum shall be attached to and made a part of the
water main extension agreement S{.EA@!!A WATER IDAHOIpAHO. !NC. and
dated the _ day of
It is understood and agreed by and between the parties hereto that the actual cost
of the main extension referred to above is Dollars ($
). !t is further understood and agreed that (1.) the actual on-site cost is
Dollars ($_). and (2.) the actual off-site cost is
Dollars ($ ).
COMPANY
slJEzvEotla WATE R +DA,H€!DAHO. r NC.
ATTEST By
Its
APPLICANT
ATTEST By
Its
lssued Per IPUC Order No.€503OEffective-ry
lssued by SUEZVEOLIA WATER I DAHO+qINC.
Marshal! Thompson, Vice President
8248 West Victory Road, Boise, ldaho
Sheet No. 58
Replacing all Previous Sheets
SUEA/EOLIA WATER IDAHOIO. INC.
Exhibit F
RESIDENTIAL OR MULTIPLE FAMILY HOUSING
NON-CONTIGUOUS WATER SYSTEM AGREEMENT
C.E.R. No.
AGREEMENT between S{JEZVEQIIA WATER +DI\HOIpAHO- lNC. hereinafter called
"Company", its successors and assigns, and hereinafter
called "Owner'', its successors and assigns.
WHEREAS, Owner has requested Company to expand its system as follows in
accordance with the map or plan attached hereto as Attachment No. 1; and
WHEREAS, Company is willing to make such expansion upon the terms and conditions
hereinafter set forth.
NOW, THEREFORE, in consideration of the premises and of the mutua! covenants and
agreements herein contained, THE PARTIES HERETO AGREE AS FOLLOWS:
1. Owner hereby applies to Company for said expansion of its system, and
Company agrees to include said expansion upon the terms and conditions hereinafter
set forth and in accordance with its Rules and Regulations.
2. For the purposes of this Agreement the term "Water Facilities" shall include,
without limitation:
(a) All property in connection with the operation and maintenance of the Water
Facilities and the furnishing of water services including, without limitation,
buildings, improvements, structures, equipment, wells, distribution lines, well lots,
well houses, reservoirs, pumps, booster pumping stations, valves, pipes, water
lines, meter boxes, machinery, inventory, surveys, maps, and supplies;
(b) AII right, title and interest of Owner in and to all easement(s) and
appurtenances existing and/or necessary for the maintenance and operation of
the Water Facilities constructed or to be constructed to serve the project
commonly known as (hereinafter called the "Project"), and any
approved development of the property in connection with the Project (hereinafter
called the "Propefi"), Source of Supply, which may include well(s), pumps,
motors, contro! equipment, pneumatic storage facilities, or that particular propefi
commonly referred to as "Source of Supply," and water and water rights and
interests appurtenant to the Property; and
(c) Alltangible property in connection with the operation and maintenance of
the Water Facilities and the furnishing of water services including, without
limitation, customer lists and records, customer deposits, well logs, maintenance
records, tariffs and rules and regulations governing the rendering of service and
extension of service to future development, franchises, permits and certificates.
The term "Water Facilities" does not include meters.
lssued Per IPUC Order No.€503OEffective-W
lssued by SIJEZVEOIIA WATER IDAHO+qINC.
Marshall Thompson, Vice President
8248 West Victory Road, Boise, Idaho
Sheet No. 59
Replacing all Previous Sheets
SI.JEZVEOLIA WATER IDAHEIJO INC
RES!DENTIAL OR MULTIPLE FAMILY HOUSING
NON-CONT! GUOUS WATER SYSTEM AGRE EM ENT (contin ued)
3. Company shall have the right to conduct, review and confirm, to Company's
satisfaction, test results in connection with any and allwells, soiltests, engineering tests,
environmental surveys, plans and specifications and/or record drawings, and related
studies of the Water Facilities deemed necessary by Company to determine the
suitability, in Company's sole discretion, of the Water Facilities for expansion. Should an
applicant propose a Development requiring specialfacilities, upgrades, modifications or,
if the Development is deemed by the Company to be unusua! or burdened with special
needs, that existing water system will be looked at independently and the terms of the
acquisition will be set forth in an amendment hereto.
[Add the following paragraph if Owner is to construct the Water Facilities:
4. lmmediately after the execution of this Agreement, Owner shall diligently
proceed to obtain allgovernmentalapprovals including, without limitation, all necessary
permits, information, and consents required by the appropriate federa!, state, or loca!
governmental authorities, agencies, or officials to permit the construction, operation and
maintenance of the Water Facilities. As soon as practicable, after receipt of such
governmental approvals, Owner shall diligently proceed to construct the Water Facilities,
as described, or to be described, in the Water Facilities plans and specifications
prepared and sealed by a licensed professional engineer and reviewed and approved by
the parties hereto. The cost of obtaining all governmental approvals, the cost of such
plans and specifications, and the cost of the construction of the Water Facilities shall be
borne by Owner at Owner's sole cost and expense. At the sole discretion of Company,
inspection of the construction of the Water Facilities shall be conducted by Company.
Based on proper advice and consideration, Company may alter the perfonnance from
strict adherence to such plans and specifications if based on job site experience, or if
adherence to such plans and specifications becomes impractica! or infeasible under the
circumstances. Company shall be the sole judge as to the adequacy of the Water
Facilities. The parties hereto shall cooperate fully with each other and al! other parties in
connection with each othe/s efforts hereunder.l
[Add the following paragraphs if Company is to construct the Water Facilities:4. Owner shall contribute to Company upon the execution hereof the sum of@'B: [5li[lriiti",i.-##il'J,: il::lt S3llBtlff :ff :",'.1,'
t e t h e
supervision, engineering, accounting, legal expenses and the cost of obtaining any
necessary governmental permits. Any difference between the actualand the amount
contributed shall be shown as a revision of the amount contributed and shall be payable
within thirty (30) days of submission. The actual cost thus finally determined shall be
referred to as the "contributed cost of facilities.' lf it is necessary to adjust the amount of
Owne/s contribution, in accordance with the terms of this paragraph, a supplemental
Memorandum will be prepared setting forth the "contributed cost of facilities" and shall be
attached hereto and made a part hereof. The amount of said "contributed cost for
lssued Per IPUC Order No.€503OEffective-@
lssued by S{JEZVEOLIA WATER IDAHO+QINC.
Marshall Thompson, Vice President
8248 West Victory Road, Boise, ldaho
Sheet No.60
Replacing all Previous Sheets
SIJEZVEOLIA WATER IDAHOTO. INC.
RESIDENTIAL OR MULTIPLE FAMILY HOUSING
NON-CONTIGUOUS WATER SYSTEM AGREEM ENT (contin ued)
facilities" shall be retained by Company and, for allWater Facilities except Source of
Supply, booked as a "contribution in aid of construction"; Source of Supply shall be
booked as an "advance in aid of construction."
It is further understood and agreed by and between the parties hereto that
Company's agreement to construct said expansion is subject to Company obtaining all
necessary consents, orders, permits and approvals of public officers or public bodies
having jurisdiction over or lawful interest in any of the subject matters herein, including
ldaho Public Utilities Commission approval of an Amendment to the Certificated Area of
Company. ln the event that Company, after prompt application and diligent effort, is
unable to obtain any necessary consent, order, permit or approval as aforesaid, or in the
event that Company is enjoined or prevented by lawful action of any such public officer
or official body from constructing said expansion, Company's sole obligation will be to
repay to Owner the sum of _ DOLLARS($ ). This amount shall be the difference between the amount contributed
and estimated expenses incurred by Company in conjunction with the expansion which
is the subject of this Agreement.
Owner agrees that before the commencement of work by Company, Owner will
clearly indicate upon the ground by means of stakes or in some other equally positive
manner the exact lines and grades to which the street, highway, or land in which said
water pipes are to be laid is to be finally built and that he will grade said street, highway,
or land so that it will be at all points within less than one (1) foot of the above finished
grades before Company commences the work of installing said water pipes. Owner also
agrees to stake the exact location and grade of all meter settings. Company, however,
shal! not be required to lay its pipes according to lines or grades of which it does not
approve. And it is agreed that in case of any time, prior to the dedication and acceptance
as a public street or highway by the municipality of any street or highway under which
any portion of the Water Facilities is laid in conformity with this Agreement it shall
become necessary to change or move said pipes or their appurtenances by reason of
any change or alteration in the lines or grades of the street, highway, or land in which
they are laid, then the expense of such change or moving of said pipes and their
appurtenances, and any other expense incidentalthereto, shal! be borne by Owner.l
5. The completely constructed and approved Water Facilities shall be
contributed, transferred and conveyed to Company by Owner, at no cost to Company,
through bill(s) of sale, warranty deed(s), easement(s) and/or other transferred
documents reasonably acceptable to Company and as required and approved by,
without limitation, the ldaho Department of Health and Welfare, Division of
Quality,
ission ("on or before the earlier of: 1)
Environmental ldaho Department of Water Resources, and the ldaho Public
Utilities Comm IPUC"), as the _ day of
to the first-2), the transfe lot in the Project from Owner
time wil! obta in releases from all su bcontractors, laborers, materia lmen,
suppliers, and any other parties furnishing materials or services in connection with the
_; or
r. Owner
applicable,
r of the first
lssued Per IPUC Order No.€5O30Effective-W
lssued by WLIA WATER I DAHO+qINC.
Marshall Thompson, Vice President
8248 West Victory Road, Boise, ldaho
Sheet No.61
Replacing all Previous Sheets
SUEJIVEOLIA WATER IDAHEIO. INC.
RESIDENTIAL OR MULTIPLE FAMILY HOUS!NG
NON-CONTIG UOUS WATE R SYSTEM AGRE EM ENT (contin ued)
construction of the Water Facilities. Owner shall warrant to Company in writing that the
Water Facilities has been constructed in accordance with the plans and specifications
reviewed and approved by Company, and shall provide Company with as-built record
drawings of the Water Facilities. Owner shall also warrant the Water Facilities against
defects in construction for a period of one (1) year from execution of such warranty.
6. Owner shall contribute to Company upon the execution hereof the Water
Facilities as described above, and shall also contribute overhead costs to Company such
as supervision, engineering, accounting, legal expenses and the cost of obtaining any
necessary governmental permits. The actual cost of contribution shall be referred to as
the "contributed cost of facilities." The Source of Supply costs shal! be referred to and be
booked as an advance in aid of construction. All other costs shall be referred to, and be
booked as, a contribution in aid of construction.
7. Upon conveyance of the Water Facilities to Company, Company shall be solely
responsible for management, maintenance and operation of the Water Facilities. The
parties agree that the Water Facilities and associated permits and licenses shall be
managed and operated by Company in a manner which is comparable to and consistent
with Company's management and operation of its other water utility facilities within the
State of ldaho. The parties further acknowledge that Company shall serve a!! residential
customers as a public utility, subject to the jurisdiction of the IPUC.
8. Owner shall prepare and record (prior to the sale of any lot in the Project)
perpetua! restrictive covenants which include, without limitation, that the Water Facilities
is or shall be owned and operated by Company. Company shall cooperate with Owner in
the preparation of such restrictive covenants and shall have the right to approve such
restrictive covenants prior to recordation. Such approval shall not be unreasonably
withheld. Owner shall cause a notation to be made on any subdivision plat of the Project
that states that the Water Facilities is or shall be owned and operated by Company.
9. lf the Project is served by a non-potable irrigation System, appropriate
backflow prevention device(s) shall be required to be installed at no cost to Company.
Owner shall prepare and record (prior to the sale of any lot in the Project) perpetual
restrictive covenants which include, without !imitation, that cross-connections are
prohibited, and shall delegate to Company the right to inspect such non-potable irrigation
system, enforce such restrictive covenants, and to remove any such cross-connections.
Company shal! cooperate with Owner in the preparation of such restrictive covenants
and shal! have the right to approve such restrictive covenants prior to recordation. Such
approval shall not be unreasonably withheld.
10. An amount not to exceed Eight Hundred Dollars ($800.00), as more fully
described on Attachment No.2 attached hereto, which is subject to modification as
Adjusted Average Residentia! Revenue may change with future rate activity, shall be
paid by Company to Owner as soon as practicable after each lot is connected to the
lssued Per IPUC Order No.€5030Effective-W
lssued by SUEZVEOLIA WATER lDAHO4qlNC.
Marshall Thompson, Vice President
8248 West Victory Road, Boise, ldaho
Sheet No.62
Replacing all Previous Sheets
SUEA/EOLIA WATER IDAHOIO. INC.
RESIDENTIAL OR MULTIPLE FAMILY HOUSING
NON-CONTIGUOUS WATER SYSTEM AGREEMENT (continued)
Water Facilities, as payment for the Source of Supply; provided, however, such payment
shall be made only once per lot, only to bona fide customers, and not in excess of the
original documented advance of construction costs in connection with the Source of
Supply. Provided, further, however, if the Project and/or the Property is served by an
additional potable Source of Supply, where a portion of the Project's and/or Propefi's
Source of Supply is provided by an entity in addition to Owner, the $800 payment
referred to in this paragraph shall be paid by Company to Owner and each other such
provlder of Source of Supply according to the percentage of contribution by Owner and
each other such provider of Source of Supply. The percentage of contribution by Owner
and each other such provider shall be established by Company and set forth in an
amendment hereto.
11. All revenue generated by the Water Facilities shall be retained by Company
as owner in compliance with all applicable rules and regulations of the IPUC. Charges
applicable to the Water Facilities shall be the Company's tariff rates for existing
customers as approved by the IPUC, which rates may be amended from time to time.
Service shall be provided in compliance with all applicable rules and regulations of the
IPUC.
(a) lf the Water Facilities include an existing, non-metered, flat rate system,
and the costs for metering the Water Facilities cannot be justified by
Company, the tariff rate shall be equalto the average revenue for the
balance of company's residentia! customers.
(b) lf Company should determine that a flat rate customer is using water in
excess of the average residential customer, the Company will provide a
meter setting and meter. Customer will then pay Company's metered tariff
rates as approved by the IPUC, which rates may be amended from time to
time.
(c) If a customer prefers to pay Company's approved metered tariff rates, the
customer shall pay the installation and material costs associated with the
installation of a meter setting.
12. lt is agreed by Owner that Owner will not build at any time hereafter on, in
or over any easement for water pipes or appurtenances any structure, the construction
or presence of which will endanger or render ineffective or difficult of access the water
pipes or appurtenances of Company, or lay other pipes or conduits within two feet (2'),
measured horizontally, from said water pipe except pipes crossing same at right angles
in which latter case a minimum distance of six inches (6") shall be maintained between
the pipes. No excavation or blasting shall be carried on which in any way endangers said
water pipes. Provided, however, that should Owner wish to do so Owner may, at
Owner's expense, provide a new location acceptable to Company for said water pipes
and Company will then move said water pipes and appurtenances to the new location.
The cost of moving and altering and any expenses incident thereto, shall be borne by
Owner. lt is further understood and agreed that in case of any damage by Owner or
lssued Per IPUC Order No.€503OEffective-W
lssued by SUEZVEOIIA WATER IDAHg+qlNC.
Marshall Thompson, Vice President
8248 West Victory Road, Boise, ldaho
Sheet No.63
Replacing all Previous Sheets
SI.IEZVEOLIA WATER IDAHO{O. INC.
RESIDENTIAL OR MULT!PLE FAM!LY HOUSING
NON-CONTIGUOUS WATER SYSTEM AGREEM ENT (contin ued)
caused by neglect of Owner to the water pipes or their appurtenanoes, or other injuries
to the propefi of Company in connection therewith, these facilities will be repaired and
brought to proper grade by Company or Company's contractor at Owner's expense.
13. lt is further mutually understood and agreed that the mains and
appurtenances within the limits of the street, avenues, roads, ways or easement areas,
whether or not attached to or serving customers but constructed as part of the expansion
shall be and remain the property of Company. Company shall have the right to extend
any main installed by it pursuant to the terms of this Agreement in or to other lands,
streets, or avenues without incurring any liability to Owner whatsoever.
14. Owner shall be reimbursed in connection with use of the Source of Supply by
"late-comers," that is, bona fide customers who use the Source of Supply and which
customers own a lot or propefi other than a lot in the Project, whereby costs, not in
excess of the original advance of construction costs in connection with the Source of
Supply, may be reimbursed to Owner over a period of fifteen (15) years from the date of
transfer of the Water Facilities. Owner shall not be entitled or receive any reimbursement
after fifteen (15) years from the date of this Agreement.
15. For the purposes of this Agreement, a bona fide customer shall mean any
person(s), firm, company, corporation, association, governmental unit or owner of
property as guarantor furnished water service of a permanent nature by Owner.
16. Each party shall be excused from further performance under this Agreement
as a consequence of any delays or defaults in the performance of this Agreement
unavoidably caused by the act of any governmental authority, the act of any public
enemy, acts of God or the public enemy, nature, weather, war, war defense condition,
strikes, walkouts or other causes beyond the control of the party whose performance is
impaired.
17 . The term of this Agreement shal! be for fifteen (15) years from the date
hereof.
lssued Per IPUC Order No.€503O
lssued by S{JEZVEQIIA WATER lDAHOlqlNC.
Marshall Thompson, Vice President
8248 West Victory Road, Boise, ldahoEffectiveav 1,2022
Sheet No.64
Replacing all Previous Sheets
SIJEZVEOLIA WATER IDAHOJO. INC.
RES!DENTIAL OR MULTIPLE FAMILY HOUSING
NON-CONTIGUOUS WATER SYSTEM AGREEM ENT (continued)
!N WITNESS WHEREOF, the parties hereto, having been duly authorized, have
executed this Agreement this day of
-,
ATTEST:COMPANY:
S{JEA/EOL|A WATE R IDA,FIOIDAHo. I NC
By:
OWNER
By
Its
ATTEST:
Print Name:
lssued Per IPUC Order No.€503e
lssued by ffillA WATER IDAHO+qJNC.
Marshall Thompson, Vice President
8248 West Victory Road, Boise, ldahoEffectivev 1,2022
Sheet No. 65
Replacing all Previous Sheets
SUEiZVEOLIA WATER IDAHO-IO. INC.
RESIDENTIAL OR MULTIPLE FAMILY HOUSING
NON-CONTIG UOUS WATER SYSTEM AGREEM ENT (continued)
ATTACHMENT NO. 1
Non-contiguous Water System Map/Plan
lssued Per IPUC Order No.€503OEffective-ry
lssued by Sl.lEA/EollA WATER IDAHO+Q,INC.
Marchall Thompson, Vice President
8248 West Victory Road, Boise, ldaho
Sheet No. 66
Replacing all Previous Sheets
SIJEZVEOLIA WATER IDAHE-IO. INC.
RES!DENTIAL OR MULTIPLE FAMILY HOUSING
NON-CONTI GUOUS WATER SYSTEM AGREEM ENT (contin ued)
ATTACHMENT NO. 2
Breakdown of Costs
(Rate Case UWI-W-97-6 Adjusted Average Residential Revenue)
1. lnvestment
2. Revenue
3. lncrease in Expenses
o&M
Ad Valorem @ 1.lYo
Depreciation @ 2.5o/o
Total Expenses
4. lncome Before lncome Taxes
5. Debt @ 53.13% of net investments
6. lnterest on Debt
7. Taxable lncome
8. lncome Tax @ 26.70/o
9. lncome Available for Return
10. Return
$800
335
145
14
20
179
156
425
35
121
32
124
15.50%
lssued Per IPUC Order No.€503e
lssued by StlE:Al'EoLIA WATER IDAHO+9,INC.
Marshall Thompson, Vice President
8248 West Victory Road, Boise, ldahoEffectivev 1,2022