BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
IN THE MATTER OF THE APPLICATION )
OF SCHWEITZER BASIN WATER LLC )CASE NO.SCH-W-15-O1
FOR A CERTIFICATE OF PUBLIC )
CONVENIENCE AND NECESSITY )NOTICE OF APPLICATION
)
)NOTICE OF
)MODIFIED PROCEDURE
)
_______________________________
)ORDER NO.33308
On February 13,2015,the Commission received an Application from Schweitzer
Basin Water LLC (“Schweitzer”or “Company”)requesting issuance of a Certificate of Public
Convenience and Necessity (“CPCN”).Schweitzer is seeking Commission authorization to
operate as a public utility in the State of Idaho and to provide water service in the following
geographical area:Township 58 North,Range 2 West,Boise Meridian,Section 20,Southeast 1/4
in Bonner County.
NOTICE OF APPLICATION
YOU ARE HEREBY NOTIFIED that Schweitzer states that it is a privately-owned
non-transient,non-community water system serving a residential area at the Schweitzer Ski
resort with approximately 3 0-40 full-time residents and transient population of 900.
YOU ARE FURTHER NOTIFIED that Schweitzer states that it has been operating
since 1964 in support of skier housing,with a weekend and holiday population during ski season.
YOU ARE FURTHER NOTIFIED that the Company has 431 residential customers
and no commercial customers.Schweitzer’s customers are billed a flat monthly rate.There are
no metered customers.
YOU ARE FURTHER NOTIFIED that Schweitzer’s water system includes 431
hookups and 75 connections.The Company utilizes four wells,five reservoirs,and more than
six miles of distribution system with seven pressure zones.All flow is by gravity.
YOU ARE FURTHER NOTIFIED that the Company included several attachments in
support of its Application,including but not limited to the following:latest Amendment to
Certificate of Limited Liability Company;registration as a business with Idaho Secretary of
State;legal description of the Company’s proposed service area;map of Schweitzer’s wells,
NOTICE OF APPLICATION
NOTICE OF MODIFIED PROCEDURE
ORDERNO.33308 1
reservoirs,water lines,and main valves;DEQ water assessment report;Certifications of Water
System Operators,Certificate Number DWT1-10022 and Certificate Number DWT1-10153:
Schweitzer’s water right;calculation of future customers served by the Company;monthly water
production data for 2013-2014;rate schedule;financial statements for 2012-2014;list of
addresses of Schweitzer customers;Notice of Application for a CPCN mailed to Schweitzer
customers as billing insert;bill template;reminder notice template;final notice template;
Schweitzer rules and regulations;Schweitzer main extension rules;and selected engineering data
from 2014.
NOTICE OF MODIFIED PROCEDURE
YOU ARE FURTHER NOTIFIED that the Commission has determined that the
public interest may not require a formal hearing in this matter and will proceed under Modified
Procedure pursuant to Rules 201 through 204 of the Idaho Public Utilities Commission’s Rules
of Procedure,IDAPA 31.01.01.201 through .204.The Commission notes that Modified
Procedure and written comments have proven to be an effective means for obtaining public input
and participation.
YOU ARE FURTHER NOTIFIED that any person desiring to state a position on this
Application may file a written comment in support or opposition with the Commission no later
than August 20,2015.The comment must contain a statement of reasons supporting the
comment.Persons desiring a hearing must specifically request a hearing in their written
comments.Written comments concerning this Application shall be mailed to the Commission
and Schweitzer at the addresses reflected below:
Commission Secretary Schweitzer Basin Water LLC
Idaho Public Utilities Commission Mel Bailey,Owner
P0 Box 83720 P.O.Box 772
Boise,ID 83720-0074 Sagle,ID 83860
E-mail:mbsnowskigmail.com
Street Address for Express Mail:
472 W.Washington Street
Boise,ID 83702-5918
These comments should contain the case caption and case number shown on the first page of this
document.Persons desiring to submit comments via e-mail may do so by accessing the
Commissions home page located at www.puc.idaho.gov.Click the “Case Comment or Question
NOTICE OF APPLICATION
NOTICE OF MODIFIED PROCEDURE
ORDER NO.33308 2
Form”under the “Consumers”tab,and complete the comment form using the case number as it
appears on the front of this document.These comments must also be sent to Schweitzer at the e
mail address listed above.
YOU ARE FURTHER NOTIFIED that the Company may file reply comments,if
necessary,no later than August 27,2015.
YOU ARE FURTHER NOTIFIED that if no written comments or protests are
received within the time limit set,the Commission will consider this matter on its merits and
enter its Order without a formal hearing.If written comments are received within the time limit
set,the Commission will consider them and,in its discretion,may set the same for formal
hearing.
YOU ARE FURTHER NOTIFIED that the Application has been filed with the
Commission and is available for public inspection during regular business hours at the
Commission offices.The Application is also available on the Commission’s web site at
www.puc.idaho.gov.Click on the “File Room”tab at the top of the page,scroll down to “Open
Water Cases,”and then click on the case number as shown on the front of this document.
YOU ARE FURTHER NOTIFIED that all proceedings in this case will be held
pursuant to the Commission’s jurisdiction under Title 61 of the Idaho Code,specifically Idaho
Code §61-125 and 61-526.The Commission may enter any final Order consistent with its
authority under Title 61 and Commission Rule of Procedure 113,IDAPA 31.01.01.113.
YOU ARE FURTHER NOTIFIED that all proceedings in this matter will be
conducted pursuant to the Commission’s Rules of Procedure,IDAPA 3 1.01.01.000 ci seq.
ORDER
IT IS HEREBY ORDERED that this Application will be processed under Modified
Procedure,Rules 20 1-204,IDAPA 31.01.0l.201-.204.Persons interested in submitting written
comments should do so no later than August 20,2015.The Company may file a response no
later than August 27,2015.
NOTICE OF APPLICATION
NOTICE OF MODIFIED PROCEDURE
ORDERNO.33308 3
DONE by Order of the Idaho Public Utilities Commission at Boise.Idaho this
day of May 2015.