HomeMy WebLinkAbout20030530Notice of Application Order No 29250.pdfOffice ofthe Secretary
Service Date
May 30, 2003
BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
IN THE MATTER OF THE APPLICATION OF
MURRAY WATER WORKS TO INCREASE ITS)CONNECTION FEE. CASE NO. MUR-03-
NOTICE OF APPLICATION
NOTICE OF MODIFIED
PROCEDURE
NOTICE OF COMMENT
DEADLINE
ORDER NO. 29250
YOU ARE HEREBY NOTIFIED that the Murray Water Works system serves the
original town site of Murray located on National Forest Highway No.9 in Shoshone County,
Idaho. Murray is situated on Pritchard Creek approximately 16 miles northeast of the City of
Wallace near the Montana border. The public system predates the Commission and serves
approximately 30 residential customers. The system changed ownership last year and the
Commission issued Mr. and Mrs. Arlen Lish Certificate No. 404 on September 25 2002. Order
No. 29119.
YOU ARE FURTHER NOTIFIED that the new owners accepted the tariffs that were
in place at the time ownership was transferred. The Company has since reviewed the tariffs
relative to the operation of the system, and more specifically, the cost to install a new service
connection. The current connection fee is $125 for materials, and the customer can either install
their own service or pay the Company $25 per hour for the installation.
YOU ARE FURTHER NOTIFIED that even though the Company does not anticipate
any new connections in the near future, Murray Water Works now requests that its connection
fee tariff be revised for two reasons. First, the Company wishes to eliminate the ability
customers to install their own service connections. The Company owns and is responsible for
the maintenance of the utility mains and services to the property lines. Therefore, the Company
wants to retain control of the method of installation for mains and services. Second, the
Company reports that the cost to install a new service is greater than the connection fee the tariff
NOTICE OF APPLICATION
NOTICE OF MODIFIED PROCEDURE
NOTICE OF COMMENT DEADLINE
ORDER NO. 29250
presently recovers. Consequently, the Company requests the connection fee be increased from
$125 and $25 per hour for the installation to a flat fee of$800.
NOTICE OF MODIFIED PROCEDURE
YOU ARE FURTHER NOTIFIED that the Commission has preliminarily determined
that the public interest regarding the proposed sale may not require a hearing to consider the
issues presented and that the issues raised by the Application may be processed under Modified
Procedure , by written submission rather than by hearing. Commission Rules of Procedure
201-204, IDAPA 31.01.01.201-204.
YOU ARE FURTHER NOTIFIED that the Commission may not hold a hearing in
this proceeding unless it receives written protests or comments opposing the use of Modified
Procedure and stating why Modified Procedure should not be used. IDAP A 31.01.01.203.
YOU ARE FURTHER NOTIFIED that all proceedings in this case will be held
pursuant to the Commission s jurisdiction under Title 61 of the Idaho Code and that the
Commission may enter any final Order consistent with its authority under Title 61.
YOU ARE FURTHER NOTIFIED that all proceedings in this matter will be
conducted pursuant to the Commission s Rules of Procedure, IDAPA 31.01.01.000 et seq.
NOTICE OF COMMENT DEADLINE
YOU ARE FURTHER NOTIFIED that any person desiring to state a position on this
Application may file a written comment in support or opposition with the Commission no later
than Friday, June 27, 2003. The comment must contain a statement of reasons supporting the
comment.Persons desiring a hearing must specifically request a hearing in their written
comments. Written comments concerning this Application shall be mailed to the Commission
and the Applicant at the addresses reflected below:
Commission Secretary
Idaho Public Utilities Commission
PO Box 83720
Boise, ID 83720-0074
Arlen Lish
Murray Water Works
Box 117
Kingston, ID 83839
Street Address for Express Mail:
472 W. Washington Street
Boise, ID 83702-5983
NOTICE OF APPLICATION
NOTICE OF MODIFIED PROCEDURE
NOTICE OF COMMENT DEADLINE
ORDER NO. 29250
These comments should contain the case caption and case number shown on the first page of this
document.Persons desiring to submit comments via e-mail may do so by accessing the
Commission s home page located at www.puc.state.id.. Click the "Comments and Questions
icon, and complete the comment form, using the case number as it appears on the front of this
document.
YOU ARE FURTHER NOTIFIED that if no written comments or protests are
received within the time limit set, the Commission will consider this matter on its merits and
enter its Order without a formal hearing. If written comments are received within the time limit
set, the Commission will consider them and, in its discretion, may set the same for formal
hearing.
YOU ARE FURTHER NOTIFIED that the Application together with supporting
workpapers have been filed with the Commission and are available for public inspection during
regular business hours at the Commission offices located at 472 West Washington Street, Boise
Idaho. The Application and supporting workpapers are also available on the Commission
Website at www.puc.state.id.under the "File Room" icon.
ORDER
IT IS HEREBY ORDERED that this Application be processed under Modified
Procedure. Persons interested in submitting written comments regarding this Application or
protesting the use of Modified Procedure should do so no later than June 27 2003.
NOTICE OF APPLICATION
NOTICE OF MODIFIED PROCEDURE
NOTICE OF COMMENT DEADLINE
ORDER NO. 29250
DONE by Order of the Idaho Public Utilities Commission at Boise, Idaho this :Z'lfl.
day of May 2003.
PAUL KJE - PRESIDENT "--
MARSHA H. SMITH, COMMISSIONER
ATTEST:
~l9Je D. Jewell
Commission Secretary
O:MURWO30Un
NOTICE OF APPLICATION
NOTICE OF MODIFIED PROCEDURE
NOTICE OF COMMENT DEADLINE
ORDER NO. 29250