Loading...
HomeMy WebLinkAbout20150227Application.pdf2, MORNING VIEW WATER COMPANY Iilt; [[B A] ri]j Sr t+6 3996 E 200 N PO Box 598 Rigby,lD83442 i_l't tr i PH 208-745-0029 February 23,2015 Jean Jewel Idaho Public Utilities Commission P.O. Box 83720 Boise, Idaho 837 20-007 4 nNv-w-li-0 I m o rni ngviewwater@ gm a i l.com FAX 208-745-0041 RE: Moming View Water Company- Order #33044 -Additional Request Dear Ms. Jewel, The Moming View Water Company would like to forrnally request approval from the Idaho Public Utilities Commission to increase the amount of our current loan with the Idaho Department of Environmental Quality for improvements to our water system. You may recall when the original scope was bid the costs came in over budget. We made some changes to the scope as well as removed many items from the project. Some of these items included; backup power to the new well site, VFD pumps to the existing well, and security fencing around both well sites. During the course of construction we have also identified some meter work in need of repair and improvements to eliminate freezing of the connection lines. The new meters and metering equipment will also require the purchase of new software that will cost approximately $5,000. The Idaho Department of Environmental Quality is requiring that the backup power and fencing be put pack in the project as required by state law for well head protection. They are also recommending the VFD's be installed in the existing well to eliminate volatility of the old pumps and reduce operation and maintenance costs on the system. Given these costs and requirements we would like to request approval from the PUC to barrow an additional $120,000 in loan funds from the IDEQ. Requesting the $120,000 will give us approximately $5,000 for contingency for the remaining work. The additional request will result in a total loan of $530,000 @1.25% interest for 30 years with $78,533 in loan forgiveness. The increase per user per month for debt and debt reserye will be approximately $15.70. We have attached the change order request from the contractor. Our engineer has reviewed the costs and recommended approval of all items pending approval from the PUC and IDEQ. We appreciate your interest and attention to this matter. Please call if you have any questions regarding this request. Nolan Gneiting President Cc: WillieTeuscher,IDEQ Rick Miller, The Development Company 3H Construction LLC P.O. Box 2250,Idaho Falls,ID 83403-2250 Office: 208-359-8009 Fax: 208-359-1512 Cell: 208-589-7713 Aspen Engineering Ryan Loftus February 10,2015 PRICES FOR CHANGE ORDER REQUESTS MORNING VIEW WATER COMPANY NEW WELL AND METER INSTALLATION Item 1: Provide additional 3/4" Meters Provide additional 1" Meters Item 2: Work has been performed. )t Additional insulation pads and earth work around existing meter pits to protect from exposure and freezing. Materials Labor. Equipment Meter installation itemized per location. (see.attached Change Order Request dated December 5, 20 14) Item 3: Provide and install (l) 80 KW generator* 2771480 v,4 wire, 1800 rpm, natural gas Sound enclosure DEC 3000 controller 1500 w 120 v block heater One 12 v baffery charger One automatic transfer switch Concrete pad for generator Up to 450 LF 314" nalural gas service *Lead time is 6 to 8 rveeks after approved submittals. $660.00 $1,080.00 $1,100.00 s2,840.00 $4,610.00 $53,580.00 3 each at $297.00 3 each at $318.00 $89r.00 $954.00 Public Works License: 15614-AA-4 Page 1 Confractor Registration: RCE-173 19 3H Construction LLC P.O. Box 225A,ldaho Falls,ID 83403-2250 Office:208-159-8:09 Fax 208-359-1512 Cell:208-589-7713 Item 4: Provide 6' fence around new well house with safety wire, (4j $9,275.00 corner posts, (1) 48" man gate, (1) 12' double swing drive thru Provide 6' fence around existing older well house, with safety $7,840.00 wire, (3) comer posts, (2) end posts, (1) 48" man gate, (l) 12' double swing drive thru Item 5: Provide VFD's and filters* for existing well house $26,972.00 (wd will honor the price on original bid alternate #1) *Lead time is 4 weeks. Demolition of existing storage tanks and old piping $2,800.00 Newmodified piping install $3,150.00 (2) 350 X Troll bladder tanks One new 8" or 6" isolation valve if required $1,920.00 Item 6: Work has been performed. X Incrpased well depth $6,954.20 (see attached Change Order Request dated August 26,2014) KNOWN COSTS TO DATE $12I,726.20 ALSO - we are waiting for easernent to connect 6" water line for circulation. Cost will be $30.00 per lineal foot. Sincerely, #s"u Public Works License: 15614-4A-4 Page2 Contactor Registation: RCE- 173 19